CN219451435U - Hanging basket - Google Patents

Hanging basket Download PDF

Info

Publication number
CN219451435U
CN219451435U CN202320329534.3U CN202320329534U CN219451435U CN 219451435 U CN219451435 U CN 219451435U CN 202320329534 U CN202320329534 U CN 202320329534U CN 219451435 U CN219451435 U CN 219451435U
Authority
CN
China
Prior art keywords
section
steel plate
connecting rod
basket according
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320329534.3U
Other languages
Chinese (zh)
Inventor
刘榆嵩
吴红亮
庞文喻
刘中东
陈欣
胡洋
孙亮亮
宝青峰
侯占京
罗轩
赵冬
沈海琦
王朋飞
刘长旭
黄小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Pearl River Delta Investment Development Co ltd
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Pearl River Delta Investment Development Co ltd
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Pearl River Delta Investment Development Co ltd, China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Pearl River Delta Investment Development Co ltd
Priority to CN202320329534.3U priority Critical patent/CN219451435U/en
Application granted granted Critical
Publication of CN219451435U publication Critical patent/CN219451435U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application provides a hanging basket, which is used for dismounting and overhauling a pipe gallery construction enclosure structure, wherein the enclosure structure comprises two steel plate columns with opposite intervals, and a steel enclosure purlin and a support column which are supported between the two steel plate columns; the steel plate column is provided with a plurality of protruding parts which are arranged at intervals along the length direction of the steel plate column; the hanging flower basket includes body and connecting portion, and the body includes the bottom and encloses to locate the bottom is guard portion all around, and connecting portion include connecting rod and pothook structure, and the one end and the guard portion of connecting rod are connected, the other end and pothook structure, and the pothook structure is used for from the inboard of the outside top card income bulge of bulge. Through the structure, the swing amplitude and probability of the hanging basket can be effectively reduced, so that constructors can be in a stable construction environment, the probability of occurrence of accidents is further reduced, and meanwhile, the body can be protected through the protecting part, and the probability of occurrence of the accidents is effectively reduced.

Description

Hanging basket
Technical Field
The application relates to the technical field of construction, in particular to a hanging basket.
Background
In urban underground utility tunnel construction, the steel encloses purlin and steel support dismouting and maintenance sometimes have not stable, safe construction environment, and the accident happens easily, can't guarantee constructor's safety.
Disclosure of Invention
In order to solve the above problems, the present application provides a basket.
The embodiment of the application provides a hanging basket, which is used for dismounting and overhauling a pipe gallery construction enclosure structure, wherein the enclosure structure comprises two steel plate columns with opposite intervals, and a steel enclosure purlin and a support column which are supported between the two steel plate columns; the steel plate column is provided with a plurality of protruding parts, and the protruding parts are arranged at intervals along the length direction of the steel plate column; the hanging basket comprises a body and a connecting part, wherein the body comprises a bottom and a protection part surrounding the bottom, the connecting part comprises a connecting rod and a clamping hook structure, one end of the connecting rod is connected with the protection part, the other end of the connecting rod is connected with the clamping hook structure, and the clamping hook structure is used for clamping the inner side of the protruding part from the outer top end of the protruding part.
In some embodiments, the catch structure comprises a first section and a second section connected, the first section being perpendicular to and connected with the connecting rod, and the second section being perpendicular to and connected with the first section.
In some embodiments, the catch structure comprises a first section and a second section connected, the first section being perpendicular to and connected with the connecting rod, the second section being perpendicular to and connected with the first section, and the second section extending towards the connecting rod.
In some embodiments, the second section is provided with a first support seat, and the first support seat is arranged at the end of the second section far away from the first section and is used for supporting the steel plate column.
In some embodiments, the hanging basket further comprises a screw, a nut and a fixing block, the fixing block is fixed on the protection part, the fixing block is provided with a through hole, one end of the screw is provided with a second supporting seat supported by the steel plate column, the other end of the screw penetrates out of the through hole, the second supporting seat is connected with the screw and can rotate around the top end of the screw, the nut is sleeved outside the screw, and the nut is located between the second supporting seat and the fixing block and used for propping against the fixing block.
In some embodiments, the bottom includes a frame and a plurality of first beams, the frame is connected to the guard portion, the plurality of first beams are longitudinally or/and transversely disposed in the frame, and two ends of the first beams extend and are connected to two opposite sides of the frame.
In some embodiments, the protection part includes a plurality of straight beams and a plurality of second beams, the straight beams are connected with the frame, and at least one second beam is arranged between two adjacent straight beams.
In some embodiments, the straight beams are connected at the junction of adjacent sides of the frame.
In some embodiments, two connecting rods are arranged on the same side of the protection part.
In some embodiments, a plurality of third cross beams are arranged between two connecting rods, two ends of each third cross beam extend to connect the connecting rods, and the third cross beams are arranged at intervals along the length direction of the connecting rods.
In one embodiment, two connecting rods are arranged, and the two connecting rods are respectively connected with the two adjacent straight beams; a plurality of third cross beams are arranged between the two connecting rods, the third cross beams are arranged at intervals, and two ends of each third cross beam extend to connect the two connecting rods.
Compared with the prior art, the hanging basket of this application is connected to the steel plate column through the connecting rod with the hanging basket, can reduce the range and the probability that the hanging basket rocked effectively to make constructor can be in stable construction environment, and then reduced the probability that the unexpected condition took place.
Drawings
Fig. 1 is a three-dimensional view of a basket according to an embodiment of the present application in use.
Fig. 2 is a three-dimensional view of another basket according to an embodiment of the present application in use.
Description of the main reference signs
The following detailed description will further illustrate the application in conjunction with the above-described figures.
Detailed Description
The following description will refer to the accompanying drawings in order to more fully describe the present application. Exemplary embodiments of the present application are illustrated in the accompanying drawings. This application may, however, be embodied in many different forms and should not be construed as limited to the exemplary embodiments set forth herein. These exemplary embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the application to those skilled in the art. Like reference numerals designate identical or similar components.
The terminology used herein is for the purpose of describing particular example embodiments only and is not intended to be limiting of the application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. Furthermore, as used herein, "comprises" and/or "comprising" and/or "having," integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, regions, integers, steps, operations, elements, and/or groups thereof.
Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. Furthermore, unless the context clearly defines otherwise, terms such as those defined in a general dictionary should be construed to have meanings consistent with their meanings in the relevant art and the present application, and should not be construed as idealized or overly formal meanings.
The following description of exemplary embodiments will be provided with reference to the accompanying drawings. It is noted that the components depicted in the referenced figures are not necessarily shown to scale; and the same or similar components will be given the same or similar reference numerals or similar technical terms.
The following detailed description of specific embodiments of the present application refers to the accompanying drawings.
Referring to fig. 1 and 2, an embodiment of the present application provides a hanging basket 100, where the hanging basket 100 is used for dismounting and repairing a pipe gallery construction enclosure structure, and the enclosure structure includes two steel plate columns 23 with opposite intervals, and a steel enclosure purlin and a support column 22 supported between the two steel plate columns 23. The steel plate column 23 is provided with a plurality of protruding portions 231, and the plurality of protruding portions 231 are arranged at intervals along the length direction of the steel plate column 23. The basket 100 includes a body 10a and a connection portion 10b. The body 10a includes a bottom 11 and a protection portion 12 surrounding the bottom 11, the connection portion 10b includes a connection rod 13a and a hook structure 13b, one end of the connection rod 13a is connected with the protection portion 12, the other end is connected with the hook structure 13b, and the hook structure 13b is used for clamping the inner side of the protruding portion 231 from the outer top end of the protruding portion 231.
In the embodiment, before construction, the steel plate columns 23 are vertically arranged on two side walls of a pipe gallery, and a plurality of steel purlins 21 are arranged on the surfaces, far away from the side walls of the pipe gallery, of the steel plate columns 23 at intervals; then the supporting column 22 is used for supporting to prevent the steel plate column 23 from toppling over, and mortar is poured between the steel plate column 23 and the side wall of the pipe gallery in a grouting mode for fixed connection. The support column 22 may be a hydraulic support column 22. In other embodiments, as shown in FIG. 2, the support table 24 may be installed for support prior to installing the steel purlin 21.
According to the hanging basket 100, the bottom 11 and the protection parts 12 surrounding the bottom 11 can enable constructors to pedal on the bottom 11 during construction, and the body can be protected through the protection parts 12, so that the occurrence probability of accidents is effectively reduced; and the hanging basket 100 is connected to the steel plate column 23 through the connecting part 10b, so that the shaking amplitude and probability of the hanging basket 100 can be effectively reduced, and accordingly constructors can be in a stable construction environment, and the probability of accidents is reduced.
In one embodiment, the hook structure 13b includes a first segment 131 and a second segment 132 connected, wherein the first segment 131 is perpendicular to and connected with the connecting rod 13a, and the second segment 132 is perpendicular to and connected with the first segment 131. Specifically, the hook structure 13b is a rod-shaped body formed by two times of bending, and the angle of each bending is 90 °, so that the hook structure 13b takes a 7-shaped hook shape. The hook structure 13b is designed into a 7-shaped hook shape, has a simple structure, is convenient to use, and can be used for quickly connecting the hanging basket 100 to the top of the steel plate column 23.
In one embodiment, as shown in fig. 2, the hook structure 13b includes a first segment 131 and a second segment 132 connected to each other, the first segment 131 is perpendicular to the connecting rod 13a and connected to the connecting rod 13a, and one end of the second segment 132 is connected to the first segment 131, and the other end of the second segment extends obliquely toward one side of the connecting rod 13a, so that an acute angle is formed between the second segment 132 and the first segment 131. Through the inclined design of the second section 132 and the first section 131, the second section 132 can be propped against the steel plate column 23, so that the firmness of clamping the clamping hook structure 13b is enhanced, and the stability of the hanging basket 100 in use is further enhanced. Further, the second section 132 is provided with a first support seat 135, and the first support seat 135 is disposed at an end of the second section 132 remote from the first section 131, for supporting the steel plate column 23. Specifically, the first support base 135 is hinged with the second section 132. By providing the first support base 135, the first support base 135 can be supported on the steel plate column 23 in different situations (such as partial protrusion or depression of the surface of the protrusion 231 in the same steel plate column 23), so that the stability of the basket 100 in use is effectively enhanced.
In an embodiment, the hanging basket 100 further includes a screw 31, a nut 32, and a fixing block 33, the fixing block 33 is fixed on the protecting portion 12, the fixing block 33 is provided with a through hole, one end of the screw 31 is provided with a second supporting seat 34 supported on the steel plate column 23, and the other end of the screw is penetrated out of the through hole, and the second supporting seat 34 is connected with the screw and can rotate around the top end of the screw 31. The nut 32 is sleeved outside the screw 31, and the nut 32 is located between the second supporting seat 34 and the protecting portion 12 for supporting the fixing block 33. Through the design, the distance between the hanging basket 100 and the steel plate column 23 can be effectively adjusted by adjusting the distance between the nut 32 and the second supporting seat 34 so as to adapt to the requirements of different scenes (such as the situation that the steel plate column 23 is partially protruded or recessed), thereby facilitating the construction of constructors. In the present embodiment, the second support seat 34 has the same function as the first support seat 135.
In one embodiment, the bottom 11 includes a frame 11a and a plurality of first beams 11b, the frame 11a being connected to the guard 12; the first beams 11b are longitudinally or/and transversely disposed in the frame 11a, and the two ends of the first beams 11b extend to connect opposite sides of the frame 11 a. In the present embodiment, the frame 11a may be formed by connecting a plurality of first cross members 11b end to end; specifically, the number of the first cross members 11b in the frame 11a is four.
In one embodiment, the guard 12 is used to prevent a constructor from sliding out of the basket 100. The guard portion 12 includes a plurality of straight beams 12a and a plurality of second cross beams 12b, the straight beams 12a are connected to sides of the frame 11a, and at least one second cross beam 12b is disposed between two adjacent straight beams 12 a.
In one embodiment, the straight beam 12a is connected to the connection of adjacent sides of the frame 11 a. Specifically, one end of each straight beam 12a is connected to one of the four corners of the frame 11a, i.e., the connection of the two first cross beams 11 b; the other end is connected with a second cross beam 12b, so that constructors can detect the steel purlin 21 and the support column 22 at the side of the hanging basket 100, and disassemble and maintain the hanging basket through the distance between the adjacent second cross beam 12b and the first cross beam 11 b; and simultaneously, the weight of the hanging basket 100 can be reduced, and the cost is saved.
In one embodiment, two connecting portions 10b are provided, and the two connecting portions 10b are provided on the same side of the protecting portion 12. Through setting up two connecting portions 10b, can go into through the card of two pothook structures 13b to strengthen the stability of hanging flower basket 100 in the use, and then reduce the range and the probability that hanging flower basket 100 rocked effectively, thereby make constructor can be in stable construction environment, and then reduced the probability that the unexpected condition took place. In this embodiment, four straight beams 12a are provided, two adjacent straight beams 12a of the four straight beams 12a are connected with the connecting rod 13a, and the straight beams 12a connected with the connecting rod 13a are integrally formed with the connecting rod 13a, so as to enhance the connection firmness of the connecting rod 13a and the protecting part 12, thereby effectively enhancing the stability of the hanging basket 100.
In an embodiment, a plurality of third beams 133 are disposed between the two connecting rods 13a, two ends of each third beam 133 respectively extend to connect with one connecting rod 13a, and the plurality of third beams 133 are disposed at intervals along the length direction of the connecting rod 13a to form a ladder.
In one embodiment, the body 10a and the connecting portion 10b are both metal structures, such as steel structures. The rigidity of the metal structure is utilized to effectively reduce the shaking amplitude and probability of the hanging basket 100, so that constructors can be in a stable construction environment, and the probability of accidents is further reduced.
The basket 100 of the present application is manufactured by welding steel (e.g., rebar) that is reported as wasted (scrapped refers to the excess that cannot be used after cutting) in a construction site, thereby saving cost and protecting the environment.
Hereinabove, the specific embodiments of the present application are described with reference to the accompanying drawings. However, those of ordinary skill in the art will appreciate that various modifications and substitutions can be made to the specific embodiments of the present application without departing from the scope thereof. Such modifications and substitutions are intended to be within the scope of the present application.

Claims (10)

1. The hanging basket is characterized by being used for dismounting and overhauling a pipe gallery construction enclosure structure, and the enclosure structure comprises two steel plate columns with opposite intervals, and a steel enclosure purlin and a support column which are supported between the two steel plate columns; the steel plate column is provided with a plurality of convex parts or a plurality of concave parts, and the convex parts or the concave parts are arranged at intervals along the length direction of the steel plate column;
the hanging basket comprises a body and a connecting part, wherein the body comprises a bottom and a protection part surrounding the bottom, the connecting part comprises a connecting rod and a clamping hook structure, one end of the connecting rod is connected with the protection part, the other end of the connecting rod is connected with the clamping hook structure, and the clamping hook structure is used for clamping the protruding part or the inner side of the recessed part from the outer top of the protruding part or the recessed part.
2. A basket according to claim 1,
the clamping hook structure comprises a first section and a second section which are connected, wherein the first section is perpendicular to the connecting rod and connected with the connecting rod, and the second section is perpendicular to the first section and connected with the connecting rod.
3. A basket according to claim 1,
the clamping hook structure comprises a first section and a second section which are connected, the first section is perpendicular to the connecting rod and is connected with the connecting rod, one end of the second section is connected with the first section, the other end of the second section extends obliquely towards one side of the connecting rod, and an acute angle is formed between the second section and the first section.
4. A basket according to claim 3,
the second section is provided with a first supporting seat, and the first supporting seat is arranged at the end part of the second section far away from the first section and is used for supporting the steel plate column.
5. A basket according to claim 1, further comprising a screw, a nut and a fixing block, the fixing block being fixed to the protecting portion, the fixing block being provided with a through hole, one end of the screw being provided with a second support seat supported by the steel plate column, the other end of the screw being passed through the through hole, the second support seat being connected to the screw and being rotatable about a top end of the screw, the nut being fitted to an outside of the screw, and the nut being located between the second support seat and the fixing block for holding the fixing block.
6. A basket according to claim 1,
the bottom comprises a frame and a plurality of first cross beams, the frame is connected with the protection part, the plurality of first cross beams are longitudinally or/and transversely arranged in the frame, and two ends of the first cross beams extend and are connected to two opposite sides of the frame.
7. A basket according to claim 6,
the protection part comprises a plurality of straight beams and a plurality of second cross beams, wherein the straight beams are connected with the frame, and at least one second cross beam is arranged between two adjacent straight beams.
8. A basket according to claim 7,
the straight beam is connected to the connection part of the two adjacent sides of the frame.
9. A basket according to any one of claims 1 to 8,
the connecting parts are arranged at two, and the two connecting rods are arranged at the same side of the protection part.
10. A basket according to claim 9,
a plurality of third cross beams are arranged between the two connecting rods, two ends of each third cross beam extend to be connected with the connecting rods respectively, and the third cross beams are arranged at intervals along the length direction of the connecting rods.
CN202320329534.3U 2023-02-27 2023-02-27 Hanging basket Active CN219451435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320329534.3U CN219451435U (en) 2023-02-27 2023-02-27 Hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320329534.3U CN219451435U (en) 2023-02-27 2023-02-27 Hanging basket

Publications (1)

Publication Number Publication Date
CN219451435U true CN219451435U (en) 2023-08-01

Family

ID=87409255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320329534.3U Active CN219451435U (en) 2023-02-27 2023-02-27 Hanging basket

Country Status (1)

Country Link
CN (1) CN219451435U (en)

Similar Documents

Publication Publication Date Title
CN103397740B (en) Three-dimensional beam string structure
CN104727235B (en) Bridge integral reinforcing device
CN219451435U (en) Hanging basket
CN110700413A (en) Detachable steel beam mounting connecting piece and steel beam connecting method
CN206616876U (en) One kind is encorbelmented protective platform system
JP6494120B2 (en) Uneven housing type temporary protective fence
CN205329845U (en) Steel member
EP1206611B1 (en) Scaffolding
CN114922421A (en) Beam formwork mounting structure and method
CN204530993U (en) One is encorbelmented load-carrying members
CN218479500U (en) Small-size operation platform of vertical aluminum alloy template
CN220011949U (en) Support body based on tower crane standard section
KR20110011566A (en) Temporary construction bracket
KR102381578B1 (en) Tunnel supports for pouring concrete
CN212714580U (en) Cast-in-place box girder cantilever
CN219586752U (en) Assembled pit roof beam articulates strutting arrangement
CN210049090U (en) Bridge expansion joint device
JP2691260B2 (en) Form support for arch concrete construction
CN219529046U (en) Roadway support
CN219240301U (en) Bracket-free construction platform for viaduct pier stud
CN217924124U (en) Building jacking device
CN219638850U (en) Tunnel corrugated plate structure
CN219953381U (en) Lining changing support structure for tunnel driving protection
CN220035690U (en) Prefabricated post node connecting device
WO1990005217A1 (en) Arrangement in mobile foot tunnel system, and arrangement in mounting fittings for coupling together foot tunnel sections

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant