CN219410951U - Can install sandbox of single-tube tower fast - Google Patents

Can install sandbox of single-tube tower fast Download PDF

Info

Publication number
CN219410951U
CN219410951U CN202320000788.0U CN202320000788U CN219410951U CN 219410951 U CN219410951 U CN 219410951U CN 202320000788 U CN202320000788 U CN 202320000788U CN 219410951 U CN219410951 U CN 219410951U
Authority
CN
China
Prior art keywords
sandbox
angle iron
angle
iron
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320000788.0U
Other languages
Chinese (zh)
Inventor
刘立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Yunhai Steel Structure Co ltd
Original Assignee
Hebei Yunhai Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Yunhai Steel Structure Co ltd filed Critical Hebei Yunhai Steel Structure Co ltd
Priority to CN202320000788.0U priority Critical patent/CN219410951U/en
Application granted granted Critical
Publication of CN219410951U publication Critical patent/CN219410951U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Abstract

The utility model discloses a sandbox capable of rapidly installing a single-pipe tower, and particularly relates to the technical field of sandboxes. This sandbox that can install single-tube tower fast, first angle bar and second angle bar all use steel for product own cost improves by a wide margin, reduces its transportation and installation cost of dead weight reduction, and product integrated cost reduces by a wide margin than traditional basic cost, and the sexual valence relative altitude improves, and the iron tower reaches after the life, but basic still recycle has further promoted the sexual valence relative altitude.

Description

Can install sandbox of single-tube tower fast
Technical Field
The utility model relates to the technical field of sandboxes, in particular to a sandbox capable of rapidly installing a single-pipe tower.
Background
The single-pipe tower refers to a self-standing high-rise structure for wireless communication, which consists of single steel pipes, wherein the main body of the single-pipe tower is mainly welded steel pipes with circular or polygonal cross sections, the single-pipe tower is mainly a concrete cast-in-situ foundation or a prefabricated foundation, and the single-pipe tower needs 14-28 days of maintenance period, so that the foundation reaches the design strength and then is provided with an iron tower.
In the prior art, a single-pipe tower is required to be maintained for a long time through a cast-in-situ foundation or a prefabricated foundation, the construction period is long, the dead weight is large, the transportation cost is high, large-scale equipment is required to be used during installation, site conditions are limited, and the cost is high.
Disclosure of Invention
The utility model mainly aims to provide a sandbox capable of rapidly installing a single-pipe tower, which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a sandbox that can install single-pipe tower fast, includes first angle bar, the fixed surface of first angle bar installs the second angle bar, the left side fixed mounting of second angle bar has the shrouding, the center department of first angle bar wears to be equipped with the column cap, the surface of column cap has cup jointed the upper fixed plate, one side fixed mounting that the column cap was kept away from to the upper fixed plate has the link plate, the surface of column cap just is located the fixed plate under fixed mounting has the fixed plate down.
Preferably, the first angle iron and the second angle iron are of full-welded structures, and the surfaces of the first angle iron and the second angle iron are subjected to hot dip galvanizing treatment.
Preferably, diagonal steel is fixedly arranged between the first angle iron and the second angle iron, and the first angle iron is perpendicular to the second angle iron, so that firmness is improved.
Preferably, the column head whole body is assembled by angle irons and steel plates with corresponding lengths, the bottoms of the upper fixing plate and the connecting plate are fixedly connected with the first angle irons, round openings are formed in the centers of the lower fixing plate and the upper fixing plate, and the lower fixing plate and the upper fixing plate are matched with the position of the fixed column head.
Preferably, the first angle iron and the second angle iron form a sandbox frame, and the sandbox is integrally paved with sand or concrete.
Preferably, the column head is positioned in the middle of the sandbox, and the first angle iron and the second angle iron on the left side and the right side of the column head form a left sandbox frame, and the three parts are connected through bolts.
Compared with the prior art, the utility model has the following beneficial effects:
1. this can install sandbox of single-tube tower fast, the sandbox frame that first angle bar and second angle bar formed, its inside pouring gravel and sand or concrete is as the iron tower basis, and the sandbox frame is made for all steel welding, and first angle bar is connected with the second angle bar and is increased the bracing, has guaranteed holistic stability, because of stable sandbox frame for whole has reached required design strength, so after the shop filled gravel or concrete, need not the maintenance, but direct mount iron tower has shortened project time limit for a project greatly.
2. This sandbox that can install single-tube tower fast, the box frame divide into the triplex, and through the design mode of unified installation again, alleviateed transportation pressure, the sandbox frame dead weight is light, has reduced site condition restriction during the installation.
3. This sandbox that can install single-tube tower fast, first angle bar and second angle bar all use steel for product own cost improves by a wide margin, reduces its transportation and installation cost of dead weight reduction, and product integrated cost reduces by a wide margin than traditional basic cost, and the sexual valence relative altitude improves, and the iron tower reaches after the life, but basic still recycle has further promoted the sexual valence relative altitude.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a single seal plate structure according to the present utility model;
fig. 3 is an enlarged view of the lower fixing plate structure of the portion a of fig. 1.
In the figure: 1. a first angle iron; 2. a sealing plate; 3. a second angle iron; 4. column head; 5. an upper fixing plate; 6. a connecting plate; 7. and a lower fixing plate.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in figures 1-3, the sandbox capable of being quickly installed on a single-pipe tower comprises a first angle iron 1, wherein a second angle iron 3 is fixedly installed on the surface of the first angle iron 1, the first angle iron 1 and the second angle iron 3 are of a full-welded structure, the surface is subjected to hot dip galvanizing treatment, a sealing plate 2 is fixedly installed on the left side of the second angle iron 3, diagonal bracing steel materials are fixedly installed between the first angle iron 1 and the second angle iron 3, the first angle iron 1 and the second angle iron 3 are mutually perpendicular, and firmness is improved.
The first angle iron 1 and the second angle iron 3 form a sandbox frame, and the sandbox is integrally paved with sand and stone or concrete.
The column head 4 is penetrated in the center of the first angle iron 1, the surface of the column head 4 is sleeved with the upper fixing plate 5, one side of the upper fixing plate 5 far away from the column head 4 is fixedly provided with the connecting plate 6, and the surface of the column head 4 is positioned right below the upper fixing plate 5 and fixedly provided with the lower fixing plate 7.
The first angle iron 1 and the second angle iron 3 form a sandbox frame, the sandbox is integrated, sand and stone or concrete are paved, the column head 4 is positioned in the middle of the sandbox, the first angle iron 1 and the second angle iron 3 on the left side and the right side of the column head 4 form a left sandbox frame, and the three parts are connected through bolts.
The column head 4 is assembled by angle irons and steel plates with corresponding lengths, the bottoms of the upper fixing plate 5 and the connecting plate 6 are fixedly connected with the first angle iron 1, round openings are formed in the centers of the lower fixing plate 7 and the upper fixing plate 5, and the lower fixing plate 7 and the upper fixing plate 5 are matched with each other to fix the position of the column head 4.
The working principle of the utility model is as follows: the sandbox frame that first angle bar 1 and second angle bar 3 formed, its inside pouring gravel or concrete is as the iron tower basis, the six shrouding 2 of sandbox frame prevents to run off, the sandbox frame is made for full steel welding, first angle bar 1 is connected with second angle bar 3 and is increased the bracing, holistic stability has been guaranteed, because of stable sandbox frame, make whole required design strength has been reached, so after filling gravel or concrete, the maintenance is unnecessary, can direct mount iron tower, project time limit for a project has been shortened greatly, go up fixed plate 5 and lower fixed plate 7 cooperation and fix column cap 4 position, the sandbox frame of upper and lower position is connected to column cap 4.
The sandbox frame is divided into three parts, and the design mode of uniform installation reduces the transportation pressure, the self weight of the sandbox frame is light, and the site condition limitation is reduced during installation.
The first angle iron 1 and the second angle iron 3 are made of steel, so that the cost of the product is greatly improved, the dead weight is reduced, the transportation and installation cost of the product is reduced, the comprehensive cost of the product is greatly reduced compared with that of a traditional foundation, the cost performance is improved, the foundation can be recycled after the iron tower reaches the service life, and the cost performance of the product is further improved.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. Can install sandbox of single-tube tower fast, including first angle iron (1), its characterized in that: the surface fixed mounting of first angle bar (1) has second angle bar (3), the left side fixed mounting of second angle bar (3) has shrouding (2), the center department of first angle bar (1) wears to be equipped with column cap (4), upper fixed plate (5) have been cup jointed on the surface of column cap (4), one side fixed mounting that upper fixed plate (5) kept away from column cap (4) has link plate (6), the surface of column cap (4) just is located under upper fixed plate (5) fixed mounting has lower fixed plate (7).
2. A sandbox capable of rapid installation of single-tube towers as claimed in claim 1, wherein: the first angle iron (1) and the second angle iron (3) are of full-welded structures, and the surfaces of the first angle iron and the second angle iron are subjected to hot dip galvanizing treatment.
3. A sandbox capable of rapid installation of single-tube towers as claimed in claim 1, wherein: and diagonal steel is fixedly arranged between the first angle iron (1) and the second angle iron (3), and the first angle iron (1) and the second angle iron (3) are mutually perpendicular.
4. A sandbox capable of rapid installation of single-tube towers as claimed in claim 1, wherein: the column head (4) is assembled by angle irons and steel plates with corresponding lengths, the bottoms of the upper fixing plate (5) and the connecting plate (6) are fixedly connected with the first angle iron (1), and round openings are formed in the centers of the lower fixing plate (7) and the upper fixing plate (5).
5. A sandbox capable of rapid installation of single-tube towers as claimed in claim 1, wherein: the sand box is characterized in that the first angle iron (1) and the second angle iron (3) form a sand box frame, sand box is integrally paved with sand and stones or concrete, and sealing plates (2) are arranged on six surfaces of the sand box frame.
6. A sandbox capable of rapid installation of single-tube towers as claimed in claim 4, wherein: the column head (4) is positioned in the middle of the sandbox, and the first angle iron (1) and the second angle iron (3) on the left side and the right side of the column head (4) form a left sandbox frame, and the left sandbox frame and the second sandbox frame are connected through bolts.
CN202320000788.0U 2023-01-03 2023-01-03 Can install sandbox of single-tube tower fast Active CN219410951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320000788.0U CN219410951U (en) 2023-01-03 2023-01-03 Can install sandbox of single-tube tower fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320000788.0U CN219410951U (en) 2023-01-03 2023-01-03 Can install sandbox of single-tube tower fast

Publications (1)

Publication Number Publication Date
CN219410951U true CN219410951U (en) 2023-07-25

Family

ID=87208011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320000788.0U Active CN219410951U (en) 2023-01-03 2023-01-03 Can install sandbox of single-tube tower fast

Country Status (1)

Country Link
CN (1) CN219410951U (en)

Similar Documents

Publication Publication Date Title
CN105696617A (en) Fabricated foundation with oblique-angle cone supports for power transmission tower, and construction method thereof
CN206706773U (en) The more annulus integral supporting structures of armored concrete in a kind of deep big foundation pit
CN219410951U (en) Can install sandbox of single-tube tower fast
CN101881029B (en) Detachable tower foundation
CN109457868A (en) A kind of steel tube concrete column feet node and its construction method
CN210459269U (en) High-order tower trickle post
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN209369178U (en) Prefabricated support column based on H profile steel
CN203383563U (en) Fast assembled communication iron tower
CN205840142U (en) Reinforced concrete column is not landed in a kind of Super High Core Walls Structure
CN203420270U (en) Fish belly sill part of foundation pit supporting and protecting inner support system
CN203393721U (en) Inner support main purlin component
CN201381803Y (en) T-shaped base of beam pumper
CN206948140U (en) Hydrogenerator machine cheats inner stator mounting platform structure
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN202416180U (en) Door-shaped lifting device for slip-form construction
CN205933009U (en) From rising tower crane foundation ballast structure
CN218261808U (en) Hydraulic jacking device for floor holding pole
CN219174990U (en) Light abutment structure
CN203420271U (en) Purlin part
CN216341000U (en) Concrete pouring box convenient to aggregate erection
CN219992470U (en) Arc pad layer and waterproof protection layer concrete placement mould
CN203755136U (en) Rear-reinforced shockproof anti-beam-falling device
CN220868340U (en) Underground box pump integrated anti-floating fire pump station
CN213709192U (en) Assembled bridge deck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant