CN219318106U - Project cost progress management device - Google Patents

Project cost progress management device Download PDF

Info

Publication number
CN219318106U
CN219318106U CN202320810665.3U CN202320810665U CN219318106U CN 219318106 U CN219318106 U CN 219318106U CN 202320810665 U CN202320810665 U CN 202320810665U CN 219318106 U CN219318106 U CN 219318106U
Authority
CN
China
Prior art keywords
fixedly connected
display screen
mounting seat
progress management
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320810665.3U
Other languages
Chinese (zh)
Inventor
杨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruisheng Construction Engineering Co ltd
Original Assignee
Ruisheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruisheng Construction Engineering Co ltd filed Critical Ruisheng Construction Engineering Co ltd
Priority to CN202320810665.3U priority Critical patent/CN219318106U/en
Application granted granted Critical
Publication of CN219318106U publication Critical patent/CN219318106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model discloses a project cost progress management device which comprises a base, a supporting plate, a mounting seat, a buffer assembly, a project cost display screen and an operation screen, wherein the bottom of the supporting plate is fixedly connected with the top of the base, the project cost display screen is movably mounted on the top of the mounting seat, the top of the mounting seat is fixedly connected with a fixing frame, one side of the project cost display screen is fixedly connected with a slideway frame, the inside of the fixing frame is hinged with a diagonal rod, the other end of the diagonal rod is movably connected with the inside of the slideway frame, one side of the diagonal rod, which is positioned inside the slideway frame, is fixedly connected with a rotating shaft, both ends of the rotating shaft are fixedly connected with threaded rods, the side surfaces of the threaded rods are in threaded connection with locking caps, the inside of the fixing frame is in sliding connection with a sliding plate, the sliding plate is connected with the sliding plate through a spring, and the rear end of the fixing frame is in threaded connection with an adjusting screw rod which is in rotating connection with the sliding plate. The folding and storage device can fold and store the engineering cost display screen, so that the engineering cost display screen is safely and reliably stored.

Description

Project cost progress management device
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a project cost progress management device.
Background
The construction cost is the construction cost of the project, and the construction cost is three factors of quantity, price and cost, and the construction cost covers the construction cost, highway construction cost, water transportation construction cost, railway construction cost, hydraulic engineering cost, electric power construction cost, communication construction cost, aerospace construction cost and the like in a broad sense.
In the process of construction cost, the construction cost and progress of the construction are often required to be displayed by using a display device, and the current display device is generally in the form of an electronic display screen, but the electronic display screen is fixed on a display frame and is inconvenient to store after being displayed.
Disclosure of Invention
The present application is directed to a project cost progress management device, so as to solve the problems set forth in the above background art.
In order to achieve the above purpose, the present application provides the following technical solutions: the utility model provides a project cost progress management device, includes base, backup pad, mount pad, project cost show screen and operation screen, the bottom of backup pad and the top fixed connection of base, the mount pad passes through the top swing joint of rolling disc and base, project cost show screen movable mounting is at the top of mount pad, operation screen fixed mounting is at the top of backup pad, the top fixedly connected with mount pad of mount pad, one side fixedly connected with slide frame of project cost show screen, the inside gliding slide of mount articulates there is the dead lever, the other end and the inside swing joint of slide frame of dead lever, the dead lever is located one side fixedly connected with axis of rotation of slide frame inside, the equal fixedly connected with threaded rod in both ends of axis of rotation, the slide has been seted up to the inside of slide frame, threaded rod and the inside swing joint of slide, threaded rod's side surface threaded connection has the locking cap, the inside sliding connection of mount has the sliding plate, sliding plate and slide pass through spring coupling, the screw thread connection is located with the adjusting screw that rotates with the sliding plate to be connected.
Preferably, the bottom of the base is provided with a self-locking wheel, and the self-locking wheel is movably connected with the bottom of the base.
Preferably, the front side at mount pad top fixedly connected with baffle, the baffle is located one side of engineering cost show screen bottom.
Preferably, the top of the rotating disc is fixedly connected with the bottom of the mounting seat, and the bottom of the rotating disc is rotationally connected with the top of the supporting plate.
Preferably, one side of the baffle is fixedly connected with a flexible protection pad.
In summary, the utility model has the technical effects and advantages that:
1. according to the utility model, the locking cap is unscrewed during storage, the sliding plate moves towards the rear end of the fixing frame by screwing the adjusting bolt, the sliding plate slides backwards, one end of the inclined rod rotates around the sliding plate, the rotating shaft is movable at the moment, the engineering cost display screen rotates backwards, the rotating shaft moves in the sliding way through the threaded rod in the rotating process, the inclined rod also rotates leftwards at the moment, the engineering cost display screen is rotationally stored, the spring provides a buffering force, so that the engineering cost display screen is more stably laid down, a user does not need to use larger force to hold the display screen, and the engineering cost display screen can be carried after being folded.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic perspective view of a construction process management device according to an embodiment of the present application;
FIG. 2 is a schematic view of an installation structure of an engineering cost display screen of an engineering cost progress management device according to an embodiment of the present application;
FIG. 3 is a schematic diagram of a mounting structure of a mounting bracket of an apparatus for managing the progress of manufacturing costs in an embodiment of the present application;
fig. 4 is a schematic view of a rotation axis structure of the construction cost progress management device according to the embodiment of the present application.
In the figure: 1. a base; 2. a support plate; 3. a mounting base; 4. project cost display screen; 5. an operation screen; 6. a self-locking wheel; 7. a baffle; 8. a rotating disc; 9. a fixing frame; 10. a slideway frame; 11. a diagonal rod; 12. a rotating shaft; 13. a threaded rod; 14. a slideway; 15. a locking cap; 16. a flexible protective pad; 17. a sliding plate; 18. adjusting a screw; 19. a spring; 20. and (3) a sliding plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples: referring to the project cost progress management device shown in fig. 1-4, the device comprises a base 1, a support plate 2, a buffer assembly 17, a mounting seat 3, a project cost display screen 4 and an operation screen 5, the bottom of the support plate 2 is fixedly connected with the top of the base 1, the mounting seat 3 is rotationally connected with the top of the base 1 through a rotating disc 8, the project cost display screen 4 is movably mounted on the top of the mounting seat 3, the operation screen 5 is fixedly mounted on the top of the support plate 2, a fixing frame 9 is fixedly connected with the top of the mounting seat 3, one side of the project cost display screen 4 is fixedly connected with a slide frame 10, a sliding plate 20 fixed in the fixing frame 9 is hinged with a diagonal rod 11, the other end of the diagonal rod 11 is rotationally connected with the inside of the slide frame 10, one side of the diagonal rod 11 positioned in the slide frame 10 is fixedly connected with a rotating shaft 12, two ends of the rotating shaft 12 are fixedly connected with threaded rods 13, the inside of the slide frame 10 is provided with slide ways 14, the threaded rods 13 are movably connected with the inside of the slide ways 14, side surfaces of the threaded rods 13 are in threaded connection with locking caps 15, the inside sliding plates 9 are connected with sliding plates 17 through sliding plates 17 and sliding plates 17, and sliding plates 17 are connected with sliding plates 17 through sliding adjusting screw plates 18.
Through the technical scheme of the utility model, the bottom of the base 1 is provided with the self-locking wheel 6, and the self-locking wheel 6 is movably connected with the bottom of the base 1 so as to facilitate the walking and fixing of the whole device.
Through the technical scheme of the utility model, the baffle 7 is fixedly connected to the front side of the top of the mounting seat 3, and the baffle 7 is positioned on one side of the bottom of the engineering cost display screen 4 for front end protection.
Through the technical scheme of the utility model, the top of the rotating disc 8 is fixedly connected with the bottom of the mounting seat 3, and the bottom of the rotating disc 8 is rotationally connected with the top of the supporting plate 2, so that the rotation demonstration of the engineering cost display screen is facilitated.
Through the technical scheme of the utility model, the flexible protection pad 16 is fixedly connected to the inner side of the baffle 7 to protect the construction cost display screen.
The working principle of the utility model is as follows: unscrewing locking cap when accomodating makes the sliding plate remove to the mount rear end through twisting adjusting bolt for the slide follows backward slip, makes the one end of dead lever rotate around the slide, and the axis of rotation is movable this moment, rotates engineering cost show screen backward, and the axis of rotation passes through the threaded rod and removes in the inside of slide at pivoted in-process, and the dead lever also rotates left this moment, accomodates engineering cost show screen rotation, and the spring provides a buffering power, thereby makes the laying of engineering cost show screen more steady, and the user need not to use great power to hold the display screen, can carry after folding.
Finally, it should be noted that: the foregoing description of the preferred embodiments of the present utility model is not intended to be limiting, but rather, although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (5)

1. Project cost progress management device, including base (1), backup pad (2), mount pad (3), project cost show screen (4) and operation screen (5), its characterized in that: the bottom of the supporting plate (2) is fixedly connected with the top of the base (1), the mounting seat (3) is rotationally connected with the top of the base (1) through the rotating disc (8), the engineering cost display screen (4) is movably mounted at the top of the mounting seat (3), the operation screen (5) is fixedly mounted at the top of the supporting plate (2), the top of the mounting seat (3) is fixedly connected with the fixing frame (9), one side of the engineering cost display screen (4) is fixedly connected with the slide rail frame (10), a slide plate (20) sliding in the fixing frame (9) is hinged with a diagonal rod (11), the other end of the diagonal rod (11) is rotationally connected with the inside of the slide rail frame (10), one side of the diagonal rod (11) located in the slide rail frame (10) is fixedly connected with a rotating shaft (12), two ends of the rotating shaft (12) are fixedly connected with threaded rods (13), the inside of the slide rail frame (10) is provided with a slide rail (14), the fixing frame (13) is movably connected with the inside of the slide rail (14), the surface of the cap (13) is connected with the slide plate (17) through a sliding plate (17), an adjusting screw (18) which is rotationally connected with the sliding plate (17) is connected at the rear end of the fixing frame (9) in a threaded manner.
2. The construction cost progress management device according to claim 1, wherein: the bottom of base (1) is provided with auto-lock wheel (6), auto-lock wheel (6) and the bottom swing joint of base (1).
3. The construction cost progress management device according to claim 1, wherein: the front side at the top of the mounting seat (3) is fixedly connected with a baffle (7), and the baffle (7) is positioned at one side of the bottom of the engineering cost display screen (4).
4. The construction cost progress management device according to claim 1, wherein: the top of the rotating disc (8) is fixedly connected with the bottom of the mounting seat (3), and the bottom of the rotating disc (8) is rotationally connected with the top of the supporting plate (2).
5. A construction cost progress management apparatus according to claim 3, wherein: the inner side of the baffle plate (7) is fixedly connected with a flexible protection pad (16).
CN202320810665.3U 2023-04-12 2023-04-12 Project cost progress management device Active CN219318106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320810665.3U CN219318106U (en) 2023-04-12 2023-04-12 Project cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320810665.3U CN219318106U (en) 2023-04-12 2023-04-12 Project cost progress management device

Publications (1)

Publication Number Publication Date
CN219318106U true CN219318106U (en) 2023-07-07

Family

ID=87022161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320810665.3U Active CN219318106U (en) 2023-04-12 2023-04-12 Project cost progress management device

Country Status (1)

Country Link
CN (1) CN219318106U (en)

Similar Documents

Publication Publication Date Title
CN219318106U (en) Project cost progress management device
CN201723927U (en) Portable global camera bracket
CN209982902U (en) Novel communication cabinet
CN214648771U (en) High-resolution energy-saving intelligent display instrument for electric bicycle
CN211623299U (en) Electric power engineering construction protection against electric shock equipment
CN216864914U (en) Warning device is used in town road bridge construction
CN206558200U (en) A kind of support for Zheng-a 21-or 25-stringed plucked instrument of convenient regulation angle
CN214405475U (en) Shooting device capable of automatically adjusting height and angle for digital media
CN206284672U (en) Electrical equipment overhauling stool/ladder
CN215076003U (en) Double-layer sunshade umbrella with adjustable height
CN211536425U (en) Golf cart that practicality is strong
CN212694709U (en) Warning sign is used in highway construction
CN214883171U (en) Construction warning board with rotary structure for constructional engineering
CN212500520U (en) Intelligent tool vehicle
CN214548075U (en) Drawing fixing device for art design
CN221324687U (en) Mounting rack convenient for butt joint
CN210478885U (en) Side support of electric motorcycle car
CN215441588U (en) A put device for intelligent transportation equipment
CN213981047U (en) Connecting mechanism for photovoltaic panel based on wind power generation
CN214144606U (en) A remove handling frame for building engineering
CN213037341U (en) Construction mounting frame for highway bridge
CN218324300U (en) Road and bridge engineering safety encloses fender
CN221142460U (en) Road and bridge guardrail reinforcing and supporting device
CN221118287U (en) Novel warning device for railway line maintenance
CN220700945U (en) Charging pile convenient to portable charging

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant