CN219261538U - Small temporary building roof structure of solar panel - Google Patents

Small temporary building roof structure of solar panel Download PDF

Info

Publication number
CN219261538U
CN219261538U CN202223296609.7U CN202223296609U CN219261538U CN 219261538 U CN219261538 U CN 219261538U CN 202223296609 U CN202223296609 U CN 202223296609U CN 219261538 U CN219261538 U CN 219261538U
Authority
CN
China
Prior art keywords
roof
solar panel
trapezoid
unit
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223296609.7U
Other languages
Chinese (zh)
Inventor
程进钊
钟天铭
梁兆强
何佳佳
曾桂林
李金库
陈华保
蔡彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shun Construction Engineering Co ltd
Original Assignee
Guangdong Shun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shun Construction Engineering Co ltd filed Critical Guangdong Shun Construction Engineering Co ltd
Priority to CN202223296609.7U priority Critical patent/CN219261538U/en
Application granted granted Critical
Publication of CN219261538U publication Critical patent/CN219261538U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a small temporary building roof structure of a solar panel, which relates to the technical field of temporary buildings and comprises a building roof structure main body, wherein the building roof structure main body comprises a welding metal frame, and an assembled roof mechanism is arranged above the welding metal frame. According to the utility model, the trapezoid splice plates and the main body support beam columns are installed and fixed through bolts and nuts to form a foundation installation frame of the roof board, the triangular sealing gaskets are paved above the trapezoid splice plates to increase the sealing performance of the inner connecting joints, the outer clamping groove plates and the right-angle sealing gaskets are covered above the roof board, the bolts and nuts are used for fixing the outer clamping groove plates, the right-angle sealing gaskets, the roof board and the trapezoid splice plates, the sealing performance of the joint between the trapezoid splice plates and the outside of the roof board is increased through the outer clamping groove plates and the right-angle sealing gaskets, the supporting cross beams and the clamping grooves are clamped to play a role in auxiliary positioning, and meanwhile, the supporting cross beams and the buffer supporting columns are mutually matched to play a role in buffering and damping on the roof board.

Description

Small temporary building roof structure of solar panel
Technical Field
The utility model relates to the technical field of temporary buildings, in particular to a small temporary building roof structure of a solar panel.
Background
Temporary buildings are buildings or other facilities that are simple in structure and must be dismantled within a prescribed period of time for units and individuals to be temporarily built and used as production and living needs. For example, because natural disasters people can build small temporary buildings when performing disaster relief activities, but because of environmental reasons, power failure can occur, the utility model provides a small temporary building roof structure of a solar panel.
In the prior art, a chinese patent document with publication number CN205077738U and publication date 2016, 03 and 09 is proposed to solve the above technical problems, and the technical scheme disclosed in the patent document is as follows: a solar photovoltaic panel roofing with a metal building structure, comprising: the waterproof coiled material layer, the isolation buffer layer, the heat preservation layer and the supporting layer that from the top down set gradually, its characterized in that, roofing top layer still is equipped with the photovoltaic electroplate layer, the photovoltaic electroplate layer comprises a plurality of photovoltaic electroplates according to the matrix structure arrangement, and every electroplate passes through the bolt fastening on the waterproof coiled material layer, the heat preservation layer with still be equipped with one deck vapour barrier between the supporting layer.
In order to solve the problem that the temporary building roof is easy to displace, the prior art adopts a mode of fixing the photovoltaic panel on the waterproof layer by using bolts, but the condition that the photovoltaic panel and the roof are integrally and fixedly installed can also occur, and then the problem of inconvenient installation is caused.
Disclosure of Invention
The utility model aims to provide a small temporary building roof structure of a solar panel, which aims to solve the problems in the background technology.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the small temporary building roof structure comprises a building roof structure main body, wherein the building roof structure main body comprises a welded metal frame, an assembled roof mechanism is arranged above the welded metal frame, and an assembled solar panel mechanism is arranged above the assembled roof mechanism; the assembled roof mechanism comprises a roof mounting unit and a buffer supporting unit, wherein the roof mounting unit is arranged above the welding metal frame, and the buffer supporting unit is arranged between the welding metal frame and the roof mounting unit; the assembled solar panel mechanism comprises a solar panel unit and a mounting unit, wherein the solar panel unit is arranged at the top of the roof mounting unit, and the mounting unit is arranged between the solar panel unit and the roof mounting unit.
The technical scheme of the utility model is further improved as follows: the roof installation unit comprises a main body support beam column welded on the upper surface of the middle of the welded metal frame, wherein a trapezoid splice plate is installed at the upper end of the main body support beam column in a clamping mode, and the lower end of the trapezoid splice plate is fixedly installed with the upper end of the main body support beam column through bolts and nuts.
By adopting the technical scheme, the trapezoidal splice plates and the main body support beam columns are installed and fixed by utilizing the bolt and the nut pair to form the roof board to build the foundation installation frame.
The technical scheme of the utility model is further improved as follows: the roof installation unit further comprises an external clamping groove plate which is clamped at the top of the trapezoid splice plate, a roof plate is fixedly installed between the inner side surface of the external clamping groove plate and the outer side surface of the upper end of the trapezoid splice plate through bolts and nuts, clamping grooves are fixedly installed on the lower surface of the roof plate, and the lower end of the roof plate is fixedly connected with two side installation grooves of the welded metal frame through bolts.
By adopting the technical scheme, the triangular sealing gasket is paved above the trapezoid splice plates, so that the tightness of the internal connecting seam is improved.
The technical scheme of the utility model is further improved as follows: the roof installation unit further comprises a triangular sealing gasket arranged between the lower surface of the roof board and the upper surface of the trapezoid splice plate, and a right-angle sealing gasket is arranged between the inner surface of the external clamping groove board and the upper surface of the roof board.
By adopting the technical scheme, the external clamping groove plate, the right-angle sealing gasket covers the upper part of the roof plate, the external clamping groove plate, the right-angle sealing gasket, the roof plate and the trapezoid splice plate are fixed by using bolts and nuts, and the sealing property of the joint between the trapezoid splice plate and the outside of the roof plate is improved by the external clamping groove plate and the right-angle sealing gasket.
The technical scheme of the utility model is further improved as follows: the buffer support unit comprises a buffer support column fixedly mounted on the upper surface of the welding metal frame, a support beam is fixedly mounted at the upper end of the buffer support column, and the outer side surface of the support beam is clamped with the inner side surface of the clamping groove.
By adopting the technical scheme, the supporting beam and the clamping groove are clamped to play a role in auxiliary positioning, and meanwhile, the supporting beam and the buffer supporting column are matched with each other to play a role in buffering and damping the roof board, so that the firmness of the structural main body of the building roof is improved, the integral splicing is simple, the later disassembly and recovery are easy, and the resource saving and the environment protection are facilitated.
The technical scheme of the utility model is further improved as follows: the installation unit comprises a fixed clamping column fixedly installed on the upper surface of the roof board, an installation seat is installed above the fixed clamping column in a clamping manner, and the lower end of the installation seat is fixedly connected with the inner surface of the fixed clamping column through bolts and nuts.
By adopting the technical scheme, the fixing clamping column is clamped with the mounting seat, and is fixed through bolts and nuts, so that the fixing clamping column is convenient to mount and dismount.
The technical scheme of the utility model is further improved as follows: the solar panel unit comprises a solar panel, wherein the outer side surface of the solar panel is clamped with the mounting seat, and the outer side surface of the solar panel is fixed with the inner side surface of the mounting seat through bolts.
By adopting the technical scheme, the mounting seat is convenient for mounting the solar panel, so that the solar panel can be overhauled and disassembled for reuse in a later period conveniently, and the service life of the solar panel is prolonged.
By adopting the technical scheme, compared with the prior art, the utility model has the following technical progress:
1. the utility model provides a small temporary building roof structure of a solar panel, which utilizes bolts and nuts to mount and fix a trapezoid splice plate and a main body support beam column into a roof panel to form a foundation mounting frame, lays a triangular sealing gasket above the trapezoid splice plate to increase the sealing performance of an inner connecting seam, covers an outer clamping groove plate and a right-angle sealing gasket above the roof panel, uses bolts and nuts to fix the outer clamping groove plate, the right-angle sealing gasket, the roof panel and the trapezoid splice plate, and the outer clamping groove plate and the right-angle sealing gasket to increase the sealing performance of the joint between the trapezoid splice plate and the outside of the roof panel.
2. The utility model provides a small temporary building roof structure of a solar panel, which is characterized in that a fixing clamping column is clamped between an installation seat and is fixed by bolts and nuts so as to be convenient to install and disassemble, the installation seat is convenient to install the solar panel, the later maintenance and the disassembly are convenient to recycle, and the service life of the solar panel is prolonged.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the bottom view of the structure of the present utility model;
FIG. 3 is a schematic view of a structural solar panel installation of the present utility model;
FIG. 4 is a schematic view of the installation of the structural assembly roofing mechanism of the present utility model.
In the figure: 1. a building roof structural body; 11. welding a metal frame; 2. an assembled roof mechanism; 21. the main body supports the beam column; 22. trapezoidal splice plates; 23. an external clamping groove plate; 24. triangular sealing gaskets; 25. a right-angle sealing gasket; 26. roof boarding; 261. a clamping groove; 27. a support beam; 28. buffering support columns; 3. an assembled solar panel mechanism; 31. a solar panel; 32. a mounting base; 33. and fixing the clamping column.
Detailed Description
The utility model is further illustrated by the following examples:
example 1
As shown in fig. 1-4, the utility model provides a small temporary building roof structure of a solar panel, which comprises a building roof structure main body 1, wherein the building roof structure main body 1 comprises a welding metal frame 11, an assembled roof mechanism 2 is arranged above the welding metal frame 11, and an assembled solar panel mechanism 3 is arranged above the assembled roof mechanism 2; the assembled roof mechanism 2 comprises a roof installation unit and a buffer supporting unit, wherein the roof installation unit is arranged above the welding metal frame 11, and the buffer supporting unit is arranged between the welding metal frame 11 and the roof installation unit; the assembled solar panel mechanism 3 comprises a solar panel unit and an installation unit, wherein the solar panel unit is arranged at the top of the roof installation unit, the installation unit is arranged between the solar panel unit and the roof installation unit, the roof installation unit comprises a main body support beam column 21 welded on the upper surface of the middle part of a welded metal frame 11, a trapezoid splice plate 22 is installed at the upper end of the main body support beam column 21 in a clamping manner, the lower end of the trapezoid splice plate 22 and the upper end of the main body support beam column 21 are fixedly installed through bolts and nuts, the roof installation unit further comprises an external clamping groove plate 23 clamped at the top of the trapezoid splice plate 22, a roof plate 26 is fixedly installed between the inner side surface of the external clamping groove plate 23 and the outer side surface of the upper end of the trapezoid splice plate 22 through bolts and nuts, clamping grooves 261 are fixedly installed on the lower surface of the roof plate 26, the lower end of the roof plate 26 is fixedly connected with two side installation grooves of the welded metal frame 11 through bolts, the trapezoid splice plate 22 and the main body support beam column 21 are fixedly installed into a basic installation frame of the trapezoid splice plate 26 through bolts and nuts, and nuts are used for paving a triangular connection joint pad 24 above the trapezoid splice plate 22, and the inner sealing joint pad is increased.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: the roof mounting unit further comprises a triangular sealing gasket 24 arranged between the lower surface of the roof plate 26 and the upper surface of the trapezoid splice plate 22, a right-angle sealing gasket 25 is arranged between the inner surface of the outer clamping groove plate 23 and the upper surface of the roof plate 26, the buffer support unit comprises a buffer support column 28 fixedly arranged on the upper surface of the welded metal frame 11, a support beam 27 is fixedly arranged at the upper end of the buffer support column 28, the outer side surface of the support beam 27 is clamped with the inner side surface of the clamping groove 261, the outer clamping groove plate 23 and the right-angle sealing gasket 25 are covered above the roof plate 26, the outer clamping groove plate 23, the right-angle sealing gasket 25, the roof plate 26 and the trapezoid splice plate 22 are fixed by using bolts and nuts, the sealing property of the outer clamping groove plate 23 and the right-angle sealing gasket 25 at the joint of the trapezoid splice plate 22 and the outside of the roof plate 26 is increased, the support beam 27 and the buffer support column 28 are mutually matched to play a role in buffering and damping when the roof plate 26 is mounted, the firmness of the main body 1 of the building structure is increased, the whole splicing is easy, the resources are saved, and the environment is protected, and the recycling is facilitated.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the present utility model provides a technical solution: the installation unit is including fixed joint post 33 of fixed mounting at the upper surface of roof boarding 26, mount pad 32 is installed to the top joint of fixed joint post 33, the lower extreme of mount pad 32 passes through bolt and nut fixed connection with the internal surface of fixed joint post 33, solar panel unit is including the solar panel 31 of outside surface and mount pad 32 joint, pass through the bolt fastening between the outside surface of solar panel 31 and the inboard surface of mount pad 32, the joint is convenient for install and dismantle through bolt and nut fixation between fixed joint post 33 and the mount pad 32, the mount pad 32 is convenient for install solar panel 31, convenient later maintenance and dismantlement are recycled, the life of extension solar panel 31.
The working principle of the small temporary building roof structure of the solar panel is specifically described below.
As shown in fig. 1 to 4, firstly, the trapezoidal splice plate 22 and the main body support beam column 21 are installed and fixed by using bolts and nuts to form a foundation installation frame for the roof plate 26, the triangular sealing gasket 24 is paved above the trapezoidal splice plate 22 to increase the sealing performance of an inner connecting seam, then, the outer clamping groove plate 23 and the right-angle sealing gasket 25 are covered above the roof plate 26, the outer clamping groove plate 23, the right-angle sealing gasket 25, the roof plate 26 and the trapezoidal splice plate 22 are fixed by using bolts and nuts, the sealing performance of the joint between the trapezoidal splice plate 22 and the outside of the roof plate 26 is increased by the outer clamping groove plate 23 and the right-angle sealing gasket 25, the supporting beam 27 and the clamping groove 261 are clamped and positioned in an auxiliary mode, the supporting beam 27 and the buffering support column 28 are matched with each other to buffer and cushion the roof plate 26, and finally, the fixing clamping column 33 and the mounting seat 32 are clamped and fixed by using bolts and nuts, and the solar panel 31 is clamped and mounted on the mounting seat 32 and fixed by using bolts.
The foregoing utility model has been generally described in great detail, but it will be apparent to those skilled in the art that modifications and improvements can be made thereto. Accordingly, it is intended to cover modifications or improvements within the spirit of the inventive concepts.

Claims (7)

1. The utility model provides a small-size interim building roofing structure of solar panel, includes building roofing structure main part (1), building roofing structure main part (1) are including welding metal frame (11), its characterized in that: an assembled roof mechanism (2) is arranged above the welding metal frame (11), and an assembled solar panel mechanism (3) is arranged above the assembled roof mechanism (2);
the assembled roof mechanism (2) comprises a roof installation unit and a buffer supporting unit, wherein the roof installation unit is arranged above the welding metal frame (11), and the buffer supporting unit is arranged between the welding metal frame (11) and the roof installation unit;
the assembled solar panel mechanism (3) comprises a solar panel unit and a mounting unit, wherein the solar panel unit is arranged at the top of the roof mounting unit, and the mounting unit is arranged between the solar panel unit and the roof mounting unit.
2. A small temporary building roof structure for a solar panel according to claim 1, wherein: the roof installation unit comprises a main body support beam column (21) welded on the upper surface of the middle of the welding metal frame (11), a trapezoid splice plate (22) is installed at the upper end of the main body support beam column (21) in a clamping mode, and the lower end of the trapezoid splice plate (22) is fixedly installed with the upper end of the main body support beam column (21) through bolts and nuts.
3. A small temporary building roof structure for solar panels as claimed in claim 2, wherein: the roof installation unit further comprises an outer clamping groove plate (23) which is clamped at the top of the trapezoid splice plate (22), a roof plate (26) is fixedly installed between the inner side surface of the outer clamping groove plate (23) and the outer side surface of the upper end of the trapezoid splice plate (22) through bolts and nuts, a clamping groove (261) is fixedly installed on the lower surface of the roof plate (26), and the lower end of the roof plate (26) is fixedly connected with two side installation grooves of the welding metal frame (11) through bolts.
4. A small temporary building roofing structure for solar panels according to claim 3, wherein: the roof installation unit further comprises a triangular sealing gasket (24) arranged between the lower surface of the roof board (26) and the upper surface of the trapezoid splice plate (22), and a right-angle sealing gasket (25) is arranged between the inner surface of the outer clamping groove plate (23) and the upper surface of the roof board (26).
5. A small temporary building roof structure for a solar panel according to claim 1, wherein: the buffer support unit comprises a buffer support column (28) fixedly mounted on the upper surface of the welding metal frame (11), a support cross beam (27) is fixedly arranged at the upper end of the buffer support column (28), and the outer side surface of the support cross beam (27) is clamped with the inner side surface of the clamping groove (261).
6. A small temporary building roof structure for a solar panel according to claim 1, wherein: the installation unit comprises a fixed clamping column (33) fixedly installed on the upper surface of the roof board (26), an installation seat (32) is installed above the fixed clamping column (33) in a clamping mode, and the lower end of the installation seat (32) is fixedly connected with the inner surface of the fixed clamping column (33) through bolts and nuts.
7. A small temporary building roof structure for a solar panel according to claim 1, wherein: the solar panel unit comprises a solar panel (31) with the outer side surface clamped with the mounting seat (32), and the outer side surface of the solar panel (31) is fixed with the inner side surface of the mounting seat (32) through bolts.
CN202223296609.7U 2022-12-09 2022-12-09 Small temporary building roof structure of solar panel Active CN219261538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223296609.7U CN219261538U (en) 2022-12-09 2022-12-09 Small temporary building roof structure of solar panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223296609.7U CN219261538U (en) 2022-12-09 2022-12-09 Small temporary building roof structure of solar panel

Publications (1)

Publication Number Publication Date
CN219261538U true CN219261538U (en) 2023-06-27

Family

ID=86861138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223296609.7U Active CN219261538U (en) 2022-12-09 2022-12-09 Small temporary building roof structure of solar panel

Country Status (1)

Country Link
CN (1) CN219261538U (en)

Similar Documents

Publication Publication Date Title
CN202131835U (en) Prefabricated assembly type glass fence
CN107190877B (en) Semi-rigid node friction energy dissipation device
KR102225506B1 (en) Pannel fixing apparatus for canopi and canopi using the same
WO2021159567A1 (en) Restorable steel-wood independent foundation and mounting method
JP5991512B2 (en) Solar panel mount
CN108462443B (en) Modular assembled water surface floating solar support and assembly method thereof
CN211774554U (en) Reinforced steel structure bearing beam structure for building
CN219261538U (en) Small temporary building roof structure of solar panel
CN114856067A (en) Building roof truss supporting structure based on structural mechanics and construction method
CN110593409A (en) Full-life-cycle detachable and replaceable frame structure system and installation and replacement method
CN213572461U (en) Energy dissipation structure of fabricated building
CN215977724U (en) Energy-saving environment-friendly building steel member
CN219281374U (en) Connection structure of bus shelter
CN212026647U (en) Floor deformation expansion joint structure
CN109594789B (en) Node reinforcing device and reinforcing method capable of restoring function
CN210238550U (en) Civil engineering composite pile
CN213296667U (en) Steel ladder connecting structure for steel skeleton light roof maintenance
CN215253623U (en) Reinforced concrete column node seismic strengthening device for building
CN215563953U (en) Floor photovoltaic installation component
CN219638477U (en) Beam-free floor roof reinforcing structure
CN214738742U (en) Full-assembly type reinforced concrete column and reinforced concrete beam connecting structure
CN217053100U (en) Combined aluminum alloy frame of parking apron platform
CN219731627U (en) Anti-seismic bridge steel structure
CN110984607B (en) Reinforced structure of square steel column
CN216109233U (en) Shockproof connecting structure of cross-layer curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant