CN215926599U - Wall plastering auxiliary frame for building construction - Google Patents
Wall plastering auxiliary frame for building construction Download PDFInfo
- Publication number
- CN215926599U CN215926599U CN202121850014.4U CN202121850014U CN215926599U CN 215926599 U CN215926599 U CN 215926599U CN 202121850014 U CN202121850014 U CN 202121850014U CN 215926599 U CN215926599 U CN 215926599U
- Authority
- CN
- China
- Prior art keywords
- plastering
- coating
- block
- auxiliary frame
- sliding sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a wall plastering auxiliary frame for building construction, which relates to the technical field of building construction and comprises a supporting bottom plate, wherein the upper surface of the supporting bottom plate is fixedly connected with a first supporting rod and a second supporting rod, the outer surface of the first supporting rod is sleeved with a first sliding sleeve, the first supporting rod is in sliding connection with the first sliding sleeve, the outer surface of the first sliding sleeve is fixedly connected with a supporting sliding rod, and the outer surface of the second supporting rod is sleeved with a second sliding sleeve. The device has a reasonable design structure, can control the thickness of the plastering plate by the coating positioning plate part through the arranged components such as the coating fixed plate, the plastering plate, the guide block and the like and through the mutual matching relationship between the coating positioning plate part and the plastering plate part, further achieves the effect that the device can paint the coating more uniformly, and solves the problems that the traditional wall plastering needs to manually dig and take the coating for painting, the efficiency is low, the time consumption is long, no auxiliary tool is provided, and the coating is not uniformly painted.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a wall plastering auxiliary frame for building construction.
Background
The plastering engineering refers to a system construction process of smearing the plastering mortar on the surface of a substrate material, having the functions of protecting the substrate and improving the appearance and providing special functions for buildings.
The wall plastering plane real-time monitor for building construction can only play a monitoring role, when the thickness is not uniformly painted, the monitor is monitored, so that the thickness is modified, when a beginner is met, the modifying place is large, time is consumed in the modifying process, and the painting efficiency is influenced.
The traditional wall plastering needs manual paint digging and taking for plastering, has low efficiency and long time consumption, does not have auxiliary tools, and has the problem of uneven paint plastering; therefore, the wall plastering auxiliary frame for building construction is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to make up the defects of the prior art and provides a wall plastering auxiliary frame for building construction.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a wall body auxiliary frame that plasters for construction, includes supporting baseplate, supporting baseplate's last fixed surface is connected with bracing piece one and bracing piece two, sliding sleeve one has been cup jointed to the surface of bracing piece one, bracing piece one and sliding sleeve one sliding connection, the outer fixed surface of sliding sleeve one is connected with the support slide bar, sliding sleeve two has been cup jointed to the surface of bracing piece two, bracing piece two and sliding sleeve two sliding connection, sliding sleeve two's surface and support slide bar fixed connection, the surface that supports the slide bar has seted up the straight line groove, supporting baseplate's top is equipped with plasters mechanism and leads grey mechanism.
Furthermore, the plastering mechanism comprises a movable sliding block and a plastering plate, the movable sliding block is fixedly connected with the plastering plate, a through hole is formed in the movable sliding block, and the movable sliding block is connected with the supporting sliding rod in a sliding mode through the through hole.
Furthermore, a coating positioning plate is sleeved on the outer surface of the movable sliding block, a U-shaped movable block is fixedly connected to the back of the coating positioning plate, and a U-shaped handle and a threaded rod are sleeved on the U-shaped movable block.
Furthermore, the back of the movable sliding block is fixedly connected with a U-shaped handle, the U-shaped handle is rotatably connected with a threaded rod, and the threaded rod is fixedly connected with a rotary torsion block.
Further, it includes coating bin and stuff pump to lead grey mechanism, coating bin and supporting baseplate fixed connection, the feed inlet has been seted up to the coating bin, the coating bin is linked together with the stuff pump.
Further, the upper surface intercommunication of stuff pump has flexible coating pipe, the fixed block has been cup jointed to the surface of flexible coating pipe, fixed block and two fixed connection of bracing piece.
Further, the one end intercommunication that the stuff pump was kept away from to flexible coating pipe has the piece of deriving, the inclined plane has been seted up to the inside of deriving the piece, derive piece and plastering plate fixed connection.
Compared with the prior art, this wall body auxiliary frame that plasters for construction possesses following beneficial effect:
according to the wall plastering auxiliary frame for building construction, the paint positioning plate part can control the thickness of the plastering plate through the arranged parts such as the paint fixed plate, the plastering plate, the guiding block and the like and through the mutual matching relationship between the paint positioning plate part and the plastering plate part, so that the effect that the paint can be smeared more uniformly by the wall plastering auxiliary frame is achieved, and the problems that the traditional wall plastering needs to manually dig and paint the paint, the efficiency is low, the time consumption is long, no auxiliary tool is provided, and the paint is not uniformly smeared are solved.
Drawings
FIG. 1 is a schematic overall three-dimensional view of the present invention;
FIG. 2 is a cross-sectional view of a three-dimensional paint positioning plate of the present invention;
FIG. 3 is a left side view of the present invention;
FIG. 4 is a front view of the present invention;
fig. 5 is a rear view of the present invention.
In the figure: 1. a support base plate; 2. a first supporting rod; 3. a second supporting rod; 4. a paint storage bin; 5. a first sliding sleeve; 6. supporting the sliding rod; 7. a second sliding sleeve; 8. a linear groove; 9. moving the slide block; 10. plastering the board; 11. a coating positioning plate; 12. a U-shaped moving block; 13. a U-shaped handle; 14. a threaded rod; 15. rotating the knob block; 16. a lead-out block; 17. a telescoping paint conduit; 18. a fixed block; 19. a pulp pump; 20. a bevel.
Detailed Description
The principles and features of this invention are described below in conjunction with the following drawings, which are set forth by way of illustration only and are not intended to limit the scope of the utility model.
This embodiment provides a wall body auxiliary frame that plasters for construction, this wall body auxiliary frame that plasters for construction is arranged in the construction realization to the supplementary of coating when painting, and the structure of auxiliary frame is plastered through the design wall body for simpler when the operation of plastering to the wall body reaches the efficiency of plastering of improvement, increases the purpose of the even degree that the coating was paintd.
Referring to fig. 1, a wall plastering auxiliary frame for building construction comprises a supporting base plate 1, wherein a first supporting rod 2 and a second supporting rod 3 are fixedly connected to the upper surface of the supporting base plate 1, a first sliding sleeve 5 is sleeved on the outer surface of the first supporting rod 2, the first supporting rod 2 is slidably connected with the first sliding sleeve 5, and a supporting sliding rod 6 is fixedly connected to the outer surface of the first sliding sleeve 5.
The sliding sleeve I5 is arranged to facilitate the up-and-down sliding of the supporting rod 6, so that the supporting rod I2 has the function of a guide rail.
The outer surface of the second supporting rod 3 is sleeved with a second sliding sleeve 7, the second supporting rod 3 is in sliding connection with the second sliding sleeve 7, the outer surface of the second sliding sleeve 7 is fixedly connected with a supporting slide rod 6, and the outer surface of the supporting slide rod 6 is provided with a linear groove 8.
Through the linear groove 8 formed in the outer surface of the support sliding rod 6, the movable sliding block 9 is effectively prevented from rotating when sliding along the support sliding rod 6, and the coating of the coating is prevented from being influenced.
A plastering mechanism is arranged above the supporting bottom plate 1.
Referring to fig. 1, 2, 3 and 4, in this embodiment, the plastering mechanism includes a movable slider 9 and a plastering plate 10, the movable slider 9 is fixedly connected with the plastering plate 10, the movable slider 9 is provided with a through hole, and the movable slider 9 is slidably connected with the support slide bar 6 through the through hole
The left and right sides of the plasterboard 10 are rounded, so that the plasterboard 10 is smoother when being applied.
Through the through hole arranged on the movable sliding block 9, the movable sliding block 9 slides linearly along the supporting sliding rod 6 to drive the plastering plate 10 to plaster linearly.
Referring to fig. 1, 2, 3 and 4, in this embodiment, a paint positioning plate 11 is sleeved on an outer surface of the movable slider 9, a U-shaped moving block 12 is fixedly connected to a back surface of the paint positioning plate 11, and a U-shaped handle 13 and a threaded rod 14 are sleeved on the U-shaped moving block 12
Through the removal of coating locating plate 11, can be as required, the thickness that the quick adjustment coating was paintd.
The arranged U-shaped moving block 12 is fixedly connected with the coating positioning plate 11 and drives the coating positioning plate 11 to perform the adjusting function.
Referring to fig. 1, 2, 3 and 4, in this embodiment, the back surface of the movable slider 9 is fixedly connected with a U-shaped handle 13, the U-shaped handle 13 is rotatably connected with a threaded rod 14, and the threaded rod 14 is fixedly connected with a rotating knob 15
Because the rotating button block 15 is arranged, when the paint positioning plate 11 needs to be adjusted, the rotating button block 15 can be rotated, and the rotating button block 15 drives the U-shaped moving block 12 to move through the threaded rod 14.
The U-shaped moving block 12 is provided with a through threaded hole, so that the threaded rod 14 can drive the U-shaped moving block 12 to move when rotating.
An ash guide mechanism is arranged above the supporting bottom plate 1
Referring to fig. 1, 2, 3 and 4, in the embodiment, the ash guiding mechanism includes a paint storage tank 4 and a slurry pump 19, the paint storage tank 4 is fixedly connected with the support bottom plate 1, a feed inlet is formed in the paint storage tank 4, and the paint storage tank 4 is communicated with the slurry pump 19
The paint storage tank 4 has the function of storing paint, and is provided with a feed inlet, so that finished paint can be poured into the paint storage tank 4 conveniently.
The coating in the coating storage tank 4 is led out under the action of the slurry pump 19, so that the labor is saved.
Referring to fig. 1, 2, 3 and 4, in this embodiment, the upper surface of the slurry pump 19 is communicated with the telescopic coating conduit 17, the outer surface of the telescopic coating conduit 17 is sleeved with the fixing block 18, and the fixing block 18 is fixedly connected with the second support rod 3
The telescopic structure of the telescopic paint guide pipe 17 facilitates adding paint at any time when the plastering plate 10 is smeared with paint.
In this embodiment, the fixing block 18 has a function of supporting the telescopic paint guide 17.
Referring to fig. 1, 2, 3 and 4, in the embodiment, one end of the telescopic coating conduit 17 away from the slurry pump 19 is communicated with the guiding block 16, the guiding block 16 is internally provided with the inclined surface 20, and the guiding block 16 is fixedly connected with the plastering plate 10
When the led-out coating enters the leading-out block 16, the coating moves downwards along the plastering plate 10 through the inclined plane 20 in the leading-out block 16, falls onto the adjusted coating positioning plate 11, and is smeared through the reciprocating movement of the plastering plate 10.
The plastering plate 10 has the function of fast smearing without manually digging and taking paint.
The working principle is as follows: pouring finished paint into the paint storage box 4 from a feeding hole formed in the paint storage box 4, temporarily storing the finished paint, rotating the rotary knob 15 to drive the threaded rod 14 to move, pushing the U-shaped moving block 12 by the threaded rod 14 through the threads arranged on the outer surface, moving the U-shaped moving block 12 along the moving slide block 9, performing push-pull adjustment on the paint positioning plate 11, after adjustment, enabling the paint positioning plate 11 to be in contact with a wall body, opening the slurry pump 19, leading the paint in the paint storage box 4 out of the flexible paint guide pipe 17 by the slurry pump 19, entering the leading-out block 16 through the flexible paint guide pipe 17, enabling the paint to move downwards along the plastering plate 10 through the inclined surface 20 in the leading-out block 16, falling onto the well-adjusted paint positioning plate 11, smearing the paint through the reciprocating movement of the plastering plate 10, holding the U-shaped handle 13 to drive the moving slide block 9 to linearly slide along the support slide rod 6, and driving the plastering plate 10 to linearly wipe, meanwhile, the support slide bar 6 is pressed downwards when the movable slide block 9 moves, so that the support slide bar 6 linearly moves up and down along the support bar I2 and the support bar II 3 through the sliding sleeve I5 and the sliding sleeve II 7.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (7)
1. The utility model provides a wall body auxiliary frame that plasters for construction, includes supporting baseplate (1), its characterized in that: the upper surface fixed connection of supporting baseplate (1) has bracing piece (2) and bracing piece two (3), sliding sleeve one (5) has been cup jointed to the surface of bracing piece one (2), bracing piece one (2) and sliding sleeve one (5) sliding connection, the surface fixed connection of sliding sleeve one (5) supports slide bar (6), sliding sleeve two (7) have been cup jointed to the surface of bracing piece two (3), bracing piece two (3) and sliding sleeve two (7) sliding connection, the surface and the support slide bar (6) fixed connection of sliding sleeve two (7), straight line groove (8) have been seted up to the surface of support slide bar (6), the top of supporting baseplate (1) is equipped with the mechanism of plastering and leads grey mechanism.
2. A wall plastering auxiliary frame for construction according to claim 1, wherein: the plastering mechanism comprises a movable sliding block (9) and a plastering plate (10), the movable sliding block (9) is fixedly connected with the plastering plate (10), a through hole is formed in the movable sliding block (9), and the movable sliding block (9) is connected with the supporting sliding rod (6) in a sliding mode through the through hole.
3. A wall plastering auxiliary frame for construction according to claim 2, wherein: the coating positioning plate (11) is sleeved on the outer surface of the movable sliding block (9), a U-shaped movable block (12) is fixedly connected to the back of the coating positioning plate (11), and a U-shaped handle (13) and a threaded rod (14) are sleeved on the U-shaped movable block (12).
4. A wall plastering auxiliary frame for construction according to claim 3, wherein: the back of the movable sliding block (9) is fixedly connected with a U-shaped handle (13), the U-shaped handle (13) is rotatably connected with a threaded rod (14), and the threaded rod (14) is fixedly connected with a rotary torsion block (15).
5. A wall plastering auxiliary frame for construction according to claim 1, wherein: lead grey mechanism and include coating bin (4) and stuff pump (19), coating bin (4) and supporting baseplate (1) fixed connection, the feed inlet has been seted up in coating bin (4), coating bin (4) are linked together with stuff pump (19).
6. A wall plastering auxiliary frame for building construction according to claim 5, wherein: the upper surface intercommunication of stuff pump (19) has flexible coating pipe (17), fixed block (18) have been cup jointed to the surface of flexible coating pipe (17), fixed block (18) and two (3) fixed connection of bracing piece.
7. A wall plastering auxiliary frame for construction according to claim 6, wherein: one end intercommunication that slurry pump (19) was kept away from in flexible coating pipe (17) has derivation piece (16), the inside of derivation piece (16) is seted up there is inclined plane (20), derivation piece (16) and plastering plate (10) fixed connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121850014.4U CN215926599U (en) | 2021-08-09 | 2021-08-09 | Wall plastering auxiliary frame for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121850014.4U CN215926599U (en) | 2021-08-09 | 2021-08-09 | Wall plastering auxiliary frame for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215926599U true CN215926599U (en) | 2022-03-01 |
Family
ID=80421744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121850014.4U Active CN215926599U (en) | 2021-08-09 | 2021-08-09 | Wall plastering auxiliary frame for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215926599U (en) |
-
2021
- 2021-08-09 CN CN202121850014.4U patent/CN215926599U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320705B (en) | Multi-use architecture device | |
CN110080506B (en) | Seam beautifying method based on two-dimensional automatic seam beautifying equipment | |
CN212613581U (en) | Wall surface mortar spraying equipment capable of automatically trowelling | |
CN215926599U (en) | Wall plastering auxiliary frame for building construction | |
CN214144565U (en) | Quick paint spraying apparatus for assembly building | |
CN211691588U (en) | Cleaning device of energy-saving building curtain wall | |
CN219112959U (en) | Distribution chute drilling equipment with positioning mechanism | |
CN213898011U (en) | Building mortar spraying equipment for building engineering | |
CN214160114U (en) | Paint spraying apparatus is used in processing of building decorative panel | |
CN213055186U (en) | Single-head hinge drilling machine for wood board processing | |
CN211421753U (en) | Wall painting device for engineering decoration | |
CN211440654U (en) | Ceramic tile cutting device for building engineering | |
CN101191378A (en) | Modified wall plastering machine | |
CN220247493U (en) | Plastering device for building engineering | |
CN206718069U (en) | A kind of directional structure board fluting apparatus | |
CN220313783U (en) | Wall surface roughening device for engineering building processing | |
CN211736235U (en) | Ash scraping tool | |
CN212926916U (en) | Wall plastering equipment | |
CN216239822U (en) | Brickwork infilled wall top foamer compaction instrument | |
CN213223075U (en) | Roller brush convenient to adjust | |
CN221792974U (en) | Board cutting and forming equipment | |
CN212217826U (en) | Angle cutter is used in aluminum alloy processing | |
CN218311124U (en) | Cutting location structure of green new building material production usefulness | |
CN219654194U (en) | Paint brush capable of automatically feeding liquid for construction site | |
CN218779886U (en) | Plastering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |