CN211037283U - Prefabricated steel beam-column joint system with built-in removable energy dissipation elements - Google Patents

Prefabricated steel beam-column joint system with built-in removable energy dissipation elements Download PDF

Info

Publication number
CN211037283U
CN211037283U CN201921715115.3U CN201921715115U CN211037283U CN 211037283 U CN211037283 U CN 211037283U CN 201921715115 U CN201921715115 U CN 201921715115U CN 211037283 U CN211037283 U CN 211037283U
Authority
CN
China
Prior art keywords
steel
column
built
stiffening plate
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921715115.3U
Other languages
Chinese (zh)
Inventor
李元齐
黄彬辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201921715115.3U priority Critical patent/CN211037283U/en
Application granted granted Critical
Publication of CN211037283U publication Critical patent/CN211037283U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a prefabricated assembly steel structure beam column node system of built-in detachable power consumption component, including steel column (1), girder steel (2), power consumption component (3), this power consumption component (3) include integrated into one piece's component horizontal part (31), connecting portion (32) and component vertical part (33), wherein, component horizontal part (31) and component vertical part (33) are mutually perpendicular; the steel beam (2) is hinged with the steel column (1), the vertical part (33) of the element is hinged with the steel beam (2), and the transverse part (31) of the element is rigidly connected with the steel column (1). Compared with the prior art, the utility model has the advantages of reduce or eliminate on-the-spot welding work load, ensure that the engineering quality is reliable, improve the prefabricated assembly degree of steel construction, satisfy the antidetonation power consumption requirement of steel construction, conveniently shake back structure reinforcement and restoration.

Description

内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统Prefabricated steel beam-column joint system with built-in removable energy dissipation elements

技术领域technical field

本实用新型涉及预制装配式建筑钢结构梁柱节点抗震耗能设计领域,尤其涉及一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统。The utility model relates to the field of seismic energy dissipation design of prefabricated building steel structure beam-column joints, in particular to a prefabricated assembled steel structure beam-column joint system with built-in detachable energy dissipation elements.

背景技术Background technique

钢结构天然具有装配式特点,安装速度快,已被广泛应用于多高层工业厂房、住宅、商业、办公及构筑物等工程之中。当前,钢结构的安装还存在着较多的现场焊接和高空危险作业等现象,致使钢结构工程的质量时而出现不良问题,给环境带来污染。随着我国整体装配式混凝土结构的大力推广和新技术应用,钢结构主体虽还能以自重轻和延性好等处于优势,但其装配化的优势逐步减少。为进一步推进我国装配式钢结构的技术发展及其推广应用和国家去钢材产能政策,装配式钢结构梁柱节点将成为装配式钢结构的关键部分,其装配化程度和抗震性能直接影响整体结构。寻求一种改变传统节点的受力模式和耗能方式,满足梁柱节点本身及整体结构的安全下,抗震性能更加优良,这种梁柱节点势必是一种更好的途径。本实用新型正是基于这种的思路进行开发。The steel structure naturally has the characteristics of prefabrication, and the installation speed is fast, and it has been widely used in multi-high-rise industrial plants, residential, commercial, office and structures and other projects. At present, there are still many on-site welding and high-altitude dangerous operations in the installation of steel structures, resulting in poor quality of steel structure projects and pollution to the environment. With the vigorous promotion and application of new technologies of the overall prefabricated concrete structure in my country, although the main body of the steel structure can still have the advantages of light weight and good ductility, the advantages of its assembly are gradually reduced. In order to further promote the technological development and popularization and application of fabricated steel structures in my country and the national policy of eliminating steel production capacity, the beam-column joints of fabricated steel structures will become a key part of fabricated steel structures, and their assembly degree and seismic performance will directly affect the overall structure. . Seeking a way to change the stress mode and energy dissipation mode of traditional joints, to satisfy the safety of beam-column joint itself and the overall structure, and to have better seismic performance, this kind of beam-column joint is bound to be a better way. The utility model is developed based on this idea.

随着全球气候的日益恶化,世界对环境的要求日趋严格,装配式钢结构正是顺应这种形式下的建造方式,发达国家已大力推广多年。装配式钢结构中的大多构件在工厂加工制作完成,但节点安装还未完全实现工业化,其节点的抗震安全性能还存在一些不足,如全焊接梁柱节点在强震作用下易脆裂等。With the deteriorating global climate, the world's requirements for the environment are becoming more and more stringent, and the fabricated steel structure conforms to the construction method in this form, which has been vigorously promoted by developed countries for many years. Most of the components in the fabricated steel structure are processed in the factory, but the installation of the joints has not been fully industrialized, and the seismic safety performance of the joints still has some shortcomings, such as the all-welded beam-column joints are easily brittle under the action of strong earthquakes.

实用新型内容Utility model content

本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种减少或消除现场焊接工作量,确保工程质量可靠,提高钢结构的预制装配化程度,满足钢结构的抗震耗能要求,方便震后结构加固和修复的内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统。The purpose of this utility model is to provide a method to reduce or eliminate the on-site welding workload in order to overcome the defects of the above-mentioned prior art, ensure reliable engineering quality, improve the prefabrication and assembly degree of the steel structure, and meet the seismic energy consumption requirements of the steel structure. A prefabricated steel beam-column joint system with built-in detachable energy-dissipating elements that facilitates post-earthquake structural reinforcement and repair.

本实用新型的目的可以通过以下技术方案来实现:The purpose of the present utility model can be achieved through the following technical solutions:

一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,包括钢柱、钢梁,耗能元件,该耗能元件包括一体成型的元件横部、连接部和元件竖部,其中,元件横部和元件竖部相互垂直;所述的钢梁与钢柱铰接,所述的元件竖部与钢梁铰接,所述的元件横部与钢柱刚接。系统遭遇多遇地震作用时,处于弹性阶段,耗能元件与钢梁和钢柱形成有机整体,提供侧向和竖向刚度,共同承受水平和竖向荷载,最大应力位于耗能元件;系统遭遇罕遇地震作用时,耗能元件开始进入塑性阶段,随着水平地震作用的不断增大,耗能元件率先形成塑性铰,耗散地震能量,直至发生破坏,钢梁和钢柱始终处于弹性阶段而不屈服或破坏;系统遭遇地震作用后,可以方便地将耗能元件进行拆卸,采用相同或同等耗能元件进行替换,从而系统可以恢复至初始同等受力水平。系统安装方便,预制装配化程度高,施工速度快;现场焊接工作少,质量可靠。A prefabricated and assembled steel beam-column joint system with built-in detachable energy-dissipating elements includes steel columns, steel beams, and energy-dissipating elements. , the transverse part of the element and the vertical part of the element are perpendicular to each other; the steel beam is hinged with the steel column, the vertical part of the element is hinged with the steel beam, and the transverse part of the element is rigidly connected with the steel column. When the system encounters frequent earthquakes, it is in the elastic stage, and the energy dissipation elements form an organic whole with steel beams and steel columns, providing lateral and vertical stiffness, jointly bearing horizontal and vertical loads, and the maximum stress is located in the energy dissipation elements; When the earthquake acts, the energy-dissipating element begins to enter the plastic stage. With the continuous increase of the horizontal seismic action, the energy-dissipating element takes the lead to form a plastic hinge and dissipate the seismic energy until the failure occurs, and the steel beam and steel column are always in the elastic stage without yielding or Damage: After the system is subjected to earthquake action, the energy-consuming components can be easily disassembled and replaced with the same or equivalent energy-consuming components, so that the system can be restored to the same initial stress level. The system is easy to install, has a high degree of prefabrication and assembly, and has fast construction speed; less on-site welding work and reliable quality.

进一步地,所述的连接部为斜杆,并与元件竖部呈40-50°夹角,或者所述的连接部为圆弧状。Further, the connecting portion is an inclined rod and forms an included angle of 40-50° with the vertical portion of the element, or the connecting portion is arc-shaped.

进一步地,所述的耗能元件的线刚度与钢梁的线刚度之比,即EIdg/Ldg:EIb/Lb=0.3-0.6。所述的耗能元件的横向跨度与钢梁的跨度之比,即Ldg/Lb=0.18-0.30。此时,节点系统的强度、刚度、延性和抗震性能可等同或高于普通钢框架的刚性梁柱节点,并随着耗能元件高度Hdg的增大,节点系统的强度、刚度、延性和抗震性能更佳。Further, the ratio of the linear stiffness of the energy dissipation element to the linear stiffness of the steel beam, namely EI dg /L dg : EI b /L b =0.3-0.6. The ratio of the transverse span of the energy dissipation element to the span of the steel beam is L dg /L b =0.18-0.30. At this time, the strength, stiffness, ductility and seismic performance of the joint system can be equal to or higher than that of the rigid beam-column joint of the ordinary steel frame, and with the increase of the height H dg of the energy dissipation element, the strength, stiffness, ductility and Better shock resistance.

进一步地,所述的钢柱上设有加劲板,该加劲板的一部分伸出钢柱,所述的加劲板的伸出部分与钢梁连接。Further, the steel column is provided with a stiffening plate, a part of the stiffening plate protrudes from the steel column, and the protruding part of the stiffening plate is connected with the steel beam.

更进一步地,所述的加劲板的伸出部分上设有螺栓孔,所述的钢梁上设有相匹配的螺栓孔,采用高强螺栓将加劲板的伸出部分与钢梁连接,使钢梁与钢柱形成铰接。Further, bolt holes are provided on the protruding part of the stiffening plate, matching bolt holes are provided on the steel beam, and high-strength bolts are used to connect the protruding part of the stiffening plate with the steel beam, so that the steel beam is The beams are hinged to the steel columns.

进一步地,所述的钢梁上设有钢梁加劲板,该钢梁加劲板的一部分伸出钢梁,所述的钢梁加劲板的伸出部分与元件竖部连接。Further, the steel beam is provided with a steel beam stiffening plate, a part of the steel beam stiffening plate extends out of the steel beam, and the protruding part of the steel beam stiffening plate is connected with the vertical part of the element.

更进一步地,所述的钢梁加劲板的伸出部分上设有螺栓孔,所述的元件竖部上设有相匹配的螺栓孔,采用高强螺栓将钢梁加劲板的伸出部分与元件竖部连接,使元件竖部与钢梁形成铰接。Further, bolt holes are provided on the protruding part of the steel beam stiffening plate, and matching bolt holes are provided on the vertical part of the element, and high-strength bolts are used to connect the protruding part of the steel beam stiffening plate to the element. The vertical part is connected to form a hinged connection between the vertical part of the element and the steel beam.

进一步地,所述的钢柱上还设有钢柱加劲板,该钢柱加劲板端部设有钢柱端板,所述的元件横部的端部设有元件端板,所述的元件端板与钢柱端板连接。Further, the steel column is also provided with a steel column stiffening plate, the end of the steel column stiffening plate is provided with a steel column end plate, the end of the horizontal part of the element is provided with an element end plate, and the element The end plates are connected to the steel column end plates.

更进一步地,所述的钢柱端板上设有螺栓孔,钢柱端板与钢柱加劲板通过一块H型钢连接;元件端板上设有相匹配的螺栓孔,采用高强螺栓将钢柱端板与元件端板连接,使元件横部与钢柱形成刚接。Further, the steel column end plate is provided with bolt holes, and the steel column end plate and the steel column stiffening plate are connected by a piece of H-shaped steel; the element end plate is provided with matching bolt holes, and high-strength bolts are used to fasten the steel column. The end plate is connected with the end plate of the element, so that the transverse part of the element forms a rigid connection with the steel column.

钢梁与钢柱、耗能元件与钢梁以及耗能元件与钢柱的连接均采用高强螺栓连接,现场没有焊接工作量,质量可控性强,有利于环境保护;施工操作简单、方便,施工速度快,预制装配化程度高,大大节省劳动力成本。耗能元件具有可拆卸性。节点系统在遭遇地震作用后,更换耗能元件,便可满足原始设计功能使用要求。修复方便,施工速度快,加固维护成本低。The connection between the steel beam and the steel column, the energy-consuming element and the steel beam, and the energy-consuming element and the steel column are all connected by high-strength bolts. There is no welding workload on site, and the quality is controllable, which is conducive to environmental protection; the construction operation is simple and convenient, The construction speed is fast, the prefabricated assembly degree is high, and the labor cost is greatly saved. The dissipative elements are removable. After the node system is subjected to earthquake action, the energy-consuming components can be replaced to meet the functional requirements of the original design. The repair is convenient, the construction speed is fast, and the reinforcement and maintenance cost is low.

通过在装配式钢结构中对不同形式连接,如铰接、半刚性连接和刚接,的节点增设不同的耗能元件,使铰接和半刚性连接的梁柱节点同等于或超越刚性连接的强度和抗震性能,刚性连接的梁柱节点具有更好的延性,钢结构的工业化程度大大提高,环境污染大大减少。因此,这种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统的实用新型便有着其深远的意义。By adding different energy dissipating elements to the nodes of different forms of connections, such as hinged, semi-rigid and rigid connections in the fabricated steel structure, the beam-column connections of hinged and semi-rigid connections are equal to or surpass the strength and performance of rigid connections. Seismic performance, rigidly connected beam-column joints have better ductility, the industrialization of steel structures is greatly improved, and environmental pollution is greatly reduced. Therefore, the utility model of the prefabricated steel structure beam-column joint system with built-in detachable energy-dissipating elements has far-reaching significance.

为达到上述意图,首先是钢梁与钢柱、耗能元件与钢梁以及耗能元件与钢柱之间均采用了高强螺栓连接,局部采用了加劲板加强,基本实现全螺栓连接方式,耗能元件完全可拆卸,避免了现场的焊接连接方式;其次,通过耗能元件形成塑性铰的耗能方式,实现钢梁和钢柱主要构件不发生屈服和破坏的模式,实现震后结构的可修复性和循环利用的可行性;再次,通过控制耗能元件的线刚度和空间位置等相关参数,实现耗能元件的最大效能可控性。In order to achieve the above purpose, first of all, high-strength bolts are used between the steel beam and the steel column, the energy dissipation element and the steel beam, and the energy dissipation element and the steel column. The energy element is completely detachable, avoiding the welding connection method on site; secondly, the energy dissipation method in which the energy dissipation element forms a plastic hinge, realizes the mode in which the main components of the steel beam and the steel column do not yield and fail, and realizes the repairability of the post-earthquake structure. And the feasibility of recycling; thirdly, by controlling the related parameters such as the linear stiffness and spatial position of the energy-consuming components, the maximum efficiency controllability of the energy-consuming components is achieved.

与现有技术相比,本实用新型具有如下优点:Compared with the prior art, the utility model has the following advantages:

(1)无现场焊接,减少高空焊接人工工作量,节省人力成本,且有利于环境保护;(1) There is no on-site welding, which reduces the manual workload of high-altitude welding, saves labor costs, and is conducive to environmental protection;

(2)安装和拆卸便利,建设和损坏后修复的施工速度快,维修成本大大降低;(2) The installation and disassembly are convenient, the construction speed of construction and repair after damage is fast, and the maintenance cost is greatly reduced;

(3)耗能元件的耗能模式优良,体系的梁柱主要构件不屈服或破坏,循环利用的价值性更高,震后修复方便;(3) The energy consumption pattern of the energy-consuming elements is excellent, the main components of the beam and column of the system do not yield or fail, the value of recycling is higher, and the post-earthquake repair is convenient;

(4)配置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,在一定条件下,其强度、刚度和抗震性能等同或高于传统的钢框架结构刚性梁柱节点;(4) The prefabricated steel beam-column joint system equipped with detachable energy-consuming elements, under certain conditions, its strength, stiffness and seismic performance are equal to or higher than the rigid beam-column joints of traditional steel frame structures;

(5)耗能元件对建筑空间的影响程度减少。(5) The influence of energy-consuming components on the building space is reduced.

附图说明Description of drawings

图1为节点系统立面图;Figure 1 is an elevation view of the node system;

图2为钢梁与钢柱连接详图;Figure 2 is a detailed view of the connection between the steel beam and the steel column;

图3为耗能元件与钢梁连接详图;Figure 3 is a detailed view of the connection between the energy dissipation element and the steel beam;

图3a为1-1剖视图;Figure 3a is a sectional view of 1-1;

图4为耗能元件与钢柱连接详图;Figure 4 is a detailed view of the connection between the energy dissipation element and the steel column;

图4a为2-2剖视图;Figure 4a is a sectional view of 2-2;

图中标号所示:钢柱1、钢柱加劲板11、钢柱端板111、加劲板12、钢梁2、钢梁加劲板21、耗能元件3、元件横部31、元件端板311、连接部32、元件竖部33。The numbers in the figure show: steel column 1, steel column stiffening plate 11, steel column end plate 111, stiffening plate 12, steel beam 2, steel beam stiffening plate 21, energy dissipation element 3, element cross section 31, element end plate 311 , connecting part 32 , component vertical part 33 .

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型进行详细说明。The present utility model will be described in detail below with reference to the accompanying drawings and specific embodiments.

实施例Example

一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,如图1所示,包括钢柱1、钢梁2,还包括耗能元件3,该耗能元件3包括一体成型的元件横部31、连接部32和元件竖部33,其中,元件横部31和元件竖部33相互垂直;钢梁2与钢柱1铰接,耗能元件3与钢梁2铰接,同时与钢柱1刚接。此时,连接部32为斜杆,并与元件竖部33呈40-50°夹角。耗能元件3的线刚度与钢梁2的线刚度之比,即EIdg/Ldg:EIb/Lb=0.3-0.6。耗能元件3的横向跨度与钢梁2的跨度之比,即Ldg/Lb=0.18-0.30。A prefabricated assembled steel beam-column joint system with built-in detachable energy-dissipating elements, as shown in Figure 1, includes a steel column 1, a steel beam 2, and an energy-dissipating element 3. The energy-dissipating element 3 includes an integrally formed The element transverse part 31, the connecting part 32 and the element vertical part 33, wherein the element transverse part 31 and the element vertical part 33 are perpendicular to each other; Column 1 is just connected. At this time, the connecting portion 32 is an inclined rod and forms an included angle of 40-50° with the vertical portion 33 of the element. The ratio of the linear stiffness of the energy dissipation element 3 to the linear stiffness of the steel beam 2 is EI dg /L dg : EI b /L b =0.3-0.6. The ratio of the transverse span of the energy dissipation element 3 to the span of the steel beam 2 is L dg /L b =0.18-0.30.

钢柱1包括钢柱截面型钢、加劲板12和钢柱加劲板11,加劲板12的一部分伸出钢柱1,并在伸出部分设有螺栓孔,钢梁2包括钢梁截面型钢和钢梁加劲板21,该钢梁加劲板21的一部分伸出钢梁2,并在伸出部分设有螺栓孔;钢柱加劲板11端部设有钢柱端板111,并在钢柱端板111上设有螺栓孔,钢柱端板111与钢柱加劲板11通过一块H型钢连接;元件横部31的端部设有元件端板311,并在元件端板311上设有螺栓孔。Steel column 1 includes steel column section steel, stiffening plate 12 and steel column stiffening plate 11, a part of stiffening plate 12 extends out of steel column 1, and is provided with bolt holes in the projecting part, and steel beam 2 includes steel beam section section steel and steel column. Beam stiffening plate 21, a part of the steel beam stiffening plate 21 protrudes from the steel beam 2, and is provided with bolt holes in the protruding part; the end of the steel column stiffening plate 11 is provided with a steel column end plate 111, and the end plate of the steel column is provided with a steel column end plate 111. Bolt holes are provided on the 111, and the steel column end plate 111 and the steel column stiffening plate 11 are connected by a piece of H-shaped steel;

如图3和图3a所示,耗能元件3与钢梁2铰接具体指,采用高强螺栓将钢梁加劲板21的伸出部分与元件竖部33连接。As shown in FIGS. 3 and 3 a , the hinged connection between the energy dissipation element 3 and the steel beam 2 specifically refers to using high-strength bolts to connect the protruding part of the steel beam stiffening plate 21 with the element vertical part 33 .

如图2所示,钢梁2与钢柱1铰接具体指,采用高强螺栓将加劲板12的伸出部分与钢梁截面型钢连接。As shown in FIG. 2 , the hinged connection between the steel beam 2 and the steel column 1 specifically refers to using high-strength bolts to connect the protruding part of the stiffening plate 12 with the steel beam section.

如图4和图4a所示,耗能元件3与钢柱1刚接具体指,采用高强螺栓将元件横部31设有的元件端板311与钢柱加劲板11上设有的钢柱端板111连接。As shown in FIG. 4 and FIG. 4a , the rigid connection between the energy dissipation element 3 and the steel column 1 specifically refers to the use of high-strength bolts to connect the element end plate 311 provided on the transverse part 31 of the element with the steel column end plate provided on the steel column stiffening plate 11 Board 111 is connected.

在具体加工方面,钢柱1、钢梁2和耗能元件3分别依据设计要求进行放样,实行工厂预制加工制作。在工厂加工完成后,运输至现场,吊装钢柱1并按照现场空间位置就位,设置临时支撑固定,将耗能元件3通过高强螺栓与钢柱1连接,而后通过高强螺栓将钢梁2分别与钢柱1和耗能元件3连接就位,至此,便完成一种配置可拆卸式耗能元件3的预制装配钢结构梁柱节点系统。In terms of specific processing, the steel column 1, the steel beam 2 and the energy-consuming element 3 are respectively set out according to the design requirements, and are prefabricated in the factory. After the factory processing is completed, it is transported to the site, the steel column 1 is hoisted and placed in place according to the location of the site, temporary support is set, the energy-consuming element 3 is connected to the steel column 1 through high-strength bolts, and then the steel beams 2 are separated by high-strength bolts. The steel column 1 and the energy dissipating element 3 are connected in place, so far, a prefabricated and assembled steel structure beam-column joint system equipped with a detachable energy dissipating element 3 is completed.

上述对实施的描述是为便于该技术领域的普通技术人员能理解和使用本实用新型。熟悉本领域技术的人员可以容易地对这些实施做出适当修改,并把在此说明的一般原理应用到其他实施中而不必经过创造性的劳动。因此,本实用新型不限于上述实施,本领域技术人员根据本实用新型的揭示,不脱离本实用新型范畴所做出的改进和修改都应该在本实用新型的保护范围之内。The above description of the implementation is for the convenience of those of ordinary skill in the art to understand and use the present invention. Those skilled in the art can readily make appropriate modifications to these implementations and apply the general principles described herein to other implementations without inventive step. Therefore, the present invention is not limited to the above-mentioned implementation, and improvements and modifications made by those skilled in the art according to the disclosure of the present invention without departing from the scope of the present invention should all fall within the protection scope of the present invention.

Claims (10)

1.一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,包括钢柱(1)、钢梁(2),其特征在于,该系统还包括耗能元件(3),该耗能元件(3)包括一体成型的元件横部(31)、连接部(32)和元件竖部(33),其中,元件横部(31)和元件竖部(33)相互垂直;所述的钢梁(2)与钢柱(1)铰接,所述的元件竖部(33)与钢梁(2)铰接,所述的元件横部(31)与钢柱(1)刚接。1. A prefabricated steel structure beam-column joint system with a built-in detachable energy-consuming element, comprising a steel column (1), a steel beam (2), characterized in that the system further comprises an energy-consuming element (3), the The energy dissipation element (3) comprises an integrally formed element transverse portion (31), a connecting portion (32) and an element vertical portion (33), wherein the element transverse portion (31) and the element vertical portion (33) are perpendicular to each other; the The steel beam (2) is hinged with the steel column (1), the vertical part (33) of the element is hinged with the steel beam (2), and the transverse part (31) of the element is rigidly connected with the steel column (1). 2.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的耗能元件(3)的线刚度与钢梁(2)的线刚度之比,即EIdg/Ldg:EIb/Lb=0.3-0.6。2. A prefabricated assembled steel structure beam-column joint system with built-in detachable energy-dissipating elements according to claim 1, characterized in that the linear stiffness of the energy-dissipating elements (3) is the same as that of the steel beam (2) The ratio of the linear stiffness of , namely EI dg /L dg : EI b /L b =0.3-0.6. 3.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的耗能元件(3)的横向跨度与钢梁(2)的跨度之比,即Ldg/Lb=0.18-0.30。3. A prefabricated assembled steel structure beam-column joint system with built-in detachable energy-dissipating elements according to claim 1, characterized in that the transverse span of the energy-dissipating element (3) is the same as that of the steel beam (2) The ratio of the spans, namely L dg /L b =0.18-0.30. 4.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的连接部(32)为斜杆,并与元件竖部(33)呈40-50°夹角,或者所述的连接部(32)为圆弧状。4. A prefabricated assembled steel structure beam-column joint system with a built-in detachable energy-dissipating element according to claim 1, wherein the connecting portion (32) is an oblique rod, and is connected with the element vertical portion (32). 33) The included angle is 40-50°, or the connecting portion (32) is arc-shaped. 5.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的钢柱(1)上设有加劲板(12),该加劲板(12)的一部分伸出钢柱(1),所述的加劲板(12)的伸出部分与钢梁(2)连接。5. A prefabricated steel structure beam-column joint system with built-in detachable energy-dissipating elements according to claim 1, wherein the steel column (1) is provided with a stiffening plate (12), the A part of the stiffening plate (12) protrudes out of the steel column (1), and the protruding part of the stiffening plate (12) is connected with the steel beam (2). 6.根据权利要求5所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的加劲板(12)的伸出部分上设有螺栓孔,所述的钢梁(2)上设有相匹配的螺栓孔,采用高强螺栓将加劲板(12)的伸出部分与钢梁(2)连接,使钢梁(2)与钢柱(1)形成铰接。6. A prefabricated steel structure beam-column joint system with built-in detachable energy dissipation elements according to claim 5, characterized in that, bolt holes are provided on the protruding part of the stiffening plate (12), The steel beam (2) is provided with matching bolt holes, and high-strength bolts are used to connect the protruding part of the stiffening plate (12) with the steel beam (2), so that the steel beam (2) is connected to the steel column (1) form a hinge. 7.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的钢梁(2)上设有钢梁加劲板(21),该钢梁加劲板(21)的一部分伸出钢梁(2),所述的钢梁加劲板(21)的伸出部分与元件竖部(33)连接。7. A prefabricated assembled steel structure beam-column joint system with built-in detachable energy-dissipating elements according to claim 1, wherein the steel beam (2) is provided with a steel beam stiffening plate (21) A part of the steel beam stiffening plate (21) protrudes from the steel beam (2), and the protruding part of the steel beam stiffening plate (21) is connected with the element vertical part (33). 8.根据权利要求7所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的钢梁加劲板(21)的伸出部分上设有螺栓孔,所述的元件竖部(33)上设有相匹配的螺栓孔,采用高强螺栓将钢梁加劲板(21)的伸出部分与元件竖部(33)连接,使元件竖部(33)与钢梁(2)形成铰接。8. A prefabricated steel structure beam-column joint system with built-in detachable energy dissipation elements according to claim 7, characterized in that, bolts are provided on the protruding part of the steel beam stiffening plate (21) The element vertical part (33) is provided with matching bolt holes, and high-strength bolts are used to connect the protruding part of the steel beam stiffening plate (21) with the element vertical part (33), so that the element vertical part (33) ) is hinged with the steel beam (2). 9.根据权利要求1所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的钢柱(1)上还设有钢柱加劲板(11),该钢柱加劲板(11)端部设有钢柱端板(111),所述的元件横部(31)的端部设有元件端板(311),所述的元件端板(311)与钢柱端板(111)连接。9. A prefabricated assembled steel structure beam-column joint system with built-in detachable energy-dissipating elements according to claim 1, wherein the steel column (1) is further provided with a steel column stiffening plate (11). ), the end of the steel column stiffening plate (11) is provided with a steel column end plate (111), the end of the element transverse portion (31) is provided with an element end plate (311), and the element end plate ( 311) is connected with the steel column end plate (111). 10.根据权利要求9所述的一种内置可拆卸式耗能元件的预制装配钢结构梁柱节点系统,其特征在于,所述的钢柱端板(111)上设有螺栓孔,钢柱端板(111)与钢柱加劲板(11)通过一块H型钢连接;元件端板(311)上设有相匹配的螺栓孔,采用高强螺栓将钢柱端板(111)与元件端板(311)连接,使元件横部(31)与钢柱(1)形成刚接。10. A prefabricated steel structure beam-column joint system with built-in detachable energy dissipation elements according to claim 9, characterized in that the steel column end plate (111) is provided with bolt holes, and the steel column is provided with bolt holes. The end plate (111) and the steel column stiffening plate (11) are connected by a piece of H-beam; the element end plate (311) is provided with matching bolt holes, and high-strength bolts are used to connect the steel column end plate (111) and the element end plate ( 311) connection, so that the transverse part (31) of the element and the steel column (1) form a rigid connection.
CN201921715115.3U 2019-10-14 2019-10-14 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements Expired - Fee Related CN211037283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921715115.3U CN211037283U (en) 2019-10-14 2019-10-14 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921715115.3U CN211037283U (en) 2019-10-14 2019-10-14 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements

Publications (1)

Publication Number Publication Date
CN211037283U true CN211037283U (en) 2020-07-17

Family

ID=71564322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921715115.3U Expired - Fee Related CN211037283U (en) 2019-10-14 2019-10-14 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements

Country Status (1)

Country Link
CN (1) CN211037283U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805130A (en) * 2019-10-14 2020-02-18 同济大学 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805130A (en) * 2019-10-14 2020-02-18 同济大学 Prefabricated steel beam-column joint system with built-in removable energy dissipation elements
CN110805130B (en) * 2019-10-14 2024-11-08 同济大学 Prefabricated steel structure beam-column node system with built-in detachable energy-absorbing elements

Similar Documents

Publication Publication Date Title
CN106930593B (en) Bamboo(Wood)Frame structure beam column assembled energy dissipation node
CN109083308B (en) Anti-seismic prefabricated assembly type wall and construction method thereof
CN107354863A (en) A kind of assembled gate-type round steel pipe bridge pier that power consumption binder is set
CN209145147U (en) A kind of double limb Special-Shaped Columns of the lattice Concrete-Filled Square Steel Tube of replaceable component
CN106759910A (en) A kind of high-performance framework damper frame barrel structure system
CN103669574A (en) Building frame system and assembly method thereof
CN108468378A (en) A kind of prefabricated assembled node of concrete structure
CN108331164A (en) A kind of attachment device and installation method of Steel Truss Beam and lattice type steel column node
CN116201232B (en) Prefabricated tiered energy dissipation combination nodes and their installation methods
CN110805130B (en) Prefabricated steel structure beam-column node system with built-in detachable energy-absorbing elements
CN106368317A (en) Prefabricated frame, slotted shear walls and frame-shear-wall structure
CN209854981U (en) A prefabricated recycled concrete buckling-resistant steel plate shear wall
CN116145810A (en) Structure and construction method of self-resetting beam-column joints connected by prefabricated bolts
CN107859196B (en) A replaceable assembled energy dissipation and vibration reduction node with self-resetting function
CN207919737U (en) A kind of assembled steel-Combined concrete frame structure
CN211690769U (en) Steel structure supporting node component
CN219431008U (en) Assembled special-shaped column steel frame-supporting structure system capable of recovering functions
CN218092198U (en) Quick installation formula shock insulation reinforced structure of existing frame construction
CN209099519U (en) An assembled prestressed reinforced concrete frame structure
CN207905104U (en) A kind of assembled architecture truss structure
CN215483566U (en) Assembled H-shaped beam column node
CN118601159A (en) A long-span steel structure arc support node
CN214614568U (en) A memory alloy inclined bar steel truss beam-column connection part
CN117468581A (en) A gathered and covered steel-wood energy-consuming combination node and its installation method
CN214834199U (en) Assembled steel stair for concrete main body structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717

Termination date: 20211014