CN219451080U - Floor and crossbeam welded structure based on assembled building - Google Patents
Floor and crossbeam welded structure based on assembled building Download PDFInfo
- Publication number
- CN219451080U CN219451080U CN202320386644.3U CN202320386644U CN219451080U CN 219451080 U CN219451080 U CN 219451080U CN 202320386644 U CN202320386644 U CN 202320386644U CN 219451080 U CN219451080 U CN 219451080U
- Authority
- CN
- China
- Prior art keywords
- floor slab
- floor
- fixed
- crossbeam
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model overcomes the defects existing in the prior art, and provides the floor slab and beam welding structure based on the assembled building, which has the advantages of small construction workload, reduced construction cost and construction period, convenient assembly operation of workers and high installation efficiency; in order to solve the technical problems, the utility model adopts the following technical scheme: the floor slab and beam welding structure based on the assembled building comprises a floor slab and a beam, wherein the floor slab is sequentially paved on the beam, two ends of the floor slab are correspondingly lapped on the beam, a plurality of through holes are sequentially formed in two ends of the floor slab positioned at the upper end of the beam, sleeves are arranged in the through holes, the sleeves are fixed with a reinforcing steel bar net of the floor slab and are poured together, studs are inserted into the sleeves, and one end of each stud close to the beam is fixed on the beam through stud welding; the utility model can be widely applied to the field of assembled buildings.
Description
Technical Field
The utility model relates to a floor slab and beam welding structure based on an assembled building, and belongs to the technical field of assembled buildings.
Background
In the construction process of the floor slab of the conventional assembly type building, the existing assembly type building is connected to the cross beam through the reserved holes in the floor slab by bolts, the problems of large workload, high cost and long construction period exist in site construction, and the assembly operation of workers is very inconvenient and the installation efficiency is low.
Disclosure of Invention
The utility model overcomes the defects existing in the prior art, and provides the floor slab and beam welding structure based on the fabricated building, which has the advantages of small construction workload, reduced construction cost and construction period, convenient assembly operation of workers and high installation efficiency.
In order to solve the technical problems, the utility model adopts the following technical scheme: floor and crossbeam welded structure based on assembled building, including floor and crossbeam, the floor is laid on the crossbeam in proper order, the both ends of floor correspond the overlap joint on the crossbeam, are located all set gradually a plurality of through-holes on the both ends of floor of crossbeam upper end, all be provided with the sleeve in the through-hole, the sleeve is fixed and is pour together with the reinforcing bar net of floor, peg graft in the sleeve has the double-screw bolt, the one end that the double-screw bolt is close to the crossbeam passes through the stud welding machine welded fastening on the crossbeam.
The upper part of the sleeve is sleeved and fixed through a hoop, and the tail end of the hoop is welded and fixed on a reinforcing mesh of the floor slab.
The lower part of the sleeve is sleeved and fixed by a hoop, and the tail end of the hoop is welded and fixed on a reinforcing mesh of the floor slab; the lower part of the sleeve is sleeved and fixed with a supporting plate with a through hole, and the upper side of the supporting plate is welded and fixed with the reinforcing mesh.
The gap between the sleeve and the stud is filled with a caulking agent.
Compared with the prior art, the utility model has the following beneficial effects: after the floor slab is paved, the studs are welded on the steel structure beam by the stud welding machine in sequence, screw holes do not need to be formed on the beam, and cement mortar is used for joint filling, so that the whole construction process is simple and efficient, the construction period is greatly shortened, the cost is reduced, the labor capacity of workers is reduced, and the installation efficiency is greatly improved.
Drawings
The utility model is further described below with reference to the accompanying drawings.
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic cross-sectional view of the present utility model.
Fig. 3 is an enlarged partial schematic view of the area a in fig. 2.
Fig. 4 is a schematic diagram of the connection between the reinforcing mesh and the sleeve according to the present utility model.
Fig. 5 is a partially enlarged schematic view of region B in fig. 4.
In the figure: the floor slab is 1, the cross beam is 2, the through hole is 3, the sleeve is 4, the hoop is 5, the reinforcing mesh is 6, and the supporting plate is 7.
Detailed Description
The utility model is further illustrated below in conjunction with specific examples.
As shown in fig. 1 to 5, the floor slab and beam welding structure based on the fabricated building comprises a floor slab 1 and a beam 2, wherein the floor slab 1 is sequentially paved on the beam 2, two ends of the floor slab 1 are correspondingly lapped on the beam 2, a plurality of through holes 3 are sequentially formed in two ends of the floor slab 1 positioned at the upper end of the beam 2, sleeves 4 are respectively arranged in the through holes 3, the sleeves 4 are fixed with a reinforcing steel bar net 6 of the floor slab 1 and are poured together, studs are inserted in the sleeves 4, and one end of each stud close to the beam 2 is welded and fixed on the beam 2 through a stud welding machine.
The upper part of the sleeve 4 is sleeved and fixed through a hoop 5, and the tail end of the hoop 5 is welded and fixed on a reinforcing mesh 6 of the floor slab 1.
The lower part of the sleeve 4 is sleeved and fixed by a hoop 5, and the tail end of the hoop 5 is welded and fixed on a reinforcing mesh 6 of the floor slab 1; the lower part of the sleeve 4 is sleeved and fixed by a supporting plate 7 with a through hole, and the upper side of the supporting plate 7 is welded and fixed with the reinforcing mesh 6.
The gap between the sleeve 4 and the stud is filled with a caulking agent.
According to the utility model, after the floor is paved, studs are welded on the steel structure beam 2 by using a stud welding machine in sequence, screw holes do not need to be formed on the beam 2, and cement mortar is used for joint filling, so that the whole construction process is simple and efficient, the construction period is greatly shortened, the cost is reduced, the labor capacity of workers is reduced, and the installation efficiency is greatly improved.
The embodiments of the present utility model have been described in detail with reference to the accompanying drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present utility model.
Claims (4)
1. Floor and crossbeam welded structure based on assembled building, including floor (1) and crossbeam (2), floor (1) are laid in proper order on crossbeam (2), its characterized in that, the both ends of floor (1) correspond the overlap joint on crossbeam (2), are located all set gradually a plurality of through-holes (3) on the both ends of floor (1) of crossbeam (2) upper end, all be provided with sleeve (4) in through-hole (3), sleeve (4) are fixed and are pour together with reinforcing bar net (6) of floor (1), the double-screw bolt has been inserted in sleeve (4), the one end that the double-screw bolt is close to crossbeam (2) is passed through stud welding machine welded fastening on crossbeam (2).
2. The floor slab and beam welding structure based on the fabricated building according to claim 1, wherein the upper part of the sleeve (4) is sleeved and fixed by a hoop (5), and the tail end of the hoop (5) is welded and fixed on a reinforcing mesh (6) of the floor slab (1).
3. The floor slab and beam welding structure based on the fabricated building according to claim 1 or 2, characterized in that the lower part of the sleeve (4) is sleeved and fixed by a hoop (5), and the tail end of the hoop (5) is welded and fixed on a reinforcing mesh (6) of the floor slab (1); the lower part of the sleeve (4) is sleeved and fixed by a supporting plate (7) with a through hole, and the upper side of the supporting plate (7) is welded and fixed with the reinforcing mesh (6).
4. The floor slab and beam welded structure based on fabricated construction according to claim 1, characterized in that the gap between the sleeve (4) and the stud is filled with a caulking agent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320386644.3U CN219451080U (en) | 2023-03-06 | 2023-03-06 | Floor and crossbeam welded structure based on assembled building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320386644.3U CN219451080U (en) | 2023-03-06 | 2023-03-06 | Floor and crossbeam welded structure based on assembled building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219451080U true CN219451080U (en) | 2023-08-01 |
Family
ID=87409105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320386644.3U Active CN219451080U (en) | 2023-03-06 | 2023-03-06 | Floor and crossbeam welded structure based on assembled building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219451080U (en) |
-
2023
- 2023-03-06 CN CN202320386644.3U patent/CN219451080U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2023279680A1 (en) | Fabricated concrete beam-column joint and construction method therefor | |
CN108086135A (en) | A kind of assembled steel tube constrains reinfored concrete line frame bridge pier | |
CN208586747U (en) | Prefabricated PC beams of concrete column connected node | |
CN207846685U (en) | Stiffened column and steel beam connecting joint with closing steel plate hoop | |
CN213773394U (en) | Novel assembled rectangular steel tube concrete truss support system | |
CN212715350U (en) | Section steel concrete beam column structure | |
CN210767266U (en) | Prefabricated assembled type stiffening concrete column member node connecting structure | |
CN219451080U (en) | Floor and crossbeam welded structure based on assembled building | |
CN111962767A (en) | Web plate open-hole section steel partially-wrapped concrete composite beam and construction method thereof | |
CN204081090U (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post | |
CN209227834U (en) | A kind of assembly concrete-filled steel tube frame-shear-wall structure | |
CN207003719U (en) | A kind of prefabricated steel faced wall with steel bar girder | |
CN207032011U (en) | A kind of assembled steel tube constrains reinfored concrete line frame bridge pier | |
CN215907025U (en) | Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column | |
CN214785031U (en) | Partially-coated steel-concrete combined shear wall member | |
CN108842927A (en) | Beam rigid connection node and construction method outside assembly concrete shear wall and face | |
CN219219375U (en) | Component based on assembled building floor and crossbeam welding | |
CN211080778U (en) | Prefabricated assembled concrete column structure | |
CN207846658U (en) | The modularization node of prefabricated buildings | |
CN107060175B (en) | Inner keel and outer formwork assembly floor structure | |
CN112323616A (en) | Assembled concrete column splicing node, construction method thereof and assembled elevated station | |
CN214574619U (en) | Beam-beam prefabricated connecting structure of concrete frame | |
CN220521548U (en) | Precast beam connecting piece and frame roof beam thereof | |
CN219219501U (en) | Floor structure based on assembled building | |
CN221168358U (en) | Special-shaped wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||