CN219327344U - Multi-effect plastering shovel for building - Google Patents

Multi-effect plastering shovel for building Download PDF

Info

Publication number
CN219327344U
CN219327344U CN202320800882.4U CN202320800882U CN219327344U CN 219327344 U CN219327344 U CN 219327344U CN 202320800882 U CN202320800882 U CN 202320800882U CN 219327344 U CN219327344 U CN 219327344U
Authority
CN
China
Prior art keywords
fixedly connected
frame
bolt
effect
plastering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320800882.4U
Other languages
Chinese (zh)
Inventor
黄绪栋
王珏
左振阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Liaojian Fangzheng Construction Co ltd
Original Assignee
Shandong Liaojian Fangzheng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Liaojian Fangzheng Construction Co ltd filed Critical Shandong Liaojian Fangzheng Construction Co ltd
Priority to CN202320800882.4U priority Critical patent/CN219327344U/en
Application granted granted Critical
Publication of CN219327344U publication Critical patent/CN219327344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a multi-effect plastering shovel for a building, which comprises a blade plate, wherein the left side of the top of the blade plate is fixedly connected with a direction frame, the right side of the direction frame is fixedly connected with a cylinder frame through an opening, a square block is placed on the inner side of the direction frame, the right side of the square block is fixedly connected with a first bolt matched with the cylinder frame for use, and the top of the square block is fixedly connected with a U-shaped frame. This multi-effect plastering shovel for building is through at blade plate's top installation direction frame, drum frame and bolt frame to take formula type piece, U type frame and retract a section of thick bamboo and use, the cooperation of these structures is used and can be switched into two kinds of shapes of plastering shovel and tile sword with equipment, and has corresponding function, thereby makes two instrument synthetic instrument, not only reduces occupation in space but also can alleviate weight and conveniently carry, has improved functionality and portability.

Description

Multi-effect plastering shovel for building
Technical Field
The utility model relates to the technical field of building tools, in particular to a multi-effect plastering shovel for a building.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The construction method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like, and a construction site is called a construction site.
At present, various building tools such as a plastering shovel, a tile cutter plumb bob and the like are required to be used when construction is carried out on a construction site, wherein the plastering shovel and the tile cutter are used for acting on cement, one is used for plastering a wall, and the other is used for building the wall, but the plastering shovel and the tile cutter are two different and similar tools, so that each time a worker goes to the construction site, the two tools are carried, the space of a tool box is occupied, and meanwhile, the weight is increased;
therefore, a multi-effect plastering shovel for construction, which can simultaneously have a plastering shovel and a tile cutter with multiple functions, is designed to solve the defects.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a multi-effect plastering shovel for a building, which solves the problems that the plastering shovel and a tile cutter are similar in shape and different in function, need to be carried at the same time, occupy space and increase weight.
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides a multi-effect ash spade for building, includes the blade board, the left side fixedly connected with direction frame at blade board top, and the right side of direction frame is through seting up opening fixedly connected with drum frame, square piece has been placed to the inboard of direction frame, and the right side fixedly connected with of square piece and the first bolt of drum frame matched with use, the top fixedly connected with U type frame of square piece, and the spacing mouth that cooperatees with U type frame to use has all been seted up at the top and the front portion of direction frame, the top fixedly connected with of U type frame is retracted a section of thick bamboo.
Preferably, the sliding tray has all been seted up to the surface and the rear portion of U type frame, the inner sideslip of sliding tray installs the sliding block, two between the sliding block and be located the inboard fixedly connected with connecting plate of U type frame, fixedly connected with first spring between the top of connecting plate and U type frame inner chamber, the left side fixedly connected with arm-tie of connecting plate.
Preferably, the right sides of the surfaces of the direction frame and the square block and the top are provided with butt joint grooves which are matched with each other, and the right side of the bottom of the connecting plate is fixedly connected with a second bolt which is matched with the butt joint grooves.
Preferably, the inner side of the retraction cylinder is slidingly provided with a pulling bolt, the right side of the pulling bolt is fixedly connected with a third bolt, the right end of the third bolt penetrates through the retraction cylinder and extends to the right side of the retraction cylinder, and a second spring is fixedly connected between the front part and the rear part of the right side of the pulling bolt and the inner wall of the retraction cylinder.
Preferably, the left side of the pulling bolt is fixedly connected with a safety rope.
Preferably, the front side of blade board top fixedly connected with and third bolt matched with bolt frame of use.
Advantageous effects
The utility model provides a multi-effect plastering shovel for a building. Compared with the prior art, the device has the following advantages
The beneficial effects are that:
(1) The multi-effect plastering shovel for the building is characterized in that the direction frame, the cylinder frame and the bolt frame are arranged at the top of the blade plate, the formula block, the U-shaped frame and the retraction cylinder are arranged for use, and the cooperation of the structures can switch the equipment into two shapes of the plastering shovel and the tile cutter and has corresponding functions, so that two tools are combined into one tool, the occupation of space is reduced, the weight is reduced, the portability is improved, and the functionality is improved.
(2) This multi-effect plastering shovel for building through being provided with the third bolt in the inboard of retracting a section of thick bamboo, collocation second bolt and butt joint groove use simultaneously, and the effect of these structures can be fixed it after equipment carries out shape adjustment, avoids taking place to rock in the work progress, has improved the stability of instrument, increase of service life.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the limiting opening, the docking slot and the latch frame of the present utility model;
FIG. 3 is a schematic view of the U-shaped frame, third pin and safety line structure of the present utility model;
FIG. 4 is a schematic view of the slider, web, first spring and pull plate configuration of the present utility model;
fig. 5 is a top view of the internal structure of the retraction barrel of the present utility model.
In the figure: 1. a blade plate; 2. a direction frame; 3. a cylinder frame; 4. square blocks; 5. a U-shaped frame; 6. a limit opening; 7. a first latch; 8. a retraction barrel; 9. a sliding groove; 10. a sliding block; 11. a connecting plate; 12. a first spring; 13. pulling a plate; 14. a butt joint groove; 15. a second latch; 16. pulling the bolt; 17. a third latch; 18. a second spring; 19. a safety rope; 20. a latch frame.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the utility model provides a multi-effect plastering shovel for building, including blade board 1, blade board 1 is stainless steel preparation, the left side fixedly connected with direction frame 2 at blade board 1 top, and the right side of direction frame 2 is through seting up opening fixedly connected with drum frame 3, square block 4 has been placed to the inboard of direction frame 2, and the right side fixedly connected with of square block 4 cooperatees first bolt 7 that uses with drum frame 3, the top fixedly connected with U type frame 5 of square block 4, and the spacing mouth 6 that cooperatees with U type frame 5 and use is all offered at the top and the front portion of direction frame 2, the top fixedly connected with of U type frame 5 is retracted section of thick bamboo 8.
As the preferred embodiment, sliding tray 9 has all been seted up to the surface and the rear portion of U type frame 5, sliding tray 10 has been installed to the inside sideslip of sliding tray 9, and be located the inboard fixedly connected with connecting plate 11 of U type frame 5 between two sliding trays 10, fixedly connected with first spring 12 between connecting plate 11 and the top of U type frame 5 inner chamber, the left side fixedly connected with arm-tie 13 of connecting plate 11, the butt joint groove 14 that mutually support and use has all been seted up on the right side of direction frame 2 and square 4 surface and top, the right side fixedly connected with of connecting plate 11 bottom and the second bolt 15 that the butt joint groove 14 cooperatees and use.
Further, the pulling bolt 16 is slidably installed in the inner side of the retraction barrel 8, the pulling bolt 16 and the retraction barrel 8 do not generate interference fit, friction force is small, a third bolt 17 is fixedly connected to the right side of the pulling bolt 16, the right end of the third bolt 17 penetrates the retraction barrel 8 and extends to the right side of the retraction barrel 8, and a second spring 18 is fixedly connected between the front portion and the rear portion of the right side of the pulling bolt 16 and the inner wall of the retraction barrel 8.
The left side of the pulling bolt 16 is fixedly connected with a safety rope 19, the safety rope 19 is a nylon rope, and the front side of the top of the blade plate 1 is fixedly connected with a bolt frame 20 matched with the third bolt 17.
And all that is not described in detail in this specification is well known to those skilled in the art.
When the wall plastering machine is used, the safety rope 19 is sleeved on the wrist, tools can be prevented from falling during construction, then the retraction barrel 8 is adjusted according to the purpose of use as required, if a wall is plastered, the retraction barrel 8 is directly held by hands to work by using the blade plate 1, if wall plastering is required, the pulling plate 13 is pulled by a side finger, the second bolt 15 is pulled out of the inner side of the butting groove 14 at the top under the limit of the sliding block 10, then the wrist is pulled by force to retract the third bolt 17 into the inner side of the retraction barrel 8, the square block 4 is pulled leftwards to separate from the direction frame 2, then the retraction barrel 8 is rotated clockwise to be in a transverse state under the action of the first bolt 7 and the cylinder frame 3, then the square block 4 is inserted into the direction frame 2, the safety rope 19 and the pulling plate 13 are loosened, at the moment, the third bolt 17 is inserted into the inner side of the bolt frame 20 under the action of the first spring 12 and the second bolt 18, the second bolt 15 is inserted into the butting groove 14 at the front, and the adjustment is completed, and the wall plastering operation can be carried out by the worker holding the square block 8 by hands.

Claims (6)

1. The utility model provides a multi-effect plastering shovel for building, includes blade board (1), its characterized in that: the left side fixedly connected with direction frame (2) at blade board (1) top, and the right side of direction frame (2) is through seting up opening fixedly connected with drum frame (3), square piece (4) have been placed to the inboard of direction frame (2), and the right side fixedly connected with of square piece (4) and drum frame (3) first bolt (7) that cooperatees and use, the top fixedly connected with U type frame (5) of square piece (4), and limit mouthful (6) that cooperatees and use with U type frame (5) have all been seted up at the top and the front portion of direction frame (2), the top fixedly connected with of U type frame (5) is retracted section of thick bamboo (8).
2. A multi-effect plastering shovel for construction according to claim 1, wherein: the sliding block (10) is installed in the interior side sliding of sliding groove (9), two between sliding block (10) and be located inboard fixedly connected with connecting plate (11) of U type frame (5), fixedly connected with first spring (12) between the top of connecting plate (11) and U type frame (5) inner chamber, the left side fixedly connected with arm-tie (13) of connecting plate (11).
3. A multi-effect plastering shovel for construction according to claim 2, wherein: the right sides of the surfaces and the tops of the direction frame (2) and the square block (4) are respectively provided with a butt joint groove (14) which is matched with each other, and the right side of the bottom of the connecting plate (11) is fixedly connected with a second bolt (15) which is matched with the butt joint groove (14).
4. A multi-effect plastering shovel for construction according to claim 1, wherein: the inner side of the retraction cylinder (8) is slidingly provided with a pulling bolt (16), the right side of the pulling bolt (16) is fixedly connected with a third bolt (17), the right end of the third bolt (17) penetrates the retraction cylinder (8) and extends to the right side of the retraction cylinder (8), and a second spring (18) is fixedly connected between the front part and the rear part of the right side of the pulling bolt (16) and the inner wall of the retraction cylinder (8).
5. The multi-effect plastering shovel for construction according to claim 4, wherein: the left side of the pulling bolt (16) is fixedly connected with a safety rope (19).
6. The multi-effect plastering shovel for construction according to claim 4, wherein: the front side of the top of the blade plate (1) is fixedly connected with a bolt frame (20) which is matched with the third bolt (17) for use.
CN202320800882.4U 2023-04-12 2023-04-12 Multi-effect plastering shovel for building Active CN219327344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320800882.4U CN219327344U (en) 2023-04-12 2023-04-12 Multi-effect plastering shovel for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320800882.4U CN219327344U (en) 2023-04-12 2023-04-12 Multi-effect plastering shovel for building

Publications (1)

Publication Number Publication Date
CN219327344U true CN219327344U (en) 2023-07-11

Family

ID=87063977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320800882.4U Active CN219327344U (en) 2023-04-12 2023-04-12 Multi-effect plastering shovel for building

Country Status (1)

Country Link
CN (1) CN219327344U (en)

Similar Documents

Publication Publication Date Title
WO2018147776A1 (en) A tile or masonry saw dust collection arrangement
CN219327344U (en) Multi-effect plastering shovel for building
CN2905954Y (en) Mechanical multifunctional wall plastering machine
CN211422523U (en) Drilling machine with supporting and limiting functions for mine
CN215491478U (en) Depth detection tool for anchor bolt hole of external wall insulation board
CN210374844U (en) Decoration engineering combination formula slide caliper
CN212336768U (en) Steel bar positioning device for civil engineering
CN110815607B (en) Intermittent manual mushroom stone piece knocking machine
CN208937358U (en) A kind of portable belt exploration tool for architectural design
CN203347193U (en) Combined tool used for joint pointing and drawing during dry wall construction
CN2150984Y (en) Ceramic tile cutting stand
CN201116399Y (en) Multifunctional putty knife
CN215632761U (en) Karst cave rock stratum blasting is with supplementary tubular explosive location blasting structure
CN215408459U (en) Telescopic device on airborne platform
CN205414490U (en) Drilling auxiliary device
CN110878673A (en) Angle-adjustable automatic drilling machine
CN211817714U (en) Plastering screeding strip for wall or ground construction
CN210396033U (en) Novel tool for building plastering
CN220059444U (en) Drilling device for construction
CN219548293U (en) Brick wall ash groove leveling tool
CN217758792U (en) A instrument that is used for hollow precast pile stake core soil to clear up
CN215926599U (en) Wall plastering auxiliary frame for building construction
CN104747077A (en) Implementation method of square hole boring machine
CN209400481U (en) A kind of architectural engineering hollowing detection device
CN221194352U (en) Multifunctional masonry tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant