CN219491412U - Ceramic tile hooking system - Google Patents

Ceramic tile hooking system Download PDF

Info

Publication number
CN219491412U
CN219491412U CN202320142516.4U CN202320142516U CN219491412U CN 219491412 U CN219491412 U CN 219491412U CN 202320142516 U CN202320142516 U CN 202320142516U CN 219491412 U CN219491412 U CN 219491412U
Authority
CN
China
Prior art keywords
mounting
clamping
ceramic tile
clamping portion
mounting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320142516.4U
Other languages
Chinese (zh)
Inventor
洪求耀
苏永润
税思均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haoheng Fujian Building Materials Technology Co Ltd
Original Assignee
Haoheng Fujian Building Materials Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haoheng Fujian Building Materials Technology Co Ltd filed Critical Haoheng Fujian Building Materials Technology Co Ltd
Priority to CN202320142516.4U priority Critical patent/CN219491412U/en
Application granted granted Critical
Publication of CN219491412U publication Critical patent/CN219491412U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a ceramic tile hanging system, which is fixedly connected on a mounting surface, and comprises: the mounting piece is locked on the mounting surface and comprises a plurality of clamping pieces extending upwards from the top surface of the mounting piece, and the clamping pieces and the mounting piece are integrally formed; the ceramic bricks are hung on the mounting piece, the ceramic bricks are mutually attached to the side surfaces of the ceramic bricks, a chute is formed in each ceramic brick, and the chute is hung on the clamping piece; the chute comprises a first installation part arranged at one side far away from the ceramic tile facing, and a second installation part extending from the first installation part to the inside of the ceramic tile; the chucking spare includes the first joint portion that upwards extends the setting from the installed part, first joint portion and first installation department butt, and the second joint portion that extends the setting in the second installation department from first joint portion, the workman only need first fixed lock solid installed part when the installation, pile up the layer after layer ceramic tile later can, installation and dismantlement's speed can both accelerate greatly.

Description

Ceramic tile hooking system
Technical Field
The utility model relates to a building brick installation system, in particular to a ceramic brick hanging system.
Background
The ceramic brick is generally prepared by firing high-quality clay, purple clay pottery clay and other raw materials at a high temperature, has finer texture, more stable color and attractive lines compared with the traditional ceramic brick, is an energy-saving novel building curtain wall material, has no pollution, is environment-friendly, light in dead weight, high in strength, corrosion-resistant, anti-seismic and anti-freezing, and sound-insulating and noise-reducing, meets the national requirements on building energy conservation, and enables the traditional ceramic culture to be skillfully and perfectly combined with a modern building.
When the ceramic tile forms a curtain wall, a groove is formed in the back of the ceramic tile, then the ceramic tile is clamped in the groove of the ceramic tile through the hanging piece, then the hanging piece is hung on the connecting piece, and finally the connecting piece is fixed on the keel, so that the quick installation process is completed.
However, the existing slotting mode is to directly open a deep slot towards the inner side of a ceramic tile so as to improve the hanging effect, or to directly set a complex hanging structure with multiple styles, the hanging force is improved by stacking the hanging structures, if the deep slot is directly opened for fixing and matching, although the hanging force is enough, the solid part of the brick body is thinned, the thickness of the brick body is thinned, the phenomenon of breakage or even breakage is easy to occur, and if a large number of hanging structures are butted, a relatively complex process is required in the process of installation or disassembly and replacement, if the installation and replacement positions are relatively high points, workers are difficult to construct in high air, the installation efficiency is low, and a large number of hanging structures also lead to the improvement of the installation cost of the whole curtain wall, so that the control cost of a constructor is inconvenient.
Therefore, the scheme aims to provide a low-cost ceramic tile hanging system which has a simple hanging structure and can stably provide hanging force.
Disclosure of Invention
The utility model provides a ceramic tile hanging system which can effectively solve the problems.
The utility model is realized in the following way:
a ceramic tile hooking system fixedly connected to a mounting surface, comprising:
the mounting piece is locked on the mounting surface and comprises a plurality of clamping pieces extending upwards from the top surface of the mounting piece, and the clamping pieces and the mounting piece are integrally formed;
the ceramic bricks are hung on the mounting piece, the ceramic bricks are mutually attached to the side faces of the ceramic bricks, a chute is formed in the ceramic bricks, and the chute is hung on the clamping piece;
the chute comprises a first installation part which is arranged at one side far away from the ceramic tile facing, and a second installation part which extends from the first installation part to the inside of the ceramic tile;
the clamping piece comprises a first clamping part which is arranged in an upward extending mode from the mounting piece, the first clamping part is in butt joint with the first mounting part, and a second clamping part which is arranged in an inward extending mode from the first clamping part to the second mounting part is arranged.
As a further improvement, the first mounting portion is arranged obliquely, the second mounting portion is communicated with the first mounting portion and is flush with the horizontal plane, the first clamping portion is clamped on the inner side of the first mounting portion, and the second clamping portion is clamped on the inner side of the second mounting portion.
As a further improvement, the clip further includes a third clip portion extending from the second clip portion into the second mounting portion.
As a further improvement, one end of the inner side of the first mounting part is a straight line, the other end of the inner side of the first mounting part is a diagonal line, the second mounting part is communicated with the first mounting part and is flush with a horizontal plane, the first clamping part is perpendicular to the mounting piece and is abutted to the straight line of the inner side of the first mounting part, the second clamping part is perpendicular to the first clamping part, and the third clamping part is inclined upwards from the second clamping part or inclined downwards from the second clamping part.
As a further improvement, one end of the inner side of the first mounting part is a straight line, the other end of the inner side of the first mounting part is an oblique line, the second mounting part is communicated with the first mounting part and is flush with a horizontal plane, the first clamping part is perpendicular to the mounting piece and is abutted to the straight line of the inner side of the first mounting part, the second clamping part is downwards inclined from the first clamping part, and the third clamping part is upwards inclined from the first clamping part.
As a further improvement, one end of the inner side of the first mounting part is a straight line, the other end of the inner side of the first mounting part is an oblique line, the second mounting part is communicated with the first mounting part and is flush with a horizontal plane, the first clamping part is perpendicular to the mounting piece and is abutted to the straight line of the inner side of the first mounting part, the second clamping part is downwards inclined from the first clamping part, and the third clamping part is downwards inclined from the first clamping part.
As a further improvement, the first mounting portion is disposed obliquely, the second mounting portion is disposed obliquely downward/upward from the first mounting portion, the first clamping portion is clamped to the inner side of the first mounting portion, the second clamping portion is connected with the first clamping portion and is flush with a horizontal plane, and the third clamping portion is connected below/above the second clamping portion.
As a further improvement, the first mounting portion is inclined, the second mounting portion is inclined downward/upward from the first mounting portion, the first clamping portion is clamped inside the first mounting portion, the second clamping portion is inclined downward from the first clamping portion, and the third clamping portion is connected below/above the second clamping portion.
As a further improvement, the mounting part is C-shaped steel, a plurality of clamping parts are uniformly arranged on the C-shaped steel at equal intervals, the C-shaped steel is locked on the keel frame, and the keel frame is locked on the mounting surface.
As a further improvement, the mounting piece is a mounting bottom plate, a plurality of clamping pieces are arranged on the mounting bottom plate, the mounting bottom plate is locked on the mounting surface, or the mounting bottom plate is locked on the keel frame, and the keel frame is locked on the mounting surface.
The beneficial effects of the utility model are as follows:
the utility model only needs to open a chute on the ceramic brick by the design of the chute on the ceramic brick and the clamping piece on the mounting piece, then the corresponding mounting part is matched with the corresponding clamping part in a vertical or transverse inserting way, at least two fulcrums on the chute in the ceramic brick are matched with the clamping piece in the mounting piece, so that the stable hanging of the ceramic brick can be realized by adopting a simple structure, the ceramic bricks after fixing are limited by mounting pieces in the vertical/horizontal directions, the ceramic bricks are mutually attached in the horizontal/vertical directions, workers only need to fix and lock the mounting pieces first during mounting and then stack the ceramic bricks layer by layer, the mounting and dismounting speeds can be greatly increased, and the whole cost is greatly reduced due to the simpler structure of the hanging connection, so that the ceramic bricks have market competitiveness in comparison.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view (first view) of a ceramic tile hanging system according to the present utility model.
Fig. 2 is a schematic structural view (second view) of a ceramic tile hanging system according to the present utility model.
Fig. 3 is a schematic structural view of a mounting base plate provided by the utility model.
Fig. 4 is a schematic front view of a ceramic tile hanging system according to a fourth embodiment of the present utility model.
Fig. 5 is a schematic front view of a ceramic tile according to the first to fourth embodiments of the present utility model.
Fig. 6 is a schematic front view of a ceramic tile according to fifth to sixth embodiments of the present utility model (the second mounting portion is inclined downward).
Fig. 7 is a schematic front view of a ceramic tile according to fifth to sixth embodiments of the present utility model (the second mounting portion is inclined upward).
Fig. 8 is a schematic structural diagram of a clamping member according to an embodiment of the utility model.
Fig. 9 is a schematic structural diagram of a clamping member according to a second embodiment of the present utility model (the third clamping portion is inclined downward).
Fig. 10 is a schematic structural diagram of a clamping member according to a second embodiment of the present utility model (the third clamping portion is inclined upward).
Fig. 11 is a schematic structural diagram of a fastening member according to a third embodiment of the present utility model.
Fig. 12 is a schematic structural diagram of a fastening member according to a fourth embodiment of the present utility model.
Fig. 13 is a schematic structural diagram of a fastening member according to a fifth embodiment of the present utility model (the third fastening portion is connected below the second fastening portion).
Fig. 14 is a schematic structural diagram of a fastening member according to a fifth embodiment of the present utility model (the third fastening portion is connected above the second fastening portion).
Fig. 15 is a schematic structural diagram of a fastening member according to a sixth embodiment of the present utility model (the third fastening portion is connected above the second fastening portion).
Fig. 16 is a schematic structural diagram of a fastening member according to a sixth embodiment of the present utility model (the third fastening portion is connected below the second fastening portion).
Detailed Description
For the purpose of making embodiments of the present utility model fall within the scope of the present utility model. Thus, the following detailed description of the embodiments of the utility model, as presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, based on the embodiments of the utility model, which are apparent to those of ordinary skill in the art without inventive faculty, are intended to be within the scope of the utility model.
In the description of the present utility model, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as referring to purposes, technical solutions and advantages of the present utility model in any way. All other implementations, which can be derived by a person skilled in the art without making any inventive effort, show or imply relative importance or implicitly indicate the number of technical features indicated on the basis of the implementations in the utility model. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present utility model, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Under the construction requirement of building, the dry hanging method gradually replaces the wet hanging method, various dry hanging structures are layered, however, in order to ensure the safety performance, the existing dry hanging structure is completely and continuously butted with various mounting and locking structures, for example, a stable structure is formed between the ceramic bricks and the hanging pieces through various bolts, glue and adhesives, so that the ceramic bricks can be firmly mounted, but in the mounting stage, the ceramic bricks are required to be subjected to a lengthy mounting process, the construction period of workers is long, the cost is high, and in addition, once one of the ceramic bricks is damaged or the function degradation needs to be replaced, the replacement procedure is complex, the labor intensity of the workers is too high, and a part of danger is increased when part of time is increased for the high-altitude operation, so that the technical problem is solved, the scheme is as follows:
referring to fig. 1-16, a ceramic tile hooking system fixedly coupled to a mounting surface, comprising: the mounting piece 1 is locked on the mounting surface, the mounting piece 1 comprises a plurality of clamping pieces 11 extending upwards from the top surface of the mounting piece 1, and the clamping pieces 11 and the mounting piece 1 are integrally formed; a mounting ear plate 2 welded to the outer side of the mounting member 1; the ceramic tile 3 is hung on the mounting piece 1, the ceramic tile 3 is mutually attached to the side face of the ceramic tile 3, a chute 31 is formed in the ceramic tile 3, and the chute 31 is hung on the clamping piece 11; the chute 31 includes a first mounting portion 311 provided on a side away from the facing of the ceramic tile 3, and a second mounting portion 312 extending from the first mounting portion 311 toward the inside of the ceramic tile 3; the clamping member 11 includes a first clamping portion 111 extending upward from the mounting member 1, the first clamping portion 111 abuts against the first mounting portion 311, and a second clamping portion 112 extending inward from the first clamping portion 111 to the second mounting portion 312.
Firstly, when the installation piece 1 is installed, the installation piece 1 can be directly installed on a conventional keel frame, when some rugged installation surfaces are used, for example, in some rugged brick wall structures, the surface of the installation piece 1 is not coated with concrete, and the keel frame is not well fixed, so that the installation piece 1 can be directly locked on the rugged installation surfaces without transition of the keel frame, and the installation mode is more flexible.
In the actual installation process, the ceramic tile 3 can be hung vertically or transversely, and the installation direction of workers can be changed according to the requirements of users as long as the positions of the corresponding clamping pieces 11 are adjusted.
The clamping member 11 in this embodiment is not required to be welded to the mounting member 1 alone, or is not locked to the mounting member 1, but is a part of the mounting member 1, and the mounting member 1 in this embodiment may be of a conventional mounting member 1 structure, however, before shipment, the manufacturer may determine the specific layout position of the clamping member 11 by knowing the space between the bricks in advance according to the requirements of the building facade that the customer needs to assemble, and then cut the shape of the clamping member 11 by a cutting machine before shipment, and then roll the clamping member 11 into a shape suitable for the brick hooking groove by a plate bending machine, so that the hooking member can be put into use immediately after being transported to the site without the need for a master to perform processing on the site.
In this embodiment, the ceramic tile 3 is divided into an outer decoration tile layer 32 and an outer decoration tile layer 33, both the outer decoration tile layer 32 and the outer decoration tile layer 33 are made of clay by firing, and after being installed into a curtain wall or other decoration surfaces, the heat preservation capability of the ceramic tile is well reflected.
While the outer decorative tile layer 32 may be colored or engraved with different patterns according to the use and the installation environment, which is not particularly limited.
The thickness of the outer brick layer 33 is at least 2-3cm longer than the chute 31 to ensure the overall strength of the outer brick layer 33.
In this embodiment, two inclined grooves 31 are provided on the outer brick layer 33 of the single ceramic brick 3 to ensure the mounting strength, so that the hanging member can provide enough hanging force to pull the outer decorative brick layer 32 and the outer brick layer 33.
Since the inclined groove 31 is provided only obliquely because the engagement force in the longitudinal direction is provided, if the inclined groove 31 is simply provided as a straight groove or a T-shaped groove, the structure of the clip 11 needs to be changed, and the structure of the clip 11 becomes complicated, thereby increasing the cost.
If only single-point fixing is adopted, the ceramic tile 3 is easy to drop directly once deformed under the condition that the single-point is interfered by external force, so in the embodiment, the chute 31 is at least provided with the first mounting part 311 and the second mounting part 312, and the clamping piece 11 is correspondingly provided with at least the first clamping part 111 and the second clamping part 112, so that the first clamping part 111 and the second clamping part 112 are respectively clamped into the first mounting part 311 and the second mounting part 312 to form the fixation of at least two nodes, and after one node is deformed and loses the binding fixation effect, the other node can also play the fixation effect.
However, when the ceramic tile 3 is still at risk of falling off due to the fact that the ceramic tile is only fixed by two fixing nodes, which is the case where the ceramic tile is heavy in the basis weight or the mounting environment is relatively bad, the clamping member 11 further includes the third clamping portion 113 extending from the second clamping portion 112 into the second mounting portion 312, and the third clamping portion 113 forms the third fixing node in the second mounting portion 312, so that the three-layer fixing effect is formed in the chute 31 by the three fixing nodes, and the overall fixing effect is equivalent to the complex hanging structure, but is completely superior to the complex hanging structure in terms of disassembly and cost control.
Moreover, the ceramic tile 3 in this embodiment is matched with the mounting member 1, and the mechanical hooking, clamping, abutting, attaching and other attaching fixing modes are fully utilized, so that bolts are not utilized in the whole hooking process, even if the ceramic tile is mounted at a higher height, workers can still easily mount the ceramic tile, the workers do not need to stay for a long time to perform screw locking operation, the structures such as adhesive or glue are not utilized in the whole process, the ceramic tile 3 is prevented from being difficult to detach due to the fixing effect of the glue in the replacement process, and in this embodiment, if the ceramic tile 3 needs to be replaced, only the ceramic tile 3 corresponding to a column is required to be removed layer by layer or laterally, and then the ceramic tile 3 is sleeved into the whole ceramic tile in sequence.
After the hanging is completed, the ceramic bricks 3 are stacked up layer by layer in the longitudinal direction, clamped and fixed by the clamping pieces 11, and fixed by the clamping pieces 11 in the longitudinal direction, and the ceramic bricks 3 are mutually attached together in the transverse direction to form a compact structure and mutually pressed to form a complete curtain wall structure, and the direction of the hanging process can be changed, for example, the ceramic bricks 3 are fixed by the clamping pieces 11 in the transverse direction, and the ceramic bricks 3 are attached to the ceramic bricks 3 in the longitudinal direction.
In the above description, the ceramic bricks are fixed at the lateral positions thereof by means of mutual clamping between the ceramic bricks 3 and 3, so in order to improve the matching effect between the external brick layer 33 and the external brick layer 33 of the external brick layer 33, one side of the external brick layer 33 is extended and provided with a matching block 3321, the other side of the external brick layer 2 is recessed inwards to form a matching groove 3322, and the adjacent matching blocks 3321 are connected with the matching groove 3322 in a clamping manner, so that the adjacent external brick layer 33 and the external brick layer 33 are matched through the matching blocks 3321 and the matching grooves 3322 in a transverse direction, and are sequentially fixed one by one, and are stably pulled by the hanging pieces in a longitudinal direction, thereby forming a stable facing structure of the whole surface.
In the conventional curtain wall or other facing wall, after the ceramic bricks or other ceramic tiles are fixed, some beautiful seams are required to be made to improve the heat insulation capability and the waterproof capability of the facing wall, and meanwhile, the overall aesthetic degree can be improved, however, in this embodiment, the beautiful seams are directly realized through the ceramic brick body, specifically, the outer decorative brick layer 32 and the outer decorative brick layer 33 are integrally formed, at least part of the outer decorative brick layer 33 is longer than the outer decorative brick layer 32, the part which is longer than the outer decorative brick layer 32 is used as one side of the beautiful seams, and the matching block 3321 which extends from the outer decorative brick layer 332, although being clamped in the matching groove 3322, has a wider width, is partially exposed outside after being clamped in the matching groove 3322 and is used as the other side of the beautiful seams, and four-sided beautiful seams are formed between the adjacent ceramic bricks, so that the beautiful seams can be formed through the adjacent ceramic bricks without separate beautiful seam construction structures and steps.
Because the requirements of different buildings and different installation positions on the ceramic tile 3 and the clamping member 11 are different, the installation of the installation part in the chute 31 and the installation of the clamping part in the clamping member 11 correspondingly can also be adjusted adaptively, and the method is specifically divided into a plurality of embodiments, and firstly, the condition that the third clamping part 113 does not exist in the clamping member 11.
Example 1
In this embodiment, the first mounting portion 311 is obliquely disposed, the second mounting portion 312 is communicated with the first mounting portion 311 and is flush with a horizontal plane, the first clamping portion 111 is clamped at the inner side of the first mounting portion 311, the second clamping portion 112 is clamped at the inner side of the second mounting portion 312, the first mounting portion 311 and the second mounting portion 312 are of a simpler obtuse angle type design, and the fixing of two nodes is completed through the first clamping portion 111 and the second clamping portion 112 which are of the same obtuse angle type design, so that the ceramic tile is suitable for places with milder environments and has lighter weight.
In the next several embodiments, the clamping members 11 are each provided with a third clamping portion 113, i.e. the clamping members 11 have three fixing nodes inside the chute 31.
Example two
The inner side end of the first mounting portion 311 is a straight line, the other end of the inner side of the first mounting portion 311 is a diagonal line, the second mounting portion 312 is communicated with the first mounting portion 311 and is flush with a horizontal plane, the first clamping portion 111 is perpendicular to the mounting member 1 and is abutted on the straight line of the inner side of the first mounting portion 311, the second clamping portion 112 is perpendicular to the first clamping portion 111, the third clamping portion 113 is inclined upwards from the second clamping portion 112, or the third clamping portion 113 is inclined downwards from the second clamping portion 112, in this embodiment, the second clamping portion 112 and the third clamping portion 113 are located on the inner side of the second mounting portion 312 to form two-point fixation, the fixation between the first clamping portion 111 and the first mounting portion 311 is further good, the matching effect between the three is good, and the brick 3 can be tightly pulled and fastened.
Example III
The difference between the present embodiment and the second embodiment is that the second clamping portion 112 is disposed obliquely downward from the first clamping portion 111, specifically: the inner side end of the first mounting portion 311 is a straight line, the other end of the inner side of the first mounting portion 311 is a diagonal line, the second mounting portion 312 is communicated with the first mounting portion 311 and is flush with a horizontal plane, the first clamping portion 111 is perpendicular to the mounting member 1 and abuts against the straight line of the inner side of the first mounting portion 311, the second clamping portion 112 is arranged obliquely downward from the first clamping portion 111, and the third clamping portion 113 is arranged obliquely upward from the first clamping portion 111, so that the same technical effects as those of the above embodiments can be achieved.
Example IV
The difference between this embodiment and the third embodiment is that the third clamping portion 113 is disposed obliquely downward from the first clamping portion 111, specifically, one end of the inner side of the first mounting portion 311 is a straight line, the other end of the inner side of the first mounting portion 311 is a diagonal line, the second mounting portion 312 is communicated with the first mounting portion 311 and is flush with a horizontal plane, the first clamping portion 111 is perpendicular to the mounting member 1 and abuts against the straight line of the inner side of the first mounting portion 311, the second clamping portion 112 is disposed obliquely downward from the first clamping portion 111, and the third clamping portion 113 is disposed obliquely downward from the first clamping portion 111, so that the same technical effect as the above embodiment can be achieved.
In the second to fourth embodiments, the inner end of the first mounting portion 311 is a straight line, and the other end of the inner side of the first mounting portion 311 is a diagonal line, so that the purpose of this arrangement is that, first, the diagonal line design of the first mounting portion 311 can ensure that a worker can insert at a certain angle during mounting, and the worker is smoother during mounting, and after mounting, the first clamping portion 111 can be abutted against the straight line portion of the first mounting portion 311, and in the daily use process, the ceramic bricks 3 and the ceramic bricks 3 are tightly attached together, and even if a part of the ceramic bricks shake, the shaking force is slowed down or even offset due to the cooperation effect between the first clamping portion 111 and the first mounting portion 311.
In the above-mentioned several embodiments, the first mounting portions 311 are all inclined at one end and straight at one end, and in fact, the first mounting portions 311 may be in other forms, for example:
example five
The first mounting portion 311 is obliquely arranged, the second mounting portion 312 is obliquely arranged downward/upward from the first mounting portion 311, the first clamping portion 111 is clamped at the inner side of the first mounting portion 311, the second clamping portion 112 is connected with the first clamping portion 111 and is flush with a horizontal plane, the third clamping portion 113 is connected below/above the second clamping portion 112, the first clamping portion 111 and the first mounting portion 311 are correspondingly obliquely arranged, and the second clamping portion 112 and the third clamping portion 113 are fixed in the second mounting portion 312, so that a fixing mode of three nodes in a single groove is completed.
Example six
The difference between this embodiment and the fifth embodiment is that: the second clamping portion 112 is disposed obliquely downward from the first clamping portion 111, specifically: the first mounting portion 311 is obliquely disposed, the second mounting portion 312 is obliquely disposed downward/upward from the first mounting portion 311, the first clamping portion 111 is clamped at the inner side of the first mounting portion 311, the second clamping portion 112 is obliquely disposed downward from the first clamping portion 111, the third clamping portion 113 is connected below/above the second clamping portion 112, in this embodiment, since the second clamping portion 112 is obliquely disposed downward from the first clamping portion 111, there is a bending force between the connection portions of the first clamping portion 111 and the second clamping portion 112, and under the condition that there is a bending force between the third clamping portion 113 and the second clamping portion 112, the bending resistance and the drawknot force of the whole clamping member 11 are greatly improved, and the clamping member 11 can be better fixed by pulling the ceramic tile 3 in cooperation with the oblique disposition of the first clamping portion 111.
In the practical use, if the number of ceramic tiles 3 hung on the wall is small, the worker can fix the mounting pieces 1 one by one, but if in curtain wall construction with large width and large height on the front, the worker is troublesome for the worker and relative to the construction period if the worker also locks the mounting pieces 1 one by one, so in the utility model, the following two embodiments are also proposed:
example seven
The installation piece 1 is C-shaped steel 1A, a plurality of clamping pieces 11 are uniformly arranged on the C-shaped steel 1A at equal intervals, the C-shaped steel 1A is locked on the keel frame through the installation lug plates 2, the keel frame is locked on the installation surface, the fixing mode of the C-shaped steel 1A can be used on the small building or local installation surface, according to the above mentioned mode, the factory can directly lock the keel frame or lock the installation surface after transporting to the site according to the positions and the intervals of the corresponding clamping pieces 11 arranged on the dimension of the ceramic tile 3 of the customer, and then the ceramic tile 3 is hung step by step.
The pattern of the clamping member 11 formed on the C-shaped steel 1A may be any of the patterns in the above embodiments, and the pattern of the chute 31 of the ceramic tile 3 corresponding to the pattern may be any of the patterns in the above embodiments, and may be combined.
Example eight
The present embodiment is different from the seventh embodiment in that: the installation piece 1 is an installation bottom plate 1B, specifically, the installation piece 1 is an installation bottom plate 1B, a plurality of clamping pieces 11 are arranged on the installation bottom plate 1B, the installation bottom plate 1B is locked on the installation surface, or the installation bottom plate 1B is locked on a keel frame, when the position where the ceramic tile 3 needs to be hung is a large-area wall body, for example, a curtain wall with a whole surface needs to be hung, if the whole surface curtain wall is installed in a whole row, the C-shaped steel 1A is relatively troublesome for workers, although the hanging effect is the same, the construction period and the cost of the workers are improved by more than one time, if the transverse rods and the longitudinal rods are directly driven into the keel frame, the whole surface installation bottom plate 1B can be directly installed on the whole span of the transverse rods and the longitudinal rods of the keel frame, and the stress of the installation bottom plate 1B is completely enough due to the support of the transverse rods and the longitudinal rods which are arranged at intervals.
The pattern of the clamping member 11 formed on the mounting base plate 1B may be any pattern of the above-described embodiment, and the pattern of the chute 31 of the ceramic tile 3 corresponding to the pattern may be any pattern of the above-described embodiment, and may be combined.
The reinforcing ribs are arranged on the C-shaped steel 1A or the mounting bottom plate 1B, so that the overall strength is improved when the C-shaped steel 1A or the mounting bottom plate 1B receives shaking force and vibration force.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, and various modifications and variations may be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (10)

1. A ceramic tile hooking system fixedly connected to a mounting surface, comprising:
the mounting piece (1) is locked on the mounting surface, the mounting piece (1) comprises a plurality of clamping pieces (11) extending upwards from the top surface of the mounting piece (1), and the clamping pieces (11) and the mounting piece (1) are integrally formed;
the ceramic tile (3) is hung on the mounting piece (1), the ceramic tile (3) is mutually attached to the side face of the ceramic tile (3), a chute (31) is formed in the ceramic tile (3), and the chute (31) is hung on the clamping piece (11);
the chute (31) comprises a first installation part (311) which is arranged at one side far away from the ceramic tile (3) facing, and a second installation part (312) which extends from the first installation part (311) to the inside of the ceramic tile (3);
the clamping piece (11) comprises a first clamping part (111) which is arranged by extending upwards from the mounting piece (1), the first clamping part (111) is in butt joint with the first mounting part (311), and a second clamping part (112) which is arranged by extending inwards from the first clamping part (111) to the second mounting part (312).
2. The ceramic tile hanging system according to claim 1, wherein the first mounting portion (311) is obliquely arranged, the second mounting portion (312) is communicated with the first mounting portion (311) and is flush with a horizontal plane, the first clamping portion (111) is clamped inside the first mounting portion (311), and the second clamping portion (112) is clamped inside the second mounting portion (312).
3. The ceramic tile hooking system of claim 1, wherein the clamping member (11) further comprises a third clamping portion (113) extending from the second clamping portion (112) into the second mounting portion (312).
4. A ceramic tile hanging system according to claim 3, wherein one end of the inner side of the first mounting portion (311) is a straight line, the other end of the inner side of the first mounting portion (311) is a diagonal line, the second mounting portion (312) is communicated with the first mounting portion (311) and is flush with a horizontal plane, the first clamping portion (111) is perpendicular to the mounting member (1) and abuts against the straight line of the inner side of the first mounting portion (311), the second clamping portion (112) is perpendicular to the first clamping portion (111), and the third clamping portion (113) is inclined upwards from the second clamping portion (112) or inclined downwards from the second clamping portion (112).
5. A ceramic tile hanging system according to claim 3, wherein one end of the inner side of the first mounting portion (311) is a straight line, the other end of the inner side of the first mounting portion (311) is a diagonal line, the second mounting portion (312) is communicated with the first mounting portion (311) and is flush with a horizontal plane, the first clamping portion (111) is perpendicular to the mounting member (1) and abuts against the straight line of the inner side of the first mounting portion (311), the second clamping portion (112) is arranged obliquely downward from the first clamping portion (111), and the third clamping portion (113) is arranged obliquely upward from the first clamping portion (111).
6. A ceramic tile hanging system according to claim 3, wherein one end of the inner side of the first mounting portion (311) is a straight line, the other end of the inner side of the first mounting portion (311) is a diagonal line, the second mounting portion (312) is communicated with the first mounting portion (311) and is flush with a horizontal plane, the first clamping portion (111) is perpendicular to the mounting member (1) and abuts against the straight line of the inner side of the first mounting portion (311), the second clamping portion (112) is arranged obliquely downward from the first clamping portion (111), and the third clamping portion (113) is arranged obliquely downward from the first clamping portion (111).
7. A ceramic tile hanging system according to claim 3, wherein the first mounting portion (311) is obliquely arranged, the second mounting portion (312) is obliquely arranged downward/upward from the first mounting portion (311), the first clamping portion (111) is clamped inside the first mounting portion (311), the second clamping portion (112) is connected with the first clamping portion (111) and is flush with a horizontal plane, and the third clamping portion (113) is connected below/above the second clamping portion (112).
8. A ceramic tile hanging system according to claim 3, wherein the first mounting portion (311) is inclined, the second mounting portion (312) is inclined downward/upward from the first mounting portion (311), the first clamping portion (111) is clamped inside the first mounting portion (311), the second clamping portion (112) is inclined downward from the first clamping portion (111), and the third clamping portion (113) is connected below/above the second clamping portion (112).
9. The ceramic tile hanging system according to claim 1, wherein the mounting member (1) is a C-shaped steel (1A), a plurality of clamping members (11) are uniformly arranged on the C-shaped steel (1A) at equal intervals, the C-shaped steel (1A) is locked on a keel frame, and the keel frame is locked on the mounting surface.
10. The ceramic tile hooking system according to claim 1, wherein the mounting member (1) is a mounting base plate (1B), a plurality of clamping members (11) are provided on the mounting base plate (1B), the mounting base plate (1B) is locked on the mounting surface, or the mounting base plate (1B) is locked on a keel frame, and the keel frame is locked on the mounting surface.
CN202320142516.4U 2023-01-30 2023-01-30 Ceramic tile hooking system Active CN219491412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320142516.4U CN219491412U (en) 2023-01-30 2023-01-30 Ceramic tile hooking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320142516.4U CN219491412U (en) 2023-01-30 2023-01-30 Ceramic tile hooking system

Publications (1)

Publication Number Publication Date
CN219491412U true CN219491412U (en) 2023-08-08

Family

ID=87476135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320142516.4U Active CN219491412U (en) 2023-01-30 2023-01-30 Ceramic tile hooking system

Country Status (1)

Country Link
CN (1) CN219491412U (en)

Similar Documents

Publication Publication Date Title
CN201605796U (en) Composite insulation template and concrete one-step constructed external wall insulation system
CN102677821A (en) Composite wallboard and combined wallboard
CN110469049B (en) Building wall and installation method thereof
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN210658835U (en) Mounting structure of assembled frame partition wall
CN110607859A (en) Mounting structure of assembled frame partition wall
CN219491412U (en) Ceramic tile hooking system
CN114215254A (en) Fireproof and flame-retardant ceiling material and assembled fireproof and flame-retardant ceiling hanging and mounting structure
CN113389300A (en) Pre-embedded keel autoclaved aerated concrete plate and manufacturing method and using method thereof
CN113404210A (en) Assembled heat-preservation and decoration integrated wall and manufacturing and mounting process thereof
CN219298544U (en) Ceramic tile hooking system
CN116427595A (en) Ceramic tile hooking system
CN116446568A (en) Ceramic tile hooking system
CN206971483U (en) A kind of top fixed structure of assembled wall
CN215802648U (en) Simple heat-insulation decoration and maintenance integrated composite wallboard and wall structure
CN210947287U (en) Mounting structure of assembled frame partition wall
CN201460201U (en) Module-connecting combined energy-saving thermal insulation wall construction formwork
CN210918070U (en) Assembled frame leveling structure
CN210562804U (en) Integrated heat-preservation building wall
CN113529955A (en) Installation method of zipper type wall part
CN201554185U (en) Splice insertion self-insulation composite wall board
CN107201816B (en) Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate
CN110607888A (en) Wall keel wall surface connecting and leveling device for ceramic tile concrete integrated plate
CN218264698U (en) Composite layer, paving structure comprising composite layer and template for manufacturing composite layer
JP3243511U (en) Dry hooking system for finishing stone

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant