CN219500677U - Pipeline integrated wall system - Google Patents

Pipeline integrated wall system Download PDF

Info

Publication number
CN219500677U
CN219500677U CN202320512893.2U CN202320512893U CN219500677U CN 219500677 U CN219500677 U CN 219500677U CN 202320512893 U CN202320512893 U CN 202320512893U CN 219500677 U CN219500677 U CN 219500677U
Authority
CN
China
Prior art keywords
pipe
mounting
arrangement
wall system
integrated wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320512893.2U
Other languages
Chinese (zh)
Inventor
葛祝军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Magic Wall Shanghai Engineering Technology Co ltd
Original Assignee
Magic Wall Shanghai Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Magic Wall Shanghai Engineering Technology Co ltd filed Critical Magic Wall Shanghai Engineering Technology Co ltd
Priority to CN202320512893.2U priority Critical patent/CN219500677U/en
Application granted granted Critical
Publication of CN219500677U publication Critical patent/CN219500677U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a pipeline integrated wall system, which comprises: a plurality of assembling pipes and a plurality of arrangement pipes, wherein the assembling pipes are detachably connected to form an assembling frame; the assembly frame comprises a plurality of mounting assemblies for mounting water equipment; the arrangement pipe is disposed in the mounting frame, and one end thereof extends to the mounting assembly and is connected to the water using apparatus. The pipeline integrated wall system is characterized in that each module is prefabricated in a factory, a plurality of assembly pipes are assembled into an assembly frame during decoration, and an installation assembly is reserved, so that the arrangement pipes and various water consuming devices are detachably installed, the assembly type installation method is adopted, welding or bonding and other operations are not needed, the installation is convenient, the pipeline arrangement is simple and regular, and the workload of an installer is effectively reduced; meanwhile, the maintenance, the replacement and the like of water equipment and the arrangement pipes are convenient. In addition, the pipeline integrated wall system has the characteristics of compact structure, high space utilization rate, integration and the like, and is suitable for various decoration conditions.

Description

Pipeline integrated wall system
Technical Field
The utility model relates to a pipeline integrated wall system.
Background
In the decoration process of spaces such as a toilet, a kitchen and the like, equipment such as a toilet, a shower, a washing table, a bowl sink, a gas water heater and the like are all required to be connected with a plurality of water pipelines, so that the arrangement of the pipelines is very important.
In the prior art, when finishing a position such as a toilet or a kitchen, a water pipe of equipment such as a toilet, a washing table and the like is usually laid separately, and then the equipment such as the toilet and the like is installed separately. However, in such a mounting mode, the process is complicated, the pipeline arrangement of each device is uneven, the condition of mutual interference is caused by the disorder of pipeline arrangement, the requirement on the installer is high, and the workload is also high.
Disclosure of Invention
The utility model aims to overcome the defects of high requirements on installers, large workload and the like caused by inconvenient pipeline installation and disordered arrangement of various water-using equipment in a toilet or a kitchen in the prior art.
The utility model solves the technical problems by the following technical scheme:
a pipeline integrated wall system, comprising: a plurality of fitting pipes and a plurality of arrangement pipes, the fitting pipes being detachably connected to form a fitting rack; the assembly frame comprises a plurality of mounting assemblies, wherein the mounting assemblies are used for mounting water equipment; the arrangement pipe is arranged in the assembly frame, and one end of the arrangement pipe extends to the installation component and is connected with the water using equipment.
In the scheme, the assembly frame is split into a plurality of modules, and all parts prefabricated in a factory are assembled into the assembly frame in an assembling mode during decoration, so that the arrangement pipes and various water consuming devices are detachably installed, the pipeline integrated wall system adopts an assembling type installation method, welding or bonding and other operations are not needed, the installation is convenient, the arrangement of pipelines is simple and regular, and the workload of an installer is effectively reduced; meanwhile, all the water consuming equipment is convenient to detach, and the water consuming equipment and the arrangement pipes are convenient to repair, replace and the like. In addition, the pipeline integrated wall system has the characteristics of compact structure, high space utilization rate, integration and the like, and is suitable for various decoration conditions.
Preferably, one side of the assembly frame is attached to the wall surface, and the other side of the assembly frame extends outwards along the direction perpendicular to the wall surface and is provided with a passage for laying the arrangement pipe.
In the scheme, the structure is adopted, so that an assembly space for arranging the pipes is reserved in the middle of the assembly frame, the pipes are conveniently laid, the pipes are more regularly laid, and water equipment is conveniently connected.
Preferably, the pipeline integrated wall system comprises a plurality of hanging pieces, the hanging pieces are arranged in the passage, and the arrangement pipe is hung on the hanging pieces.
Preferably, the pipeline integrated wall system comprises a plurality of supports, the supports being disposed in the passageway, the deployment pipe being disposed against the supports.
In this scheme, adopt above-mentioned structural style for arrange the pipe and can hang or lean on to establish on articulated member and support piece in the relevant position of assembly jig, effectively improved the stability of arranging the pipe installation in the assembly jig, reduced the risk of arranging the pipe damage, thereby guaranteed its security. In addition, the mounting positions of the hanging piece and the supporting piece can be adjusted according to the actual laying condition of the arrangement pipes, so that the application range of the pipeline integrated wall system is wider.
Preferably, the pipeline integrated wall system comprises a main water supply pipeline, wherein the main water supply pipeline is arranged in the assembly frame and is connected with a plurality of the arrangement pipes.
Preferably, the mounting assembly comprises a first mounting portion for mounting the gas water heater and a second mounting portion for mounting the toilet.
In this scheme, adopt above-mentioned structural style for each water using equipment all has the mounted position who presets, and the assembly of this pipeline integrated wall system of being convenient for also makes the installation of each water using equipment more accurate in addition, can not appear mutual interference.
Preferably, the first installation part is arranged on the upper edge of the assembly frame, one end of the arrangement pipe is connected with a main water supply pipeline, and the other end of the arrangement pipe is connected with the gas water heater; and/or one end of the arrangement pipe is connected to the gas water heater, and the other end extends in a direction away from the first installation part.
In the scheme, the gas water heater is connected with the main water supply pipeline by adopting the structure, so that the water inflow of the gas water heater is ensured; meanwhile, the gas water heater is connected with other water consuming devices, so that water heated by the gas water heater is ensured to be supplied to the water consuming devices; the mounting position is preset for the gas water heater on the assembly frame, so that the gas water heater is convenient to mount, the gas water heater is guaranteed not to influence the mounting of other equipment, and in addition, the gas water heater is also convenient to lay and arrange pipes.
Preferably, the second installation part is arranged at the bottom end of the assembly frame, the arrangement pipe is installed at the bottom of the assembly frame, one end of the arrangement pipe is connected with the toilet, and the other end of the arrangement pipe extends to the sewer opening; and/or one end of the arrangement pipe is connected to a main water supply pipeline, and the other end is connected to the toilet bowl.
In the scheme, the structure is adopted, so that the closestool is connected to the preset installation position of the assembly frame, the installation is convenient, meanwhile, the arrangement pipe is convenient to pre-embed, and the arrangement pipe is ensured to supply water for each water-using device; in addition, each structure is installed through the mode of assembly, and its installation is simple, firm, can not influence the installation of other equipment.
Preferably, the mounting assembly further comprises a plurality of hanging parts detachably connected to the assembly frame, and the hanging parts are used for hanging water equipment.
Preferably, one end of the arrangement pipe is connected to a main water supply pipe, and the other end is connected to the water using device; and/or one end of the arrangement pipe is connected with the gas water heater, and the other end of the arrangement pipe is connected with the water using equipment.
In the scheme, the water using equipment is connected to the preset mounting position of the assembly frame in a hanging manner by adopting the structural form, so that the water using equipment is convenient to mount, dismount, replace and the like, the structure is compact, the space utilization rate is high, and the water using equipment is ensured not to be affected by each other; meanwhile, the installation and connection of the arrangement pipes are convenient, and the arrangement pipes are guaranteed to supply water for all water consuming devices.
The utility model has the positive progress effects that:
the pipeline integrated wall system is characterized in that the assembly frame is divided into a plurality of modules, and each prefabricated part in a factory is assembled into the assembly frame in an assembling mode during decoration, so that the arrangement pipes and various water consuming devices are detachably installed, the pipeline integrated wall system adopts an assembling type installation method, welding or bonding and other operations are not needed, the installation is convenient, the arrangement of pipelines is simple and regular, and the workload of an installer is effectively reduced; meanwhile, all the water consuming equipment is convenient to detach, and the water consuming equipment and the arrangement pipes are convenient to repair, replace and the like. In addition, the pipeline integrated wall system has the characteristics of compact structure, high space utilization rate, integration and the like, and is suitable for various decoration conditions.
Drawings
Fig. 1 is a schematic structural diagram of a pipeline integrated wall system according to an embodiment of the present utility model.
Reference numerals illustrate:
assembly frame 1
Assembling pipe 11
Mounting assembly 12
First mounting portion 121
Second mounting portion 122
Hitching section 123
Arranging pipe 2
Hanging piece 21
Support 22
Main water supply pipe 23
Sewer opening 24
Water-using device 3
Gas water heater 31
Toilet 32
Wall surface 4
Detailed Description
The utility model is further illustrated by means of examples which follow, without thereby restricting the scope of the utility model thereto.
As shown in fig. 1, the utility model discloses a pipeline integrated wall system, which comprises: a plurality of fitting pipes 11 and a plurality of arrangement pipes 2, the fitting pipes 11 being detachably connected to form a fitting rack 1; the mounting rack 1 comprises a plurality of mounting assemblies 12, wherein the mounting assemblies 12 are used for mounting the water using equipment 3; the arrangement tube 2 is provided in the mounting bracket 1, and one end of the arrangement tube 2 extends to the mounting assembly 12 and is connected to the water using apparatus 3.
In this embodiment, the pipeline integrated wall system is split into a plurality of modules, such as the assembly pipe 11, the assembly rack 1, the installation assembly 12 and the like shown in fig. 1, all the modules are manufactured in advance in a factory, when in decoration, only the assembly pipe 11 is assembled into the assembly rack 1 in an assembly mode, the installation assembly 12 is reserved, and then the arrangement pipe 2 and various water consuming devices 3 are detachably arranged, so that the pipeline integrated wall system adopts an assembly type installation method, and the operations such as welding or bonding are not needed, the installation is convenient, the arrangement of pipelines is simple and regular, and the workload of an installer is effectively reduced; meanwhile, the water using devices 3 are convenient to detach, and the water using devices 3 and the arrangement pipes 2 are convenient to repair, replace and the like. In addition, the pipeline integrated wall system has the characteristics of compact structure, high space utilization rate, integration and the like, and is suitable for various decoration conditions.
Specifically, one side of the mounting frame 1 is attached to the wall surface 4, and the other side extends outwards along a direction perpendicular to the wall surface 4, and a passage through which the arrangement pipe 2 can be laid is formed.
By assembling the assembly frame 1 into the structure shown in fig. 1, an assembly space for arranging the pipes 2 is reserved in the middle of the assembly frame 1, so that the arrangement pipes 2 are conveniently paved, the arrangement pipes 2 are more regularly paved, and the water equipment 3 is conveniently connected; in addition, the structural shape of the assembly frame 1 can be correspondingly adjusted according to the actual installation condition, the structure of the wall surface 4 and the like, so that the application range of the pipeline integrated wall system is effectively enlarged.
Specifically, as shown in fig. 1, the pipe integrated wall system includes a plurality of hitches 21, the hitches 21 being disposed in the passage, and the arrangement pipe 2 being hitched to the hitches 21.
Specifically, the pipe integrated wall system includes a plurality of support members 22, the support members 22 being disposed in the passages, the arrangement pipe 2 being disposed against the support members 22.
The hanging piece 21 and the supporting piece 22 are arranged in the assembly frame 1, so that the arrangement pipe 2 can be hung or leaned against the hanging piece 21 and the supporting piece 22 at the corresponding position of the assembly frame 1, the arrangement pipe 2 is simpler and more convenient to install, the stability of the arrangement pipe 2 in the assembly frame 1 is effectively improved, the damage risk of the arrangement pipe 2 is reduced, and the safety of the arrangement pipe is ensured. In addition, the mounting positions of the hanging piece 21 and the supporting piece 22 can be adjusted according to the actual laying condition of the arrangement pipe 2, so that the application range of the pipeline integrated wall system is wider.
Specifically, the pipe integrated wall system includes a main water supply pipe 23, the main water supply pipe 23 being provided in the jig 1, the main water supply pipe 23 being connected to the plurality of arrangement pipes 2.
Specifically, the mounting assembly 12 includes a first mounting portion 121 for mounting the gas water heater 31 and a second mounting portion 122 for mounting the toilet 32, the first mounting portion 121 being configured to mount the gas water heater 31.
When this assembly jig 1 is assembled, each installation component 12 is reserved, in this embodiment, a first installation portion 121 and a second installation portion 122 are provided for installing the gas water heater 31 and the toilet 32, so that each water using device 3 has a preset installation position, the assembly of this pipeline integrated wall system is facilitated, and in addition, the installation of each water using device 3 is more accurate and no mutual interference occurs.
In other embodiments, the setting positions and the number of the installation assemblies 12 may be set according to the actual installation situation and the specific requirements of the clients, and thus, the setting positions and the number of the installation assemblies 12 are not limited to the scope disclosed in the embodiment.
Specifically, the first installation part 121 is provided at the upper edge of the mounting bracket 1, and one end of the arrangement pipe 2 is connected to the main water supply pipe 23, and the other end is connected to the gas water heater 31; and/or one end of the arrangement pipe 2 is connected to the gas water heater 31, and the other end extends in a direction away from the first mounting portion 121.
The first installation part 121 is arranged on the upper edge of the assembly frame 1, and the main water supply pipeline 23, the gas water heater 31 and other installation components 12 are connected through the arrangement pipe 2, so that the gas water heater 31 is connected with the main water supply pipeline 23, and the water inflow of the gas water heater 31 is ensured; meanwhile, the gas water heater 31 is connected with other water consuming devices 3, so that water heated by the gas water heater 31 is ensured to be supplied to the water consuming devices 3; the mounting position is preset for the gas water heater 31 on the assembly frame 1, so that the gas water heater 31 is convenient to mount, the mounting of other equipment cannot be influenced, and in addition, the laying of the arrangement pipe 2 is convenient.
Specifically, the second mounting portion 122 is disposed at the bottom end of the mounting frame 1, the arrangement pipe 2 is mounted at the bottom of the mounting frame 1, one end of the arrangement pipe 2 is connected to the toilet 32, and the other end extends to the sewer port 24; and/or the arrangement pipe 2 has one end connected to the main water supply pipe 23 and the other end connected to the toilet 32.
The second installation part 122 is arranged at the bottom end of the assembly frame 1, and the second installation part 122 is connected with the main water supply pipeline 23 and the sewer port 24 through the arrangement pipe 2, so that the closestool 32 is connected at the preset installation position of the assembly frame 1, the installation is convenient, meanwhile, the arrangement pipe 2 is also convenient to pre-embed, and the arrangement pipe 2 is ensured to supply water for all water using equipment 3; in addition, each structure is installed through the mode of assembly, and its installation is simple, firm, can not influence the installation of other equipment.
Specifically, the mounting assembly 12 further includes a plurality of hooking portions 123, the hooking portions 123 being detachably connected to the mounting bracket 1, the hooking portions 123 being for hooking the water appliance 3.
Specifically, the arrangement pipe 2 has one end connected to the main water supply pipe 23 and the other end connected to the water using apparatus 3; and/or one end of the arrangement pipe 2 is connected to the gas water heater 31 and the other end is connected to the water using device 3.
In this embodiment, the plurality of hanging parts 123 are arranged on the assembly frame 1, and the water using devices 3 such as a shower and a face washing table are hung, and each water using device 3 is connected to a preset installation position of the assembly frame 1 in a hanging manner, so that the water using devices 3 are convenient to install, detach, replace and the like, the structure is compact, the space utilization rate is high, and the mutual influence among the water using devices 3 is avoided; meanwhile, the installation and connection of the arrangement pipes 2 are also facilitated, and the arrangement pipes 2 are ensured to supply water for the water consuming devices 3.
In other embodiments, the installation positions and the number of the installation parts and the hanging parts 123 of the installation assembly 12 can be adjusted correspondingly according to the actual installation requirements, the number of the water using devices 3, the installation modes and the like, and therefore, the pipeline integrated wall system disclosed by the utility model effectively expands the application range and improves the space utilization rate by adopting the assembly type installation mode.
While specific embodiments of the utility model have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and the scope of the utility model is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the principles and spirit of the utility model, but such changes and modifications fall within the scope of the utility model.

Claims (10)

1. The utility model provides a pipeline integrated wall system which characterized in that, it includes:
a plurality of mounting tubes detachably connected to form a mounting rack;
the assembly frame comprises a plurality of mounting assemblies, wherein the mounting assemblies are used for mounting water equipment;
the plurality of arrangement pipes are arranged in the assembly frame, and one ends of the arrangement pipes extend to the installation assembly and are connected to the water using equipment.
2. The piping integrated wall system of claim 1, wherein one side of said mounting bracket is attached to a wall surface, and the other side extends outwardly in a direction perpendicular to said wall surface, and is formed with a passage through which said deployment pipe is laid.
3. The pipe integrated wall system of claim 2, wherein the pipe integrated wall system includes a plurality of hangers disposed in the passageway, the deployment pipe being hooked to the hangers.
4. The pipe integrated wall system of claim 2, wherein the pipe integrated wall system includes a plurality of supports, the supports being disposed in the passageway, the deployment pipe resting on the supports.
5. The pipe integrated wall system of claim 1, comprising a main water supply pipe disposed within the mounting bracket, the main water supply pipe being connected to a plurality of the deployment pipes.
6. The pipe integrated wall system of claim 1 wherein the mounting assembly comprises a first mounting portion for mounting a gas water heater and a second mounting portion for mounting a toilet.
7. The pipe integrated wall system according to claim 6, wherein the first installation part is provided at an upper edge of the mounting bracket, one end of the arrangement pipe is connected to a main water supply pipe, and the other end is connected to the gas water heater;
and/or one end of the arrangement pipe is connected to the gas water heater, and the other end extends in a direction away from the first installation part.
8. The pipe integrated wall system according to claim 6, wherein the second installation part is provided at a bottom end of the mounting frame, the arrangement pipe is installed at a bottom of the mounting frame, one end of the arrangement pipe is connected to the toilet bowl, and the other end extends to a sewer opening;
and/or one end of the arrangement pipe is connected to a main water supply pipeline, and the other end is connected to the toilet bowl.
9. The pipe integrated wall system of claim 1, wherein the mounting assembly further comprises a plurality of hitching sections removably connected to the mounting bracket, the hitching sections being adapted to hitch with water equipment.
10. The pipe integrated wall system of claim 9 wherein one end of the deployment pipe is connected to a main water supply pipe and the other end is connected to the water utility;
and/or one end of the arrangement pipe is connected with the gas water heater, and the other end of the arrangement pipe is connected with the water using equipment.
CN202320512893.2U 2023-03-15 2023-03-15 Pipeline integrated wall system Active CN219500677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320512893.2U CN219500677U (en) 2023-03-15 2023-03-15 Pipeline integrated wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320512893.2U CN219500677U (en) 2023-03-15 2023-03-15 Pipeline integrated wall system

Publications (1)

Publication Number Publication Date
CN219500677U true CN219500677U (en) 2023-08-11

Family

ID=87526909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320512893.2U Active CN219500677U (en) 2023-03-15 2023-03-15 Pipeline integrated wall system

Country Status (1)

Country Link
CN (1) CN219500677U (en)

Similar Documents

Publication Publication Date Title
US20120318934A1 (en) Multiple vertical clevis hangers
CN219500677U (en) Pipeline integrated wall system
CN205641151U (en) Baseboard radiator
EP1110036B1 (en) Central heating radiator assembly
KR200443777Y1 (en) Sink Pipe Connector using Hot Water Distributor
KR20100000377U (en) A fixing bracket of pipe for distributor
KR20160119462A (en) water distributer for boiler
CN210772808U (en) Novel connecting pipe assembly
CN209893601U (en) Pipeline hanger for installing central air conditioner
KR100703626B1 (en) A cool water and hot water piping combination unit of bathroom
CN205062976U (en) Detachable urine device in men's lavatory
CN217056629U (en) Stable water pipe seat
CN211476034U (en) Cleaning nozzle assembly and range hood
JPH067159Y2 (en) Trench for piping in dwelling unit
KR200292699Y1 (en) Device for connecting water supply pipes utilizing hot water circulation header
CN210032739U (en) Integrated bathroom
CN212056168U (en) Pipeline installation construction is with a gallows
CN218335206U (en) Waterproof cable bridge convenient to fix
CN209877071U (en) Ground heating water collecting and distributing device branch fixing support
JP3343306B2 (en) Kitchenware mounting bracket and piping wiring unit
EP3519648A1 (en) Device and method for mounting and encasing a fireplace, stove or heating appliance
CN220957177U (en) Pipe frame structure of preset vertical pipe
CN201671263U (en) Mobile toilet pipe wall
CN219796372U (en) Building water supply and drainage heating ventilation fixed mounting structure
CN212804587U (en) Adjustable fixing device for floor water supply and drainage pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant