CN219314379U - Device for pre-buried pile head of construction site - Google Patents

Device for pre-buried pile head of construction site Download PDF

Info

Publication number
CN219314379U
CN219314379U CN202320645505.8U CN202320645505U CN219314379U CN 219314379 U CN219314379 U CN 219314379U CN 202320645505 U CN202320645505 U CN 202320645505U CN 219314379 U CN219314379 U CN 219314379U
Authority
CN
China
Prior art keywords
pile head
plate
hanging
hanging plate
anchor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320645505.8U
Other languages
Chinese (zh)
Inventor
刘晓峰
秦海龙
段志刚
贺俊锋
闫军玲
李志兰
王禹洲
梁睿奇
郭玉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sixth Construction Group Co ltd
Original Assignee
Shanxi Sixth Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sixth Construction Group Co ltd filed Critical Shanxi Sixth Construction Group Co ltd
Priority to CN202320645505.8U priority Critical patent/CN219314379U/en
Application granted granted Critical
Publication of CN219314379U publication Critical patent/CN219314379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the field of construction, and particularly relates to a device for a pre-buried pile head in a construction site, which comprises a lifting ring, a steel bar and an anchor plate, wherein the lifting ring comprises a lifting lug, a connecting piece and a hanging plate, the connecting piece is arranged in the middle of the upper end face of the hanging plate, the lifting lug is rotationally connected with the connecting piece, two fixing through holes are respectively formed in two sides of the hanging plate, two connecting through holes are formed in the anchor plate, a threaded section is arranged at the upper end of the steel bar, the upper end of the steel bar sequentially penetrates through the connecting through holes, the fixing through holes and nuts of the upper end face of the hanging plate, the steel bar is connected with the anchor plate through welding, and the anchor plate is buried in pile head concrete. According to the utility model, the anchor plate is embedded in the pile head, so that the structural strength is improved, and the hanging ring is adopted to facilitate the hanging of the tower crane, so that the construction efficiency can be improved, and the construction safety is ensured.

Description

Device for pre-buried pile head of construction site
Technical Field
The utility model belongs to the field of construction, and particularly relates to a device for pre-burying type pile head in a construction site.
Background
The pre-buried pile head of hanging of job site is an important link, directly influences the progress of engineering, adopts the steel wire to lift by crane the pile head at present, and this kind of mode factor of safety is low, and the steel wire is stretched out easily, has just pre-buried reinforcing bar in the pile head in addition at present, and structural strength is low.
Disclosure of Invention
In order to solve the problems, the utility model discloses a device for pre-burying a pile head in a construction site, which is characterized in that an anchor plate is pre-buried in the pile head, so that the structural strength is improved, and a hanging ring is adopted to facilitate a tower crane hook, so that the construction efficiency can be improved, and the construction safety is ensured.
The utility model provides a pre-buried pile head's of job site device, includes rings, still includes reinforcing bar and anchor slab, rings include lug, connecting piece and hanging plate, the connecting piece install in hanging plate's up end middle part, the lug with the connecting piece rotates to be connected, a fixed through-hole has been seted up respectively to hanging plate's both sides, two connecting through-holes have been seted up on the anchor slab, the upper end of reinforcing bar has the screw thread section, the upper end of reinforcing bar passes in proper order connecting through-hole fixed through-hole with hanging plate's up end nut is connected, the reinforcing bar with the anchor slab passes through welded connection, the anchor slab buries into pile head concrete.
Preferably, nuts are connected to the steel bars on the lower end face of the hanging plate.
Preferably, a steel backing plate is arranged between the nut on the upper end face of the hanging plate and the hanging plate.
Preferably, the anchor plate is further provided with a lightening hole.
Preferably, the lower end of the reinforcing bar has a hook.
Preferably, the lifting lug is connected with the connecting piece through a pulley.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the anchor plate is embedded in the pile head, so that the structural strength is improved, and the hanging ring is adopted to facilitate the hanging of the tower crane, so that the construction efficiency can be improved, and the construction safety is ensured.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a top view of the bail;
fig. 3 is a schematic view of an anchor plate structure.
Detailed Description
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other.
In order to better understand the embodiments of the present application, the following description will clearly and completely describe the embodiments of the present application, and it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments herein without making any inventive effort, shall fall within the scope of the present application.
As shown in fig. 1-3, a device for pre-burying pile head in construction site comprises a lifting ring 1, a steel bar 2 and an anchor plate 3, wherein the lifting ring 1 comprises a lifting lug 11, a connecting piece 12 and a hanging plate 13, the connecting piece 12 is installed in the middle of the upper end face of the hanging plate 13, the lifting lug 11 is rotationally connected with the connecting piece 12, two fixing through holes 14 are respectively formed in two sides of the hanging plate 13, two connecting through holes 31 are formed in the anchor plate 3, a threaded section is arranged at the upper end of the steel bar 2, the upper end of the steel bar 2 sequentially penetrates through the connecting through holes 31, the fixing through holes 14 are connected with nuts 4 on the upper end face of the hanging plate 13, the steel bar 2 is welded with the anchor plate 3, and the anchor plate 3 is buried into pile head concrete 5.
The steel bar 2 on the lower end surface of the hanging plate 13 is connected with a nut 4, so that the stability of connection is ensured;
a steel backing plate 6 is arranged between the nut 4 on the upper end surface of the hanging plate 13 and the hanging plate 13, so that the structural strength of connection is ensured.
The anchor plate 3 is also provided with a lightening hole 32, the anchor plate 3 can enlarge the contact area between the steel bar 2 and the concrete, so that the steel bar 2 is firmly anchored in the pile head, the lightening hole 32 can save materials, and the lightening hole is better combined with the pile head concrete 5.
The lower end of the reinforcing steel bar 2 is provided with a hook 21.
The lifting lug 11 is connected with the connecting piece 12 through the pulley 7, and the pulley 7 can change the direction of force when the weight is lifted, so that the gravity center of the weight is always consistent with the lifting gravity center of the tower crane.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The utility model provides a device of pre-buried pile head of hanging in job site, includes rings, its characterized in that still includes reinforcing bar and anchor plate, rings include lug, connecting piece and hanging plate, the connecting piece install in hanging plate's up end middle part, the lug with the connecting piece rotates to be connected, a fixed through-hole has been seted up respectively to hanging plate's both sides, two connecting through-holes have been seted up on the anchor plate, the upper end of reinforcing bar has the screw thread section, the upper end of reinforcing bar passes in proper order connecting through-hole fixed through-hole with hanging plate's up end nut is connected, the reinforcing bar with the anchor plate passes through welded connection, the anchor plate buries into pile head concrete.
2. The device for pre-burying pile head at a construction site according to claim 1, wherein nuts are connected to the steel bars at the lower end face of said hanging plate.
3. The device for pre-buried hanging pile head in construction site according to claim 1, wherein a steel backing plate is arranged between the nut on the upper end face of the hanging plate and the hanging plate.
4. The device for pre-burying pile head at a construction site according to claim 1, wherein said anchor plate is further provided with a lightening hole.
5. The device for pre-buried pile head in construction site according to claim 2, wherein the lower end of the reinforcing bar is provided with a hook.
6. The apparatus of claim 2, wherein the lifting lug is connected to the connector by a pulley.
CN202320645505.8U 2023-03-29 2023-03-29 Device for pre-buried pile head of construction site Active CN219314379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320645505.8U CN219314379U (en) 2023-03-29 2023-03-29 Device for pre-buried pile head of construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320645505.8U CN219314379U (en) 2023-03-29 2023-03-29 Device for pre-buried pile head of construction site

Publications (1)

Publication Number Publication Date
CN219314379U true CN219314379U (en) 2023-07-07

Family

ID=87026397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320645505.8U Active CN219314379U (en) 2023-03-29 2023-03-29 Device for pre-buried pile head of construction site

Country Status (1)

Country Link
CN (1) CN219314379U (en)

Similar Documents

Publication Publication Date Title
CN201301173Y (en) Auxiliary lifting appliance for large-sized component
CN203452014U (en) Hoop type hoisting support
CN219314379U (en) Device for pre-buried pile head of construction site
CN209758838U (en) Special lifting appliance device for lifting T beam by bridge girder erection machine
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN215925647U (en) Arch rib buckle cable anchoring beam for tower buckle integration
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN216042984U (en) Collapse-prevention steel pipe tower with stable base
CN201713940U (en) Steel column base structure
CN212388543U (en) On-site fixing device for ultra-high cable wind rope
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN202358820U (en) Lifting tool for steel truss structure
CN201649667U (en) Reinforcement cage immersion guide frame
CN202518930U (en) Lifting appliance structure for hoisting steel reinforcement cage
CN201635013U (en) Device for resisting horizontal component force of stayed cable
CN220644206U (en) Anti-pulling square pile head
CN220684407U (en) Lifting appliance device for installing prefabricated box girder
CN220578740U (en) Horizontal hoisting device for large-scale prestressed hollow slab member
CN216475048U (en) Novel steel reinforcement cage hanging system
CN210064931U (en) Prefabricated T roof beam template hoist device
CN221318891U (en) Anchor rod hoisting device
CN220578699U (en) Hoisting lengthening device for vertical member
CN211712447U (en) Pile combined type lifting appliance
CN220285363U (en) Assembled superimposed sheet installation device
CN209619993U (en) A kind of strong rammer hammer with removable secondary hammer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant