CN219508946U - Glass curtain wall point supporting device - Google Patents

Glass curtain wall point supporting device Download PDF

Info

Publication number
CN219508946U
CN219508946U CN202320119931.8U CN202320119931U CN219508946U CN 219508946 U CN219508946 U CN 219508946U CN 202320119931 U CN202320119931 U CN 202320119931U CN 219508946 U CN219508946 U CN 219508946U
Authority
CN
China
Prior art keywords
groove
frame
curtain wall
wall
glass curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320119931.8U
Other languages
Chinese (zh)
Inventor
邵观芳
俞录中
杜炉敏
高立祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Guanding Municipal Engineering Co ltd
Original Assignee
Hangzhou Guanding Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Guanding Municipal Engineering Co ltd filed Critical Hangzhou Guanding Municipal Engineering Co ltd
Priority to CN202320119931.8U priority Critical patent/CN219508946U/en
Application granted granted Critical
Publication of CN219508946U publication Critical patent/CN219508946U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Securing Of Glass Panes Or The Like (AREA)

Abstract

本实用新型提供一种玻璃幕墙墙点支撑装置。所述玻璃幕墙墙点支撑装置包括:底板,所述底板上设置有幕墙框架主体、两个固定机构、两个夹持机构和两个支撑机构;所述幕墙框架主体包括安装板、第一安装槽、框架、第二安装槽和玻璃幕墙,所述安装板固定安装在底板的顶部,所述第一安装槽开设在安装板上,所述框架设置在安装板的上方,所述第二安装槽开设在框架上,所述玻璃幕墙安装在第二安装槽内;所述固定机构包括插块、第一凹槽、矩形块、第一腔体、拉杆、第一复位弹簧和环形块,所述插块固定安装在底板的顶部。本实用新型提供的玻璃幕墙墙点支撑装置可以进行简单的进行安装与拆卸,具有密封性防水,对装置进行加固,提高结构强度的优点。

The utility model provides a point support device for a glass curtain wall. The glass curtain wall wall point support device includes: a bottom plate, on which a curtain wall frame main body, two fixing mechanisms, two clamping mechanisms and two supporting mechanisms are arranged; the curtain wall frame main body includes a mounting plate, a first installation Groove, frame, second installation groove and glass curtain wall, the described installation plate is fixedly installed on the top of the base plate, the described first installation groove is opened on the installation plate, the frame is arranged on the top of the installation plate, and the second installation The groove is opened on the frame, and the glass curtain wall is installed in the second installation groove; the fixing mechanism includes an insert block, a first groove, a rectangular block, a first cavity, a pull rod, a first return spring and an annular block, and the The above plug-in block is fixedly installed on the top of the bottom plate. The point support device for the glass curtain wall provided by the utility model can be easily installed and disassembled, and has the advantages of sealing and waterproofing, reinforcing the device and improving the structural strength.

Description

一种玻璃幕墙墙点支撑装置A point support device for glass curtain wall

技术领域technical field

本实用新型属于支撑技术领域,尤其涉及一种玻璃幕墙墙点支撑装置。The utility model belongs to the field of support technology, in particular to a point support device for a glass curtain wall.

背景技术Background technique

玻璃幕墙是一种美观新颖的建筑墙体装饰方法,是现代主义高层建筑时代的显著特征,玻璃幕墙一般都需要用到玻璃支撑装置来对其玻璃进行支撑,现有市场上的支撑装置具有不便于安装的缺点,因传统的玻璃支撑装置与玻璃的连接方式都是以固定安装的方式进行连接,在安装过程中不仅需要花费大量的时间与工具,且在玻璃需要更换时也十分不便于拆卸,大大降低了支撑装置的安装效率,故而提出一种玻璃幕墙用玻璃支撑装置以解决上述问题。Glass curtain wall is a beautiful and novel method of building wall decoration. It is a remarkable feature of the era of modernist high-rise buildings. Glass curtain walls generally need to use glass support devices to support their glass. The support devices on the existing market have different characteristics. The disadvantage of easy installation, because the traditional glass support device and the glass are connected in a fixed way, it not only takes a lot of time and tools during the installation process, but also is very inconvenient to disassemble when the glass needs to be replaced , which greatly reduces the installation efficiency of the support device, so a glass support device for glass curtain wall is proposed to solve the above problems.

相关技术中,公开了一种玻璃幕墙用玻璃支撑装置,包括安装座,所述安装座顶部的左右两侧均固定连接有承重架,所述承重架的顶部固定连接有外框,所述安装座的顶部固定连接有数量为九个的弹簧,所述弹簧的顶部固定连接有移动板,所述移动板顶部的左右两侧均固定连接有插接块,所述插接块的顶部插接有安装框。In the related art, a glass support device for a glass curtain wall is disclosed, which includes a mounting base, a load-bearing frame is fixedly connected to the left and right sides of the top of the mounting base, and an outer frame is fixedly connected to the top of the load-bearing frame. The top of the seat is fixedly connected with nine springs, the top of the spring is fixedly connected with a moving plate, the left and right sides of the top of the moving plate are fixedly connected with plugging blocks, and the top of the plugging block is plugged into With mounting box.

但是,上述结构中还存在不足之处,其一,该装置上与玻璃幕墙接触没有设置橡胶垫,在安装过程中可能会发生破损;其二,该装置没有支撑装置,没有防止阳光直射。But also there are deficiencies in the above-mentioned structure, one, on this device contact with glass curtain wall and not be provided with rubber pad, damage may take place in installation process; Its two, this device has no supporting device, does not prevent direct sunlight.

因此,有必要提供一种新的玻璃幕墙墙点支撑装置解决上述技术问题。Therefore, it is necessary to provide a new glass curtain wall point support device to solve the above technical problems.

实用新型内容Utility model content

本实用新型解决的技术问题是提供一种可以进行简单的进行安装与拆卸,具有密封性防水,对装置进行加固,提高结构强度的玻璃幕墙墙点支撑装置。The technical problem solved by the utility model is to provide a glass curtain wall point support device that can be easily installed and disassembled, has sealing and waterproof properties, can reinforce the device, and improve the structural strength.

为解决上述技术问题,本实用新型提供的玻璃幕墙墙点支撑装置包括:底板,所述底板上设置有幕墙框架主体、两个固定机构、两个夹持机构和两个支撑机构;In order to solve the above technical problems, the point support device for the glass curtain wall provided by the utility model includes: a bottom plate, on which the main body of the curtain wall frame, two fixing mechanisms, two clamping mechanisms and two supporting mechanisms are arranged on the bottom plate;

所述幕墙框架主体包括安装板、第一安装槽、框架、第二安装槽和玻璃幕墙,所述安装板固定安装在底板的顶部,所述第一安装槽开设在安装板上,所述框架设置在安装板的上方,所述第二安装槽开设在框架上,所述玻璃幕墙安装在第二安装槽内;The main body of the curtain wall frame includes a mounting plate, a first mounting groove, a frame, a second mounting groove and a glass curtain wall, the mounting plate is fixedly installed on the top of the bottom plate, the first mounting groove is opened on the mounting plate, and the frame It is arranged above the installation plate, the second installation groove is opened on the frame, and the glass curtain wall is installed in the second installation groove;

所述固定机构包括插块、第一凹槽、矩形块、第一腔体、拉杆、第一复位弹簧和环形块,所述插块固定安装在底板的顶部,所述第一凹槽开设在框架的底部,所述插块与第一凹槽相适配,所述矩形块固定安装在框架的一侧外壁上,所述第一腔体开设在矩形块内,所述拉杆滑动安装在第一腔体内,所述拉杆的一端延伸至第一凹槽内,所述拉杆的一端延伸至矩形块外,所述第一复位弹簧套设在拉杆上,所述第一复位弹簧的一端与第一腔体的一侧内壁固定连接,所述环形块固定套设在拉杆上,所述第一复位弹簧的一端与环形块固定连接。The fixing mechanism includes an insert block, a first groove, a rectangular block, a first cavity, a pull rod, a first return spring and an annular block, the insert block is fixedly installed on the top of the bottom plate, and the first groove is opened in The bottom of the frame, the insert fits into the first groove, the rectangular block is fixedly installed on one side of the outer wall of the frame, the first cavity is opened in the rectangular block, and the pull rod is slidably installed on the second side of the frame. In a cavity, one end of the pull rod extends into the first groove, one end of the pull rod extends out of the rectangular block, the first return spring is sleeved on the pull rod, and one end of the first return spring is connected to the first One side inner wall of a cavity is fixedly connected, the ring block is fixedly sleeved on the pull rod, and one end of the first return spring is fixedly connected to the ring block.

作为本实用新型的进一步方案,所述夹持机构包括第二凹槽、矩形凹槽、夹持板、连接块和旋转螺杆,所述第二凹槽开设在框架的一侧内壁上,所述矩形凹槽开设在第二凹槽的一侧内壁上,所述夹持板设置在第二凹槽内,所述夹持板与第二凹槽相适配,所述连接块固定安装在夹持板的一侧外壁上,所述连接块延伸至矩形凹槽内并与矩形凹槽相适配,所述旋转螺杆转动安装在连接块的一侧外壁上,所述旋转螺杆的一端延伸至框架外并与框架螺纹连接。As a further solution of the present utility model, the clamping mechanism includes a second groove, a rectangular groove, a clamping plate, a connecting block and a rotating screw, the second groove is provided on one side of the inner wall of the frame, and the A rectangular groove is set on one side of the inner wall of the second groove, the clamping plate is arranged in the second groove, the clamping plate is matched with the second groove, and the connecting block is fixedly installed on the clamping plate. On one side of the outer wall of the holding plate, the connecting block extends into the rectangular groove and fits into the rectangular groove, the rotating screw is rotatably mounted on one side of the connecting block, and one end of the rotating screw extends to Outside the frame and screwed with the frame.

作为本实用新型的进一步方案,所述支撑机构包括条形板、第一支撑杆、第一内螺纹凹槽、第二支撑杆、第二内螺纹凹槽、双向螺纹杆和圆形旋转块,所述条形板铰接安装在框架的一侧外壁上,所述第一支撑杆铰接安装在条形板的顶部,所述第一内螺纹凹槽开设在第一支撑杆上,所述第二支撑杆铰接安装在框架的一侧外壁上,所述第二内螺纹凹槽开设在第二支撑杆上,所述双向螺纹杆螺纹安装在第一内螺纹凹槽内,所述双向螺纹杆的一端延伸至第二内螺纹凹槽内并与第二内螺纹凹槽螺纹连接,所述圆形旋转块固定安装在双向螺纹杆上。As a further solution of the present utility model, the support mechanism includes a strip plate, a first support rod, a first internal thread groove, a second support rod, a second internal thread groove, a two-way thread rod and a circular rotating block, The strip plate is hingedly installed on one side of the outer wall of the frame, the first support rod is hingedly mounted on the top of the strip plate, the first internal thread groove is opened on the first support rod, and the second The support rod is hingedly installed on one side of the outer wall of the frame, the second internal thread groove is opened on the second support rod, the two-way threaded rod is threaded in the first internal thread groove, and the two-way threaded rod One end extends into the second internal thread groove and is threadedly connected with the second internal thread groove, and the circular rotating block is fixedly installed on the two-way threaded rod.

作为本实用新型的进一步方案,所述第二安装槽的顶部内壁上和第一安装槽的底部内壁上均固定安装有橡胶垫,所述两个夹持板的一侧外壁上均固定安装有缓冲垫。As a further solution of the present invention, rubber pads are fixedly installed on the top inner wall of the second installation groove and the bottom inner wall of the first installation groove, and a rubber pad is fixedly installed on one side outer wall of the two clamping plates. cushion.

作为本实用新型的进一步方案,所述插块上开设有第一卡槽,所述拉杆的一端延伸至第一卡槽内并与第一卡槽相适配。As a further solution of the present invention, a first card slot is opened on the insert block, and one end of the pull rod extends into the first card slot and fits into the first card slot.

作为本实用新型的进一步方案,所述框架的两侧外壁上均开设有注胶孔,两个所述注胶孔均与第二安装槽相连通。As a further solution of the present invention, glue injection holes are opened on the outer walls of both sides of the frame, and the two glue injection holes communicate with the second installation groove.

与相关技术相比较,本实用新型提供的玻璃幕墙墙点支撑装置具有如下有益效果:Compared with related technologies, the point support device for glass curtain wall provided by the utility model has the following beneficial effects:

1、本实用新型通过设置幕墙框架主体,使得玻璃幕墙能够安装在框架上,并具有一定的稳定性;1. The utility model sets the main body of the curtain wall frame so that the glass curtain wall can be installed on the frame and has certain stability;

2、本实用新型通过设置固定机构,使得可以有效的固定住玻璃幕墙,使玻璃幕墙与框架衔接的更紧密;2. The utility model can effectively fix the glass curtain wall by setting the fixing mechanism, so that the glass curtain wall and the frame can be connected more closely;

3、本实用新型通过设置夹持机构,使得能够夹住玻璃幕墙,保持稳定,避免玻璃幕墙出现晃动;3. The utility model can clamp the glass curtain wall by setting the clamping mechanism, keep it stable, and avoid the shaking of the glass curtain wall;

4、本实用新型通过设置支撑机构,通过改变两个支撑杆的距离,能够加强玻璃幕墙的的稳定和结构强度。4. The utility model can strengthen the stability and structural strength of the glass curtain wall by setting the support mechanism and changing the distance between the two support rods.

附图说明Description of drawings

为了便于本领域技术人员理解,下面结合附图对本实用新型作进一步的说明。In order to facilitate the understanding of those skilled in the art, the utility model will be further described below in conjunction with the accompanying drawings.

图1为本实用新型玻璃幕墙墙点支撑装置的正视剖视结构示意图;Fig. 1 is a front view sectional structural schematic diagram of a glass curtain wall wall point support device of the present invention;

图2为本实用新型中固定机构的结构示意图;Fig. 2 is the structural representation of fixing mechanism in the utility model;

图3为本实用新型中夹持机构的结构示意图;Fig. 3 is the structural representation of clamping mechanism in the utility model;

图4为本实用新型中支撑机构的结构示意图。Fig. 4 is a structural schematic diagram of the supporting mechanism in the utility model.

图中:1、底板;2、安装板;3、第一安装槽;4、框架;5、第二安装槽;6、玻璃幕墙;7、插块;8、第一凹槽;9、矩形块;10、第一腔体;11、拉杆;12、第一复位弹簧;13、环形块;矩形凹槽;14、第二凹槽;15、夹持板;16、连接块;17、旋转螺杆;18、条形板;19、第一支撑杆;20、第一内螺纹凹槽;21、第二支撑杆;22、第二内螺纹凹槽;23、双向螺纹杆;24、圆形旋转块。In the figure: 1. Bottom plate; 2. Mounting plate; 3. First mounting groove; 4. Frame; 5. Second mounting groove; 6. Glass curtain wall; 7. Inserting block; 8. First groove; 9. Rectangle block; 10, first cavity; 11, pull rod; 12, first return spring; 13, ring block; rectangular groove; 14, second groove; 15, clamping plate; 16, connecting block; 17, rotation Screw; 18, strip plate; 19, the first support rod; 20, the first internal thread groove; 21, the second support rod; 22, the second internal thread groove; 23, two-way threaded rod; 24, circular Rotate blocks.

具体实施方式Detailed ways

请结合参阅图1、图2、图3和图4,其中,图1为本实用新型玻璃幕墙墙点支撑装置的正视剖视结构示意图;图2为本实用新型中固定机构的结构示意图;图3为本实用新型中夹持机构的结构示意图;图4为本实用新型中支撑机构的结构示意图。玻璃幕墙墙点支撑装置包括:底板1,所述底板1上设置有幕墙框架主体、两个固定机构、两个夹持机构和两个支撑机构;Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4 in combination, wherein, Fig. 1 is a front view sectional structural diagram of the glass curtain wall wall point support device of the present utility model; Fig. 2 is a structural schematic diagram of the fixing mechanism in the present utility model; Fig. 3 is a structural schematic diagram of the clamping mechanism in the present invention; FIG. 4 is a structural schematic diagram of the supporting mechanism in the present utility model. The point support device for the glass curtain wall includes: a bottom plate 1, on which the main body of the curtain wall frame, two fixing mechanisms, two clamping mechanisms and two supporting mechanisms are arranged;

所述幕墙框架主体包括安装板2、第一安装槽3、框架4、第二安装槽5和玻璃幕墙6,所述安装板2固定安装在底板1的顶部,所述第一安装槽3开设在安装板2上,所述框架4设置在安装板2的上方,所述第二安装槽5开设在框架4上,所述玻璃幕墙6安装在第二安装槽5内;The main body of the curtain wall frame includes a mounting plate 2, a first mounting groove 3, a frame 4, a second mounting groove 5 and a glass curtain wall 6, the mounting plate 2 is fixedly installed on the top of the bottom plate 1, and the first mounting groove 3 is opened On the mounting plate 2, the frame 4 is arranged above the mounting plate 2, the second mounting groove 5 is opened on the frame 4, and the glass curtain wall 6 is installed in the second mounting groove 5;

所述固定机构包括插块7、第一凹槽8、矩形块9、第一腔体10、拉杆11、第一复位弹簧12和环形块13,所述插块7固定安装在底板1的顶部,所述第一凹槽8开设在框架4的底部,所述插块7与第一凹槽8相适配,所述矩形块9固定安装在框架4的一侧外壁上,所述第一腔体10开设在矩形块9内,所述拉杆11滑动安装在第一腔体10内,所述拉杆11的一端延伸至第一凹槽8内,所述拉杆11的一端延伸至矩形块9外,所述第一复位弹簧12套设在拉杆11上,所述第一复位弹簧12的一端与第一腔体10的一侧内壁固定连接,所述环形块13固定套设在拉杆11上,所述第一复位弹簧12的一端与环形块13固定连接。The fixing mechanism includes an insert block 7, a first groove 8, a rectangular block 9, a first cavity 10, a pull rod 11, a first return spring 12 and an annular block 13, and the insert block 7 is fixedly installed on the top of the bottom plate 1 , the first groove 8 is opened at the bottom of the frame 4, the insert block 7 is adapted to the first groove 8, the rectangular block 9 is fixedly installed on one side of the outer wall of the frame 4, the first The cavity 10 is set in the rectangular block 9, the pull rod 11 is slidably installed in the first cavity 10, one end of the pull rod 11 extends into the first groove 8, and one end of the pull rod 11 extends to the rectangular block 9 In addition, the first return spring 12 is sleeved on the pull rod 11, one end of the first return spring 12 is fixedly connected to one side inner wall of the first cavity 10, and the annular block 13 is fixedly sleeved on the pull rod 11 , one end of the first return spring 12 is fixedly connected to the ring block 13 .

如图3所示,所述夹持机构包括第二凹槽14、矩形凹槽、夹持板15、连接块16和旋转螺杆17,所述第二凹槽14开设在框架4的一侧内壁上,所述矩形凹槽开设在第二凹槽14的一侧内壁上,所述夹持板15设置在第二凹槽14内,所述夹持板15与第二凹槽14相适配,所述连接块16固定安装在夹持板15的一侧外壁上,所述连接块16延伸至矩形凹槽内并与矩形凹槽相适配,所述旋转螺杆17转动安装在连接块16的一侧外壁上,所述旋转螺杆17的一端延伸至框架4外并与框架4螺纹连接;As shown in Figure 3, the clamping mechanism includes a second groove 14, a rectangular groove, a clamping plate 15, a connecting block 16 and a rotating screw 17, and the second groove 14 is provided on the inner wall of one side of the frame 4 Above, the rectangular groove is set on the inner wall of one side of the second groove 14, the clamping plate 15 is arranged in the second groove 14, and the clamping plate 15 is matched with the second groove 14 , the connecting block 16 is fixedly installed on one side of the outer wall of the clamping plate 15, the connecting block 16 extends into the rectangular groove and fits with the rectangular groove, and the rotating screw 17 is rotatably installed on the connecting block 16 On one side of the outer wall, one end of the rotating screw 17 extends outside the frame 4 and is threadedly connected with the frame 4;

通过设置夹持机构,使得能够对玻璃幕墙6进行稳固的加持,避免发生晃动。By providing a clamping mechanism, the glass curtain wall 6 can be stably supported to avoid shaking.

如图4所示,所述支撑机构包括条形板18、第一支撑杆19、第一内螺纹凹槽20、第二支撑杆21、第二内螺纹凹槽22、双向螺纹杆23和圆形旋转块24,所述条形板18铰接安装在框架4的一侧外壁上,所述第一支撑杆19铰接安装在条形板18的顶部,所述第一内螺纹凹槽20开设在第一支撑杆19上,所述第二支撑杆21铰接安装在框架4的一侧外壁上,所述第二内螺纹凹槽22开设在第二支撑杆21上,所述双向螺纹杆23螺纹安装在第一内螺纹凹槽20内,所述双向螺纹杆23的一端延伸至第二内螺纹凹槽22内并与第二内螺纹凹槽22螺纹连接,所述圆形旋转块24固定安装在双向螺纹杆23上;As shown in Figure 4, described support mechanism comprises strip plate 18, first support rod 19, first internal thread groove 20, second support rod 21, second internal thread groove 22, two-way threaded rod 23 and circle Shaped rotary block 24, the strip plate 18 is hingedly mounted on one side of the outer wall of the frame 4, the first support rod 19 is hingedly mounted on the top of the strip plate 18, and the first internal thread groove 20 is opened in On the first support rod 19, the second support rod 21 is hingedly installed on one side of the outer wall of the frame 4, the second internal thread groove 22 is provided on the second support rod 21, and the two-way threaded rod 23 is threaded. Installed in the first internally threaded groove 20, one end of the two-way threaded rod 23 extends into the second internally threaded groove 22 and is threadedly connected with the second internally threaded groove 22, and the circular rotating block 24 is fixedly installed on the two-way threaded rod 23;

通过设置支撑机构,使得能够对玻璃幕墙6进行加固,提高其结构强度。By arranging the supporting mechanism, the glass curtain wall 6 can be reinforced to improve its structural strength.

如图1和图3所示,所述第二安装槽5的顶部内壁上和第一安装槽3的底部内壁上均固定安装有橡胶垫,所述两个夹持板15的一侧外壁上均固定安装有缓冲垫。As shown in Figures 1 and 3, rubber pads are fixedly installed on the top inner wall of the second installation groove 5 and the bottom inner wall of the first installation groove 3, and on one side of the outer wall of the two clamping plates 15 All are fixedly installed with buffer pads.

通过设置橡胶垫和缓冲垫,使得有效防止玻璃幕墙6在安装的过程中发生意外,起到缓冲的作用。By arranging rubber pads and buffer pads, it is possible to effectively prevent accidents during the installation of the glass curtain wall 6 and play a role of buffering.

如图2所示,所述插块7上开设有第一卡槽,所述拉杆11的一端延伸至第一卡槽内并与第一卡槽相适配;As shown in Figure 2, a first card slot is opened on the insert block 7, and one end of the pull rod 11 extends into the first card slot and fits into the first card slot;

通过设置卡槽,使得能够有效地固定住玻璃幕墙6,增加其稳固性,便于后期的维护工作。By setting the card slot, it is possible to effectively fix the glass curtain wall 6, increase its stability, and facilitate later maintenance work.

如图1所示,所述框架4的两侧外壁上均开设有注胶孔,两个所述注胶孔均与第二安装槽5相连通;As shown in FIG. 1 , glue injection holes are provided on the outer walls of both sides of the frame 4 , and the two glue injection holes communicate with the second installation groove 5 ;

通过设置注胶孔,使得能够对玻璃幕墙6的密封性进行加强,防止雨水渗出。By providing glue injection holes, the sealing performance of the glass curtain wall 6 can be strengthened to prevent rainwater from seeping out.

本实用新型提供的玻璃幕墙墙点支撑装置的工作原理如下:The working principle of the glass curtain wall wall point support device provided by the utility model is as follows:

第一步骤:将玻璃幕墙6放入第一安装槽3内,拉开拉杆11,推动底板1,将玻璃幕墙6推入第二安装槽5内,使玻璃幕墙6接触到第二安装槽5内橡胶垫,插块7在底板1的移动下同时插入第一凹槽8内,松开拉杆11,拉杆11插入插块7上的卡槽;The first step: Put the glass curtain wall 6 into the first installation groove 3, pull the pull rod 11, push the bottom plate 1, push the glass curtain wall 6 into the second installation groove 5, so that the glass curtain wall 6 touches the second installation groove 5 The inner rubber pad, the insert block 7 is inserted into the first groove 8 under the movement of the bottom plate 1 at the same time, the pull rod 11 is released, and the pull rod 11 is inserted into the slot on the insert block 7;

第二步骤:转动旋转螺杆17,旋转螺杆17推动连接块16,连接块16推动夹持板15向玻璃幕墙6移动,两个夹持板15上的橡胶缓冲垫对玻璃幕墙6进行挤压,直至无法转动旋转螺杆17,从而完成对玻璃幕墙6的固定;The second step: turn the rotating screw 17, the rotating screw 17 pushes the connecting block 16, the connecting block 16 pushes the clamping plate 15 to move towards the glass curtain wall 6, and the rubber buffer pads on the two clamping plates 15 squeeze the glass curtain wall 6, Until the rotating screw 17 cannot be rotated, the fixing of the glass curtain wall 6 is completed;

第三步骤:向注胶孔内注入适量的胶,保证玻璃幕墙6与第二安装槽5之间没有缝隙,旋转圆形旋转块24,圆形旋转块24带动双向螺纹杆23转动,调节第一支撑杆19和第二支撑杆21之间的距离,从而改变璃幕墙6的角度,从而对框架4进行支撑,提高结构强度。The third step: inject an appropriate amount of glue into the glue injection hole to ensure that there is no gap between the glass curtain wall 6 and the second installation groove 5, rotate the circular rotating block 24, and the circular rotating block 24 drives the two-way threaded rod 23 to rotate, adjust the second The distance between the first support rod 19 and the second support rod 21 changes the angle of the glass curtain wall 6 to support the frame 4 and improve the structural strength.

需要说明的是,本实用新型的设备结构和附图主要对本实用新型的原理进行描述,在该设计原理的技术上,装置的动力机构、供电系统及控制系统等的设置并没有完全描述清楚,而在本领域技术人员理解上述实用新型的原理的前提下,可清楚获知其动力机构、供电系统及控制系统的具体,申请文件的控制方式是通过控制器来自动控制,控制器的控制电路通过本领域的技术人员简单编程即可实现;It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described clearly. On the premise that those skilled in the art understand the principles of the above-mentioned utility model, they can clearly know the details of its power mechanism, power supply system and control system. The control method of the application document is automatically controlled by the controller, and the control circuit of the controller is passed Those skilled in the art can implement simple programming;

其中所使用到的标准零件均可以从市场上购买,而且根据说明书和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等常规手段,机械、零件和设备均采用现有技术中常规的型号,且本领域技术人员知晓的部件,其结构和原理都为本技术人员均可通过技术手册得知或通过常规实验方法获知。The standard parts used in it can be purchased from the market, and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional methods such as bolts, rivets, and welding in the prior art. , the machinery, parts and equipment all adopt conventional models in the prior art, and the components known to those skilled in the art, their structures and principles are known to those skilled in the art through technical manuals or known through conventional experimental methods.

尽管已经表示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型或直接或间接运用,在其它相关的技术领域,本实用新型的范围由所附权利要求及其等同物限定,均同理包括在本实用新型的专利保护范围内。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , Replacement and modification or direct or indirect application, in other relevant technical fields, the scope of the present invention is defined by the appended claims and their equivalents, all of which are equally included in the patent protection scope of the present invention.

Claims (6)

1.一种玻璃幕墙墙点支撑装置,其特征在于,包括:底板,所述底板上设置有幕墙框架主体、两个固定机构、两个夹持机构和两个支撑机构;1. A glass curtain wall wall point support device, characterized in that it comprises: a base plate, on which a curtain wall frame main body, two fixing mechanisms, two clamping mechanisms and two supporting mechanisms are arranged on the base plate; 所述幕墙框架主体包括安装板、第一安装槽、框架、第二安装槽和玻璃幕墙,所述安装板固定安装在底板的顶部,所述第一安装槽开设在安装板上,所述框架设置在安装板的上方,所述第二安装槽开设在框架上,所述玻璃幕墙安装在第二安装槽内;The main body of the curtain wall frame includes a mounting plate, a first mounting groove, a frame, a second mounting groove and a glass curtain wall, the mounting plate is fixedly installed on the top of the bottom plate, the first mounting groove is opened on the mounting plate, and the frame It is arranged above the installation plate, the second installation groove is opened on the frame, and the glass curtain wall is installed in the second installation groove; 所述固定机构包括插块、第一凹槽、矩形块、第一腔体、拉杆、第一复位弹簧和环形块,所述插块固定安装在底板的顶部,所述第一凹槽开设在框架的底部,所述插块与第一凹槽相适配,所述矩形块固定安装在框架的一侧外壁上,所述第一腔体开设在矩形块内,所述拉杆滑动安装在第一腔体内,所述拉杆的一端延伸至第一凹槽内,所述拉杆的一端延伸至矩形块外,所述第一复位弹簧套设在拉杆上,所述第一复位弹簧的一端与第一腔体的一侧内壁固定连接,所述环形块固定套设在拉杆上,所述第一复位弹簧的一端与环形块固定连接。The fixing mechanism includes an insert block, a first groove, a rectangular block, a first cavity, a pull rod, a first return spring and an annular block, the insert block is fixedly installed on the top of the bottom plate, and the first groove is opened in The bottom of the frame, the insert fits into the first groove, the rectangular block is fixedly installed on one side of the outer wall of the frame, the first cavity is opened in the rectangular block, and the pull rod is slidably installed on the second side of the frame. In a cavity, one end of the pull rod extends into the first groove, one end of the pull rod extends out of the rectangular block, the first return spring is sleeved on the pull rod, and one end of the first return spring is connected to the first One side inner wall of a cavity is fixedly connected, the ring block is fixedly sleeved on the pull rod, and one end of the first return spring is fixedly connected to the ring block. 2.根据权利要求1所述的玻璃幕墙墙点支撑装置,其特征在于:所述夹持机构包括第二凹槽、矩形凹槽、夹持板、连接块和旋转螺杆,所述第二凹槽开设在框架的一侧内壁上,所述矩形凹槽开设在第二凹槽的一侧内壁上,所述夹持板设置在第二凹槽内,所述夹持板与第二凹槽相适配,所述连接块固定安装在夹持板的一侧外壁上,所述连接块延伸至矩形凹槽内并与矩形凹槽相适配,所述旋转螺杆转动安装在连接块的一侧外壁上,所述旋转螺杆的一端延伸至框架外并与框架螺纹连接。2. The point support device for glass curtain wall according to claim 1, characterized in that: the clamping mechanism includes a second groove, a rectangular groove, a clamping plate, a connecting block and a rotating screw, and the second concave The groove is provided on one side inner wall of the frame, the rectangular groove is provided on one side inner wall of the second groove, the clamping plate is arranged in the second groove, and the clamping plate and the second groove Matching, the connecting block is fixedly installed on one side of the outer wall of the clamping plate, the connecting block extends into the rectangular groove and fits with the rectangular groove, and the rotating screw is rotatably installed on one side of the connecting block On the side outer wall, one end of the rotating screw extends out of the frame and is threadedly connected with the frame. 3.根据权利要求2所述的玻璃幕墙墙点支撑装置,其特征在于:所述支撑机构包括条形板、第一支撑杆、第一内螺纹凹槽、第二支撑杆、第二内螺纹凹槽、双向螺纹杆和圆形旋转块,所述条形板铰接安装在框架的一侧外壁上,所述第一支撑杆铰接安装在条形板的顶部,所述第一内螺纹凹槽开设在第一支撑杆上,所述第二支撑杆铰接安装在框架的一侧外壁上,所述第二内螺纹凹槽开设在第二支撑杆上,所述双向螺纹杆螺纹安装在第一内螺纹凹槽内,所述双向螺纹杆的一端延伸至第二内螺纹凹槽内并与第二内螺纹凹槽螺纹连接,所述圆形旋转块固定安装在双向螺纹杆上。3. The point support device for glass curtain wall according to claim 2, characterized in that: the support mechanism includes a strip plate, a first support rod, a first internal thread groove, a second support rod, and a second internal thread Groove, two-way threaded rod and circular rotating block, the strip plate is hingedly installed on one side of the outer wall of the frame, the first support rod is hingedly installed on the top of the strip plate, and the first internal thread groove It is provided on the first support rod, the second support rod is hingedly installed on one side of the outer wall of the frame, the second internal thread groove is provided on the second support rod, and the two-way threaded rod is threadedly installed In the internally threaded groove, one end of the two-way threaded rod extends into the second internally threaded groove and is threadedly connected with the second internally threaded groove, and the circular rotating block is fixedly mounted on the two-way threaded rod. 4.根据权利要求2所述的玻璃幕墙墙点支撑装置,其特征在于:所述第二安装槽的顶部内壁上和第一安装槽的底部内壁上均固定安装有橡胶垫,所述两个夹持板的一侧外壁上均固定安装有缓冲垫。4. The point support device for glass curtain wall according to claim 2, characterized in that: rubber pads are fixedly installed on the top inner wall of the second installation groove and the bottom inner wall of the first installation groove, and the two A buffer pad is fixedly installed on one side of the outer wall of the clamping plate. 5.根据权利要求1所述的玻璃幕墙墙点支撑装置,其特征在于:所述插块上开设有第一卡槽,所述拉杆的一端延伸至第一卡槽内并与第一卡槽相适配。5. The point support device for glass curtain wall according to claim 1, characterized in that: the insert block is provided with a first card slot, and one end of the pull rod extends into the first card slot and connects with the first card slot match. 6.根据权利要求1所述的玻璃幕墙墙点支撑装置,其特征在于:所述框架的两侧外壁上均开设有注胶孔,两个所述注胶孔均与第二安装槽相连通。6. The point support device for glass curtain wall according to claim 1, characterized in that: there are glue injection holes on the outer walls of both sides of the frame, and the two glue injection holes are connected with the second installation groove .
CN202320119931.8U 2023-02-06 2023-02-06 Glass curtain wall point supporting device Active CN219508946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320119931.8U CN219508946U (en) 2023-02-06 2023-02-06 Glass curtain wall point supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320119931.8U CN219508946U (en) 2023-02-06 2023-02-06 Glass curtain wall point supporting device

Publications (1)

Publication Number Publication Date
CN219508946U true CN219508946U (en) 2023-08-11

Family

ID=87549677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320119931.8U Active CN219508946U (en) 2023-02-06 2023-02-06 Glass curtain wall point supporting device

Country Status (1)

Country Link
CN (1) CN219508946U (en)

Similar Documents

Publication Publication Date Title
CN207018773U (en) A kind of LED display fixed mount for being easy to regulation
CN220598719U (en) Steel construction connecting device with adjustable function for construction
CN210120519U (en) But angle regulation's photovoltaic board mounting bracket
CN217734952U (en) Nearly modern building antidetonation reinforcing apparatus based on structural performance optimizes
CN218715378U (en) Ancient building repairs and uses reinforcing fixture
CN207021947U (en) A kind of new energy solar panels mounting bracket
CN216893035U (en) A kind of building decoration energy-saving curtain wall
CN218543667U (en) Anti-seismic support
CN219411966U (en) An energy-saving center column support structure
CN219300095U (en) Building water supply and drainage pipeline locating support
CN211501871U (en) Water conservancy pipeline's supporting mechanism
CN220686747U (en) Frame post template reinforcing apparatus is built in room
CN208797891U (en) A kind of integrated roof of green building based on solar panels
CN221665448U (en) Debugging type support hanger device
CN219033687U (en) Fixed connection device for building curtain wall engineering
CN209653570U (en) A kind of transformable building construction security protection enclosing
CN221194346U (en) Reinforcing bar location structure for construction
CN218153960U (en) Integrated solar LED street lamp
CN218951229U (en) Magnetizing device for environmental design
CN221957197U (en) Combined pouring template
CN206667632U (en) A kind of wall brick for being transformed into folding table
CN219196728U (en) A formwork fixing component for building engineering construction
CN214462627U (en) Energy-saving construction equipment for building construction
CN222797011U (en) A curtain wall hanging basket rear support heightening and reinforcement installation structure
CN220167592U (en) An L-shaped seismic reinforcement device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant