CN219314385U - Aerated concrete wallboard auxiliary installation equipment - Google Patents

Aerated concrete wallboard auxiliary installation equipment Download PDF

Info

Publication number
CN219314385U
CN219314385U CN202320141987.3U CN202320141987U CN219314385U CN 219314385 U CN219314385 U CN 219314385U CN 202320141987 U CN202320141987 U CN 202320141987U CN 219314385 U CN219314385 U CN 219314385U
Authority
CN
China
Prior art keywords
pipe
pipes
wallboard
aerated concrete
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320141987.3U
Other languages
Chinese (zh)
Inventor
纪培峰
杨位珂
王孝波
王伟伟
李维宝
董子涵
谢宁宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 14th Bureau Group Co Ltd
Priority to CN202320141987.3U priority Critical patent/CN219314385U/en
Application granted granted Critical
Publication of CN219314385U publication Critical patent/CN219314385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to auxiliary installation equipment of an aerated concrete wallboard, which belongs to the technical field of transfer equipment and comprises a support frame, wherein the support frame comprises a base part and a hoisting part arranged at the upper part of the base part; the base part and the hoisting part are all hinged and built by steel pipes; a supporting plate capable of assisting the wallboard to move is horizontally slid on the steel pipe of the base part; the bottom of the base part is provided with a moving wheel; the hoisting part is provided with a winch, and a sling capable of hoisting the wallboard is wound on the winch. Hoisting the wallboard by using a winch, supporting the lower part of the suspended wallboard by using a supporting plate, and reducing shaking to form protection; when the wallboard needs to be transported, the device can flexibly move by virtue of the moving wheels on the basis of the functional effects; moreover, the steel pipe is adopted for hinging and constructing, so that the local material is more convenient.

Description

Aerated concrete wallboard auxiliary installation equipment
Technical Field
The utility model belongs to the technical field of transfer equipment, and particularly relates to auxiliary installation equipment for an aerated concrete wallboard.
Background
In recent years, the domestic assembled building rapidly develops, the assembled wall structure plate is replacing the traditional masonry wall, is similar to the light partition wall of an AAC wallboard, has the characteristics of light weight, high strength, good heat preservation and insulation, environment friendliness and the like, can be produced in a standardized manner, is rapidly constructed, saves cost, and is widely applied to building construction. In particular to an aerated concrete slab which is fully called an autoclaved aerated concrete slab and is a porous plate which is prepared by taking siliceous materials and calcareous materials as main raw materials, aluminum powder as a gas generating material, adding a reinforcing steel bar net sheet subjected to corrosion prevention treatment, adding water, stirring, casting, pre-curing, cutting and autoclaved curing. The wall surface crack-relieving and sound-insulating wall has the characteristics of improving the wall surface crack and having good sound-insulating effect, and is widely used.
Because wallboard area and dead weight are great, the installation of wallboard needs with the help of appurtenance, is great to assembled wallboard construction volume, construction cycle is short, the facility is more complicated in the building, again because the pile of partition plate is horizontal placement, transportation also is horizontal transportation, above mounting tool can't satisfy and the nimble convenient requirement of installation of transportation in actual construction.
The existing simple installation tool for erecting the self-made steel pipe is flexible and simple to operate and use, can only be installed and cannot be transported, and the lower part of the wallboard is suspended and swayed severely in the hoisting process, so that the protection effect of a finished product is poor; there are also automation devices on the market, and although the devices are convenient to install, the primary devices are relatively large in investment, are relatively heavy in restriction of the use places, are relatively complex to operate, are relatively heavy in self weight, and are relatively troublesome to transport between floors.
Disclosure of Invention
The utility model provides auxiliary installation equipment for aerated concrete wallboards, which aims to solve the problems that auxiliary tools for wallboard installation lack of protection support and wallboard transportation cannot be realized.
The utility model is realized by the following technical scheme:
the auxiliary installation equipment of the aerated concrete wallboard comprises a support frame, wherein the support frame comprises a base part and a hoisting part arranged at the upper part of the base part; the base part and the hoisting part are all hinged and built by steel pipes;
a supporting plate capable of assisting the wallboard to move is horizontally slid on the steel pipe of the base part;
a moving wheel is arranged at the bottom of the base part; the hoisting part is provided with a winch, and a sling capable of hoisting the wallboard is wound on the winch.
Hoisting the wallboard by using a winch, supporting the lower part of the suspended wallboard by using a supporting plate, and reducing shaking to form protection; when the wallboard needs to be transported, the device can flexibly move by virtue of the moving wheels on the basis of the functional effects; moreover, the steel pipe is adopted for hinging and constructing, so that the local material is more convenient.
The utility model further improves that the base part comprises two sweeping longitudinal pipes which are arranged in parallel, and the front end and the rear end of each sweeping longitudinal pipe are respectively connected with a sweeping transverse pipe through a fastener; longitudinal pipes which are arranged in parallel in the same vertical plane are respectively arranged above the two floor sweeping longitudinal pipes, and a first stable transverse pipe is respectively connected between the front end and the rear end of each longitudinal pipe through a fastener; the front and rear ends of the sweeping longitudinal pipe and the front and rear ends of the longitudinal pipe are respectively connected with a front vertical pipe and a rear vertical pipe through fasteners. Through the lower part setting vertical pipe of sweeping floor and sweep the floor and cross the pipe, upper portion sets up vertical pipe and first stable cross the pipe, can improve the height of base portion, provides the space of placing when transporting the wallboard simultaneously.
The utility model further improves that the hoisting part comprises two front vertical pipes which are parallel to each other and are respectively arranged above the front vertical pipe I, and one end of the top end of the front vertical pipe II, which is close to the rear vertical pipe, is connected with a main inclined pipe through a fastener; the upper ends of the two front vertical pipes are connected with a top transverse pipe through a fastener, and the top transverse pipe is close to the joint of the front vertical pipes and the main inclined pipe. The front vertical pipe II, the main inclined pipe and the longitudinal pipe form a stable triangular structure, and the stability of the wallboard during hoisting can be realized under the support of the top transverse pipe.
The utility model further improves that the windlass is connected and arranged between the lower sections of the two main inclined pipes through a fixed transverse pipe; the middle of the top transverse tube is suspended with a fixed pulley which can be used for a sling to bypass and guide downwards. Install the hoist engine between two main inclined tube, can effectively increase the structural strength of two main inclined tube, the hoist cable upwards extends the back and downwardly extending behind the fixed pulley to hoist and mount the wallboard.
The utility model further improves that a second stable transverse pipe which is uniformly distributed along the length direction of the main inclined pipe and is vertical to the main inclined pipe is connected between the two main inclined pipes above the winch through a fastener; the second stable horizontal pipe at the bottom is connected with a side horizontal pipe and a side inclined pipe through fasteners respectively at the middle part and the lower part of the front vertical pipe II. Through the cooperation of the horizontal pipe of second stability, the horizontal pipe of side and side inclined tube, strengthen the structure of hoist and mount portion, the state when guaranteeing to use is stable.
The utility model further improves that the bottom surface of the supporting plate is provided with two guide grooves which are parallel to each other and matched with the steel pipe. The supporting plate slides back and forth on the steel pipe through the matching of the guide groove and the steel pipe.
The utility model further improves that at least two bearing pulleys which are distributed along the length direction of the guide groove and are in contact with the top of the steel pipe are arranged in the guide groove. The smoothness of movement is improved by the bearing pulleys.
The utility model further improves that the bearing pulley is fixedly connected with the two inner side walls of the guide groove through a bearing fixing rod penetrating through the axial lead of the bearing pulley. The bearing pulley is supported and fixed in the guide groove through the bearing fixing rod.
From the technical scheme, the beneficial effects of the utility model are as follows: hoisting the wallboard by using a winch, supporting the lower part of the suspended wallboard by using a supporting plate, and reducing shaking to form protection; when the wallboard needs to be transported, the device can flexibly move by virtue of the moving wheels on the basis of the functional effects; moreover, the steel pipe is adopted for hinging and constructing, so that the local material is more convenient.
Drawings
In order to more clearly illustrate the technical solutions of the present utility model, the drawings that are needed in the description will be briefly introduced below, it being obvious that the drawings in the following description are only some embodiments of the present utility model, and that other drawings can be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic view of a first structure according to an embodiment of the present utility model.
Fig. 2 is a second structural schematic diagram of an embodiment of the present utility model.
Fig. 3 is a schematic diagram of an exploded structure of an embodiment of the present utility model.
Fig. 4 is a schematic cross-sectional view of a pallet according to an embodiment of the utility model.
In the accompanying drawings: 10. the device comprises a support frame, 20, a base part, 21, a sweeping vertical pipe, 22, a sweeping horizontal pipe, 23, a first front vertical pipe, 24, a second rear vertical pipe, 25, a longitudinal pipe, 26, a first stable horizontal pipe, 30, a hoisting part, 31, a second front vertical pipe, 32, a main inclined pipe, 33, a top horizontal pipe, 331, a fixed pulley, 34, a second stable horizontal pipe, 35, a side horizontal pipe, 36, a side inclined pipe, 40, a winch, 41, a sling, 42, a lifting hook, 43, a fixed horizontal pipe, 50, a moving wheel, 60, a supporting plate, 61, a guide groove, 62, a bearing pulley, 63 and a bearing fixing rod.
Detailed Description
In order to make the objects, features and advantages of the present utility model more obvious and understandable, the technical solutions of the present utility model will be clearly and completely described below with reference to the drawings in this specific embodiment, and it is apparent that the embodiments described below are only some embodiments of the present utility model, but not all embodiments of the present utility model. All other embodiments, based on the embodiments in this patent, which would be within the purview of one of ordinary skill in the art without the particular effort to make the utility model are intended to be within the scope of the patent protection.
As shown in fig. 1 to 4, an aerated concrete wallboard auxiliary installation apparatus comprises a support frame 10, wherein the support frame 10 comprises a base part 20 and a hoisting part 30 arranged at the upper part of the base part 20; the base part 20 and the lifting part 30 are all hinged and built by steel pipes. The steel pipe is adopted for hinging and constructing, so that the local material is more convenient.
The base part 20 comprises two sweeping longitudinal pipes 21 which are arranged in parallel, and a sweeping transverse pipe 22 is respectively connected between the front end and the rear end of the two sweeping longitudinal pipes 21 through fasteners; the upper parts of the two sweeping longitudinal pipes 21 are respectively provided with longitudinal pipes 25 which are arranged in parallel in the same vertical plane, and the front end and the rear end of each longitudinal pipe 25 are respectively connected with a first stable transverse pipe 26 through a fastener; a front vertical pipe 23 and a rear vertical pipe 24 are respectively connected between the front end and the rear end of the sweeping vertical pipe 21 and the front end and the rear end of the vertical pipe 25 through fasteners. Through lower part setting up and sweep floor vertical tube 21 and sweep floor horizontal tube 22, upper portion sets up vertical tube 25 and first stable horizontal tube 26, can improve the height of base portion 20, provides the space of placing for when transporting the wallboard simultaneously.
A moving wheel 50 is arranged at the bottom of the base part 20; specifically, the bottom ends of the front riser 23 and the rear riser 24 are provided with a moving wheel 50. The flexibility of movement of the device is improved.
A supporting plate 60 is arranged on the two sweeping longitudinal pipes 21 in a sliding manner; the bottom surface of the supporting plate 60 is provided with two guide grooves 61 which are parallel to each other and are matched with the sweeping vertical pipe 21. The supporting plate 60 slides reciprocally on the sweeping vertical tube 21 by being engaged with the sweeping vertical tube 21 through the guide groove 61.
At least two bearing pulleys 62 which are distributed along the length direction of the guide groove 61 and are in contact with the top of the steel pipe are arranged in the guide groove 61. The smoothness of movement is enhanced by the bearing pulleys 62.
The bearing pulley 62 is fixedly connected with the two inner side walls of the guide groove 61 through a bearing fixing rod 63 penetrating through the axial line of the bearing pulley 62. The bearing pulley 62 is supported and fixed in the guide groove 61 by a bearing fixing rod 63.
The hoisting part 30 comprises two front risers second 31 which are parallel to each other and are respectively arranged above the front riser first 23, and a main inclined pipe 32 is connected with one end of the longitudinal pipe 25, which is close to the rear riser 24, through a fastener; a top transverse pipe 33 is connected between the upper ends of the two front vertical pipes 31 through a fastener, and the top transverse pipe 33 is close to the joint of the front vertical pipes 31 and the main inclined pipe 32. The front vertical pipe II 31, the main inclined pipe 32 and the longitudinal pipe 25 form a stable triangular structure, and the stability of the wallboard during hoisting can be realized under the support of the top transverse pipe 33.
The front second 31 and front first 23 risers are of unitary construction, that is, the front second 31 riser is actually an extension of the front first 23 riser above the longitudinal tube 25.
A winch 40 is connected between the lower sections of the two main inclined pipes 32 through a fixed transverse pipe 43; a sling 41 capable of hoisting the wallboard is wound on the hoist 40, and a lifting hook 42 is connected to the free end of the sling 41. The wall plate is lifted by the winch 40, and the lower part of the suspended wall plate is supported by the supporting plate 60, so that shaking is reduced to form protection.
A fixed pulley 331 through which the sling 41 passes around and is guided downward is suspended in the middle of the top cross tube 33. The hoist 40 is arranged between the two main inclined pipes 32, so that the structural strength of the two main inclined pipes 32 can be effectively increased, and the sling 41 extends upwards and then downwards after passing through the fixed pulley 331 so as to hoist the wallboard.
A second stable transverse pipe 34 which is uniformly distributed along the length direction of the main inclined pipe 32 and is vertical to the main inclined pipe 32 is connected between the two main inclined pipes 32 above the winch 40 through a fastener; the lowest second stable horizontal pipe 34 and the middle and lower parts of the front vertical pipe two 31 are respectively connected with a side horizontal pipe 35 and a side inclined pipe 36 through fasteners. The structure of the hoisting part 30 is reinforced by the cooperation of the second stable transverse tube 34, the side transverse tube 35 and the side inclined tube 36, so that the stability of the state in use is ensured.
The fastener is a fixing piece for binding two adjacent steel pipes which are in different extending directions and are in contact with each other in the scaffold.
According to the aerated concrete wallboard auxiliary installation equipment, a wallboard is lifted by using a winch, and the lower part of the suspended wallboard is supported by a supporting plate, so that shaking is reduced to form protection; when the wallboard needs to be transported, the device can flexibly move by virtue of the moving wheels on the basis of the functional effects; moreover, the steel pipe is adopted for hinging and constructing, so that the local material is more convenient.
In the present specification, each embodiment is described in a progressive manner, and each embodiment focuses on the difference from other embodiments, and the same and similar parts between the embodiments are only required to be referred to each other.
The terms "upper", "lower", "outside", "inside", and the like in the description and in the claims of the present utility model and in the above drawings, if any, are used for distinguishing between relative relationships in position and not necessarily for giving qualitative sense. It is to be understood that the data so used may be interchanged where appropriate such that the embodiments of the utility model described herein may be implemented in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprise" and "have," as well as any variations thereof, are intended to cover a non-exclusive inclusion.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present utility model. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present utility model is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (8)

1. The auxiliary installation equipment of the aerated concrete wallboard comprises a support frame (10), and is characterized in that the support frame (10) comprises a base part (20) and a hoisting part (30) arranged at the upper part of the base part (20); the base part (20) and the hoisting part (30) are hinged and built by steel pipes;
a supporting plate (60) capable of assisting the wallboard to move is horizontally slid on the steel pipe of the base part (20);
the bottom of the base part (20) is provided with a moving wheel (50); a hoist (40) is arranged on the hoisting part (30), and a sling (41) capable of hoisting the wallboard is wound on the hoist (40).
2. An aerated concrete wallboard auxiliary installation device according to claim 1, wherein the base part (20) comprises two sweeping longitudinal pipes (21) which are arranged in parallel, and a sweeping transverse pipe (22) is respectively connected between the front end and the rear end of the two sweeping longitudinal pipes (21) through fasteners; longitudinal pipes (25) which are arranged in parallel in the same vertical plane are respectively arranged above the two sweeping longitudinal pipes (21), and a first stable transverse pipe (26) is respectively connected between the front end and the rear end of each longitudinal pipe (25) through a fastener; the front and rear ends of the sweeping vertical pipe (21) and the front and rear ends of the vertical pipe (25) are respectively connected with a front vertical pipe (23) and a rear vertical pipe (24) through fasteners.
3. An aerated concrete wallboard auxiliary installation device according to claim 2, wherein the hoisting part (30) comprises two front risers (31) which are parallel to each other and are respectively arranged above the front risers (23), and a main inclined tube (32) is connected with one end of the longitudinal tube (25) close to the rear riser (24) at the top end of the front risers (31) through a fastener; the upper ends of the two front vertical pipes II (31) are connected with a top transverse pipe (33) through a fastener, and the top transverse pipe (33) is close to the joint of the front vertical pipes II (31) and the main inclined pipe (32).
4. An aerated concrete wallboard auxiliary installation apparatus according to claim 3, wherein the hoist (40) is connected by a fixed cross pipe (43) and installed between the lower sections of the two main inclined pipes (32); a fixed pulley (331) which can be used for a sling (41) to bypass and guide downwards is suspended at the middle of the top transverse tube (33).
5. The auxiliary installation device for the aerated concrete wallboard according to claim 4, wherein second stable transverse pipes (34) which are uniformly distributed along the length direction of the main inclined pipes (32) and are perpendicular to the main inclined pipes (32) are connected between the two main inclined pipes (32) above the winch (40) through fasteners; the lowest second stable transverse pipe (34) is connected with a side transverse pipe (35) and a side inclined pipe (36) through fasteners respectively at the middle part and the lower part of the front vertical pipe II (31).
6. An aerated concrete wallboard auxiliary installation apparatus according to any one of claims 1 to 5, wherein the bottom surface of the pallet (60) is provided with two guide grooves (61) parallel to each other and cooperating with the steel pipes.
7. An aerated concrete wallboard auxiliary installation apparatus according to claim 6, wherein at least two bearing pulleys (62) are arranged in the guide groove (61) and distributed along the length direction of the guide groove (61) and are in contact with the top of the steel tube.
8. An aerated concrete wallboard auxiliary installation apparatus according to claim 7, wherein the bearing pulley (62) is fixedly connected to both inner side walls of the guide groove (61) by bearing fixing rods (63) penetrating the axis of the bearing pulley (62).
CN202320141987.3U 2023-01-18 2023-01-18 Aerated concrete wallboard auxiliary installation equipment Active CN219314385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320141987.3U CN219314385U (en) 2023-01-18 2023-01-18 Aerated concrete wallboard auxiliary installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320141987.3U CN219314385U (en) 2023-01-18 2023-01-18 Aerated concrete wallboard auxiliary installation equipment

Publications (1)

Publication Number Publication Date
CN219314385U true CN219314385U (en) 2023-07-07

Family

ID=87034112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320141987.3U Active CN219314385U (en) 2023-01-18 2023-01-18 Aerated concrete wallboard auxiliary installation equipment

Country Status (1)

Country Link
CN (1) CN219314385U (en)

Similar Documents

Publication Publication Date Title
CN111188497A (en) Autoclaved aerated concrete wallboard mounting construction machine tool and using method thereof
CN208087069U (en) A kind of the standpipe hanging apparatus and its Lift-on/Lift-off System of adjustable position
CN208088852U (en) Assembled architecture precast light wallboard working vehicle
CN219314385U (en) Aerated concrete wallboard auxiliary installation equipment
CN108265981A (en) A kind of design method of building element production technology layout
CN213774554U (en) Assembled self-control sliding lifting construction unloading platform
CN211306798U (en) Demoulding device is used in production of concrete prefabricated member
CN218893376U (en) Electric hoisting device for building ALC wallboard
CN208039579U (en) Load module formula concrete folding plate
CN115028100B (en) Electric hoisting device for building ALC wallboard and construction method thereof
CN216512739U (en) Heavy well lid start-stop equipment of inspection shaft
CN212562423U (en) Ring type sliding scaffold for corridor
CN108560797A (en) Load module formula concrete folding plate
CN209817461U (en) Wallboard lifting and mounting device
CN212609232U (en) Tool for assisting installation of light partition board
CN202248861U (en) Device for substituting lifting formwork with supporting formwork in pouring of concrete floor of multi-storey building
CN203545520U (en) Rooftop material hoister
CN207943814U (en) A kind of assembled architecture wall element translating device
CN111894253B (en) Ring-type sliding scaffold for corridor and construction method thereof
CN203715109U (en) Rotary type material elevator
CN219689198U (en) Temporary hanging bracket on concrete frame column
CN214780419U (en) Evaporate and press aerated concrete wallboard hoist device
CN219158371U (en) Through air shaft shaping operation platform
CN217627278U (en) Cross-floor material lifting tool
CN213774552U (en) Assembled self-control sliding discharging platform for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant