CN219410564U - Temporary consolidation structure of continuous beam bridge pier - Google Patents

Temporary consolidation structure of continuous beam bridge pier Download PDF

Info

Publication number
CN219410564U
CN219410564U CN202320553049.4U CN202320553049U CN219410564U CN 219410564 U CN219410564 U CN 219410564U CN 202320553049 U CN202320553049 U CN 202320553049U CN 219410564 U CN219410564 U CN 219410564U
Authority
CN
China
Prior art keywords
block
bridge pier
piece
continuous beam
beam bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320553049.4U
Other languages
Chinese (zh)
Inventor
牛达满
李学民
王宏伟
范文广
张帅
张泽志
王宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Roadbridge Group Co Ltd
Original Assignee
PowerChina Roadbridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Roadbridge Group Co Ltd filed Critical PowerChina Roadbridge Group Co Ltd
Priority to CN202320553049.4U priority Critical patent/CN219410564U/en
Application granted granted Critical
Publication of CN219410564U publication Critical patent/CN219410564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Abstract

The utility model belongs to the technical field of bridge construction facilities, and particularly relates to a temporary consolidation structure of a continuous beam bridge pier, which comprises a main body, wherein a zero block is arranged at the lower end of the main body, a pier is arranged at the lower end of the zero block, a fixing frame for fixing is arranged at the outer side of the pier, connecting blocks are arranged at two sides of the fixing frame, square blocks are arranged at the lower ends of the connecting blocks, supporting rods are arranged in the connecting blocks, bonding blocks are arranged at two sides of the inner part of the fixing frame, positioning grooves are formed in one side of the bonding blocks, positioning blocks are arranged in the positioning grooves, clamping blocks are arranged at two ends of one side of the fixing frame, and the supporting rods are pulled to rotate to a proper position by taking a through hole as a center of a circle so as to push a stressed block at the upper end of the square block to reach a proper position, and the stressed block is extruded to be in a reset group in a movable groove, so that the contact area between the pier and the main body is reached, and the stress is uniform.

Description

Temporary consolidation structure of continuous beam bridge pier
Technical Field
The utility model belongs to the technical field of bridge construction facilities, and particularly relates to a temporary consolidation structure of a continuous beam bridge pier.
Background
With the development of society, the span of a continuous beam bridge is larger and larger, the hanging blue construction method is used more and more, but the continuous beam bridge established by adopting the hanging blue construction method has the problem of system conversion, and zero blocks are subjected to system conversion from temporary consolidation to a bridge forming support in the construction stage, and different anchoring forms have different influences on the internal force of the zero blocks, so that the anchoring forms of the zero blocks are fully considered in the design.
The original temporary consolidation structure of the continuous beam bridge pier has the following defects in use:
1. the original temporary consolidation structure of the continuous beam bridge pier has the advantages that the support structure is too simple in use and only has a zero support block, so that the stress is uneven.
2. The original temporary consolidation structure of the continuous beam bridge pier is inconvenient to detach and install in use, and a large number of screws are needed to fix the temporary consolidation structure.
Disclosure of Invention
In order to solve the problems in the prior art, the utility model provides a temporary consolidation structure of a continuous beam bridge pier, which has the characteristics of being capable of uniformly bearing force and being convenient to install and detach.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a temporary consolidation structure of continuous beam bridge mound, includes the main part, the lower extreme of main part is equipped with the zero number piece, the lower extreme of zero number piece is equipped with the pier, the outside of pier is equipped with the mount that is used for fixed, the both sides of mount all are equipped with the connecting block, the lower extreme of connecting block all is equipped with square piece, the inside of connecting block all is equipped with the bracing piece, the inside both sides of mount all are equipped with the laminating piece, the constant head tank has all been seted up to one side of laminating piece, the inside of constant head tank all is equipped with the locating piece, one side both ends of mount are equipped with the fixture block, the rear end of locating piece all is equipped with the threaded rod, both ends one side of bracing piece all is equipped with the through-hole that runs through the bracing piece, a plurality of screw hole has all been seted up in the outside of through-hole, the movable groove's inside all is equipped with the compound group, the upper end of compound group all is equipped with the atress piece, the inside of through-hole all is equipped with the bolt, the outside both ends of bolt all are equipped with the nut, the both sides family of connecting block all is equipped with the screw.
As a preferable technical scheme of the temporary consolidation structure of the continuous beam bridge pier, the zero block is fixedly connected with the main body, the clamping block is in clamping connection with the fixing frame, the threaded rod is connected with the fixing frame through threads, and the zero block is fixedly connected with the bridge pier.
As a preferable technical scheme of the temporary consolidation structure of the continuous beam bridge pier, the positioning blocks are connected with the attaching blocks through clamping, the threaded rods are fixedly connected with the positioning blocks, and the attaching blocks are connected with the bridge pier through attaching.
As an optimal technical scheme of the temporary consolidation structure of the continuous beam bridge pier, the reset group is fixedly connected with the square blocks, the square blocks are fixedly connected with the connecting blocks, and the stress blocks are fixedly connected with the square blocks through clamping.
As a preferable technical scheme of the temporary consolidation structure of the continuous beam bridge pier, the supporting rods are connected with the connecting blocks through bolts, and the nuts are connected with the bolts through threads.
As a preferable technical scheme of the temporary consolidation structure of the continuous beam bridge pier, the screw is connected with the connecting block through threads.
Compared with the prior art, the utility model has the beneficial effects that:
1. the support rod is pulled to rotate to a proper position by taking the through hole as the center of a circle, and the stress block at the upper end of the square block is pushed to reach a proper position, so that the stress block extrudes the reset group in the movable groove, thereby reaching the contact area of the bridge pier and the main body, and ensuring that the stress is uniform.
2. Through promoting the fly leaf, make the fixture block get into the inside of mount, rotatory screw is fixed it to reach the effect of being convenient for its dismantlement.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic side view of the present utility model;
FIG. 3 is a schematic view of the overall cross-sectional structure of the front view of the present utility model;
FIG. 4 is a schematic view showing the structure of the support bar according to the present utility model;
FIG. 5 is a schematic view of a square block structure according to the present utility model;
FIG. 6 is a schematic view of a partial enlarged structure at A in the present utility model;
in the figure: 1. a main body; 2. bridge piers; 3. zero block; 4. a fixing frame; 5. square blocks; 6. a connecting block; 7. a support rod; 8. a threaded rod; 9. a clamping block; 10. a bonding block; 11. a positioning groove; 12. a positioning block; 13. a threaded hole; 14. a through hole; 15. a movable groove; 16. resetting groups; 17. a stress block; 18. a screw; 19. a bolt; 20. and (3) a nut.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples
Referring to fig. 1-6, the present utility model provides the following technical solutions: the utility model provides a temporary consolidation structure of continuous beam bridge mound, including main part 1, the lower extreme of main part 1 is equipped with zero number piece 3, zero number piece 3's lower extreme is equipped with pier 2, pier 2's outside is equipped with the mount 4 that is used for fixed, mount 4's both sides all are equipped with connecting block 6, connecting block 6's lower extreme all is equipped with square piece 5, connecting block 6's inside all is equipped with bracing piece 7, mount 4's inside both sides all are equipped with laminating piece 10, positioning groove 11 has all been seted up to one side of laminating piece 10, positioning groove 11's inside all is equipped with locating piece 12, mount 4's one side both ends are equipped with fixture block 9, locating piece 12's rear end all is equipped with threaded rod 8, bracing piece 7's both ends one side all is equipped with the through-hole 14 that runs through bracing piece 7, a plurality of screw hole 13 has all been seted up in the outside of through-hole 14, movable slot 15 has all been seted up in the upper end of square piece 5, movable slot 15's inside all is equipped with compound group 16, compound group 16's upper end all is equipped with atress piece 17, the inside of through-hole 14 all is equipped with bolt 19, both ends of the outside of bolt 19 all are equipped with nut 20, connecting block 6's both sides are all equipped with screw 18.
Specifically, the zero block 3 is fixedly connected with the main body 1, the clamping block 9 is in clamping connection with the fixing frame 4, the threaded rod 8 is connected with the fixing frame 4 through threads, the zero block 3 is fixedly connected with the bridge pier 2, and the clamping block 9 is a trapezoid component in the embodiment.
Specifically, the positioning block 12 is connected with the attaching block 10 through a clamping manner, the threaded rod 8 is fixedly connected with the positioning block 12, the attaching block 10 is connected with the pier 2 through attaching, and the positioning block 12 is a T-shaped member in the embodiment.
Specifically, the reset group 16 is fixedly connected with the square block 5, the square block 5 is fixedly connected with the connecting block 6, and the stress block 17 is fixedly connected with the square block 5 through clamping, in this embodiment, the stress block 17 is an i-shaped member.
Specifically, the support rod 7 is connected to the connection block 6 by a bolt 19, and a nut 20 is connected to the bolt 19 by a screw.
Specifically, the screw 18 is screwed to the connection block 6.
The working principle and the using flow of the utility model are as follows: the supporting rod 7 at the lower end of the main body 1 is pulled to rotate to a proper position by taking the through hole 14 as a circle center, the stress block 17 is pushed, the stress block 17 extrudes the reset group 16 positioned in the movable groove 15 at the upper side of the square block 5 at the lower end of the connecting block 6, the nuts 20 at the two ends at the outer side of the bolts 19 are rotated, and the feed screws 18 are screwed into the threaded holes 13, so that the contact area of the bearing block is enlarged, and the bearing force is uniform; the clamping blocks 9 at two ends of one side of the movable plate are pushed into the fixing frame 4, two ends of the clamping blocks are fixed by the threaded holes 13, the threaded rod 8 is rotated, the threaded rod 8 is enabled to rotate with the positioning block 12 positioned in the positioning groove 11, and the attaching block 10 is pushed to attach to the bridge pier 2 at the lower end of the zero block 3, so that the effect of fixing the bridge pier is achieved.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. A temporary consolidation structure of a continuous beam bridge pier is characterized in that: including main part (1), the lower extreme of main part (1) is equipped with zero number piece (3), the lower extreme of zero number piece (3) is equipped with pier (2), the outside of pier (2) is equipped with mount (4) that are used for fixed, the both sides of mount (4) all are equipped with connecting block (6), the lower extreme of connecting block (6) all is equipped with square piece (5), the inside of connecting block (6) all is equipped with bracing piece (7), the inside both sides of mount (4) all are equipped with laminating piece (10), constant head tank (11) have all been seted up to one side of laminating piece (10), the inside of constant head tank (11) all is equipped with locating piece (12), one side both ends of mount (4) are equipped with fixture block (9), the rear end of locating piece (12) all is equipped with threaded rod (8), the both ends one side of bracing piece (7) all are equipped with through-hole (14) that run through bracing piece (7), a plurality of screw hole (13) have all been seted up in the outside of through-hole (14), movable groove (15) have all been seted up to the inside both sides of square piece (6), all set up movable groove (15), all be equipped with inside (16) and all be equipped with on the inside hole (16), nuts (20) are arranged at two ends of the outer side of the bolt (19), and screws (18) are arranged at two sides of the connecting block (6).
2. The temporary consolidation structure of a continuous beam bridge pier according to claim 1, wherein: the zero block (3) is fixedly connected with the main body (1), the clamping block (9) is in clamping connection with the fixing frame (4), the threaded rod (8) is connected with the fixing frame (4) through threads, and the zero block (3) is fixedly connected with the bridge pier (2).
3. The temporary consolidation structure of a continuous beam bridge pier according to claim 1, wherein: the positioning block (12) is connected with the attaching block (10) through clamping, the threaded rod (8) is fixedly connected with the positioning block (12), and the attaching block (10) is connected with the pier (2) through attaching.
4. The temporary consolidation structure of a continuous beam bridge pier according to claim 1, wherein: the reset group (16) is fixedly connected with the square block (5), the square block (5) is fixedly connected with the connecting block (6), and the stress block (17) is fixedly connected with the square block (5) through clamping.
5. The temporary consolidation structure of a continuous beam bridge pier according to claim 1, wherein: the supporting rod (7) is connected with the connecting block (6) through a bolt (19), and the nut (20) is connected with the bolt (19) through threads.
6. The temporary consolidation structure of a continuous beam bridge pier according to claim 1, wherein: the screw (18) is connected with the connecting block (6) through threads.
CN202320553049.4U 2023-03-18 2023-03-18 Temporary consolidation structure of continuous beam bridge pier Active CN219410564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320553049.4U CN219410564U (en) 2023-03-18 2023-03-18 Temporary consolidation structure of continuous beam bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320553049.4U CN219410564U (en) 2023-03-18 2023-03-18 Temporary consolidation structure of continuous beam bridge pier

Publications (1)

Publication Number Publication Date
CN219410564U true CN219410564U (en) 2023-07-25

Family

ID=87228761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320553049.4U Active CN219410564U (en) 2023-03-18 2023-03-18 Temporary consolidation structure of continuous beam bridge pier

Country Status (1)

Country Link
CN (1) CN219410564U (en)

Similar Documents

Publication Publication Date Title
CN202299050U (en) Unitized curtain wall plate ball hinge type universal connecting device
CN207048318U (en) A kind of aluminum alloy pattern plate bracing device
CN219410564U (en) Temporary consolidation structure of continuous beam bridge pier
CN209891396U (en) Intercolumnar bearing structure for steel construction
CN208884983U (en) A kind of aluminum alloy mould plate device being easily installed
CN202259345U (en) Adjustable pressing block of solar cell panel
CN217203445U (en) Municipal works road and bridge crack restoration fixed knot constructs
CN212198273U (en) Portable tower footing wall-attached frame inner support
CN218911785U (en) Connection assembly convenient to install
CN219863380U (en) Steel structure module
CN219012064U (en) Novel adjustable bracket
CN220704328U (en) Triangular bracket
CN220543464U (en) Traffic maintenance signal lamp
CN220685758U (en) Steel pipe bailey support stop device
CN219863384U (en) Cross cable connection cable clamp for string truss
CN219510383U (en) Ripple compensator with auxiliary positioning and mounting structure
CN220150533U (en) Assembled steel structure connecting piece
CN220184247U (en) Steel structure beam column
CN219547577U (en) Temporary telescopic equipment for bridge
CN212453607U (en) T-shaped shear wall aluminum alloy template assembly
CN216343337U (en) High-reliability anti-loosening Q195 light spring washer
CN215562063U (en) Deceleration strip for traffic construction convenient to dismantle and change
CN218541644U (en) Reinforced concrete reinforced structure
CN210216185U (en) Reinforcing device of large-tonnage supporting mechanism
CN220754759U (en) Photovoltaic module of zero carbon garden

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant