CN219386677U - Membrane structure bicycle shed stand fixer - Google Patents

Membrane structure bicycle shed stand fixer Download PDF

Info

Publication number
CN219386677U
CN219386677U CN202320165239.9U CN202320165239U CN219386677U CN 219386677 U CN219386677 U CN 219386677U CN 202320165239 U CN202320165239 U CN 202320165239U CN 219386677 U CN219386677 U CN 219386677U
Authority
CN
China
Prior art keywords
bevel gear
wall
fixed
column
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320165239.9U
Other languages
Chinese (zh)
Inventor
张可
姚艳
张秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Judian Material Technology Co ltd
Original Assignee
Anhui Judian Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Judian Material Technology Co ltd filed Critical Anhui Judian Material Technology Co ltd
Priority to CN202320165239.9U priority Critical patent/CN219386677U/en
Application granted granted Critical
Publication of CN219386677U publication Critical patent/CN219386677U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to the technical field of membrane structure cabins, and discloses a membrane structure cabins upright post fixer, which comprises a base and further comprises: the fixing mechanism comprises a fixing column, the side face of the fixing column is movably connected with the side face of the base, the bottom end of the column body is fixedly connected with the top end of the fixing mechanism, the fixing mechanism comprises a through hole is formed in the side face of the fixing column, the position, corresponding to the through hole, of the side face inner wall of the fixing column is fixedly connected with a mounting sleeve, and the side face inner wall of the mounting sleeve is movably connected with a fixing rod; according to the utility model, the base is pre-buried under the ground, the fixing column is inserted into the inner wall of the base, the fixing rod is moved outwards along the mounting sleeve, and the fixing rod is inserted into the fixing hole in the inner wall of the inner face of the base, so that the stability of the fixing mechanism is improved, the operation is convenient, the work efficiency is improved, and the stability of the shed is improved.

Description

Membrane structure bicycle shed stand fixer
Technical Field
The utility model relates to the technical field of membrane structure sheds, in particular to a membrane structure shed upright post fixer.
Background
The membrane structure shed is one of the main construction forms of a modern large-span space structure parking lot, has the characteristics of light weight, good stress, unique shape and the like, and has better identification and solicitation effects besides meeting the basic functions of wind and rain prevention, sun protection and the like, wherein the stand column enables the important structure of the shed, the whole shed needs to support the sunshade at the top through the stand column, the bottom of the stand column is installed on the ground, the whole shed is fixed, and therefore, the stand column needs to be fixed by the fixer, so that the overall stability of the shed is ensured.
The prior art is not enough: however, when the existing fixer is used for fixing the upright post and installing the upright post on the ground, the upright post is fixed by bolts, however, the external environment is complex, the bolts are easy to corrode, the disassembly and maintenance of the upright post are inconvenient, and the threaded holes are easy to corrode and inconvenient to recycle; and the height of the upright post cannot be adjusted.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model provides a membrane structure bicycle shed upright post fixer, which solves the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a membrane structure bicycle shed stand fixer, includes the base, still includes: the fixing mechanism comprises a fixing column, the side inner wall of the fixing column is movably connected with the side face of the fixing mechanism, the bottom end of the column body is fixedly connected with the top end of the fixing mechanism, the fixing mechanism comprises a fixing column, the side face of the fixing column is movably connected with the side face inner wall of the base, a through hole is formed in the side face of the fixing column, the side face inner wall of the fixing column is fixedly connected with a mounting sleeve to the position of the through hole, the side face inner wall of the mounting sleeve is movably connected with a fixing rod, the through holes are uniformly distributed in the side face of the fixing column, the side face inner wall of the base is provided with fixing holes corresponding to the positions of the through holes, and the side face of the fixing rod is movably connected with the side face of the fixing holes.
Further, the bottom inner wall activity of fixed column has cup jointed the transfer line, the side fixedly connected with first driven bevel gear of transfer line, the side inner wall activity of side of fixed column has cup jointed second drive bevel gear, the side of second drive bevel gear and the side intermeshing of first driven bevel gear, the side fixedly connected with first drive bevel gear of transfer line, the side inner wall activity of the side of fixed column has cup jointed second driven bevel gear, the side of first drive bevel gear and the side intermeshing of second driven bevel gear, the top fixedly connected with first threaded rod of second driven bevel gear, the side of through-hole and the side inner wall threaded connection of fixed column, the top swing joint of second drive bevel gear has first turning handle.
Further, the side of dead lever has seted up the spacing groove, the side inner wall fixedly connected with stopper of installation cover, the side and the side swing joint of spacing groove of stopper.
Further, the top end of the fixing rod is of a conical structure.
Further, the stand main part includes the support column, the bottom and the top fixed connection of fixed column of support column, the side inner wall swing joint of support column has the telescopic link, the side inner wall fixedly connected with fixed block of support column, the top activity of fixed block has cup jointed the second threaded rod, the side of second threaded rod and the side inner wall threaded connection of telescopic link, the bottom fixedly connected with third driven bevel gear of second threaded rod, the side inner wall activity of support column has cup jointed third drive bevel gear, third drive bevel gear's side and third driven bevel gear's side intermeshing, third drive bevel gear's top swing joint has the second rotating handle.
Further, a clamping groove is formed in the top end of the second drive bevel gear, a clamping block is fixedly connected to the bottom end of the first rotary handle, the side face of the clamping block and the side face of the clamping groove are mutually wedged, and the first rotary handle and the second drive bevel gear are identical in structure with the third drive bevel gear and the second rotary handle.
The utility model has the technical effects and advantages that:
1. according to the utility model, the base is pre-buried under the ground, the fixing column is inserted into the inner wall of the base, the fixing rod is moved outwards along the mounting sleeve, and the fixing rod is inserted into the fixing hole in the inner wall of the inner face of the base, so that the stability of the fixing mechanism is improved, the operation is convenient, the work efficiency is improved, and the stability of the shed is improved.
2. According to the utility model, the second rotating handle is rotated according to the use requirement, so that the third driving bevel gear drives the third driven bevel gear to rotate, the second threaded rod is rotated, the telescopic rod is driven to move along the inner wall of the support column through threads, the upright column is kept at a proper height, and the practicability of the upright column is facilitated.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a fixing mechanism according to the present utility model;
FIG. 3 is a schematic view of the inner structure of the fixing column according to the present utility model;
FIG. 4 is a schematic view of the structure of FIG. 2A according to the present utility model;
FIG. 5 is a schematic cross-sectional view of FIG. 3B according to the present utility model;
fig. 6 is a schematic cross-sectional structure of the column body of the present utility model.
The reference numerals are: 1. a base; 2. a fixing mechanism; 201. fixing the column; 202. a first swivel handle; 203. a through hole; 204. a transmission rod; 205. a first driven bevel gear; 206. a first drive bevel gear; 207. a second driven bevel gear; 208. a mounting sleeve; 209. a second drive bevel gear; 210. a clamping groove; 211. a clamping block; 212. a fixed rod; 213. a first threaded rod; 3. a column main body; 301. a support column; 302. a second swivel handle; 303. a telescopic rod; 304. a second threaded rod; 305. a fixed block; 306. a third driven bevel gear; 307. and a third drive bevel gear.
Detailed Description
The embodiments of the present utility model will be described more fully hereinafter with reference to the accompanying drawings, in which the configurations of the structures described in the following embodiments are shown by way of illustration only, and the membrane structure roof pillar holder according to the present utility model is not limited to the configurations described in the following embodiments, but all other embodiments obtained by one skilled in the art without any inventive effort are within the scope of the present utility model.
Referring to fig. 1 to 6, the present utility model provides a membrane structure shed pillar fixer, comprising a base 1, further comprising: the fixing mechanism comprises a fixing mechanism 2 and a stand column main body 3, wherein the side inner wall of a base 1 is movably connected with the side face of the fixing mechanism 2, the bottom end of the stand column main body 3 is fixedly connected with the top end of the fixing mechanism 2, the fixing mechanism 2 comprises a fixing column 201, the side face of the fixing column 201 is movably connected with the side inner wall of the base 1, a through hole 203 is formed in the side face of the fixing column 201, the position of the side inner wall of the fixing column 201, which is opposite to the through hole 203, of a mounting sleeve 208 is fixedly connected with a mounting sleeve 208, the side face of the mounting sleeve 208 is movably connected with a fixing rod 212, the through hole is uniformly distributed on the side face of the fixing column 201, the side face of the base 1 is provided with a fixing hole corresponding to the position of the through hole 203, the side face of the fixing rod 212 is fixedly connected with the side face of the fixing hole, the base 1 is pre-buried under the ground when the stand column is mounted, the fixing column 201 is inserted into the inner wall of the base 1, the fixing rod 212 is moved outwards along the mounting sleeve 208, and the fixing rod 212 is inserted into the fixing hole of the inner wall of the inner face of the base 1, so that the stability of the fixing mechanism 2 is increased.
Wherein, the bottom inner wall activity of fixed column 201 has cup jointed transfer line 204, the side fixedly connected with first driven bevel gear 205 of transfer line 204, the side inner wall activity of fixed column 201 has cup jointed second drive bevel gear 209, the side of second drive bevel gear 209 and the side intermeshing of first driven bevel gear 205, the side fixedly connected with first drive bevel gear 206 of transfer line 204, the side inner wall activity of fixed column 201 has cup jointed second driven bevel gear 207, the side of first drive bevel gear 206 and the side intermeshing of second driven bevel gear 207, the top fixedly connected with first threaded rod 213 of second driven bevel gear 207, the side of through-hole 203 and the side inner wall threaded connection of dead lever 212, the top swing joint of second drive bevel gear 209 has first rotating handle 202, first rotating handle 202 drives second drive bevel gear 209, thereby make first driven bevel gear 205 drive transfer line 204 rotate, intermesh with four second driven bevel gears 207 through first drive bevel gear 206, thereby drive first threaded rod 213, make dead lever 212 remove along the inner wall of installation cover 208 through the screw thread.
Wherein, the spacing groove has been seted up to the side of dead lever 212, and the side inner wall fixedly connected with stopper of installation cover 208, the side of stopper and the side swing joint of spacing groove, and when dead lever 212 moved along the inner wall of installation cover 208, the spacing of installation cover 208 side inner wall was slided in the spacing groove in the dead lever 212 side and is carried out spacingly to dead lever 212.
Wherein the top end of the fixing rod 212 is in a conical structure.
The column main body 3 comprises a support column 301, the bottom end of the support column 301 is fixedly connected with the top end of the fixed column 201, the side inner wall of the support column 301 is movably connected with a telescopic rod 303, the side inner wall of the support column 301 is fixedly connected with a fixed block 305, the top end of the fixed block 305 is movably sleeved with a second threaded rod 304, the side surface of the second threaded rod 304 is in threaded connection with the side inner wall of the telescopic rod 303, the bottom end of the second threaded rod 304 is fixedly connected with a third driven bevel gear 306, the side surface of the support column 301 is movably sleeved with a third driving bevel gear 307, the side surface of the third driving bevel gear 307 is meshed with the side surface of the third driven bevel gear 306, the top end of the third driving bevel gear 307 is movably connected with a second rotating handle 302, and according to use requirements, the second rotating handle 302 enables the third driving bevel gear 307 to drive the third driven bevel gear 306 to rotate, so that the second threaded rod 304 drives the telescopic rod 303 to move along the inner wall of the support column 301 through threads, and the column keeps proper height.
Wherein, the clamping groove 210 is provided at the top end of the second drive bevel gear 209, the clamping block 211 is fixedly connected to the bottom end of the first rotating handle 202, the side surface of the clamping block 211 and the side surface of the clamping groove 210 are mutually wedged, the structures of the first rotating handle 202 and the second drive bevel gear 209 are identical to those of the third drive bevel gear 307 and the second rotating handle 302, and the structures of the second rotating handle 302 and the second rotating handle 302 are identical to each other.
The working principle of the utility model is as follows: when the upright post is installed, the base 1 is pre-buried under the ground, the fixing post 201 is inserted into the inner wall of the base 1, the clamping block 211 at the top end of the first rotating handle 202 is inserted into the clamping groove 210 at the top end of the second driving bevel gear 209, the first rotating handle 202 drives the second driving bevel gear 209 to rotate, thereby the first driven bevel gear 205 drives the transmission rod 204 to rotate, the first driving bevel gear 206 is meshed with the four second driven bevel gears 207 mutually, thereby the first threaded rod 213 is driven to rotate, the fixing rod 212 is moved along the inner wall of the installation sleeve 208 through threads, the fixing rod 212 is moved outwards along the installation sleeve 208, the fixing rod 212 is inserted into the fixing hole in the inner wall of the inner face of the base 1, the stability of the fixing mechanism 2 is improved, the first rotating handle 202 is removed, the second rotating handle 302 is rotated, the third driving bevel gear 307 is driven to rotate the third driven bevel gear 306, thereby the second threaded rod 304 is driven to rotate, the telescopic rod 303 is driven to move along the inner wall of the support post 301, the upright post is kept at a proper height, the second rotating handle 302 is removed, and the fixing rod 212 is moved outwards along the installation sleeve 208 in reverse direction during disassembly, and the base 201 can be taken in the base 201 from the inner face of the base 1.

Claims (6)

1. The utility model provides a membrane structure bicycle shed stand fixer, includes base (1), its characterized in that still includes: fixed establishment (2) and stand main part (3), the side inner wall of base (1) and the side swing joint of fixed establishment (2), the bottom of stand main part (3) and the top fixed connection of fixed establishment (2), fixed establishment (2) include fixed column (201), the side of fixed column (201) and the side inner wall swing joint of base (1), through-hole (203) have been seted up to the side of fixed column (201), the side inner wall of fixed column (201) is to the position fixedly connected with installation cover (208) of through-hole (203), the side inner wall swing joint of installation cover (208) has dead lever (212), through-hole (203) evenly distributed is in the side of fixed column (201), the side of fixed lever (212) is seted up to the side inner wall of base (1) corresponding the position of through-hole (203), the side of dead lever (212) and the side swing joint of fixed hole.
2. A membrane structure shed pillar holder as in claim 1, wherein: the bottom inner wall activity of fixed column (201) has cup jointed transfer line (204), the side fixedly connected with first driven bevel gear (205) of transfer line (204), the side inner wall activity of fixed column (201) has cup jointed second drive bevel gear (209), the side of second drive bevel gear (209) and the side intermeshing of first driven bevel gear (205), the side fixedly connected with first drive bevel gear (206) of transfer line (204), the side inner wall activity of fixed column (201) has cup jointed second driven bevel gear (207), the side of first drive bevel gear (206) and the side intermeshing of second driven bevel gear (207), the top fixedly connected with first threaded rod (213) of second driven bevel gear (207), the side of through-hole (203) and the side inner wall threaded connection of fixed rod (212), the top swing joint of second drive bevel gear (209) has first turning handle (202).
3. A membrane structure shed pillar holder as in claim 2, wherein: the side of dead lever (212) has seted up the spacing groove, the side inner wall fixedly connected with stopper of installation cover (208), the side and the side swing joint of spacing groove of stopper.
4. A membrane structure shed pillar holder as in claim 2, wherein: the top end of the fixed rod (212) is of a conical structure.
5. A membrane structure shed pillar holder as in claim 2, wherein: the stand main part (3) includes support column (301), the top fixed connection of bottom and fixed column (201) of support column (301), the side inner wall swing joint of support column (301) has telescopic link (303), the side inner wall fixedly connected with fixed block (305) of support column (301), second threaded rod (304) has been cup jointed in the activity of the top of fixed block (305), the side of second threaded rod (304) and the side inner wall threaded connection of telescopic link (303), the bottom fixedly connected with third driven bevel gear (306) of second threaded rod (304), the side inner wall activity of support column (301) has cup jointed third drive bevel gear (307), the side of third drive bevel gear (307) and the side intermeshing of third driven bevel gear (306), the top swing joint of third drive bevel gear (307) has second turning handle (302).
6. A membrane structure shed pillar holder as in claim 5, further characterized by: the clamping groove (210) is formed in the top end of the second drive bevel gear (209), a clamping block (211) is fixedly connected to the bottom end of the first rotary handle (202), the side face of the clamping block (211) and the side face of the clamping groove (210) are mutually wedged, and the structures of the first rotary handle (202) and the second drive bevel gear (209) are identical to those of the third drive bevel gear (307) and the second rotary handle (302).
CN202320165239.9U 2023-02-09 2023-02-09 Membrane structure bicycle shed stand fixer Active CN219386677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320165239.9U CN219386677U (en) 2023-02-09 2023-02-09 Membrane structure bicycle shed stand fixer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320165239.9U CN219386677U (en) 2023-02-09 2023-02-09 Membrane structure bicycle shed stand fixer

Publications (1)

Publication Number Publication Date
CN219386677U true CN219386677U (en) 2023-07-21

Family

ID=87200157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320165239.9U Active CN219386677U (en) 2023-02-09 2023-02-09 Membrane structure bicycle shed stand fixer

Country Status (1)

Country Link
CN (1) CN219386677U (en)

Similar Documents

Publication Publication Date Title
CN112982660B (en) Assembly type steel structure building assembly and assembly method
CN219386677U (en) Membrane structure bicycle shed stand fixer
CN111576805A (en) Wall whitewashes device for building
CN111473194B (en) Building engineering environment supervise device
CN112157643A (en) Industrial intelligent inspection robot with spraying and dust-settling effects
CN212027231U (en) A telescopic pillar for building field
CN210151603U (en) Liftable traffic platform
CN112157674B (en) Robot arm butt-joint structure
CN219936537U (en) Solar signal lamp convenient to assemble for traffic control
CN214943008U (en) Cold-resistant tent that extremely cold district used
CN214195678U (en) Installation mechanism is used in construction of portable barracks
CN214045791U (en) Dome camera
CN220605825U (en) Anti-loosening photovoltaic bracket
CN212484776U (en) Indicating device for municipal building construction convenient to installation
CN115288335B (en) Prestress single-layer bidirectional cable mesh mounting structure
CN217537835U (en) Aluminum template supports and links device
CN212026632U (en) Sunshine board sealing connection device
CN217977298U (en) Fixing mechanism for gear reducer
CN218968717U (en) Tower crane attaches wall structure
CN214659107U (en) Civil engineering is with construction site watertight fittings
CN216743917U (en) Municipal administration building construction is with construction lighting apparatus
CN213143520U (en) Freezing-resistant stone curtain wall structure
CN217871996U (en) But supporting mechanism for building engineering construction of height-adjusting
CN214495315U (en) Fixing device for fixing elevator structural beam
CN213705708U (en) Convenient and fast aluminum alloy pillar for ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant