CN219343000U - Building construction ground water jet equipment - Google Patents
Building construction ground water jet equipment Download PDFInfo
- Publication number
- CN219343000U CN219343000U CN202320808953.5U CN202320808953U CN219343000U CN 219343000 U CN219343000 U CN 219343000U CN 202320808953 U CN202320808953 U CN 202320808953U CN 219343000 U CN219343000 U CN 219343000U
- Authority
- CN
- China
- Prior art keywords
- water
- shaped
- spraying device
- construction
- limiting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Nozzles (AREA)
Abstract
The utility model belongs to the technical field of building construction and discloses a building construction ground water spraying device which comprises a water delivery mechanism and a mounting mechanism, wherein the water delivery mechanism comprises a T-shaped supporting plate, a water tank is arranged on the T-shaped supporting plate, a water pipe is arranged on the water tank and connected with a water separator, the water separator is connected with a spray head, the mounting mechanism comprises an L-shaped supporting plate fixed at one end of the T-shaped supporting plate and a U-shaped limiting plate detachably connected with the L-shaped supporting plate, and the water separator and the spray head are positioned in the U-shaped limiting plate. The construction ground water spraying device can reduce the labor intensity of workers in a trolley mode, and can perform large-scale water spraying operation through the water distributor connected with the spray head, so that the efficiency of water spraying operation is effectively improved.
Description
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a water spraying device for the ground of building construction.
Background
In urban air quality monitoring, dust pollution in building construction is an objective factor causing surface dust emission and is also a main pollution source affecting regional air quality. In the building construction process, dust pollution mainly comes from on-site earthwork leveling, sawdust and concrete stirring in a wood working room, and transportation and carrying of materials such as cement, stones, backfill soil and the like. Therefore, the construction is carried out by adopting a scientific and environment-friendly construction method and technology, the possible occurrence of harmful environmental factors in the construction process can be reduced, and the effects of green and energy conservation are realized from the source. For example, construction sites require on-site trunk roads and processing sites to harden, special persons are responsible for sprinkling water and cleaning every day, keeping the roads clean and moist, greening other bare soil on the site, cleaning each vehicle by special persons before the earth-moving vehicle goes out of the site, and cleaning the site when each earth-moving is finished.
The sprinkling of water on the construction ground can not only reduce the splashing of dust, thereby reducing the pollution of air, but also play a role in cooling the ground in hot weather. However, the conventional water spraying to the construction ground is often performed by a worker through a single water pipe connected with a water pump, so that the labor capacity of the worker is high, the water spraying coverage of the single water pipe is small, and the efficiency of water spraying operation is low.
The prior art improves conventional ground water spraying device, for example, chinese patent discloses a water spraying dust collector for civil construction (grant publication No. CN 218221674U), and the device sprays water through double-end spray pipes to reduce dust, solves the problem of water spraying efficiency to a certain extent, but still can not cover a larger construction area, and the working efficiency is still lower.
Disclosure of Invention
The utility model aims to provide a water spraying device for the ground of building construction, which can realize large-area water spraying and improve the water spraying operation efficiency.
The technical scheme adopted by the utility model is that the ground water spraying device for building construction comprises a water delivery mechanism and a mounting mechanism, wherein the water delivery mechanism comprises a T-shaped supporting plate, a water tank is arranged on the T-shaped supporting plate, a water pipe is arranged on the water tank, the water pipe is connected with a water distributor, the water distributor is connected with a spray head, the mounting mechanism comprises an L-shaped supporting plate fixed at one end of the T-shaped supporting plate and a U-shaped limiting plate detachably connected with the L-shaped supporting plate, and the water distributor and the spray head are positioned in the U-shaped limiting plate.
Preferably, a plurality of spray heads are arranged at intervals.
Preferably, a plurality of first limit grooves are formed in the L-shaped support plate, first T-shaped screws are arranged in the first limit grooves in a penetrating mode, first nuts are sleeved outside the first T-shaped screws, and the first T-shaped screws are fixedly connected with the U-shaped limit plates.
Preferably, a bolt is arranged on one side of the water separator, and penetrates through the U-shaped limiting plate.
Preferably, the upper end width value of the U-shaped limiting plate is larger than the width value of the water separator.
Preferably, a water pump is arranged on the water tank, and the water pump is electrically connected with the power supply box.
Preferably, universal wheels are arranged at the bottom of the T-shaped supporting plate.
Preferably, a window is embedded on the side surface of the water tank.
Preferably, a switch is arranged on the branch pipe of the water separator.
The utility model has the beneficial effects that:
the utility model provides a water spraying device for building construction ground, which can reduce the labor intensity of workers in a trolley form, and can perform large-scale water spraying operation by connecting a spray head through a water distributor, thereby effectively improving the efficiency of the water spraying operation;
the U-shaped limiting plate is adjustable in position, is convenient for spraying water to the cement road on the side face, and is used for spraying water to maintain the poured concrete road, so that the poured concrete road is prevented from being too fast in water loss.
Drawings
FIG. 1 is a perspective view showing the overall structure of a floor water spraying device for construction of the present utility model;
FIG. 2 is a schematic top view of a construction floor water spray device of the present utility model;
FIG. 3 is a schematic view of the connection between the water delivery mechanism and the mounting mechanism;
fig. 4 is an enlarged schematic view at a in fig. 1.
In the figure: 100. a water delivery mechanism; 110. a T-shaped support plate; 120. a universal wheel; 130. a water tank; 140. a water pump; 150. a power supply box; 160. a T-shaped push rod; 170. a water pipe; 180. a water separator; 190. a spray head; 200. a mounting mechanism; 210. an L-shaped support plate; 220. a first limit groove; 230. a first T-screw; 240. a first nut; 250. a U-shaped limiting plate; 260. a bolt; 300. a window; 410. the second limit groove; 420. a second T-screw; 430. and a second nut.
Detailed Description
The following is a further detailed description of the embodiments:
referring to fig. 1, the floor water spraying device for construction of the present utility model includes a water delivery mechanism 100 and a mounting mechanism 200.
Referring to fig. 1 and 2, the water delivery mechanism 100 includes a T-shaped support plate 110, a universal wheel 120 provided at the bottom of the T-shaped support plate 110, a water tank 130 installed at the top of the T-shaped support plate 110, a water pump 140 connected to the water tank 130, a power supply box 150 electrically connected to the water pump 140, a T-shaped push rod 160 fixed on the side of the T-shaped support plate 110, a water pipe 170 communicating with the water pump 140, a water separator 180 installed at the other end of the water pipe 170, and a spray head 190 provided on a branch pipe of the water separator 180.
The T-shaped support plate 110 has the functions of arranging and carrying each structure, the universal wheels 120 are uniformly arranged, and the universal wheels 120 can be other mechanisms with walking functions.
Referring to fig. 3, the water tank 130 is a closed container, a water inlet and a blocking cover are arranged at the top of the water tank 130, an opening is arranged on the side wall of the water tank, the opening is connected with the water pump 140, the water pump 140 conveys water in the water tank 130 through the water pipe 170, the water pipe 170 is a hose, one end of the water pipe 170 is communicated with the water pump 140, the other end of the water pipe 170 is communicated with the water separator 180, the water separator 180 is a plastic flow divider, the water separator 180 is connected with the water pipe 170 through a movable joint, the disassembly and the installation are convenient, and the spray head 190 is installed on a branch pipe of the water separator 180.
Referring to fig. 4, the mounting mechanism 200 includes an L-shaped support plate 210 having one end portion fixed on a side surface of the T-shaped support plate 110, a first limit groove 220 formed on the other end portion of the L-shaped support plate 210, a first T-shaped screw 230 penetrating the first limit groove 220, a first nut 240 screwed on the first T-shaped screw 230, a U-shaped limit plate 250 fixed at the lower end of the first T-shaped screw 230, and a bolt 260 penetrating the side surface of the U-shaped limit plate 250, wherein a water separator 180 is disposed in an inner cavity portion of the U-shaped limit plate 250, the bolt 260 is screwed with the U-shaped limit plate 250, a hole is preset on the side surface of the U-shaped limit plate 250, and a water pipe 170 connected with the water separator 180 is penetrated in the hole. Because the first T-shaped screw 230 is fixedly connected with the U-shaped limiting plate 250, the U-shaped limiting plate 250 and the L-shaped supporting plate 210 can be detachably and tightly connected together by tightening the first nut 240. The bolts 260 may function to fix the water separator 180. In this embodiment, the width dimension of the upper end of the U-shaped limiting plate 250 is larger than the dimensions of the water separator 180 and the spray head 190, and the upper end of the U-shaped limiting plate 250 shields the upper parts of the water separator 180 and the spray head 190, so that the water separator 180 and the spray head 190 are prevented from being sunned, and the service life is prolonged.
The mounting process of the mounting mechanism 200 is as follows: taking out the bolt 260, clamping the water separator 180 into the inner cavity of the U-shaped limiting plate 250, screwing the bolt 260 with a screw hole preset on the side surface of the U-shaped limiting plate 250, limiting the water separator 180 in the inner cavity of the U-shaped limiting plate 250, installing the spray head 190 on the water separator, and finally connecting the water pipe 170 with the water separator 180.
A window 300 is embedded on the side surface of the water tank 130, and water can be conveniently added into the water tank 130 in time through the window 300; the side surface of the branch pipe of the water separator 180 is provided with a switch, so that the branch pipe of the water separator 180 can be independently opened or closed, the branch pipe of the water separator 180 can be conveniently closed according to different requirements of road water consumption or road width, and the waste of water resources is reduced; the side surfaces of the universal wheels 120 are provided with brake pads, so that the building construction ground water spraying device is prevented from sliding on an inclined ramp when the building construction ground water spraying device is parked; the upper end of L type backup pad 210 has seted up second spacing groove 410, the inner chamber of second spacing groove 410 runs through there is the second T type screw rod 420, the spiro union has second nut 430 on the side of second T type screw rod 420, and the lower tip fixed connection U type limiting plate 250 of second T type screw rod 420, through the card of second T type screw rod 420 into second spacing groove 410 and screw up through second nut 430, thereby connect the tip of U type limiting plate 250 on the tip of L type backup pad 210 indirectly, be convenient for spray water to the cement way of side, prevent that the concrete road of pouring from losing water too fast, carry out the maintenance of spraying water to the concrete road of pouring, increase the multifunctionality of this kind of construction ground water jet equipment.
The concrete working process of the building construction ground water spraying device is as follows: the water pump 140 is started through the power box 150, the water in the water tank 130 is conveyed into the water separator 180 through the water pipe 170 by the water pump 140, the water is sprayed through the spray heads 190 on the branch pipes by the water separator 180, the spraying range of the water is enlarged through the water separator 180 and the spray heads 190 in sequence, the spraying efficiency of a worker in spraying construction ground is improved, the worker pushes the T-shaped push rod 160 to drive the universal wheel 120 to rotate through the T-shaped support plate 110, the labor intensity of the worker is reduced, the water separator 180 can be conveniently detached and replaced through the bolts 260, and the after-sale maintenance cost of the building construction ground water spraying device is reduced.
Claims (9)
1. The utility model provides a construction ground water jet equipment, its characterized in that, includes water delivery mechanism and mounting mechanism, water delivery mechanism includes T type backup pad, be provided with the water tank in the T type backup pad, be provided with the water pipe on the water tank, the water pipe is connected with the water knockout drum, the water knockout drum is connected with the shower nozzle, mounting mechanism is including fixing L type backup pad, the U type limiting plate of being connected can be dismantled with L type backup pad to T type backup pad one end, the water knockout drum is located with the shower nozzle U type limiting plate.
2. The construction floor water spraying device according to claim 1, wherein the spray heads are provided at intervals.
3. The building construction ground water spraying device according to claim 1, wherein a plurality of first limit grooves are formed in the L-shaped supporting plate, first T-shaped screws penetrate through the first limit grooves, first nuts are sleeved outside the first T-shaped screws, and the first T-shaped screws are fixedly connected with the U-shaped limit plates.
4. A construction floor water spray device according to claim 3, wherein a bolt is provided on one side of the water separator, the bolt passing through the U-shaped limiting plate.
5. The construction floor water spraying device according to claim 1, wherein the upper end width of the U-shaped limiting plate is larger than the width of the water separator.
6. The construction floor water spraying device according to claim 1, wherein a water pump is provided on the water tank, and the water pump is electrically connected with the power supply box.
7. The construction floor water spraying device according to claim 1, wherein the bottom of the T-shaped support plate is provided with universal wheels.
8. The construction floor water spraying device according to claim 1, wherein a window is embedded in a side surface of the water tank.
9. The floor water spraying device for construction according to any one of claims 1 to 8, wherein a switch is provided on a branch pipe of the water separator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320808953.5U CN219343000U (en) | 2023-04-13 | 2023-04-13 | Building construction ground water jet equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320808953.5U CN219343000U (en) | 2023-04-13 | 2023-04-13 | Building construction ground water jet equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219343000U true CN219343000U (en) | 2023-07-14 |
Family
ID=87104887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320808953.5U Active CN219343000U (en) | 2023-04-13 | 2023-04-13 | Building construction ground water jet equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219343000U (en) |
-
2023
- 2023-04-13 CN CN202320808953.5U patent/CN219343000U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105065056B (en) | A kind of underground coal mine multi-stage, energy-saving tunnel cleaning device | |
CN210370677U (en) | Two lining concrete intelligence curing means in tunnel | |
CN219343000U (en) | Building construction ground water jet equipment | |
CN210916931U (en) | Asphalt disposal device for preventing and treating highway asphalt concrete bridge deck diseases | |
CN212801380U (en) | Energy-saving watering dust fall equipment for municipal construction | |
CN219491784U (en) | Concrete maintenance device for building construction | |
CN216474364U (en) | Road surface leveling device for highway engineering | |
CN211395262U (en) | Road surface leveling device for highway engineering operation | |
CN210289372U (en) | Novel energy-conserving wind screen presses down dirt wall | |
CN207960455U (en) | A kind of improvement steel construction assembled building site gate | |
CN210140761U (en) | Spraying equipment for highway maintenance | |
CN113430976A (en) | Leveling device for repairing roads and facilitating waste cleaning | |
CN219298373U (en) | Energy-saving and environment-friendly asphalt pavement drainage structure | |
CN218573190U (en) | Mixing station fog pile | |
CN218861592U (en) | Distribution equipment basis prefabricating device | |
CN215484452U (en) | Mortar spraying device for anticorrosive building engineering construction | |
CN217266816U (en) | Road construction is with removing operation big-arch shelter | |
CN211185264U (en) | Road intelligent greening three-dimensional maintenance device | |
CN220696246U (en) | Dust fall device of highway maintenance operation | |
CN220433376U (en) | Construction marking device | |
CN213610442U (en) | Watering and dust removing device for highway bridge and tunnel construction | |
CN213417522U (en) | Highway subgrade maintenance road surface cementation of fissures device | |
CN220450050U (en) | Automatic curing means of tunnel cable duct concrete | |
CN215594224U (en) | Gardens rainwater collection device convenient to installation | |
CN215518275U (en) | Highway construction and maintenance device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |