level meter
fixing pin
loading station
guide rail
automatic loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223347637.7U
Other languages
Chinese (zh)
Inventor
王亚东
任永昕
姚庆宇
张海宇
王勇
王旭东
王轲瑛
张海梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Weicheng Technology Co ltd
Original Assignee
Tangshan Weicheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Weicheng Technology Co ltd filed Critical Tangshan Weicheng Technology Co ltd
Priority to CN202223347637.7U priority Critical patent/CN219243266U/en
Application granted granted Critical
Publication of CN219243266U publication Critical patent/CN219243266U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a loading station level meter installation device for an underground unmanned electric locomotive, and belongs to the technical field of mining equipment. The technical scheme of the utility model is as follows: the movable guide rail (10) is arranged on the profile bracket (2); the driving gear motor (3) and the driven sprocket (7) are respectively arranged at two ends of the profile bracket (2), the driving sprocket (11) is arranged on the shaft of the driving gear motor (3), and the chain (8) is arranged between the driving sprocket (11) and the driven sprocket (7); the level meter installation slide plate (5) and the movable slide block (6) are installed together, the movable slide block (6) is slidably installed in the movable guide rail (10), the level meter installation slide plate (5) is connected with the chain (8), and the level meter (12) is installed on the level meter installation slide plate (5). The beneficial effects of the utility model are as follows: through the application of the movable guide rail and the chain transmission, the material level meter is sent to a designated position, the safety of the working environment of debugging personnel is improved, and the later debugging, maintenance and replacement are more convenient.

Description

Automatic loading station level meter installation device of underground unmanned electric locomotive
Technical Field
The utility model relates to a loading station level meter installation device for an underground unmanned electric locomotive, and belongs to the technical field of mining equipment.
Background
At present, an unmanned system of an underground mine electric locomotive needs to monitor a material level of an unloading station, a material level meter is mostly installed in the middle position of a rock stratum at the top of the unloading station, a mounting hole needs to be drilled in the top, the material level meter and a mounting seat are installed, and a mineral aggregate storage cavity with a depth of hundreds of meters is arranged below. The method is very complicated in installing and adjusting the level meter, the working environment of installation and debugging personnel is dangerous, and the level meter is very inconvenient to overhaul and replace in the later period.
Disclosure of Invention
The utility model aims to provide a loading station level meter installation device for an underground unmanned electric locomotive, which can be used for conveying a level meter to a designated position through the application of a movable guide rail and chain transmission, so that the safety of the working environment of debugging personnel is improved, the later debugging and maintenance replacement are more convenient, and the problems in the background technology are solved.
The technical scheme of the utility model is as follows: the utility model provides an unmanned electric locomotive automatic loading station material level meter installation device in pit, contains section bar support, drive gear motor, electric putter formula fixed pin, material level meter installation slide, removal slider, driven sprocket, chain, fixed pinhole, removal guide rail and drive sprocket, the removal guide rail is installed on section bar support; the driving gear motor and the driven sprocket are respectively arranged at two ends of the profile bracket, the driving sprocket is arranged on a shaft of the driving gear motor, and the chain is arranged between the driving sprocket and the driven sprocket; the material level meter installation slide plate is installed together with the movable slide block, the movable slide block is slidably installed in the movable guide rail, the material level meter installation slide plate is connected with the chain, and the material level meter is installed on the material level meter installation slide plate; the electric push rod type fixing pin is arranged on the level meter installation sliding plate, the fixing pin hole is arranged on the section bar support, and the electric push rod type fixing pin is matched with the fixing pin hole.
The protection cover is arranged on the outer side of the profile bracket.
The two electric push rod type fixing pins are respectively arranged at two ends of the level meter installation sliding plate.
The number of the fixing pin holes is matched with the length of the section bar support, and the fixing pin holes are uniformly distributed on the section bar support.
The length of the movable guide rail is matched with that of the section bar bracket.
The steel wire rope is arranged at the front end of the section bar bracket.
The beneficial effects of the utility model are as follows: through the application of the movable guide rail and the chain transmission, the material level meter is sent to a designated position, the safety of the working environment of debugging personnel is improved, and the later debugging, maintenance and replacement are more convenient.
Drawings
FIG. 1 is a front view of the present utility model;
FIG. 2 is a left side view of the present utility model;
FIG. 3 is a right side view of the present utility model;
FIG. 4 is a diagram of the state of operation of the background art of the utility model;
FIG. 5 is a diagram of the operation of the present utility model;
in the figure: the automatic material level meter comprises a protective cover 1, a section support 2, a driving gear motor 3, an electric push rod type fixing pin 4, a material level meter installation sliding plate 5, a movable sliding block 6, a driven sprocket 7, a chain 8, a fixing pin hole 9, a movable guide rail 10, a driving sprocket 11, a material level meter 12, a worker 13, a working platform 14, a protruding working platform 14', a mining area rock wall 15, a material level meter installation hole 16 and a pre-buried installation seat 17.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments, and it is apparent that the described embodiments are a small part of the embodiments of the present utility model, but not all the embodiments, based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without making any inventive effort are within the scope of the present utility model.
The automatic loading station level meter mounting device of the underground unmanned electric locomotive comprises a section bar bracket 2, a driving gear motor 3, an electric push rod type fixing pin 4, a level meter mounting sliding plate 5, a movable sliding block 6, a driven sprocket 7, a chain 8, a fixing pin hole 9, a movable guide rail 10 and a driving sprocket 11, wherein the movable guide rail 10 is mounted on the section bar bracket 2; the driving gear motor 3 and the driven sprocket 7 are respectively arranged at two ends of the profile bracket 2, the driving sprocket 11 is arranged on the shaft of the driving gear motor 3, and the chain 8 is arranged between the driving sprocket 11 and the driven sprocket 7; the level meter installation slide plate 5 and the movable slide block 6 are installed together, the movable slide block 6 is slidably installed in the movable guide rail 10, the level meter installation slide plate 5 is connected with the chain 8, and the level meter 12 is installed on the level meter installation slide plate 5; the electric push rod type fixing pin 4 is arranged on the level meter installation sliding plate 5, the fixing pin hole 9 is arranged on the section bar bracket 2, and the electric push rod type fixing pin 4 is matched with the fixing pin hole 9.
The protective cover 1 is arranged on the outer side of the profile bracket 2.
The two electric push rod type fixing pins 4 are respectively arranged at two ends of the level meter installation sliding plate 5.
The number of the fixing pin holes 9 is matched with the length of the profile support 2, and the fixing pin holes are uniformly distributed on the profile support 2.
The moving guide rail 10 is matched with the length of the profile bracket 2.
And the steel wire rope is arranged at the front end of the profile bracket 2.
In the prior art, the installation process is to prepare a protruding working platform 14' which can convey the staff 13 to a position right above the center of a material storage cavity of a loading station, the staff 13' stands on the working platform to open a level meter installation hole 16 on a rock wall 15' of a mining area, the level meter 12 is placed in the level meter installation hole 16 to adjust a proper angle, and the level meter 12 is fixed in the level meter installation hole 16 after the angle adjustment is finished. The associated cable is then routed along the mine wall 15.
The overhaul and replacement process is to prepare an extended working platform 14 'which can convey a worker 13' to a position right above the center of a material storage cavity of a loading station, the worker 13 'stands on the extended working platform to chisel the fixed level gauge 12 out of the level gauge mounting hole 16', overhaul and replace the fixed level gauge, and then fix a new level gauge 12 back to the original position.
Below the protruding work platform 14' is a mineral aggregate storage cavern several hundred meters deep. The original method is very complicated in installing and adjusting the level meter, the working environment of installation and debugging personnel is dangerous, and the level meter is very inconvenient to overhaul and replace in the later period.
In practical application, the utility model is assembled on the ground firstly: the movable guide rail 10 is arranged on the profile bracket 2, the driving gear motor 3 is arranged on the profile bracket 2, the driving sprocket 11 is arranged on the shaft of the driving gear motor 2, the driven sprocket 7 is arranged on the profile bracket 2, and the chain 8 is arranged on the driving sprocket 11 and the driven sprocket 7. The level meter mounting slide 5 and the moving slide 6 are mounted together, the moving slide 6 is slid into the moving guide rail 10, and the mounting slide 5 is connected with the chain 8. The shield 1 is then mounted on the profile support 2. Finally, the level gauge 12 is mounted on the mounting slide 5.
The staff member 13 then brings the utility model to the mine level gauge installation site. The worker 13 stands on a working platform 14 prepared in advance and installs the pre-buried installation seat 17 at a designated point of the mine rock wall 15. The utility model is connected with the embedded mounting seat 3. The driving sprocket 11 is driven to rotate anticlockwise by the driving gear motor 3 to enable the chain 8 to move, the level meter installation sliding plate 5 is driven to move along the moving guide rail 10 to enable the level meter 12 to reach the working position, and the electric push rod type fixing pin 4 extends out of the fixing pin hole 9 inserted into the profile bracket 2 to enable the level meter 12 to fix the working position. The whole utility model is arranged on an embedded mounting seat which is deep into the rock wall, and the front end of the whole utility model is provided with a pulled steel wire rope which is fixed with the rock wall.
The maintenance and replacement process is to drive the gear motor 3 to drive the driving sprocket 11 to rotate clockwise, so that the chain 8 is moved, the level meter installation slide plate 5 is driven to move along the moving guide rail 10, and the level meter 12 is returned to the maintenance and replacement position. The worker 13 stands on the work platform 14 prepared in advance to perform maintenance and replacement. After the completion of the work, the level gauge 12 is brought to the work position by the operation in the installation process.

Claims (6)

1. An unmanned electric locomotive automatic loading station material level meter installation device in pit, its characterized in that: the intelligent material level meter comprises a section bar bracket (2), a driving gear motor (3), an electric push rod type fixing pin (4), a material level meter mounting sliding plate (5), a movable sliding block (6), a driven sprocket (7), a chain (8), a fixing pin hole (9), a movable guide rail (10) and a driving sprocket (11), wherein the movable guide rail (10) is mounted on the section bar bracket (2); the driving gear motor (3) and the driven sprocket (7) are respectively arranged at two ends of the profile bracket (2), the driving sprocket (11) is arranged on the shaft of the driving gear motor (3), and the chain (8) is arranged between the driving sprocket (11) and the driven sprocket (7); the material level meter mounting slide plate (5) and the movable slide block (6) are mounted together, the movable slide block (6) is slidably mounted in the movable guide rail (10), the material level meter mounting slide plate (5) is connected with the chain (8), and the material level meter (12) is mounted on the material level meter mounting slide plate (5); the electric push rod type fixing pin (4) is arranged on the level meter installation sliding plate (5), the fixing pin hole (9) is arranged on the profile support (2), and the electric push rod type fixing pin (4) is matched with the fixing pin hole (9).
2. The automatic loading station level gauge mounting apparatus for an unmanned electric vehicle downhole according to claim 1, wherein: the novel steel bar profile support further comprises a protective cover (1), and the protective cover (1) is arranged on the outer side of the profile support (2).
3. The automatic loading station level gauge mounting apparatus for an unmanned electric vehicle downhole according to claim 1, wherein: the two electric push rod type fixing pins (4) are respectively arranged at two ends of the level meter installation sliding plate (5).
4. The automatic loading station level gauge mounting apparatus for an unmanned electric vehicle downhole according to claim 1, wherein: the number of the fixing pin holes (9) is matched with the length of the section bar support (2), and the fixing pin holes are uniformly distributed on the section bar support (2).
5. The automatic loading station level gauge mounting apparatus for an unmanned electric vehicle downhole according to claim 1, wherein: the length of the movable guide rail (10) is matched with that of the profile bracket (2).
6. The automatic loading station level gauge mounting apparatus for an unmanned electric vehicle downhole according to claim 1, wherein: the steel wire rope is arranged at the front end of the section bar bracket (2).
CN202223347637.7U 2022-12-14 2022-12-14 Automatic loading station level meter installation device of underground unmanned electric locomotive Active CN219243266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223347637.7U CN219243266U (en) 2022-12-14 2022-12-14 Automatic loading station level meter installation device of underground unmanned electric locomotive

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223347637.7U CN219243266U (en) 2022-12-14 2022-12-14 Automatic loading station level meter installation device of underground unmanned electric locomotive

Publications (1)

Publication Number Publication Date
CN219243266U true CN219243266U (en) 2023-06-23

Family

ID=86803879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223347637.7U Active CN219243266U (en) 2022-12-14 2022-12-14 Automatic loading station level meter installation device of underground unmanned electric locomotive

Country Status (1)

Country Link
CN (1) CN219243266U (en)

Similar Documents

Publication Publication Date Title
CN111764855B (en) Near-horizontal continuous directional coring advanced geological exploration system and method
CN111157388B (en) Test bed capable of simulating tool behaviors at each position of cutter head
CN107023262B (en) Cannon combined mining device for fully-mechanized mining face machine
CN110873230B (en) Pipe jacking engineering construction process
CN219243266U (en) Automatic loading station level meter installation device of underground unmanned electric locomotive
CN203822175U (en) Drilling machine rack
CN203499708U (en) Self-propelled coal mine tunnel temporary supporting anchor protecting machine
CN114876363A (en) Prevent backfilling ground pile drilling equipment
CN109458045A (en) Construction of the highway coaming plate auto-erecting structure and its construction method
CN109669024B (en) Installation method of similar material model test excavation and supporting structure based on laser positioning
CN102305035B (en) Device for adjusting centration of complete vehicle-mounted service machine to wellhead
CN110778279A (en) Lifting type synchronous drilling equipment
CN113445911B (en) Thin coal seam anchor rod drill carriage
CN216285260U (en) Large longitudinal slope pipe-jacking tunneling model test device
CN207093089U (en) A kind of monitoring instrument of parallel tunneling with TBM process buries platform
CN206187890U (en) Portable sprocket chain drive dolly
CN110282486A (en) Power construction actinobacillus device
CN207033491U (en) A kind of mine roof separation indicator anchor erecting device
CN220451985U (en) Colliery environmental monitoring equipment
CN215292405U (en) Logging cable depth acquisition device
CN220378198U (en) Rock drilling device for measuring drilling depth by using sensor
CN220267766U (en) Crawler-type underground explosive auxiliary pushing machine
CN211784917U (en) Test bed capable of simulating tool behaviors at each position of cutter head
CN215672210U (en) Hard rock cutting equipment for tunnel communication channel
CN215485865U (en) Full-section construction anchor rod drill boom structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant