CN219411954U - Waterproof construction equipment for wall cracks - Google Patents

Waterproof construction equipment for wall cracks Download PDF

Info

Publication number
CN219411954U
CN219411954U CN202320398551.2U CN202320398551U CN219411954U CN 219411954 U CN219411954 U CN 219411954U CN 202320398551 U CN202320398551 U CN 202320398551U CN 219411954 U CN219411954 U CN 219411954U
Authority
CN
China
Prior art keywords
rod
casing
air pump
construction equipment
waterproof construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320398551.2U
Other languages
Chinese (zh)
Inventor
程世银
高小东
康凯
叶牧文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhongcheng Shenggu Waterproof Engineering Co ltd
Original Assignee
Anhui Zhongcheng Shenggu Waterproof Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhongcheng Shenggu Waterproof Engineering Co ltd filed Critical Anhui Zhongcheng Shenggu Waterproof Engineering Co ltd
Priority to CN202320398551.2U priority Critical patent/CN219411954U/en
Application granted granted Critical
Publication of CN219411954U publication Critical patent/CN219411954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses wall crack waterproof construction equipment which comprises a shell, wherein a connecting ring is sleeved on the outer ring of the top of the shell, an air pump is arranged at the top of the right side of the shell, an air pipe is connected to the bottom of the air pump, a first connecting rod is arranged on the left side of the shell, a handrail is connected between the two first connecting rods, a switch is arranged on one side of the handrail, a supporting rod is arranged on one side of the first connecting rod, a spring is connected to one end of the supporting rod, a connecting block is connected to one end of the spring, a second connecting rod and a scraping plate are respectively arranged at the bottom of the connecting block, and the scraping plate is arranged on one side of the second connecting rod. Through the cooperation of air pump, trachea and lantern ring, can clear away the dust in the crack, make material and wall body laminating more, the air pump is connected with the trachea, and the air current is blown out by the trachea when the air pump is opened, aim at the crack with tracheal one end this moment can clear up the dust in the crack, need the deashing for a long time simultaneously can place the trachea in the lantern ring, reduce staff's work.

Description

Waterproof construction equipment for wall cracks
Technical Field
The utility model relates to the technical field of building construction, in particular to wall crack waterproof construction equipment.
Background
The wall body mainly comprises a bearing wall and a non-bearing wall, and mainly plays a role in enclosing and separating space. The wall body of the wall bearing structure building integrates bearing and enclosing, and the function of the wall body of the framework structure building is enclosing and separating space. The wall body has enough strength and stability and has the capabilities of heat preservation, heat insulation, sound insulation, fire prevention and water prevention. After the wall body is used for a certain time, water leakage is caused by the occurrence of cracks due to environmental reasons, the life of the masses is not good, generally, smaller cracks are used for injecting waterproof paint into the cracks by a worker master, but the steps are many, a plurality of different tools are needed, and the construction efficiency is affected to a certain extent.
Disclosure of Invention
The utility model aims to provide wall crack waterproof construction equipment for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the novel hydraulic lifting device comprises a shell, wherein a connecting ring is sleeved on the outer ring of the top of the shell, an air pump is arranged on the top of the right side of the shell, an air pipe is connected to the bottom of the air pump, a first connecting rod is arranged on the left side of the shell, an armrest is connected between the two first connecting rods, a switch is arranged on one side of the armrest, a supporting rod is arranged on one side of the first connecting rod, a spring is connected to one end of the supporting rod, a connecting block is connected to one end of the spring, a second connecting rod and a scraping plate are respectively arranged on the bottom of the connecting block, the scraping plate is arranged on one side of the second connecting rod, a rotating rod is connected between the two second connecting rods, a rolling shaft is sleeved on the outer ring of the rotating rod, a plurality of supporting rods are arranged on the top of the shell, a hydraulic rod is connected to the bottom of the hydraulic rod, a pushing block is connected to the bottom of the shell, a spray head is connected to one side of the outer ring of the connecting rod, and a lantern ring is connected to one end of the third connecting rod.
Preferably, the air pump is fixed on one side of the casing through the connecting ring, and the air pipe is movably arranged in the inner cavity of the lantern ring.
Preferably, the switch is electrically connected with the hydraulic rod, the bottom end of the pushing block is conical, and meanwhile, the pushing block is made of rubber.
Preferably, the roller rotates on the outer ring of the rotating rod, and the roller, the scraping plate and the spray head are positioned on the same horizontal line.
Preferably, the spray head is movably connected with the connecting piece.
Preferably, the length of the armrest is longer than the width of an adult male palm.
Compared with the prior art, the utility model has the beneficial effects that:
1. this waterproof construction equipment of wall body crack uses through the cooperation of air pump, trachea and lantern ring, can clear away the dust in the crack, makes material and wall body laminating more, and the air pump is connected with the trachea, and the air current is blown out by the trachea when the air pump is opened, aims at the crack with tracheal one end this moment and can clear up the dust in the crack, needs the deashing for a long time simultaneously can place the trachea in the lantern ring, reduces staff's work.
2. This waterproof construction equipment of wall body crack uses through the cooperation of roller bearing, bull stick and scraper blade, can avoid the material extravagant to a certain extent, also can make the construction more pleasing to the eye, and the shower nozzle is with behind the material discharge, and the roller bearing of its same horizon then can rotate at the bull stick outer lane, then can roll it when unnecessary material, paints the material in the wall body around the crack, has avoided the material extravagant, then the scraper blade then can scrape the material and level, makes the wall behind the construction more pleasing to the eye.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model.
Fig. 2 is a front view of the structure of the present utility model.
Fig. 3 is a partially disassembled view of the structure of the present utility model.
Fig. 4 is an enlarged view at a in a third embodiment of the structure of the present utility model.
In the figure: 1. a housing; 2. a connecting ring; 3. an air pump; 4. an air pipe; 5. a first connecting rod; 6. an armrest; 7. a switch; 8. a support rod; 9. a spring; 10. a connecting block; 11. a second connecting rod; 12. a rotating rod; 13. a roller; 14. a scraper; 15. a brace rod; 16. a hydraulic rod; 17. a pushing block; 18. a connecting piece; 19. a spray head; 20. a third connecting rod; 21. a collar;
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples: referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a wall body crack waterproof construction equipment, what casing 1 has been cup jointed at the top outer lane of casing 1, the right side top of casing 1 is provided with air pump 3, the bottom of air pump 3 is connected with trachea 4, the left side of casing 1 is provided with head rod 5, be connected with handrail 6 in the middle of two head rods 5, one side of handrail 6 is provided with switch 7, one side of head rod 5 is provided with branch 8, the one end of branch 8 is connected with spring 9, the one end of spring 9 is connected with connecting block 10, the bottom of connecting block 10 is provided with second connecting rod 11 and scraper blade 14 respectively, scraper blade 14 sets up in one side of second connecting rod 11, be connected with bull stick 12 in the middle of two second connecting rods 11, roller 13 has been cup jointed in the outer lane of bull stick 12, the top of casing 1 is provided with a plurality of vaulting poles 15, the one end of vaulting pole 15 is connected with hydraulic rod 16, the bottom of hydraulic rod 16 is connected with pusher 17, the bottom of casing 1 is connected with connecting piece 18, the outer lane threaded connection of connecting piece 18 has shower nozzle 19, one side of shower nozzle 19 is provided with third connecting rod 20, the one end of third connecting rod 20 is connected with lantern ring 21.
Wherein, the air pump 3 is fixed at one side of the casing 1 through the connecting ring 2, and the air pipe 4 is movably arranged in the inner cavity of the lantern ring 21.
In this embodiment, when filling a wall crack, if dust exists in the crack, the solidification of the material in the crack may generate bubbles, or the crack may not be completely cut with the wall, so that the crack may still be permeated after the construction is finished, in order to avoid the occurrence of the above situation, the air pump 3 is provided to clean the dust, specifically, the air pump 3 is connected with the air pipe 4, when the air pump 3 is opened, the air flow is blown out by the air pipe 4, at this time, one end of the air pipe 4 is aligned with the crack to blow out the dust in the crack, and when some air is cloudy places are constructed, the air pump 4 may be inserted into the inner cavity of the collar 21, and the crack is continuously blown, so that the dust enters the crack to cause obstruction to the construction while the construction.
Wherein, switch 7 and hydraulic stem 16 electric connection, push block 17 bottom is the toper, and the material of push block 17 is rubber simultaneously.
In this embodiment, setting up switch 7 in the use of this device of staff's convenience in one side of handrail 6, the hydraulic stem 16 inwards lengthens when opening switch 7, and the ejector pad 17 that the hydraulic stem 16 one end is connected then can release the material outside casing 1 fills the crack, and the leakproofness of ejector pad 17 that the material is rubber is better simultaneously, can avoid the material to ooze, can clear up the inner wall of casing 1 simultaneously when the activity, avoids there being the material to remain in the device solidification, and the bottom of ejector pad 17 is the toper, can avoid the material to remain in shower nozzle 19, has reduced the waste of resource.
Wherein, the roller 13 rotates on the outer ring of the rotating rod 12, and the roller 13, the scraping plate 14 and the spray head 19 are positioned on the same horizontal line.
In this embodiment, after the device extrudes the material into the crack, some material may protrude the crack, which affects the wall surface beauty, so the roller 13 and the scraper 14 are set to process the redundant material, specifically, after the spray head 19 discharges the material, the roller 13 on the same horizontal line with the material will rotate on the outer ring of the rotating rod 12, when passing through the redundant material, it will roll the redundant material, preventing the wall around the crack, avoiding the material waste, then the scraper 14 will scrape the material to achieve the beautiful effect, and meanwhile the connecting block 10 is connected with the strut 8 through the spring 9, so the influence of the scraper 14 and the roller 13 on the device can be avoided when the device is required to be inclined for discharging.
Wherein the spray head 19 is movably connected with the connecting piece 18.
In this embodiment, since the nozzle 19 is screwed with the connecting member 18, the nozzle 19 can be removed from the outer ring of the connecting member 18 when the device is in use or requires charging, and cleaning of the nozzle 19 is facilitated, so as to prevent the nozzle 19 from being blocked by material.
Wherein the length of the armrest 6 is longer than the width of an adult male's palm.
In this embodiment, considering that the device may need to be used at a higher position, the first connecting rod 5 is disposed at one side of the housing 1, and the armrest 6 is disposed between the two first connecting rods 5, so that the device can be carried by a worker.
Working principle: when the device is used, the spray head 19 is taken down, materials are poured into the inner cavity of the shell 1, then the spray head 19 is connected to the connecting piece 18, at the moment, a worker holds the handrail 6, the air pump 3 is opened to clean dust in cracks through the air pipe 4, then the spray head 19 is aligned to the cracks, at the moment, the hydraulic rod 16 is prolonged, at the moment, the push block 17 connected with one end of the hydraulic rod 16 can push the materials out of the shell 1 to fill the cracks, at the moment, the worker moves the device downwards, after the spray head 19 discharges the materials, the roller 13 which is in the same horizontal line with the spray head 19 rotates on the outer ring of the rotating rod 12, when the spray head passes through redundant materials, the spray head 19 rolls the materials, the wall body around the cracks is prevented, the waste of the materials is avoided, then the scraping plate 14 can scrape the materials, the spray head 19 can be taken down for feeding when the construction is completed or the spray head 19 is cleaned when the charging is needed, the structure of the device is less, the device is safe when used at a high place, and the device can be used as a whole.
In the description of the present utility model, it should also be noted that, unless explicitly specified and limited otherwise, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a waterproof construction equipment of wall body crack, includes what casing (1), its characterized in that: the utility model discloses a hydraulic device, including casing (1), connecting ring (2) have been cup jointed at the top outer lane of casing (1), the right side top of casing (1) is provided with air pump (3), the bottom of air pump (3) is connected with trachea (4), the left side of casing (1) is provided with head rod (5), be connected with handrail (6) in the middle of two head rods (5), one side of handrail (6) is provided with switch (7), one side of head rod (5) is provided with branch (8), the one end of branch (8) is connected with spring (9), the one end of spring (9) is connected with connecting block (10), the bottom of connecting block (10) is provided with second connecting rod (11) and scraper blade (14) respectively, scraper blade (14) set up in one side of second connecting rod (11), be connected with bull stick (12) in the middle of two second connecting rods (11), the outer lane of bull stick (12) has been connected with roller (13), the top of casing (1) is provided with a plurality of vaulting poles (15), the one end of branch (8) is connected with spring (9), the one end of connecting rod (16) is connected with connecting block (16), hydraulic device (18) is connected with the bottom (16), the novel shower nozzle is characterized in that a shower nozzle (19) is connected with the outer ring of the connecting piece (18) in a threaded mode, a third connecting rod (20) is arranged on one side of the shower nozzle (19), and one end of the third connecting rod (20) is connected with a lantern ring (21).
2. The wall crack waterproof construction equipment according to claim 1, wherein: the air pump (3) is fixed on one side of the casing (1) through the connecting ring (2), and the air pipe (4) is movably arranged in the inner cavity of the lantern ring (21).
3. The wall crack waterproof construction equipment according to claim 1, wherein: the switch (7) is electrically connected with the hydraulic rod (16), the bottom end of the pushing block (17) is conical, and meanwhile, the pushing block (17) is made of rubber.
4. The wall crack waterproof construction equipment according to claim 1, wherein: the roller (13) rotates on the outer ring of the rotating rod (12), and the roller (13), the scraping plate (14) and the spray head (19) are positioned on the same horizontal line.
5. The wall crack waterproof construction equipment according to claim 1, wherein: the spray head (19) is movably connected with the connecting piece (18).
6. The wall crack waterproof construction equipment according to claim 1, wherein: the length of the armrest (6) is longer than the width of the palm of an adult male.
CN202320398551.2U 2023-03-06 2023-03-06 Waterproof construction equipment for wall cracks Active CN219411954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320398551.2U CN219411954U (en) 2023-03-06 2023-03-06 Waterproof construction equipment for wall cracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320398551.2U CN219411954U (en) 2023-03-06 2023-03-06 Waterproof construction equipment for wall cracks

Publications (1)

Publication Number Publication Date
CN219411954U true CN219411954U (en) 2023-07-25

Family

ID=87209331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320398551.2U Active CN219411954U (en) 2023-03-06 2023-03-06 Waterproof construction equipment for wall cracks

Country Status (1)

Country Link
CN (1) CN219411954U (en)

Similar Documents

Publication Publication Date Title
CN104226623B (en) Overhead transmission line atomization cleaning head
CN210727670U (en) Glass curtain wall belt cleaning device
CN219411954U (en) Waterproof construction equipment for wall cracks
CN105290033A (en) Self-circulation water-saving high-pressure insulator washing device
CN211159140U (en) A environmental protection dust collecting equipment for concrete production
CN210935246U (en) A reducing mechanism for production of water-saving cleaner
CN217369387U (en) Roller wiping device of battery pole piece roller press
CN214273869U (en) Cleaning device for wind power generation blade
CN211054168U (en) Plastic granulating and cutting device capable of cleaning cutting knife
CN210225612U (en) Monitoring device with ash removal function for electric power engineering construction
CN204980940U (en) Multifunctional tower crane
CN208788789U (en) A kind of thimble-type stripping die-cutting apparatus
CN112072526B (en) Outdoor switch board surface snow remove device
CN205617748U (en) Manual ceiling putty powder knife coating ware
CN215424381U (en) Glass curtain wall with self-cleaning function
CN212237478U (en) Civil engineering construction waste material environmental protection processing apparatus
CN205236247U (en) Lubricating grease spraying device
CN205236496U (en) Cleaning equipment of transformer substation based on wireless monitoring
CN210788349U (en) Tower section of thick bamboo belt cleaning device that facilitates use
CN210589803U (en) Novel patching machine capable of preventing splashing mortar
CN209234825U (en) A kind of automatic extension ice maker of uniform frozen food processing
CN102533469A (en) Cleaning agent and cleaning method for building outer walls
CN113327727B (en) Self-cleaning rigid suspension pin insulator and self-cleaning method thereof
CN203622224U (en) Device for jetting cleaning of charged insulator
CN110882872A (en) Construction is with even atomizing spray set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant