CN219365379U - Skirting line for building aluminum climbing frame - Google Patents

Skirting line for building aluminum climbing frame Download PDF

Info

Publication number
CN219365379U
CN219365379U CN202320927905.8U CN202320927905U CN219365379U CN 219365379 U CN219365379 U CN 219365379U CN 202320927905 U CN202320927905 U CN 202320927905U CN 219365379 U CN219365379 U CN 219365379U
Authority
CN
China
Prior art keywords
seat
climbing frame
main body
skirting line
aluminum climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320927905.8U
Other languages
Chinese (zh)
Inventor
黄敏豪
刘晓锋
卓志鸿
崔杰武
胡春生
王炜
钟盛孙
齐胜昔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Nanlu Construction Robot Technology Co ltd
Original Assignee
Guangdong Nanlu Construction Robot Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Nanlu Construction Robot Technology Co ltd filed Critical Guangdong Nanlu Construction Robot Technology Co ltd
Priority to CN202320927905.8U priority Critical patent/CN219365379U/en
Application granted granted Critical
Publication of CN219365379U publication Critical patent/CN219365379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of skirting lines, in particular to a skirting line for an aluminum climbing frame of a building, which comprises a first main body, a second main body and an aluminum climbing frame body, wherein the first main body and the second main body are mutually and vertically connected, the back of the first main body is provided with a mounting seat, and the mounting seat is provided with a connecting mechanism; the connecting mechanism comprises a sliding seat, a telescopic rod is arranged on the sliding seat, a limiting seat is arranged at the other end of the telescopic rod, a reset spring is sleeved outside the telescopic rod and connected with the sliding seat and the limiting seat, an adjusting rod is sleeved at the other end of the limiting seat, a rotating handle is arranged at one end of the adjusting rod, and a supporting rod in the aluminum climbing frame body is clamped between the mounting seat and the limiting seat. The utility model is convenient to install and disassemble with the aluminum climbing frame, solves the problem of low installation efficiency of the traditional skirting line, is convenient to splice, can prevent garbage or other objects on the pavement plate in the aluminum climbing frame from falling from the gap at the joint, and improves the safety.

Description

Skirting line for building aluminum climbing frame
Technical Field
The utility model relates to the technical field of skirting lines, in particular to a skirting line for an aluminum climbing frame of a building.
Background
The plate arranged beside the pavement plate of the building aluminum climbing frame is called skirting board, which is also called skirting board. Skirting boards are riveted on two sides of the pavement plate on the climbing frame and are divided into steel plates, aluminum plates or plywood and used for blocking garbage on the pavement plate or preventing objects falling from high altitude.
However, the existing skirting board is fixedly installed by using a plurality of groups of screws, bolts and nuts, holes are sometimes drilled during installation, and a large gap is formed after installation, so that a great deal of time and labor are required during installation and disassembly, and potential safety hazards exist.
Disclosure of Invention
The utility model aims at solving the problems in the background technology and provides a skirting line for a building aluminum climbing frame.
The technical scheme of the utility model is as follows: the skirting line for the aluminum climbing frame of the building comprises a first main body, a second main body and an aluminum climbing frame body, wherein the first main body and the second main body are mutually and vertically connected, the bottom end surface of the second main body is abutted against a pavement plate in the aluminum climbing frame body, an installation seat is installed on the back surface of the first main body, a connecting mechanism is arranged on the installation seat, and the installation seat is in limiting connection with the aluminum climbing frame body through the connecting mechanism;
the connecting mechanism comprises a sliding seat, the sliding seat is connected with the inner wall of an installation seat in a sliding manner, a telescopic rod is installed on the sliding seat, a limiting seat is installed at the other end of the telescopic rod, a reset spring is sleeved outside the telescopic rod and connected with the sliding seat and the limiting seat, an adjusting rod is sleeved at the other end of the limiting seat, a rotating handle is installed at one end of the adjusting rod, the other end of the adjusting rod extends to the inside of the installation seat and is in threaded connection with the sliding seat, and a supporting rod in the aluminum climbing frame body is clamped between the installation seat and the limiting seat.
Preferably, one end of the first main body and one end of the second main body are provided with plug boards, the other ends of the first main body and the second main body are provided with plug grooves, and the plug boards are matched with the plug grooves.
Preferably, the cross section of the plugboard is L-shaped, and the plugboard groove are integrally cast.
Preferably, an anti-slip pad is arranged between the bottom end of the second main body and the pavement plate in the aluminum climbing frame body.
Preferably, a plurality of groups of jacks are formed in the side wall of the mounting seat, and the adjusting rod is movably inserted into the jacks.
Preferably, a pull ring is arranged in the middle of the limit seat.
Preferably, the adjusting rod is provided with a thread part, the sliding seat is provided with a thread groove, and the thread groove is matched with the thread part on the adjusting rod.
Compared with the prior art, the technical scheme provided by the utility model has the following beneficial technical effects: according to the utility model, the limit seat can be driven to horizontally displace on the mounting seat through the mounting seat, so that the support columns at different positions on the aluminum climbing frame body are adapted; the support column which is matched with the telescopic rod, the reset spring and the limit seat can be abutted on the mounting seat; the skirting line can be rapidly limited on the aluminum climbing frame body by the rotating handle and the adjusting rod penetrating the limiting seat and the corresponding jack and then being in threaded connection with the thread groove until the rotating handle abuts the limiting seat on the supporting column and the mounting seat in the aluminum climbing frame body; two adjacent groups of first main bodies and second main bodies can be spliced through the plug board and the plug groove, so that the problem that garbage or other objects on the pavement board in the aluminum climbing frame body fall due to gaps at the joint is avoided, and the safety is improved.
Drawings
FIG. 1 is a top view of the overall structure of the present utility model;
FIG. 2 is a schematic view of the installation structure of the present utility model;
FIG. 3 is a perspective view of the present utility model;
fig. 4 is a schematic structural view of a connecting mechanism of the present utility model.
Reference numerals: 1. a first body; 101. a second body; 102. a plug board; 103. a plug-in groove; 2. an aluminum climbing frame body; 3. an anti-slip pad; 4. a mounting base; 401. a jack; 402. a sliding seat; 403. a thread groove; 5. a telescopic rod; 501. a return spring; 502. a limit seat; 503. pulling the ring; 504. an adjusting rod; 505. a rotating handle.
Detailed Description
Example 1
As shown in fig. 1 and fig. 2, the skirting line for the aluminum climbing frame for the building provided by the utility model comprises a first main body 1, a second main body 101 and an aluminum climbing frame body 2, wherein the first main body 1 and the second main body 101 are mutually and vertically connected, the bottom end surface of the second main body 101 is abutted against a pavement plate in the aluminum climbing frame body 2, an installation seat 4 is installed on the back surface of the first main body 1, a connecting mechanism is arranged on the installation seat 4, at least three groups of connecting mechanisms are arranged, and the installation seat 4 is in limit connection with the aluminum climbing frame body 2 through the connecting mechanism;
further, an anti-slip pad 3 is arranged between the bottom end of the second main body 101 and the pavement plate in the aluminum climbing frame body 2, so that friction force between the second main body 101 and the pavement plate is increased, and fine garbage can be prevented from falling to the outside from the connecting position;
further, the first main body 1 and the second main body 101 are integrally cast, so that the rigidity and stability of the whole skirting line are improved;
as shown in fig. 1 to 4, the connection mechanism comprises a sliding seat 402, the sliding seat 402 is connected with the inner wall of an installation seat 4 in a sliding manner, a telescopic rod 5 is installed on the sliding seat 402, a limit seat 502 is installed at the other end of the telescopic rod 5, a reset spring 501 is sleeved outside the telescopic rod 5, the reset spring 501 is connected with the sliding seat 402 and the limit seat 502, an adjusting rod 504 is sleeved at the other end of the limit seat 502, a rotating handle 505 is installed at one end of the adjusting rod 504, the other end of the adjusting rod 504 extends to the inside of the installation seat 4 and is in threaded connection with the sliding seat 402, a supporting rod in the aluminum climbing frame body 2 is clamped between the installation seat 4 and the limit seat 502, a threaded part is arranged on the adjusting rod 504, a threaded groove 403 is formed in the sliding seat 402, and the threaded groove 403 is matched with the threaded part on the adjusting rod 504;
furthermore, the side wall of the mounting seat 4 is provided with a plurality of groups of jacks 401, and the adjusting rod 504 is movably inserted into the jacks 401, so that after the sliding seat 402 slides along the mounting seat 4 to adjust the position, the sliding seat 402 is inserted into the corresponding jacks 401 and then connected with the sliding seat 402, and then the sliding seat is in limit connection with a supporting rod matched with the aluminum climbing frame body 2;
further, the middle part of the limiting seat 502 is provided with a pull ring 503, so that the limiting seat 502 is pulled outwards through the pull ring 503 to adjust.
In this embodiment, the second main body 101 is placed at the top edge of the pavement slab in the aluminum climbing frame body 2, and the mounting seat 4 is abutted against the support rod at the edge of the pavement slab in the aluminum climbing frame body 2, the sliding seat 402 is slidingly adjusted along the horizontal direction of the mounting seat 4 until the limit seat 502 on the sliding seat 402 corresponds to the support rod on the aluminum climbing frame body 2, then the limit seat 502 is pulled by the hand-held pulling ring 503, so that the telescopic rod 5 and the return spring 501 are stretched while the sliding seat 402 is driven to continuously move along the mounting seat 4 towards the nearest group of support rods, the pulling ring 503 is released, under the elastic restoring action of the return spring 501, the limit seat 502 is abutted against the support rod in the aluminum climbing frame body 2, then the adjusting rod 504 passes through one end of the limit seat 502 far away from the telescopic rod 5, then passes through the corresponding insertion hole 401 and is in threaded connection with the thread groove 403 on the sliding seat 402, until the rotating handle 505 drives the limit seat 502 to clamp the support rod in the aluminum climbing frame body 2 on the mounting seat 4, and then the first main body 1 is stably connected with the aluminum climbing frame body 2.
Example two
As shown in fig. 1 to 3, in the skirting line for an aluminum climbing frame for a building provided by the present utility model, compared with the first embodiment, one ends of the first body 1 and the second body 101 are provided with the plugboard 102, the other ends of the first body 1 and the second body 101 are provided with the plugboard 103, and the plugboard 102 is adapted to the plugboard 103;
further, the cross section of the plugboard 102 is L-shaped, and the plugboard 102 and the pluggroove 103 are cast integrally with the first body 1 and the second body 101, so that the rigidity and stability of the whole skirting line are improved.
In this embodiment, the plug board 102 may be slidably inserted into the plug slot 103, so that two sets of adjacent first bodies 1 and second bodies 101 that are vertically connected are spliced, and the situation that the garbage or other objects on the pavement board in the aluminum climbing frame body 2 fall due to gaps at the connection part is avoided.
Working principle: the limit seat 502 can be driven to displace horizontally on the mounting seat 4 through the mounting seat 4 so as to adapt to support columns at different positions on the aluminum climbing frame body 2; the support column which is correspondingly matched can be abutted on the mounting seat 4 through the telescopic rod 5, the reset spring 501 and the limiting seat 502; the skirting line can be rapidly limited on the aluminum climbing frame body 2 by passing through the limiting seat 502 and the corresponding jack 401 through the rotating handle 505 and the adjusting rod 504 and then connecting the limiting seat 502 with the thread groove 403 until the rotating handle 505 tightly supports the limiting seat 502 on the supporting column and the mounting seat 4 in the aluminum climbing frame body 2; two adjacent groups of first main bodies 1 and second main bodies 101 can be spliced through the plug board 102 and the plug groove 103, so that the situation that garbage or other objects on a pavement board in the aluminum climbing frame body 2 fall due to gaps at the joint is avoided, and the safety is improved.
The embodiments of the present utility model have been described in detail with reference to the drawings, but the present utility model is not limited thereto, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present utility model.

Claims (7)

1. The utility model provides a building aluminium climbs skirting line for frame, including first main part (1), second main part (101) and aluminium climb frame body (2), its characterized in that, perpendicular connection each other between first main part (1) and second main part (101), the pavement board looks butt in second main part (101) bottom end face and the aluminium climb frame body (2), the back-mounted of first main part (1) has mount pad (4), be provided with coupling mechanism on mount pad (4), mount pad (4) are through coupling mechanism and aluminium climb frame body (2) spacing connection;
the connecting mechanism comprises a sliding seat (402), the sliding seat (402) is connected with the inner wall of an installation seat (4) in a sliding manner, a telescopic rod (5) is installed on the sliding seat (402), a limiting seat (502) is installed at the other end of the telescopic rod (5), a reset spring (501) is sleeved outside the telescopic rod (5), the sliding seat (402) and the limiting seat (502) are connected through the reset spring (501), an adjusting rod (504) is sleeved at the other end of the limiting seat (502), a rotating handle (505) is installed at one end of the adjusting rod (504), the other end of the adjusting rod (504) extends to the inside of the installation seat (4) and is in threaded connection with the sliding seat (402), and a supporting rod in the aluminum climbing frame body (2) is clamped between the installation seat (4) and the limiting seat (502).
2. The skirting line for the building aluminum climbing frame according to claim 1, wherein a plug board (102) is arranged at one end of the first main body (1) and one end of the second main body (101), a plug slot (103) is formed at the other end of the first main body (1) and the other end of the second main body (101), and the plug board (102) is matched with the plug slot (103).
3. The skirting line for the aluminum climbing frame for the building according to claim 2, wherein the cross section of the plugboard (102) is L-shaped, and the plugboard (102) and the pluggroove (103) are integrally cast.
4. The skirting line for the aluminum climbing frame for the building according to claim 1, wherein a non-slip mat (3) is arranged between the bottom end of the second main body (101) and a pavement plate in the aluminum climbing frame body (2).
5. The skirting line for the building aluminum climbing frame according to claim 1, wherein a plurality of groups of jacks (401) are formed in the side wall of the mounting base (4), and the adjusting rod (504) is movably connected with the jacks (401).
6. The skirting line for the building aluminum climbing frame according to claim 1, wherein a pull ring (503) is arranged in the middle of the limiting seat (502).
7. The skirting line for the building aluminum climbing frame according to claim 1, wherein a threaded portion is arranged on the adjusting rod (504), a threaded groove (403) is formed in the sliding seat (402), and the threaded groove (403) is matched with the threaded portion on the adjusting rod (504).
CN202320927905.8U 2023-04-21 2023-04-21 Skirting line for building aluminum climbing frame Active CN219365379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320927905.8U CN219365379U (en) 2023-04-21 2023-04-21 Skirting line for building aluminum climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320927905.8U CN219365379U (en) 2023-04-21 2023-04-21 Skirting line for building aluminum climbing frame

Publications (1)

Publication Number Publication Date
CN219365379U true CN219365379U (en) 2023-07-18

Family

ID=87140795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320927905.8U Active CN219365379U (en) 2023-04-21 2023-04-21 Skirting line for building aluminum climbing frame

Country Status (1)

Country Link
CN (1) CN219365379U (en)

Similar Documents

Publication Publication Date Title
CN219365379U (en) Skirting line for building aluminum climbing frame
CN212562548U (en) Self-climbing device for material transferring platform
CN214885295U (en) High scaffold supports protective structure for construction
CN113944339B (en) Fixing device for installing steel structure fence and protection structure
CN214436024U (en) Auxiliary assembly is used in fire control pipeline installation
CN111979919A (en) Construction device and method for disassembling and assembling railway bridge anti-vibration beam falling stop block
CN221031886U (en) Combined soil and water conservation device
CN220957154U (en) Pipeline bracket with good suitability
CN216949690U (en) Directional moving stage transmission device
CN214246785U (en) Stage for starting race
CN220909360U (en) Combined steel railing post applied to engineering construction
CN220469052U (en) Ground sewage pipeline installation frock
CN219228191U (en) Lifting slide rail convenient to disassemble and assemble
CN114045965B (en) Framework structure for mounting aluminum plate curtain wall
CN221565739U (en) Crane lifting platform device
CN215406121U (en) Be used for domatic soil erosion and water loss protective structure of soil property side slope
CN220033730U (en) Car item guardrail convenient to design and quick to install
CN210013442U (en) Building support frame for high-rise building
CN214204703U (en) Portable easy dismouting support that cable was used
CN115596951B (en) LED screen support convenient to disassemble and assemble and installation method
CN219952556U (en) Supporting structure for quick-dismantling floor installation
CN219176039U (en) Safety device for construction
CN214418716U (en) Device is swiftly pulled out to fixed steel nail of pre-buried threading box
CN219660205U (en) Combined lifting guide rail
CN210289241U (en) Stair mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant