CN219240975U - Building curtain wall - Google Patents

Building curtain wall Download PDF

Info

Publication number
CN219240975U
CN219240975U CN202223468932.8U CN202223468932U CN219240975U CN 219240975 U CN219240975 U CN 219240975U CN 202223468932 U CN202223468932 U CN 202223468932U CN 219240975 U CN219240975 U CN 219240975U
Authority
CN
China
Prior art keywords
curtain wall
crossbeam
shuttle
foraminiferous
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223468932.8U
Other languages
Chinese (zh)
Inventor
刘超
刘瑞瑾
眭志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hansheng Times Architectural Design Co ltd
Original Assignee
Chengdu Hansheng Times Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hansheng Times Architectural Design Co ltd filed Critical Chengdu Hansheng Times Architectural Design Co ltd
Priority to CN202223468932.8U priority Critical patent/CN219240975U/en
Application granted granted Critical
Publication of CN219240975U publication Critical patent/CN219240975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model provides a building curtain, includes many parallel arrangement's crossbeam and a plurality of foraminiferous curtain wall brick that have the through-hole, foraminiferous curtain wall brick arranges between adjacent crossbeam, still includes many shuttle poles, shuttle pole passes whole parallel crossbeam and sets up foraminiferous curtain wall brick between the crossbeam through the through-hole, be provided with two at least fixed parts that can make crossbeam and shuttle pole fixed connection on the flexible shuttle pole, be located highest crossbeam and minimum crossbeam respectively, and the size of fixed part is less than foraminiferous curtain wall brick's brick hole. The building curtain wall can continuously pass through the cross beam with the holes and the curtain wall bricks through the shuttle rod, so that the previous process of installing the support rods between adjacent cross beams is reduced, the construction process is simplified, and the construction efficiency is improved.

Description

Building curtain wall
Technical Field
The utility model belongs to the field of buildings, and relates to a curtain wall, in particular to a building curtain wall.
Background
The curtain wall is an outer wall enclosure of a building, is not generally load-bearing, is a light wall body with a decorative effect commonly used in modern large-scale and high-rise buildings, is composed of a panel and a supporting structure system, can have certain displacement capacity or certain deformation capacity relative to a main structure, and is not generally used for bearing a building outer enclosure structure or a decorative structure acted by the main structure.
The vertical building curtain wall which is not abnormal generally adopts a steel beam to be erected, the perforated curtain wall bricks are built on the steel beams, rigid supporting rods are adopted in the prior art to penetrate through the perforated curtain wall bricks between the beams and fix the two ends of the supporting rods on the upper beam and the lower beam, so that the curtain wall bricks are fixed on the beams, a batch of supporting rods are required to be installed for the connection of each pair of beams in the mode, and the construction process is complicated.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model discloses a building curtain wall.
The building curtain wall comprises a plurality of parallel beams with through holes, a plurality of perforated curtain wall bricks, a plurality of shuttle rods, wherein the perforated curtain wall bricks are arranged between adjacent beams, the shuttle rods pass through all the parallel beams and the perforated curtain wall bricks arranged between the beams through the through holes, at least two fixing pieces capable of enabling the beams to be fixedly connected with the shuttle rods are arranged on the shuttle rods, the fixing pieces are respectively arranged on the highest beam and the lowest beam, and the size of the fixing pieces is smaller than that of the brick holes of the perforated curtain wall bricks.
Preferably, the fixing member is a clip.
Preferably, the shuttle rod is provided with external threads, and the fixing piece is a nut.
Preferably, the fixing member is disposed above or below each of the cross members.
Preferably, the shuttle bar is a flexible shuttle bar.
Preferably, the building curtain wall further comprises a support frame, and the support frame is fixedly connected between the building body structure and the at least one cross beam.
Preferably, the support frame comprises a longitudinal beam fixedly connected to the plurality of cross beams and a plurality of cross bars fixedly connected between the longitudinal beam and the building body structure.
The building curtain wall can continuously pass through the cross beam with the holes and the curtain wall bricks through the shuttle rod, so that the previous process of installing the support rods between adjacent cross beams is reduced, the construction process is simplified, and the construction efficiency is improved.
Drawings
FIG. 1 is a schematic view of an embodiment of a building curtain wall according to the present utility model without installed curtain wall bricks;
FIG. 2 is a schematic view of an embodiment of a building curtain wall according to the present utility model after installation of curtain wall bricks;
the reference numerals in the figures are: 1-shuttle rods, 2-cross beams, 3-fixing pieces, 4-perforated curtain wall bricks, 5-building body structures, 6-cross beams and 7-longitudinal beams.
Detailed Description
The following describes the present utility model in further detail.
As shown in fig. 1 and 2, the building curtain wall of the present utility model comprises a plurality of parallel beams 2 with through holes, a plurality of perforated curtain wall bricks 4, and a plurality of shuttle rods 1, wherein the perforated curtain wall bricks are arranged between adjacent beams, the shuttle rods 1 pass through all the parallel beams 2 and the perforated curtain wall bricks 4 arranged between the beams through the through holes, at least two fixing pieces 3 which can fixedly connect the beams with the flexible shuttle rods 1 are arranged on the flexible shuttle rods, the fixing pieces are respectively positioned on the highest beam and the lowest beam, and the size of the fixing pieces is smaller than the brick holes of the perforated curtain wall bricks.
During construction, the bottom cross beam can be firstly erected through the auxiliary scaffold, the shuttle rods penetrate through the bottom cross beam and are fixed on the bottom cross beam through the fixing pieces, then the perforated curtain wall bricks are arranged on the bottom cross beam, after one layer of the shuttle rods are arranged, the second cross beam penetrates through the shuttle rods and is fixed through the auxiliary scaffold, then the perforated curtain wall bricks are arranged on the second cross beam again, the fixing pieces can not be arranged on the second cross beam, and the fixing pieces can also be arranged before the perforated curtain wall bricks are arranged.
The fixing piece can be a nut, external threads matched with the nut are arranged on the shuttle rod, the nut is screwed and screwed above or below a beam to be fixed from the end part of the shuttle rod before the curtain wall brick with holes is installed, the fixing piece can also adopt a clamp, the fixing clamp can be fixedly clamped on the shuttle rod from the side surface of the shuttle rod, and the size of the clamped clamp is larger than that of a through hole on the beam.
The shuttle rod can adopt a flexible shuttle rod, when the cross beam is long, a small amount of dislocation can exist in the through holes of the cross beam due to processing reasons, and the flexible shuttle rod can tolerate the dislocation to a certain extent.
In the embodiment shown in figures 1 and 2,
the building curtain wall further comprises a support frame, the support frame is fixedly connected between the building body structure and at least one cross beam, the curtain wall and the building body structure 5 can be combined together, and in the specific embodiment shown in fig. 1, the support frame comprises a longitudinal beam 7 fixedly connected to the plurality of cross beams 2, and a plurality of cross beams 6 fixedly connected between the longitudinal beam 7 and the building body structure 5.
The special-shaped grid connecting piece can simultaneously connect and fix the upper grid layer and the lower grid layer through the single connecting arm, can adapt to different grid included angles, is suitable for the fixed connection of the special-shaped grid and the main structure of a building, and has a simple angle adjusting mode.
The foregoing description of the preferred embodiments of the present utility model is not obvious contradiction or on the premise of a certain preferred embodiment, but all the preferred embodiments can be used in any overlapped combination, and the embodiments and specific parameters in the embodiments are only for clearly describing the utility model verification process of the inventor and are not intended to limit the scope of the utility model, and the scope of the utility model is still subject to the claims, and all equivalent structural changes made by applying the specification and the content of the drawings of the present utility model are included in the scope of the utility model.

Claims (7)

1. The utility model provides a building curtain, includes crossbeam (2) and a plurality of foraminiferous curtain wall brick (4) that have the through-hole of many parallel arrangement, foraminiferous curtain wall brick (4) are arranged between adjacent crossbeam (2), a serial communication port, still include many shuttle bars (1), shuttle bars pass whole parallel crossbeam and foraminiferous curtain wall brick (4) of setting between the crossbeam through the through-hole, be provided with two at least on shuttle bars (1) and make crossbeam and shuttle bar fixed connection's mounting (3), be located respectively on highest crossbeam and the lowest crossbeam, and the size of mounting (3) is less than foraminiferous curtain wall brick's brick hole.
2. Building curtain wall according to claim 1, characterized in that the fixing element (3) is a clip.
3. Building curtain wall according to claim 1, characterized in that the shuttle bar (1) is provided with an external thread and the fixing element (3) is a nut.
4. Building curtain wall according to claim 1, characterized in that the fixing (3) is arranged above or below each of the cross beams (2).
5. Building curtain wall according to claim 1, characterized in that the shuttle bar (1) is a flexible shuttle bar.
6. The building curtain wall according to claim 1, further comprising a support frame fixedly connected between the building body structure (5) and the at least one cross beam (2).
7. The building curtain wall of claim 6, wherein the support frame comprises a longitudinal beam (7) fixedly connected to the plurality of cross beams (2), and a plurality of cross bars (6) fixedly connected between the longitudinal beam and the building body structure.
CN202223468932.8U 2022-12-26 2022-12-26 Building curtain wall Active CN219240975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223468932.8U CN219240975U (en) 2022-12-26 2022-12-26 Building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223468932.8U CN219240975U (en) 2022-12-26 2022-12-26 Building curtain wall

Publications (1)

Publication Number Publication Date
CN219240975U true CN219240975U (en) 2023-06-23

Family

ID=86809469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223468932.8U Active CN219240975U (en) 2022-12-26 2022-12-26 Building curtain wall

Country Status (1)

Country Link
CN (1) CN219240975U (en)

Similar Documents

Publication Publication Date Title
CN105780925B (en) Truss-hanging combined system installation construction method
CN110656698B (en) Shock resistance connection structure of concrete beam column
CN215378812U (en) Prestressed cable truss photovoltaic support
CN112681724B (en) High and large space section steel-concrete structure roof construction formwork system and method
CN219240975U (en) Building curtain wall
CN207934304U (en) A kind of suspended ceiling reverse support structure
CN108457193B (en) Box beam skew web plate formwork erecting structure and its erection method
CN216999251U (en) Support firm large-span pipe truss structure
CN110468960B (en) Supporting structure capable of adjusting node displacement of net rack and construction method
CN210947143U (en) Steel structure for building
CN111219005A (en) Keel assembly, hoisting structure and hoisting method of double-fish belly guy cable curtain wall
CN221627391U (en) Suspended ceiling unit for roof and suspended ceiling structure thereof
CN111395625A (en) Horizontal force self-balancing suspension cable hanging roof structure
CN219471661U (en) Detachable equipment rainproof shed
CN217079490U (en) Insulation board structure with truss for assembly type building
CN221193693U (en) High-strength steel structure
CN113845030B (en) Lifting method of stepped steel truss
CN215564419U (en) High and large space section steel-concrete structure roof construction formwork system
CN214006171U (en) Curtain wall structure
CN213477332U (en) Curtain wall framework mounting structure
CN217812519U (en) Beam reinforcing structure for building structure design
CN212477449U (en) Arc scaffold fixing device
CN212388802U (en) Keel component and hoisting structure of double-fish belly guy cable curtain wall
CN212001589U (en) Strong antidetonation shaped steel structure
CN216390343U (en) Floor bridge device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant