CN219451080U - Floor and crossbeam welded structure based on assembled building - Google Patents

Floor and crossbeam welded structure based on assembled building Download PDF

Info

Publication number
CN219451080U
CN219451080U CN202320386644.3U CN202320386644U CN219451080U CN 219451080 U CN219451080 U CN 219451080U CN 202320386644 U CN202320386644 U CN 202320386644U CN 219451080 U CN219451080 U CN 219451080U
Authority
CN
China
Prior art keywords
floor slab
floor
fixed
crossbeam
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320386644.3U
Other languages
Chinese (zh)
Inventor
杨文朝
王宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Honghou Prefabricated Building Technology Development Co ltd
Original Assignee
Shanxi Honghou Prefabricated Building Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Honghou Prefabricated Building Technology Development Co ltd filed Critical Shanxi Honghou Prefabricated Building Technology Development Co ltd
Priority to CN202320386644.3U priority Critical patent/CN219451080U/en
Application granted granted Critical
Publication of CN219451080U publication Critical patent/CN219451080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model overcomes the defects existing in the prior art, and provides the floor slab and beam welding structure based on the assembled building, which has the advantages of small construction workload, reduced construction cost and construction period, convenient assembly operation of workers and high installation efficiency; in order to solve the technical problems, the utility model adopts the following technical scheme: the floor slab and beam welding structure based on the assembled building comprises a floor slab and a beam, wherein the floor slab is sequentially paved on the beam, two ends of the floor slab are correspondingly lapped on the beam, a plurality of through holes are sequentially formed in two ends of the floor slab positioned at the upper end of the beam, sleeves are arranged in the through holes, the sleeves are fixed with a reinforcing steel bar net of the floor slab and are poured together, studs are inserted into the sleeves, and one end of each stud close to the beam is fixed on the beam through stud welding; the utility model can be widely applied to the field of assembled buildings.

Description

Floor and crossbeam welded structure based on assembled building
Technical Field
The utility model relates to a floor slab and beam welding structure based on an assembled building, and belongs to the technical field of assembled buildings.
Background
In the construction process of the floor slab of the conventional assembly type building, the existing assembly type building is connected to the cross beam through the reserved holes in the floor slab by bolts, the problems of large workload, high cost and long construction period exist in site construction, and the assembly operation of workers is very inconvenient and the installation efficiency is low.
Disclosure of Invention
The utility model overcomes the defects existing in the prior art, and provides the floor slab and beam welding structure based on the fabricated building, which has the advantages of small construction workload, reduced construction cost and construction period, convenient assembly operation of workers and high installation efficiency.
In order to solve the technical problems, the utility model adopts the following technical scheme: floor and crossbeam welded structure based on assembled building, including floor and crossbeam, the floor is laid on the crossbeam in proper order, the both ends of floor correspond the overlap joint on the crossbeam, are located all set gradually a plurality of through-holes on the both ends of floor of crossbeam upper end, all be provided with the sleeve in the through-hole, the sleeve is fixed and is pour together with the reinforcing bar net of floor, peg graft in the sleeve has the double-screw bolt, the one end that the double-screw bolt is close to the crossbeam passes through the stud welding machine welded fastening on the crossbeam.
The upper part of the sleeve is sleeved and fixed through a hoop, and the tail end of the hoop is welded and fixed on a reinforcing mesh of the floor slab.
The lower part of the sleeve is sleeved and fixed by a hoop, and the tail end of the hoop is welded and fixed on a reinforcing mesh of the floor slab; the lower part of the sleeve is sleeved and fixed with a supporting plate with a through hole, and the upper side of the supporting plate is welded and fixed with the reinforcing mesh.
The gap between the sleeve and the stud is filled with a caulking agent.
Compared with the prior art, the utility model has the following beneficial effects: after the floor slab is paved, the studs are welded on the steel structure beam by the stud welding machine in sequence, screw holes do not need to be formed on the beam, and cement mortar is used for joint filling, so that the whole construction process is simple and efficient, the construction period is greatly shortened, the cost is reduced, the labor capacity of workers is reduced, and the installation efficiency is greatly improved.
Drawings
The utility model is further described below with reference to the accompanying drawings.
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a schematic cross-sectional view of the present utility model.
Fig. 3 is an enlarged partial schematic view of the area a in fig. 2.
Fig. 4 is a schematic diagram of the connection between the reinforcing mesh and the sleeve according to the present utility model.
Fig. 5 is a partially enlarged schematic view of region B in fig. 4.
In the figure: the floor slab is 1, the cross beam is 2, the through hole is 3, the sleeve is 4, the hoop is 5, the reinforcing mesh is 6, and the supporting plate is 7.
Detailed Description
The utility model is further illustrated below in conjunction with specific examples.
As shown in fig. 1 to 5, the floor slab and beam welding structure based on the fabricated building comprises a floor slab 1 and a beam 2, wherein the floor slab 1 is sequentially paved on the beam 2, two ends of the floor slab 1 are correspondingly lapped on the beam 2, a plurality of through holes 3 are sequentially formed in two ends of the floor slab 1 positioned at the upper end of the beam 2, sleeves 4 are respectively arranged in the through holes 3, the sleeves 4 are fixed with a reinforcing steel bar net 6 of the floor slab 1 and are poured together, studs are inserted in the sleeves 4, and one end of each stud close to the beam 2 is welded and fixed on the beam 2 through a stud welding machine.
The upper part of the sleeve 4 is sleeved and fixed through a hoop 5, and the tail end of the hoop 5 is welded and fixed on a reinforcing mesh 6 of the floor slab 1.
The lower part of the sleeve 4 is sleeved and fixed by a hoop 5, and the tail end of the hoop 5 is welded and fixed on a reinforcing mesh 6 of the floor slab 1; the lower part of the sleeve 4 is sleeved and fixed by a supporting plate 7 with a through hole, and the upper side of the supporting plate 7 is welded and fixed with the reinforcing mesh 6.
The gap between the sleeve 4 and the stud is filled with a caulking agent.
According to the utility model, after the floor is paved, studs are welded on the steel structure beam 2 by using a stud welding machine in sequence, screw holes do not need to be formed on the beam 2, and cement mortar is used for joint filling, so that the whole construction process is simple and efficient, the construction period is greatly shortened, the cost is reduced, the labor capacity of workers is reduced, and the installation efficiency is greatly improved.
The embodiments of the present utility model have been described in detail with reference to the accompanying drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present utility model.

Claims (4)

1. Floor and crossbeam welded structure based on assembled building, including floor (1) and crossbeam (2), floor (1) are laid in proper order on crossbeam (2), its characterized in that, the both ends of floor (1) correspond the overlap joint on crossbeam (2), are located all set gradually a plurality of through-holes (3) on the both ends of floor (1) of crossbeam (2) upper end, all be provided with sleeve (4) in through-hole (3), sleeve (4) are fixed and are pour together with reinforcing bar net (6) of floor (1), the double-screw bolt has been inserted in sleeve (4), the one end that the double-screw bolt is close to crossbeam (2) is passed through stud welding machine welded fastening on crossbeam (2).
2. The floor slab and beam welding structure based on the fabricated building according to claim 1, wherein the upper part of the sleeve (4) is sleeved and fixed by a hoop (5), and the tail end of the hoop (5) is welded and fixed on a reinforcing mesh (6) of the floor slab (1).
3. The floor slab and beam welding structure based on the fabricated building according to claim 1 or 2, characterized in that the lower part of the sleeve (4) is sleeved and fixed by a hoop (5), and the tail end of the hoop (5) is welded and fixed on a reinforcing mesh (6) of the floor slab (1); the lower part of the sleeve (4) is sleeved and fixed by a supporting plate (7) with a through hole, and the upper side of the supporting plate (7) is welded and fixed with the reinforcing mesh (6).
4. The floor slab and beam welded structure based on fabricated construction according to claim 1, characterized in that the gap between the sleeve (4) and the stud is filled with a caulking agent.
CN202320386644.3U 2023-03-06 2023-03-06 Floor and crossbeam welded structure based on assembled building Active CN219451080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320386644.3U CN219451080U (en) 2023-03-06 2023-03-06 Floor and crossbeam welded structure based on assembled building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320386644.3U CN219451080U (en) 2023-03-06 2023-03-06 Floor and crossbeam welded structure based on assembled building

Publications (1)

Publication Number Publication Date
CN219451080U true CN219451080U (en) 2023-08-01

Family

ID=87409105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320386644.3U Active CN219451080U (en) 2023-03-06 2023-03-06 Floor and crossbeam welded structure based on assembled building

Country Status (1)

Country Link
CN (1) CN219451080U (en)

Similar Documents

Publication Publication Date Title
WO2023279680A1 (en) Fabricated concrete beam-column joint and construction method therefor
CN108086135A (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN208586747U (en) Prefabricated PC beams of concrete column connected node
CN207846685U (en) Stiffened column and steel beam connecting joint with closing steel plate hoop
CN213773394U (en) Novel assembled rectangular steel tube concrete truss support system
CN212715350U (en) Section steel concrete beam column structure
CN210767266U (en) Prefabricated assembled type stiffening concrete column member node connecting structure
CN219451080U (en) Floor and crossbeam welded structure based on assembled building
CN111962767A (en) Web plate open-hole section steel partially-wrapped concrete composite beam and construction method thereof
CN204081090U (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post
CN209227834U (en) A kind of assembly concrete-filled steel tube frame-shear-wall structure
CN207003719U (en) A kind of prefabricated steel faced wall with steel bar girder
CN207032011U (en) A kind of assembled steel tube constrains reinfored concrete line frame bridge pier
CN215907025U (en) Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column
CN214785031U (en) Partially-coated steel-concrete combined shear wall member
CN108842927A (en) Beam rigid connection node and construction method outside assembly concrete shear wall and face
CN219219375U (en) Component based on assembled building floor and crossbeam welding
CN211080778U (en) Prefabricated assembled concrete column structure
CN207846658U (en) The modularization node of prefabricated buildings
CN107060175B (en) Inner keel and outer formwork assembly floor structure
CN112323616A (en) Assembled concrete column splicing node, construction method thereof and assembled elevated station
CN214574619U (en) Beam-beam prefabricated connecting structure of concrete frame
CN220521548U (en) Precast beam connecting piece and frame roof beam thereof
CN219219501U (en) Floor structure based on assembled building
CN221168358U (en) Special-shaped wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant