CN219261739U - Construction device for constructional column of filling wall - Google Patents
Construction device for constructional column of filling wall Download PDFInfo
- Publication number
- CN219261739U CN219261739U CN202320135991.9U CN202320135991U CN219261739U CN 219261739 U CN219261739 U CN 219261739U CN 202320135991 U CN202320135991 U CN 202320135991U CN 219261739 U CN219261739 U CN 219261739U
- Authority
- CN
- China
- Prior art keywords
- groups
- plates
- mounting seat
- plate
- sealing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the field of building construction devices, in particular to a construction device for a filling wall constructional column. The device comprises two groups of fixed plates, two groups of movable plates and a sealing connecting strip; the two groups of fixing plates are oppositely arranged, the two sides of the fixing plates are respectively provided with a tensioning piece, and the top of the fixing plates is provided with a cement filling piece; the sealing connecting strips are detachably arranged at the opposite ends of the two groups of fixing plates; the two groups of movable plates are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates, and are arranged on the side parts of each group of movable plates and corresponding sealing connecting strips. The sealing connecting strip is provided with a clamping groove; a fixing nail connected with the fixing plate is arranged in the clamping groove; the end part of the moving plate stretches into the clamping groove to be connected with the clamping groove in a clamping way. According to the grouting device, on one hand, the construction requirements of different constructional column sizes are met by adjusting the size of the grouting space, and on the other hand, the movable plate and the fixed plate are more tightly connected, the sealing performance is good, and slurry leakage is reduced. And the device is convenient to install and disassemble, good in molding effect and convenient to reuse.
Description
Technical Field
The utility model relates to the field of building construction devices, in particular to a construction device for a filling wall constructional column.
Background
The wall body of the framework structure is a filling wall, the filling wall plays roles of enclosing and separating, the weight is borne by beam columns, the filling wall is not loaded, the framework structure is divided into a full framework and a half framework, the full framework is not loaded with the bearing wall, the half framework is loaded with the bearing wall, the constructional column is used for enhancing the integrity and stability of a building, the reinforced concrete constructional column is also arranged in the wall body of the multi-layer brick-concrete structure building and is connected with ring beams of each layer to form a space framework capable of bending and shearing, the space framework is an effective measure for preventing house collapse, and a template is generally built before the constructional column is constructed, and then casting and forming are carried out.
The Chinese patent document with the publication number of CN212562480U discloses a novel construction device for a filling wall constructional column for building construction, which comprises a first template, the side templates are all installed at first template side both ends, the second template is installed to side templates one end, the equal fixed mounting in side templates both ends has the butt joint strip, the butt joint groove that corresponds with the butt joint strip has all been seted up at first template and second template side both ends, the even fixedly connected with multiunit locating plate in side templates side, accomplishes the joint through the effect of butt joint strip and butt joint groove between first template, second template and the side templates.
According to the wall-filling constructional column construction device, the fixed butt joint strips and the butt joint grooves are arranged among the first template, the second template and the side templates, the construction space formed by the wall-filling constructional column construction device is fixed, constructional columns with different sizes cannot be poured according to construction requirements, and construction limitations of the constructional columns are caused.
Disclosure of Invention
Aiming at the problems in the background technology, a construction device for a filling wall constructional column is provided. According to the grouting device, on one hand, the construction requirements of different constructional column sizes are met by adjusting the size of the grouting space, and on the other hand, the movable plate and the fixed plate are more tightly connected, the sealing performance is good, and slurry leakage is reduced. And the device is convenient to install and disassemble, good in molding effect and convenient to reuse.
The utility model provides a construction device for a filled wall constructional column, which comprises two groups of fixed plates, two groups of movable plates and a sealing connecting strip; the two groups of fixing plates are oppositely arranged, the two sides of the fixing plates are respectively provided with a tensioning piece, and the top of the fixing plates is provided with a cement filling piece; the sealing connecting strips are detachably arranged at the opposite ends of the two groups of fixing plates; the two groups of movable plates are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates, and are arranged on the side parts of each group of movable plates and corresponding sealing connecting strips. The sealing connecting strip is provided with a clamping groove; a fixing nail connected with the fixing plate is arranged in the clamping groove; the end part of the moving plate stretches into the clamping groove to be connected with the clamping groove in a clamping way.
Preferably, the sealing connecting strip is of a U-shaped structure.
Preferably, a sealing rubber pad is arranged at the end part of the moving plate.
Preferably, the tensioning members are arranged between the two groups of fixing plates at equal intervals along the vertical direction.
Preferably, the tensioning piece comprises a mounting seat I, a threaded rod and an adjusting disc; the first mounting seat is provided with two groups which are respectively positioned on the side walls of the two groups of fixing plates; two ends of the threaded rod are respectively connected with a first mounting seat at the corresponding side; the adjusting disk is connected with the two ends of the threaded rod in a threaded way.
Preferably, the threaded rod is in threaded connection with the mounting base.
Preferably, the cement filling piece comprises a sealing plate, a second mounting seat and a fastening rod; the top of the fixed plate is provided with a grouting opening; the sealing plate is connected with the inner side of the second mounting seat and is clamped with the grouting opening; the fastening rod is arranged on the second mounting seat along the periphery of the sealing plate and is in threaded connection with the second mounting seat and the fixing plate.
Preferably, the longitudinal section of the grouting opening is of a transverse T-shaped structure.
Compared with the prior art, the utility model has the following beneficial technical effects:
1. according to the utility model, the position of the sealing connecting strip is changed, and then the movable plate is clamped into the sealing connecting strip to enclose a grouting space. On the one hand, the size of the grouting space is adjusted to meet construction requirements of different constructional column sizes, and on the other hand, the movable plate and the fixed plate are connected more tightly, the sealing performance is good, and slurry leakage is reduced. And the device is convenient to install and disassemble, good in molding effect and convenient to reuse.
2. According to the utility model, the tensioning piece is arranged, after a grouting space is initially assembled, the threaded rod sequentially passes through the first mounting seats at the two sides, and the adjusting disc is screwed, so that the purpose of positioning the fixing plate is achieved, and the grouting space is stable. The installation and the disassembly are convenient.
3. The utility model sets cement filling piece, opens the filling mouth when filling, stretches the filling pipe into the filling space. After grouting, the sealing plate and the mounting seat II are clamped into the grouting opening, and the fastening rod is screwed. The sealing performance of the grouting opening is ensured, and slurry leakage is effectively prevented.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present utility model;
FIG. 2 is a side view of an embodiment of the present utility model;
FIG. 3 is a transverse cross-sectional view of one embodiment of the present utility model;
FIG. 4 is an enlarged view of FIG. 3 at A;
fig. 5 is an enlarged view at B in fig. 3.
Reference numerals: 1. a fixing plate; 2. a moving plate; 3. sealing the connecting strip; 4. a first mounting seat; 5. a threaded rod; 6. an adjusting plate; 7. a cement filling member; 8. fixing nails; 9. sealing a rubber pad; 10. a clamping groove; 11. a second mounting seat; 12. a sealing plate; 13. a grouting port; 14. and a fastening rod.
Detailed Description
Example 1
As shown in fig. 1 to 4, the utility model provides a construction device for a infill wall constructional column, which comprises two groups of fixed plates 1, two groups of movable plates 2 and a sealing connecting strip 3; the two groups of fixing plates 1 are oppositely arranged, tensioning pieces are respectively arranged at two sides, and cement pouring pieces 7 are arranged at the top; the sealing connecting strips 3 are detachably arranged at the opposite ends of the two groups of fixing plates 1; the two groups of movable plates 2 are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates 1, and the side parts of each group of movable plates 2 are connected with the corresponding sealing connecting strips 3. The sealing connecting strip 3 is provided with a clamping groove 10; a fixing nail 8 connected with the fixing plate 1 is arranged in the clamping groove 10; the end of the moving plate 2 extends into the clamping groove 10 and is connected with the clamping groove in a clamping way.
The working principle of this embodiment is as follows: when in construction, firstly, marks are made on the proper positions on the fixed plate 1 according to the size of the constructional column required by the filling wall. The sealing connecting strip 3 is arranged at the marking position, and the fixing nails 8 are nailed between the sealing connecting strip 3 and the fixing plate 1 to fix the sealing connecting strip 3. Two sets of moving plates 2 are then positioned at the construction site of the constructional column, and the spacing is adjusted. And then the two groups of fixed plates 1 are moved to the two sides of the two groups of movable plates 2, the movable plates 2 are clamped into the sealing connecting strips 3 at the corresponding sides, and grouting spaces meeting the size of the constructional column to be constructed are enclosed. The tightening piece is then operated to further position the grouting space. And cement slurry is poured in the position of the cement pouring member 7. After the slurry is formed, loosening the tensioning piece, and disassembling the fixed plate 1 and the movable plate 2 in sequence.
Example two
As shown in fig. 1 to 4, the utility model provides a construction device for a infill wall constructional column, which comprises two groups of fixed plates 1, two groups of movable plates 2 and a sealing connecting strip 3; the two groups of fixing plates 1 are oppositely arranged, tensioning pieces are respectively arranged at two sides, and cement pouring pieces 7 are arranged at the top; the sealing connecting strips 3 are detachably arranged at the opposite ends of the two groups of fixing plates 1; the two groups of movable plates 2 are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates 1, and the side parts of each group of movable plates 2 are connected with the corresponding sealing connecting strips 3. The sealing connecting strip 3 is provided with a clamping groove 10; a fixing nail 8 connected with the fixing plate 1 is arranged in the clamping groove 10; the end of the moving plate 2 extends into the clamping groove 10 and is connected with the clamping groove in a clamping way.
Further, the sealing connecting strip 3 is of a U-shaped structure. The end of the moving plate 2 is provided with a sealing rubber pad 9. The sealing rubber gasket 9 stretches into the clamping groove 10, so that the movable plate 2 is connected with the sealing connecting strip 3 more tightly, the sealing performance is good, and slurry leakage is reduced.
Further, the tensioning members are arranged between the two groups of fixing plates 1 at equal intervals along the vertical direction. The tensioning piece comprises a mounting seat I4, a threaded rod 5 and an adjusting disc 6; the first mounting seat 4 is provided with two groups and is respectively positioned on the side walls of the two groups of fixing plates 1; two ends of the threaded rod 5 are respectively connected with a mounting seat I4 at the corresponding side; the adjusting disk 6 is connected with two ends of the threaded rod 5 in a threaded way.
Further, the threaded rod 5 is in threaded connection with the first mounting seat 4.
In this embodiment, the concrete structure of the tensioning member is set, after the grouting space is initially assembled, the threaded rod 5 sequentially passes through the mounting seats 4 on two sides, and then the adjusting disc 6 is screwed, so that the purpose of positioning the fixing plate 1 is achieved, and the grouting space is stable.
Example III
As shown in fig. 1 to 4, the utility model provides a construction device for a infill wall constructional column, which comprises two groups of fixed plates 1, two groups of movable plates 2 and a sealing connecting strip 3; the two groups of fixing plates 1 are oppositely arranged, tensioning pieces are respectively arranged at two sides, and cement pouring pieces 7 are arranged at the top; the sealing connecting strips 3 are detachably arranged at the opposite ends of the two groups of fixing plates 1; the two groups of movable plates 2 are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates 1, and the side parts of each group of movable plates 2 are connected with the corresponding sealing connecting strips 3. The sealing connecting strip 3 is provided with a clamping groove 10; a fixing nail 8 connected with the fixing plate 1 is arranged in the clamping groove 10; the end of the moving plate 2 extends into the clamping groove 10 and is connected with the clamping groove in a clamping way.
Further, the sealing connecting strip 3 is of a U-shaped structure. The end of the moving plate 2 is provided with a sealing rubber pad 9. The sealing rubber gasket 9 stretches into the clamping groove 10, so that the movable plate 2 is connected with the sealing connecting strip 3 more tightly, the sealing performance is good, and slurry leakage is reduced.
Further, the tensioning members are arranged between the two groups of fixing plates 1 at equal intervals along the vertical direction. The tensioning piece comprises a mounting seat I4, a threaded rod 5 and an adjusting disc 6; the first mounting seat 4 is provided with two groups and is respectively positioned on the side walls of the two groups of fixing plates 1; two ends of the threaded rod 5 are respectively connected with a mounting seat I4 at the corresponding side; the adjusting disk 6 is connected with two ends of the threaded rod 5 in a threaded way.
Further, the threaded rod 5 is in threaded connection with the first mounting seat 4.
As shown in fig. 5, the cement pouring member 7 includes a sealing plate 12, a second mounting seat 11, and a fastening rod 14; the top of the fixed plate 1 is provided with a grouting opening 13; the sealing plate 12 is connected with the inner side of the second mounting seat 11 and is clamped with the grouting opening 13; the fastening rod 14 is disposed on the second mounting seat 11 along the outer periphery of the sealing plate 12, and is in threaded connection with the second mounting seat 11 and the fixing plate 1.
Further, the longitudinal section of the grouting opening 13 is of a transverse T-shaped structure.
In this embodiment, a concrete structure of the cement pouring member 7 is provided, and the grouting opening 13 is opened during grouting to extend the grouting pipe into the grouting space. After grouting, the sealing plate 12 and the second mounting seat 11 are clamped into the grouting opening 13, and the fastening rod 14 is screwed. Ensure the tightness and effectively prevent slurry leakage.
The embodiments of the present utility model have been described in detail with reference to the drawings, but the present utility model is not limited thereto, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present utility model.
Claims (8)
1. The construction device for the constructional column of the filling wall is characterized by comprising two groups of fixed plates (1), two groups of movable plates (2) and a sealing connecting strip (3); the two groups of fixing plates (1) are oppositely arranged, tensioning pieces are respectively arranged at the two sides, and cement filling pieces (7) are arranged at the top; the sealing connecting strips (3) are detachably arranged at the opposite ends of the two groups of fixing plates (1); the two groups of moving plates (2) are opposite in position and adjustable in distance, are arranged between the two groups of fixed plates (1), and the side part of each group of moving plates (2) is connected with the corresponding sealing connecting strip (3);
a clamping groove (10) is arranged on the sealing connecting strip (3); a fixing nail (8) connected with the fixing plate (1) is arranged in the clamping groove (10); the end part of the moving plate (2) stretches into the clamping groove (10) to be connected with the clamping groove in a clamping way.
2. A infill wall construction column construction device according to claim 1, characterised in that the sealing connection strip (3) is of U-shaped construction.
3. A infill wall construction column construction device according to claim 1, characterised in that the ends of the moving plate (2) are provided with sealing rubber pads (9).
4. A infill wall construction column construction device according to claim 1, characterised in that the tensioning elements are arranged between two sets of fixing plates (1) at equally spaced intervals in the vertical direction.
5. A infill wall construction column construction device according to claim 1, characterised in that the tensioning element comprises a mounting seat one (4), a threaded rod (5) and an adjusting disc (6); the first mounting seat (4) is provided with two groups and is respectively positioned on the side walls of the two groups of fixing plates (1); two ends of the threaded rod (5) are respectively connected with a mounting seat I (4) at the corresponding side; the adjusting disc (6) is connected with the two ends of the threaded rod (5) in a threaded way.
6. A infill wall construction column construction device according to claim 5, characterised in that the threaded rod (5) is screwed with the first mounting seat (4).
7. A infill wall construction column construction device according to claim 1, characterised in that the cement filler (7) comprises a sealing plate (12), a second mounting seat (11) and a fastening rod (14); the top of the fixed plate (1) is provided with a grouting opening (13); the sealing plate (12) is connected with the inner side of the second mounting seat (11) and is clamped with the grouting opening (13); the fastening rod (14) is arranged on the second mounting seat (11) along the periphery of the sealing plate (12) and is in threaded connection with the second mounting seat (11) and the fixing plate (1).
8. A infill wall constructional column construction device according to claim 7, characterized in that the longitudinal section of the grouting openings (13) is of a transverse T-shaped configuration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320135991.9U CN219261739U (en) | 2023-02-07 | 2023-02-07 | Construction device for constructional column of filling wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320135991.9U CN219261739U (en) | 2023-02-07 | 2023-02-07 | Construction device for constructional column of filling wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219261739U true CN219261739U (en) | 2023-06-27 |
Family
ID=86868056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320135991.9U Active CN219261739U (en) | 2023-02-07 | 2023-02-07 | Construction device for constructional column of filling wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219261739U (en) |
-
2023
- 2023-02-07 CN CN202320135991.9U patent/CN219261739U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106438213B (en) | Tower drum for wind driven generator | |
CN109736204B (en) | Construction process for prefabricating section beam by adopting short line method | |
CN107143039B (en) | Construction method of shock-insulation elastic sliding plate support for building | |
CN111058631B (en) | Concrete construction method for large-gradient inclined roof | |
CN207063522U (en) | A kind of frame column high-supported formwork | |
CN116378428A (en) | Construction method of longitudinal rib superimposed shear wall structure wall | |
KR101542536B1 (en) | undrained type expansion joint for ballast railway bridge supporting member and constructing method of drain apparatus installed slab laying gap for pier | |
CN219261739U (en) | Construction device for constructional column of filling wall | |
CN108915085A (en) | The pre-buried assembling module of beam bottom constructional column anchor bar and construction method | |
CN215947749U (en) | Prefabricated assembled ballast bed | |
CN212562480U (en) | Novel construction of infilled wall constructional column for construction device | |
CN110043279B (en) | Tunnel mould spraying concrete support construction device and method | |
CN110685404A (en) | Construction method of prefabricated combined structure constructional column | |
CN210598344U (en) | Hybrid connection prefabricated prestressed concrete circular storage bin structure | |
CN215979401U (en) | Rubber air bag plug template for tunnel secondary lining construction | |
CN211647283U (en) | Plane or cambered surface pouring template | |
CN214981852U (en) | Improved T-beam movable template support device | |
CN208918294U (en) | The baffle plate assembly that segmentation for concrete pours | |
CN113863549A (en) | Construction process of ribbed floor | |
CN110593398A (en) | Underground building for assembly construction and construction method thereof | |
CN220579812U (en) | Cylinder type concrete veneer template structure | |
CN112796513A (en) | Formwork supporting structure for post-cast strip and construction method | |
CN212888231U (en) | Be applied to standardized prefabricated reinforcing bar die carrier of bridge beam slab | |
JPS5849375B2 (en) | PC concrete plate sliding forming equipment | |
CN218028982U (en) | Be used for middle partition of antidetonation structure to shake upper support pier template fixing device |
Legal Events