CN219242846U - Aluminum-substituted wood steel structure air conditioner pipeline installation system - Google Patents
Aluminum-substituted wood steel structure air conditioner pipeline installation system Download PDFInfo
- Publication number
- CN219242846U CN219242846U CN202223417439.3U CN202223417439U CN219242846U CN 219242846 U CN219242846 U CN 219242846U CN 202223417439 U CN202223417439 U CN 202223417439U CN 219242846 U CN219242846 U CN 219242846U
- Authority
- CN
- China
- Prior art keywords
- aluminum
- steel structure
- anchor ear
- air conditioner
- substituted wood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 49
- 239000010959 steel Substances 0.000 title claims abstract description 49
- 239000002023 wood Substances 0.000 title claims abstract description 33
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 210000005069 ears Anatomy 0.000 claims abstract description 4
- 238000004378 air conditioning Methods 0.000 claims description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 6
- 229910052782 aluminium Inorganic materials 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses an aluminum-substituted wood steel structure air conditioner pipeline installation system, which comprises an aluminum-substituted wood steel structure main body, wherein the aluminum-substituted wood steel structure main body comprises a first side edge and a second side edge; the anchor ear assembly comprises anchor ear fixing pieces and anchor ears. The system adopts the adjustable pipeline anchor ear, one end of the anchor ear is of a barb structure, and the other end is of a pressing buckle, so that the length adjustment and manual tightness can be realized, and the system is simple and easy to use. The pipeline fixing support on the steel structure has a height adjusting function, can meet the drainage gradient requirement of an air conditioner, is provided with reverse threads at two ends of a transverse supporting rod, and supports two ends of a movable supporting rod against the side edges of a steel frame through rotation; in addition, the support rod and the hanging frames on two sides are not in an integral structure, and can be used for steel structures with different sizes. The system can be applied to the pipeline installation on the aluminum-substituted wood Liang Zhuna steel structure, can realize the rapid installation of the pipeline, and opens up a new application path for the popularization of the archaize building.
Description
Technical Field
The utility model relates to the technical field of building decoration, in particular to an aluminum-substituted wood steel structure air conditioner pipeline installation system.
Background
Along with the increase of economy, china has entered a stage of increasing demands for travel consumption, and more cultural travel items should be generated. Archaize buildings are limited by the number of old decorative materials (namely old green bricks and tiles), and more than 98% of the archaize buildings are made of novel building materials.
Many modern imitations are local suspended ceilings or suspended ceilings, so that some pipelines contained in the air conditioning equipment are required to be installed in an open mode or partially installed in an open mode, and the indoor attractiveness of the Chinese type building is affected.
According to analysis, the archaize building usually has more independent beams and columns, and the modern archaize building also adopts the style, but aluminum plates are usually used for replacing the traditional timber. After the beam column adopts aluminum substituted wood, steel is adopted as structural support in the aluminum substituted wood, and a large cavity exists in the aluminum substituted wood; the interior space of a traditional aluminum-substituted wood beam or column is usually in an idle state, and a certain space waste is caused. The main reason is that the aluminum-substituted wood beam column is lack of a structure for installing a fixing piece, so that components such as an air conditioner pipeline and the like are difficult to fix in the aluminum-substituted wood beam column.
Therefore, how to provide a mounting system that can be applied to the fixed pipeline inside the aluminum-substituted wood beam column is a technical problem that needs to be solved by those skilled in the art.
Disclosure of Invention
The utility model provides an aluminum-substituted wood steel structure air conditioner pipeline installation system.
The utility model provides the following scheme:
an aluminum-substituted wood-steel structure air conditioner pipe installation system, comprising:
the aluminum-substituted wood steel structure body comprises a first side edge and a second side edge;
the anchor ear assembly comprises anchor ear fixing pieces and anchor ears; the anchor ear comprises an anchor ear body and a tightening buckle; the hoop body is fixedly connected with the hoop fixing piece, and the free end of the hoop body is connected with the tightening buckle;
the two ends of the anchor ear fixing piece are respectively provided with a supporting rod, so that the anchor ear fixing piece is abutted to the inner sides of the first side edge and the second side edge through the supporting rods, and the anchor ear fixing piece is connected with the aluminum-substituted wood steel structure main body.
Preferably: the tightening buckle comprises a pressing buckle, and the free end of the hoop body is provided with barbs.
Preferably: the support rod is provided with reverse external threads; the anchor ear fixing piece is provided with an internal thread matched with the reverse external thread.
Preferably: and a jacking block is arranged at one end of the supporting rod, which is far away from the hoop fixing piece.
Preferably: the device also comprises two fixed bracket hanging frames, wherein the two fixed bracket hanging frames are respectively and correspondingly spliced with the first side edge and the second side edge; one end of the support rod, which is far away from the hoop fixing piece, is abutted with the fixing support hanging frame.
Preferably: the fixed bolster stores pylon has U-shaped structure, U-shaped structure includes bottom plate and two flank, the bottom plate is provided with the screw hole, threaded hole internal is provided with adjusting bolt.
According to the specific embodiment provided by the utility model, the utility model discloses the following technical effects:
according to the utility model, an aluminum-substituted wood-steel structure air conditioner pipeline installation system can be realized, and in one implementation mode, the system can comprise an aluminum-substituted wood-steel structure main body, wherein the aluminum-substituted wood-steel structure main body comprises a first side edge and a second side edge; the anchor ear assembly comprises anchor ear fixing pieces and anchor ears; the anchor ear comprises an anchor ear body and a tightening buckle; the hoop body is fixedly connected with the hoop fixing piece, and the free end of the hoop body is connected with the tightening buckle; the two ends of the anchor ear fixing piece are respectively provided with a supporting rod, so that the anchor ear fixing piece is abutted to the inner sides of the first side edge and the second side edge through the supporting rods, and the anchor ear fixing piece is connected with the aluminum-substituted wood steel structure main body. The utility model provides an aluminium takes place of wooden steel construction air conditioner pipeline installation system, adjustable pipeline staple bolt, the one end of staple bolt is the barb structure, and one end is the push type buckle, can realize length adjustment and manual elasticity, and is simple easy to use. The pipeline fixing support on the steel structure has a height adjusting function, can meet the drainage gradient requirement of an air conditioner, is provided with reverse threads at two ends of a transverse supporting rod, and supports two ends of a movable supporting rod against the side edges of a steel frame through rotation; in addition, the support rod and the hanging frames on two sides are not in an integral structure, and can be used for steel structures with different sizes. The system can be applied to the pipeline installation on the aluminum-substituted wood Liang Zhuna steel structure, can realize the rapid installation of the pipeline, and opens up a new application path for the popularization of the archaize building.
Of course, it is not necessary for any one product to practice the utility model to achieve all of the advantages set forth above at the same time.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural diagram of an air conditioner pipeline installation system with an aluminum-substituted wood-steel structure according to an embodiment of the utility model.
In the figure: the aluminum-substituted wood steel structure comprises an aluminum-substituted wood steel structure main body 1, a first side 11, a second side 12, a hoop assembly 2, a hoop fixing piece 21, a hoop 22, a supporting rod 23, a jacking block 24, a fixing support hanging frame 3 and an adjusting bolt 4.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which are derived by a person skilled in the art based on the embodiments of the utility model, fall within the scope of protection of the utility model.
Examples
Referring to fig. 1, in order to provide an aluminum-substituted wood-steel structure air conditioner pipeline installation system according to an embodiment of the present utility model, as shown in fig. 1, the system may include:
the aluminum-substituted wood steel structure body 1, wherein the aluminum-substituted wood steel structure body 1 comprises a first side 11 and a second side 12;
the anchor ear assembly 2, anchor ear assembly 2 includes anchor ear fixing piece 21 and anchor ear 22; the anchor ear comprises an anchor ear body and a tightening buckle; the hoop body is fixedly connected with the hoop fixing piece 21, and the free end of the hoop body is connected with the tightening buckle;
the two ends of the anchor ear fixing piece 21 are respectively provided with a supporting rod 23, so that the anchor ear fixing piece 21 is abutted to the inner sides of the first side 11 and the second side 12 through the supporting rods 23, and the anchor ear fixing piece 21 is connected with the aluminum-substituted wood steel structural body 1.
According to the aluminum-substituted wood steel structure air conditioner pipeline installation system, the hoop fixing piece is adopted to achieve the effect that the hoop assembly is connected with the aluminum-substituted wood steel structure, an air conditioner pipeline can be fixed inside the aluminum-substituted wood steel structure through the hoop, the purpose of improving the utilization rate of the inner space of the aluminum-substituted wood steel structure is achieved, meanwhile, the overall attractiveness of an archaize building can be improved, and the pipeline is prevented from being exposed.
The staple bolt that this application embodiment provided is used for fixing the air conditioner pipeline, and is specific, for convenient operation, this application embodiment can provide tighten up the buckle and include the pressure formula buckle, the free end of the hoop body is provided with the barb. The adjustable pipeline staple bolt, the one end of staple bolt is barb structure, and one end is the push type buckle, can realize length adjustment and manual elasticity, and is simple easy to use.
Because the distances between the first side and the second side included in different aluminum-substituted wood steel structures may be different, in order to improve the application range of the system provided by the embodiment of the present application, the embodiment of the present application may provide that the support rod 23 is provided with a reverse external thread; the anchor ear fixing member 21 is provided with an internal thread adapted to the reverse external thread. The position of the support rod relative to the hoop fixing piece can be adjusted through the reverse external threads and the internal threads, so that the requirements of different distances between the first side edge and the second side edge are met, and the hoop fixing piece can be fastened and propped between the first side edge and the second side edge.
In order to further improve stability after tightening, the embodiment of the present application may further provide that a tightening block 24 is disposed at an end of the support rod 23 away from the anchor ear fixing member 21.
In order to adjust the height of the hoop, the embodiment of the application may further provide two fixing support hangers, where the two fixing support hangers 3 are respectively connected with the first side 11 and the second side 12 in a one-to-one corresponding manner; one end of the supporting rod 23, which is far away from the anchor ear fixing piece 21, is abutted against the fixing support hanging frame 3. Specifically, the fixed bolster stores pylon has U-shaped structure, U-shaped structure includes bottom plate and two flank, the bottom plate is provided with the screw hole, threaded hole is provided with adjusting bolt 4. The extension length of the adjusting bolt is adjusted, so that the front end of the adjusting bolt is abutted against the end face of the corresponding side edge, and the adjustment of different heights of the two ends can be realized, thereby meeting the requirement of drainage gradient.
In a word, the aluminum substituted wood steel structure air conditioner pipeline installation system that this application provided, adjustable pipeline staple bolt, the barb structure is given to one end of staple bolt, and one end is pressed for the pressure buckle, can realize length adjustment and manual elasticity, and is simple easy to use. The pipeline fixing support on the steel structure has a height adjusting function, can meet the drainage gradient requirement of an air conditioner, is provided with reverse threads at two ends of a transverse supporting rod, and supports two ends of a movable supporting rod against the side edges of a steel frame through rotation; in addition, the support rod and the hanging frames on two sides are not in an integral structure, and can be used for steel structures with different sizes. The system can be applied to the pipeline installation on the aluminum-substituted wood Liang Zhuna steel structure, can realize the rapid installation of the pipeline, and opens up a new application path for the popularization of the archaize building.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
The foregoing description is only of the preferred embodiments of the present utility model and is not intended to limit the scope of the present utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model are included in the protection scope of the present utility model.
Claims (6)
1. An aluminum-substituted wood-steel structure air conditioner pipe installation system, comprising:
the aluminum-substituted wood steel structure body comprises a first side edge and a second side edge;
the anchor ear assembly comprises anchor ear fixing pieces and anchor ears; the anchor ear comprises an anchor ear body and a tightening buckle; the hoop body is fixedly connected with the hoop fixing piece, and the free end of the hoop body is connected with the tightening buckle;
the two ends of the anchor ear fixing piece are respectively provided with a supporting rod, so that the anchor ear fixing piece is abutted to the inner sides of the first side edge and the second side edge through the supporting rods, and the anchor ear fixing piece is connected with the aluminum-substituted wood steel structure main body.
2. The aluminum-substituted wood-steel structure air conditioning duct mounting system of claim 1, wherein the tightening clasp comprises a press clasp, and the free end of the hoop body is provided with barbs.
3. The aluminum-substituted wood-steel structure air conditioner duct mounting system of claim 1, wherein the support bar is provided with reverse external threads; the anchor ear fixing piece is provided with an internal thread matched with the reverse external thread.
4. The aluminum-substituted wood-steel structure air conditioner pipeline installation system according to claim 3, wherein a jacking block is arranged at one end of the supporting rod, which is far away from the anchor ear fixing piece.
5. The aluminum-substituted wood-steel structure air conditioner pipeline installation system according to claim 1, further comprising two fixing bracket hanging frames, wherein the two fixing bracket hanging frames are respectively connected with the first side edge and the second side edge in a one-to-one corresponding manner in an inserting manner; one end of the support rod, which is far away from the hoop fixing piece, is abutted with the fixing support hanging frame.
6. The aluminum-substituted wood-steel structure air conditioner duct mounting system of claim 5, wherein the fixed bracket hanger has a U-shaped structure comprising a bottom plate and two side wings, the bottom plate is provided with threaded holes, and the threaded holes are provided with adjusting bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223417439.3U CN219242846U (en) | 2022-12-20 | 2022-12-20 | Aluminum-substituted wood steel structure air conditioner pipeline installation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223417439.3U CN219242846U (en) | 2022-12-20 | 2022-12-20 | Aluminum-substituted wood steel structure air conditioner pipeline installation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219242846U true CN219242846U (en) | 2023-06-23 |
Family
ID=86844485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223417439.3U Active CN219242846U (en) | 2022-12-20 | 2022-12-20 | Aluminum-substituted wood steel structure air conditioner pipeline installation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219242846U (en) |
-
2022
- 2022-12-20 CN CN202223417439.3U patent/CN219242846U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206428879U (en) | A kind of adjustable environmentally friendly grid ceiling | |
CN102493622A (en) | Wallboard installing component and method for installing decorative wallboard by using same | |
WO2006024214A1 (en) | A link mechanism between the unit board and main body of the curtain wall | |
CN112095862A (en) | Building curtain wall mounting structure and building curtain wall mounting method | |
CN219242846U (en) | Aluminum-substituted wood steel structure air conditioner pipeline installation system | |
CN220150634U (en) | Aluminum veneer decorative curtain wall | |
CN219100584U (en) | Wall aluminum honeycomb panel stone pendant adjusting screw mounting structure | |
CN211738235U (en) | Assembled butterfly type water supply and drainage pipeline support | |
CN206987270U (en) | A kind of close joint hanging-type aluminium single plate structure | |
CN202899391U (en) | Ceiling system with pure wood structure | |
CN215106784U (en) | Honeycomb decorative plate decorative structure | |
CN211597228U (en) | Wall keel structure component for light steel house | |
CN212029864U (en) | Ventilation air conditioner installation device based on multi-region heat and mass balance | |
CN216340609U (en) | Connecting mechanism for easily installing PC external wall panel | |
CN219011669U (en) | Glass fiber board furred ceiling structure | |
CN212200972U (en) | Light steel keel easy to install | |
CN212773082U (en) | Ceiling access hole repairing structure | |
CN219671970U (en) | Assembled seamless aluminium magnesium alloy house ornamentation wall mounting | |
CN114704011B (en) | Mounting structure for curtain | |
CN215888907U (en) | Assembled aluminium honeycomb panel furred ceiling from taking piece keel structure | |
CN115247469B (en) | Anti-cracking suspended ceiling structure and construction method thereof | |
CN220353444U (en) | Composite board curtain wall mounting system | |
CN114427284A (en) | Wall aluminum plate installation device | |
CN220621206U (en) | Auxiliary assembly for curtain wall reconstruction | |
CN215253855U (en) | Integrated mounting structure for ceiling decoration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |