CN219499806U - Operation energy efficiency monitoring device applied to central air conditioner water pump - Google Patents

Operation energy efficiency monitoring device applied to central air conditioner water pump Download PDF

Info

Publication number
CN219499806U
CN219499806U CN202320365708.1U CN202320365708U CN219499806U CN 219499806 U CN219499806 U CN 219499806U CN 202320365708 U CN202320365708 U CN 202320365708U CN 219499806 U CN219499806 U CN 219499806U
Authority
CN
China
Prior art keywords
adjusting
cabinet body
central air
water pump
energy efficiency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320365708.1U
Other languages
Chinese (zh)
Inventor
杜彬
李志伟
任行文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Longhua Environment Integrated System Co ltd
Original Assignee
Hangzhou Longhua Environment Integrated System Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Longhua Environment Integrated System Co ltd filed Critical Hangzhou Longhua Environment Integrated System Co ltd
Priority to CN202320365708.1U priority Critical patent/CN219499806U/en
Application granted granted Critical
Publication of CN219499806U publication Critical patent/CN219499806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model discloses an operation energy efficiency monitoring device applied to a central air-conditioning water pump, which comprises a cabinet body, wherein a placing component is arranged in the cabinet body, the placing component is sequentially arranged at two sides of the interior of the cabinet body, monitoring connecting components are arranged at two sides of the placing component close to the cabinet body, a protecting component is arranged at one side of the placing component close to the cabinet body, and a monitoring screen is arranged at one side of the cabinet body.

Description

Operation energy efficiency monitoring device applied to central air conditioner water pump
Technical Field
The utility model relates to the technical field of energy efficiency monitoring, in particular to an operation energy efficiency monitoring device applied to a central air conditioner water pump.
Background
As central air conditioners are popular, the energy consumption is not small, and the distribution of building energy consumption is studied, so that the energy consumption of the central air conditioner is 50-60% in general, and the energy consumption of a refrigerating station room is 50-60% in the energy consumption of the central air conditioner. Initially, in order to meet the maximum load demand of the tail end, therefore, the central air conditioner is designed according to the maximum load demand of the tail end, most of the time is only required by partial load in actual operation, so that energy is wasted, and when the central air conditioner and the central air conditioner water pump monitor energy efficiency, the monitored cables are required to be uniformly managed and monitored through the control cabinet, but when the control cabinet monitors the energy efficiency, the control cabinet is limited in size, so that only a small amount of monitoring equipment can be placed, the operation energy efficiency of the central air conditioner water pump is limited, and when the monitoring is performed, the monitoring lines are messy, and the monitoring effect is affected.
For the problems in the related art, no effective solution has been proposed at present.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides the operation energy efficiency monitoring device applied to the central air conditioner water pump, which has the advantage of ensuring the operation energy efficiency monitoring effect of the central air conditioner water pump, thereby solving the problems in the prior art.
(II) technical scheme
In order to achieve the advantage of ensuring the operation energy efficiency monitoring effect of the central air conditioner water pump, the utility model adopts the following specific technical scheme:
the utility model provides an operation efficiency monitoring devices for central air conditioner water pump, includes the cabinet body, and cabinet body inside is provided with places the subassembly, places the subassembly and sets gradually in cabinet body inside both sides, places the subassembly and is provided with the monitoring coupling assembling near cabinet body both sides, it is provided with the protection subassembly near cabinet body one side to place the subassembly, and cabinet body one side is provided with the monitoring screen.
Further, for better assurance monitoring facilities's effect of placing, place the subassembly and set up in the connecting block including cabinet body both sides, the movable groove has been seted up to connecting block one side, is provided with in the movable groove and places the board, places the board middle part and has seted up and place the mouth, places the mouth and is located and places the board both sides and have seted up the adjustment tank, is provided with a plurality of regulation fixed plate in the adjustment tank, adjusts the fixed plate middle part and is provided with adjusting part.
Further, for better assurance monitoring facilities's fixed effect, adjusting part is including adjusting fixed plate one side and has seted up the movable groove, is provided with adjusting rack in the movable groove, and adjusting rack one side is provided with adjusting gear, and adjusting gear middle part is provided with the connecting rod, and connecting rod one end is provided with adjustment handle, and adjustment handle is close to the connecting rod and is provided with self-locking structure, and adjusting fixed plate one end is provided with fixed movable block, and fixed movable block one side is provided with connecting bolt, monitors coupling assembling and sets up and is close to cabinet body both sides at adjusting fixed plate.
Further, for better assurance monitoring circuit's connection effect, monitoring coupling assembling is including adjusting a plurality of connecting holes that the fixed plate was close to cabinet body both sides and offer, and one side is provided with equidistant electric putter in a plurality of connecting holes, and electric putter one end is provided with spacing connecting plate, is provided with buffer spring between the spacing connecting plate.
Further, for better assurance monitoring circuit's connection fixed effect, a plurality of connecting holes are close to and place board one end and are provided with the fixed strip, and the fixed orifices has all been seted up to the one end and the both sides of fixed strip, and is provided with adjusting bolt in one of them fixed orifices, and fixed orifices internal connection has monitoring facilities, and monitoring facilities sets up in adjusting fixed plate one end, and protection components sets up and is close to cabinet body one side at the fixed strip.
Further, for the inside protective effect of better assurance solid, the protective component is close to the conveyer pipe that the cabinet body set up including the fixed strip, and the conveyer pipe both sides are provided with the protective tube, and protective tube one side is connected with a plurality of shower nozzle, and conveyer pipe one end runs through cabinet body one end and is provided with the direction cover.
Further, in order to better guarantee the internal radiating effect of cabinet, guide housing one end is provided with the conveying fan, and conveying fan one end is provided with the semiconductor refrigeration group, and semiconductor refrigeration group one end sets up in cabinet one end.
(III) beneficial effects
Compared with the prior art, the utility model has the following beneficial effects:
(1) Through setting gradually at the cabinet is internal to place the subassembly, be convenient for when using, can avoid cabinet body size to receive the restriction to can guarantee the effect of placing of the operation energy efficiency monitoring facilities of central air conditioner water pump, and can also be as required to fix the regulation to the operation energy efficiency monitoring facilities of central air conditioner water pump, simultaneously through setting up monitoring connection subassembly, be convenient for when using, can carry out reason line processing to the monitoring circuit, and then can guarantee the operation energy efficiency monitoring effects of central air conditioner water pump.
(2) Through at the protection subassembly, be convenient for when carrying out the operation energy efficiency monitoring production heat of central air conditioner water pump, to connecting position and cabinet internal portion carry out the protection heat dissipation and handle to can guarantee the life of the operation energy efficiency monitoring facilities of central air conditioner water pump.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of an operation energy efficiency monitoring device applied to a central air conditioner water pump according to an embodiment of the present utility model;
FIG. 2 is a schematic diagram of a monitoring connection assembly of an energy efficiency monitoring device for a central air conditioner water pump according to an embodiment of the present utility model;
FIG. 3 is a schematic diagram of a placement assembly of an energy efficiency monitoring device for a central air conditioner water pump according to an embodiment of the present utility model;
FIG. 4 is a schematic diagram of an adjusting component of an energy efficiency monitoring device for a central air conditioner water pump according to an embodiment of the present utility model;
fig. 5 is a schematic structural diagram of a protection component of an operation energy efficiency monitoring device applied to a central air conditioner water pump according to an embodiment of the present utility model.
In the figure:
1. a cabinet body; 2. placing the assembly; 201. a connecting block; 202. placing a plate; 203. adjusting the fixing plate; 204. an adjusting member; 2041. adjusting the rack; 2042. an adjusting gear; 2043. a connecting rod; 2044. an adjusting handle; 2045. a self-locking structure; 2046. fixing the moving block; 3. monitoring the connection assembly; 301. a connection hole; 302. an electric push rod; 303. a limit connecting plate; 304. a buffer spring; 305. a fixing strip; 306. an adjusting bolt; 4. a protective assembly; 401. a delivery tube; 402. a protective tube; 403. a spray head; 404. a guide cover; 405. a conveying fan; 406. a semiconductor refrigeration group; 5. monitoring a screen; 6. a placement port; 7. and (5) connecting bolts.
Detailed Description
For the purpose of further illustrating the various embodiments, the present utility model provides the accompanying drawings, which are a part of the disclosure of the present utility model, and which are mainly used to illustrate the embodiments and, together with the description, serve to explain the principles of the embodiments, and with reference to these descriptions, one skilled in the art will recognize other possible implementations and advantages of the present utility model, wherein elements are not drawn to scale, and like reference numerals are generally used to designate like elements.
Referring to fig. 1, a device for monitoring operation energy efficiency of a central air-conditioning water pump according to an embodiment of the present utility model includes a cabinet body 1 having a rectangular structure and made of metal material, wherein the cabinet body 1 is used for carrying operation energy efficiency monitoring equipment of the central air-conditioning water pump, a placement component 2 for monitoring and placing the operation energy efficiency monitoring equipment of the central air-conditioning water pump is disposed inside the cabinet body 1, the placement component 2 is sequentially disposed at two sides inside the cabinet body 1, monitoring connection components 3 for arranging connection lines of the monitoring equipment 307 are disposed at two sides of the placement component 2 close to the cabinet body 1, a protection component 4 for protecting the interior of the cabinet body 1 is disposed at one side of the placement component 2 close to the cabinet body 1, a monitoring screen 5 for displaying operation energy efficiency monitoring data of the central air-conditioning water pump is disposed at one side of the cabinet body 1, and the model number is LH170-M4.
As shown in fig. 3 and 4, the placement component 2 comprises a rectangular structure, two side outer walls of a cabinet body 1 made of metal materials are arranged on a connecting block 201, the connecting block 201 is fixed on two sides of the cabinet body 1 through bolts, a moving groove with a rectangular structure is formed on one side outer wall of the connecting block 201, a placement plate 202 with a rectangular saw-tooth structure is arranged in the moving groove in a clamping manner, a placement opening 6 is formed in the middle of the placement plate 202, adjusting rods are arranged on two sides of the placement plate 202 in the placement opening 6, a plurality of adjusting fixing plates 203 with rectangular structures are arranged in the adjusting groove, two adjusting rods (similar to dampers) are arranged at one ends of the adjusting fixing plates 203, one ends of the two adjusting rods are arranged on one side in the adjusting rods, one ends of the two adjusting rods and the adjusting fixing plates 203 are arranged into an integrated structure, and the adjusting and fixing plate 203 is partly long and partly short in length, adjusting part 204 is provided in the middle part of adjusting and fixing plate 203, the movable groove has been seted up including being rectangular structure's adjusting and fixing plate 203 one side to adjusting part 204, movable groove inner wall one side is provided with the adjusting rack 2041 who is connected with adjusting and fixing plate 203, adjusting rack 2041 one side is provided with adjusting gear 2042, adjusting gear 2042 middle part is provided with connecting rod 2043, connecting rod 2043 one end is provided with adjustment handle 2044, adjustment handle 2044 is close to connecting rod 2043 and is provided with auto-lock structure 2045 (current conventional structure), adjusting and fixing plate 203 one end is provided with the fixed movable block 2046 that is U type structure, fixed movable block 2046 one side is provided with connecting bolt 7, monitoring coupling assembling 3 sets up in adjusting and fixing plate 203 and is close to cabinet 1 both sides.
Specifically, when the operation energy efficiency monitoring device of the central air-conditioning water pump is installed, the placing plate 202 with a rectangular saw-tooth structure is placed in the moving groove of the connecting block 201, then the placing plate 202 is fixed in the moving groove in a clamping manner, then the connecting rod 2043 is rotated by rotating the adjusting handle 2044 to drive the adjusting gear 2042 to rotate, then the adjusting gear 2042 is meshed with the adjusting rack 2041 to drive the adjusting fixing plate 203 to adjust, then the fixing moving block 2046 is driven to fixedly install the monitoring device 307, and the limiting can be performed in the adjusting process through the self-locking structure 2045 in the adjusting process, so that the installation effect and the placing effect of the operation energy efficiency monitoring device of the central air-conditioning water pump can be achieved.
As shown in fig. 2 and fig. 3, the monitoring connection assembly 3 includes a plurality of connecting holes 301 that are rectangular structure's regulation fixed plate 203 is close to cabinet 1 both sides outer wall and offer, one side is provided with equidistant electric putter 302 in the plurality of connecting holes 301, and electric putter 302 is located the inner wall one side of a plurality of connecting holes 301, electric putter 302 one end is provided with a plurality of spacing connecting plates 303 that are arc structure, be provided with buffer spring 304 between the spacing connecting plates 303, and a plurality of connecting holes 301 are close to placing plate 202 one end and are provided with the fixed strip 305 that is rectangular structure, the fixed hole has all been offered to one end and both sides of fixed strip 305, and be provided with adjusting bolt 306 in one of them fixed hole, be connected with monitoring equipment 307 in the fixed hole, monitoring equipment 307's structure principle is similar with the structure and the principle of model BYQ3712PK, and monitoring equipment 307 sets up in adjusting fixed plate 203 one end, protection assembly 4 sets up in fixed strip 305 and is close to cabinet 1 one side.
Specifically, when the connection is performed, the operation energy efficiency monitoring circuit of the central air conditioner water pump is required to be placed in the connection hole 301, after a certain position is moved, the electric push rod 302 is started by controlling the monitoring screen 5, then the electric push rod 302 is fixed by being mutually matched with the buffer spring 304 of the limit connection plate 303 with an arc-shaped structure, then the operation energy efficiency monitoring circuit of the central air conditioner water pump is partially placed in the fixing hole of the fixing strip 305, then the operation energy efficiency monitoring circuit is connected with the circuit of the monitoring device 307, and then the two circuits are connected together through the adjusting bolt 306.
As shown in fig. 5, the protection component 4 includes a conveying pipe 401 that is set by a fixing strip 305 with a rectangular structure near the cabinet body 1, and the conveying pipe 401 is set on one side of the inner wall of the cabinet body 1, two sides of the conveying pipe 401 are provided with protection pipes 402, one side of each protection pipe 402 is connected with a plurality of spray heads 403 with a round table structure, one end of each conveying pipe 401 penetrates through one end of the cabinet body 1 and is provided with a guide cover 404 with a round table structure, one end of each guide cover 404 is provided with a conveying fan 405, one end of each conveying fan 405 is provided with a semiconductor refrigeration group 406 which is similar to the refrigeration group with the model XH-X302 in structure, the semiconductor refrigeration group comprises a conductor arranged at the top end of the conveying fan 405, and one side of the conductor is connected with a semiconductor refrigeration sheet through a bolt. And the conductor is connected with the cold junction of semiconductor refrigeration piece, and the semiconductor refrigeration piece hot junction is provided with the fin (current conventional structure), fin one side is provided with radiator fan through the bolt, and semiconductor refrigeration group 406 one end sets up in cabinet body 1 one end.
Specifically, when the inside of the cabinet body 1 is protected, the semiconductor refrigeration group 406 is started through the monitor screen 5, then the cold end of the semiconductor refrigeration group 406 generates cooling gas by mixing with gas, then the cooling gas is conveyed through a conductor, then the cooling gas is conveyed into the conveying pipe 401 through the guide cover 404 with a circular truncated cone-shaped structure through the conveying fan 405, then the cooling gas is split through the conveying pipe 401 to be split into the protection pipe 402, and then the internal parts of the cabinet body 1 are protected through the spray head 403 with the circular truncated cone-shaped structure.
And the electric push rod 302, the semiconductor refrigeration unit 406, and the conveying fan 405 are electrically connected with the monitor screen 5 and an external power supply
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "configured," "connected," "secured," "screwed," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intermediaries, or in communication with each other or in interaction with each other, unless explicitly defined otherwise, the meaning of the terms described above in this application will be understood by those of ordinary skill in the art in view of the specific circumstances.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.

Claims (7)

1. Be applied to operation efficiency monitoring devices of central air conditioning water pump, including cabinet body (1), its characterized in that: the intelligent cabinet is characterized in that a placement component (2) is arranged inside the cabinet body (1), the placement component (2) is sequentially arranged on two sides inside the cabinet body (1), and monitoring connection components (3) are arranged on two sides, close to the cabinet body (1), of the placement component (2);
the cabinet is characterized in that a protective component (4) is arranged on one side, close to the cabinet body (1), of the placement component (2), and a monitoring screen (5) is arranged on one side, close to the cabinet body (1), of the placement component.
2. The operation energy efficiency monitoring device applied to the central air conditioner water pump according to claim 1, wherein the placement component (2) comprises a cabinet body (1), two sides of the cabinet body are arranged on a connecting block (201), a moving groove is formed in one side of the connecting block (201), a placement plate (202) is arranged in the moving groove, a placement opening (6) is formed in the middle of the placement plate (202), the placement opening (6) is located at two sides of the placement plate (202), adjusting grooves are formed in the adjusting grooves, a plurality of adjusting fixing plates (203) are arranged in the adjusting grooves, and an adjusting part (204) is arranged in the middle of the adjusting fixing plates (203).
3. The operation energy efficiency monitoring device applied to the central air conditioner water pump according to claim 2, wherein the adjusting component (204) comprises an adjusting fixing plate (203), a movable groove is formed in one side of the adjusting fixing plate, an adjusting rack (2041) is arranged in the movable groove, an adjusting gear (2042) is arranged on one side of the adjusting rack (2041), a connecting rod (2043) is arranged in the middle of the adjusting gear (2042), an adjusting handle (2044) is arranged at one end of the connecting rod (2043), a self-locking structure (2045) is arranged on the adjusting handle (2044) close to the connecting rod (2043), a fixed moving block (2046) is arranged at one end of the adjusting fixing plate (203), a connecting bolt (7) is arranged on one side of the fixed moving block (2046), and the monitoring connecting component (3) is arranged on two sides of the adjusting fixing plate (203) close to the cabinet body (1).
4. The device for monitoring the operation energy efficiency of the central air conditioner water pump according to claim 3, wherein the monitoring connection assembly (3) comprises a plurality of connection holes (301) formed in the way that the adjusting fixing plate (203) is close to two sides of the cabinet body (1), a plurality of equidistant electric push rods (302) are arranged on one side in the connection holes (301), one end of each electric push rod (302) is provided with a limiting connection plate (303), and buffer springs (304) are arranged between the limiting connection plates (303).
5. The operation energy efficiency monitoring device applied to a central air conditioner water pump according to claim 4, wherein a plurality of connecting holes (301) are provided with fixing strips (305) near one end of a placing plate (202), one end and two sides of each fixing strip (305) are provided with fixing holes, an adjusting bolt (306) is arranged in one fixing hole, monitoring equipment (307) is connected in each fixing hole, the monitoring equipment (307) is arranged at one end of the adjusting fixing plate (203), and the protection component (4) is arranged on one side, close to the cabinet body (1), of each fixing strip (305).
6. The operation energy efficiency monitoring device applied to the central air conditioner water pump according to claim 5, wherein the protection component (4) comprises a conveying pipe (401) which is arranged close to the cabinet body (1) through a fixing strip (305), the two sides of the conveying pipe (401) are provided with protection pipes (402), one side of each protection pipe (402) is connected with a plurality of spray heads (403), and one end of each conveying pipe (401) penetrates through one end of the cabinet body (1) to be provided with a guide cover (404).
7. The operation energy efficiency monitoring device applied to the central air conditioner water pump according to claim 6, wherein a conveying fan (405) is arranged at one end of the guide cover (404), a semiconductor refrigerating group (406) is arranged at one end of the conveying fan (405), and one end of the semiconductor refrigerating group (406) is arranged at one end of the cabinet body (1).
CN202320365708.1U 2023-03-02 2023-03-02 Operation energy efficiency monitoring device applied to central air conditioner water pump Active CN219499806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320365708.1U CN219499806U (en) 2023-03-02 2023-03-02 Operation energy efficiency monitoring device applied to central air conditioner water pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320365708.1U CN219499806U (en) 2023-03-02 2023-03-02 Operation energy efficiency monitoring device applied to central air conditioner water pump

Publications (1)

Publication Number Publication Date
CN219499806U true CN219499806U (en) 2023-08-08

Family

ID=87507605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320365708.1U Active CN219499806U (en) 2023-03-02 2023-03-02 Operation energy efficiency monitoring device applied to central air conditioner water pump

Country Status (1)

Country Link
CN (1) CN219499806U (en)

Similar Documents

Publication Publication Date Title
CN202374619U (en) Novel heat-exchange communication cabinet
CN110958825B (en) Heat dissipation device of frequency converter
CN111884094A (en) Combined cooling device for electric power cabinet
CN210156801U (en) Forced cooling device of mobile switch cabinet
CN115642501A (en) Novel ring main unit
CN219499806U (en) Operation energy efficiency monitoring device applied to central air conditioner water pump
CN110474243A (en) A kind of movable switching cabinet forced cooling device
CN212319971U (en) Refrigerating machine room
CN210928472U (en) Quick cooling device for heating point of electrical equipment
CN215676618U (en) Refrigerating system
CN114725871A (en) Internal temperature and humidity adjusting device and system for bus duct
CN210470095U (en) Frequency conversion control cabinet
CN211208919U (en) High-efficient radiating high-low voltage distribution cabinet
CN220235248U (en) Air-cooled SVG container
CN213425499U (en) Low-voltage power cabinet
CN219779578U (en) Heat radiation structure of power cabinet
CN220874090U (en) Novel safe intelligent low-voltage switch cabinet
CN221670285U (en) Heat extraction structure of switch board
CN220253919U (en) Compound switch looped netowrk cabinet
CN211088030U (en) Combined transformer
CN217423473U (en) Intelligent remote control air conditioner
CN220492535U (en) High-efficient radiating high-voltage wire inlet cabinet
CN215185196U (en) Low-voltage capacitor box
CN211829696U (en) Regulator cubicle wind channel heat dissipation mechanism
CN216251808U (en) Remote control remote adjustment integrated dual-power cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An operational energy efficiency monitoring device applied to central air conditioning water pumps

Granted publication date: 20230808

Pledgee: Guotou Taikang Trust Co.,Ltd.

Pledgor: HANGZHOU LONGHUA ENVIRONMENT INTEGRATED SYSTEM CO.,LTD.

Registration number: Y2024980011360

PE01 Entry into force of the registration of the contract for pledge of patent right