CN219219754U - Construction carrying frame - Google Patents
Construction carrying frame Download PDFInfo
- Publication number
- CN219219754U CN219219754U CN202320333093.4U CN202320333093U CN219219754U CN 219219754 U CN219219754 U CN 219219754U CN 202320333093 U CN202320333093 U CN 202320333093U CN 219219754 U CN219219754 U CN 219219754U
- Authority
- CN
- China
- Prior art keywords
- support
- carrying
- rods
- frame
- climbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 230000009194 climbing Effects 0.000 claims abstract description 42
- 230000003014 reinforcing effect Effects 0.000 claims description 15
- 230000000087 stabilizing effect Effects 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本实用新型提供施工搭载架,涉及搭载架技术领域,以解决现有不使用时占用空间较大,不方便存放的问题,包括支撑组件;所述连接组件共设有两组,且两组连接组件安装在支撑组件的左右两侧;所述攀爬组件安装在支撑组件的前侧;所述搭载组件安装在支撑组件的顶部;所述空心管共设有四个,且四个空心管固定安装在支撑座的顶部;所述支撑杆共设有四个,且四个支撑杆滑动安装在四个空心管的内部;该施工搭载架,因四个支撑杆滑动安装在四个空心管的内部,且四个限位杆固定安装在四个支撑杆的顶部,并且四个限位杆插入在支撑框中,从而方便工作人员进行组装,不使用时占用空间更小。
The utility model provides a construction mounting frame, relates to the technical field of mounting frame, and solves the problems of large space occupation and inconvenient storage when not in use. The components are installed on the left and right sides of the support component; the climbing component is installed on the front side of the support component; the carrying component is installed on the top of the support component; there are four hollow tubes in total, and the four hollow tubes are fixed Installed on the top of the support seat; there are four support rods in total, and the four support rods are slidably installed inside the four hollow tubes; Inside, the four limit rods are fixedly installed on the top of the four support rods, and the four limit rods are inserted into the support frame, which is convenient for the staff to assemble and takes up less space when not in use.
Description
技术领域technical field
本实用新型属于搭载架技术领域,更具体地说,特别涉及施工搭载架。The utility model belongs to the technical field of carrying frames, and more specifically relates to construction carrying frames.
背景技术Background technique
在房建过程中,常常需要对高处进行建设作业,对墙面或屋顶进行装修或抹灰作业,而在对高处进行作业的过程中,需要使用到房建搭载架对所需建材及操作人员搭载。In the process of house construction, it is often necessary to carry out construction work on high places, to decorate or plaster the walls or roofs, and in the process of working on high places, it is necessary to use the house construction carrying frame to carry out the required building materials and Operator on board.
如申请号为:CN202122917387.5的专利中,公开了一种用于房屋建筑施工的搭载架,包括有安装底板和承载板,安装底板上设置有四组支撑斜杆,四组支撑斜杆上均套设有滑框,其中每两组滑框通过一组连接杆进行连接,连接杆上设置有四组支撑杆,支撑杆的一端与承载板底部滑动连接,两组丝杠分别穿设在螺纹座内;该搭载架中的承载板可进行升降方便对不同高度进行施工,承载板和工作人员的重量分散至四组支撑斜杆上,进而减少丝杠所受到的力,并通过支撑斜杆进行支撑,提高了该搭载架的稳定性。For example, in the patent with the application number: CN202122917387.5, a carrying frame for building construction is disclosed, which includes a mounting base plate and a bearing plate. Sliding frames are evenly set, and every two groups of sliding frames are connected by a set of connecting rods. Four sets of supporting rods are arranged on the connecting rods. One end of the supporting rods is slidingly connected with the bottom of the bearing plate. In the threaded seat; the bearing plate in the mounting frame can be lifted and lowered to facilitate construction at different heights. The weight of the bearing plate and the staff is distributed to the four sets of supporting slanting rods, thereby reducing the force on the screw, and through the supporting slanting rods. The rod is supported to improve the stability of the carrier.
基于上述,本发明人发现,目前的施工搭载架,大多为一体式结构,不使用时占用空间较大,不方便存放。Based on the above, the inventors have found that most of the current construction racks are integrated structures, which take up a lot of space when not in use and are inconvenient to store.
实用新型内容Utility model content
为了解决上述技术问题,本实用新型提供施工搭载架,以解决现有不使用时占用空间较大,不方便存放的问题。In order to solve the above-mentioned technical problems, the utility model provides a construction carrying frame to solve the existing problems of large space occupation and inconvenient storage when not in use.
本实用新型施工搭载架的目的与功效,由以下具体技术手段所达成:The purpose and effect of the construction carrying frame of the present utility model are achieved by the following specific technical means:
施工搭载架,包括支撑组件、连接组件、攀爬组件和搭载组件;Construction carrying frame, including supporting components, connecting components, climbing components and carrying components;
所述连接组件共设有两组,且两组连接组件安装在支撑组件的左右两侧;所述攀爬组件安装在支撑组件的前侧;所述搭载组件安装在支撑组件的顶部;There are two groups of connecting components, and the two groups of connecting components are installed on the left and right sides of the supporting component; the climbing component is installed on the front side of the supporting component; the carrying component is installed on the top of the supporting component;
所述支撑组件包括:支撑座、空心管、支撑杆、支撑框和连接槽孔;所述空心管共设有四个,且四个空心管固定安装在支撑座的顶部;所述支撑杆共设有四个,且四个支撑杆滑动安装在四个空心管的内部;所述支撑框设置在四个支撑杆的顶部,且支撑框上设置有连接槽孔。The support assembly includes: a support base, a hollow tube, a support rod, a support frame and a connecting slot; there are four hollow tubes in total, and the four hollow tubes are fixedly installed on the top of the support base; There are four, and the four support rods are slidably installed inside the four hollow tubes; the support frame is arranged on the top of the four support rods, and the support frame is provided with connection slots.
进一步的,所述攀爬组件还包括:攀爬杆;所述攀爬杆共设有五个,且五个攀爬杆固定安装在攀爬框上。Further, the climbing assembly further includes: climbing poles; there are five climbing poles in total, and the five climbing poles are fixedly installed on the climbing frame.
进一步的,所述支撑组件还包括:限位杆和稳定块;所述限位杆共设有四个,且四个限位杆固定安装在四个支撑杆的顶部,并且四个限位杆插入在支撑框中;所述稳定块共设有四个,且四个稳定块固定安装在支撑座的底部。Further, the support assembly also includes: a limit rod and a stabilizing block; there are four limit rods in total, and the four limit rods are fixedly installed on the tops of the four support rods, and the four limit rods Inserted in the supporting frame; there are four stabilizing blocks in total, and the four stabilizing blocks are fixedly installed on the bottom of the supporting seat.
进一步的,所述搭载组件包括:搭载杆和加固杆;所述搭载杆共设有两个,且两个搭载杆滑动安装在支撑框的顶部;所述加固杆共设有六个,且六个加固杆固定安装在两个搭载杆的内侧。Further, the carrying assembly includes: carrying rods and reinforcing rods; there are two carrying rods in total, and the two carrying rods are slidably installed on the top of the support frame; there are six reinforcing rods in total, and six A reinforcing rod is fixedly installed on the inner side of the two carrying rods.
进一步的,所述连接组件包括:连接杆、连接板和把手;所述连接杆共设有两个,且两个连接杆分别插入在支撑座和支撑框的内部;所述连接板固定安装在两个连接杆的外侧;所述把手固定安装在连接板的外侧。Further, the connection assembly includes: a connecting rod, a connecting plate and a handle; there are two connecting rods in total, and the two connecting rods are respectively inserted into the support seat and the support frame; the connecting plate is fixedly installed on The outside of the two connecting rods; the handle is fixedly installed on the outside of the connecting plate.
进一步的,所述搭载组件还包括:搭载板和通槽;所述搭载板固定安装在两个搭载杆和六个加固杆的顶部,且搭载板上设置有通槽。Further, the carrying assembly further includes: a carrying plate and a through groove; the carrying plate is fixedly installed on the tops of the two carrying rods and the six reinforcing rods, and the carrying plate is provided with a through groove.
进一步的,所述攀爬组件包括:L型卡板和攀爬框;所述L型卡板滑动安装在连接槽孔的内部;所述攀爬框固定安装在L型卡板的底部,且攀爬框的底部与支撑座接触。Further, the climbing assembly includes: an L-shaped cardboard and a climbing frame; the L-shaped cardboard is slidably installed inside the connection slot; the climbing frame is fixedly installed on the bottom of the L-shaped cardboard, and The bottom of the climbing frame is in contact with the support seat.
与现有技术相比,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
1、该施工搭载架,因四个支撑杆滑动安装在四个空心管的内部,且四个限位杆固定安装在四个支撑杆的顶部,并且四个限位杆插入在支撑框中,从而方便工作人员进行组装,不使用时占用空间更小。1. The construction carrying frame, because the four support rods are slidably installed inside the four hollow tubes, and the four limit rods are fixedly installed on the top of the four support rods, and the four limit rods are inserted into the support frame, This makes it easier for workers to assemble and takes up less space when not in use.
2、该施工搭载架,因两个连接杆分别插入在支撑座和支撑框的内部,且连接板固定安装在两个连接杆的外侧,从而使得支撑组件组装后更加牢固。2. In the construction carrier, since the two connecting rods are respectively inserted into the inside of the support base and the supporting frame, and the connecting plate is fixedly installed on the outside of the two connecting rods, the assembled support components are more firm.
3、该施工搭载架,因五个攀爬杆固定安装在攀爬框上,从而方便工作人员进行攀爬。3. The construction carrying frame is convenient for staff to climb because five climbing poles are fixedly installed on the climbing frame.
4、该施工搭载架,因搭载板固定安装在两个搭载杆和六个加固杆的顶部,且搭载板上设置有通槽,从而方便工作人员进行组装,起到了搭载作用。4. The construction carrying frame, because the carrying plate is fixedly installed on the top of the two carrying rods and the six reinforcing rods, and the carrying plate is provided with through grooves, it is convenient for the staff to assemble and plays a carrying role.
附图说明Description of drawings
图1是本实用新型的立体结构示意图。Fig. 1 is the three-dimensional structure schematic diagram of the present utility model.
图2是本实用新型图1的底部视角结构示意图。Fig. 2 is a schematic view of the bottom view of Fig. 1 of the utility model.
图3是本实用新型支撑组件的结构示意图。Fig. 3 is a structural schematic diagram of the support assembly of the present invention.
图4是本实用新型连接组件的结构示意图。Fig. 4 is a structural schematic diagram of the connection assembly of the present invention.
图5是本实用新型攀爬组件的结构示意图。Fig. 5 is a structural schematic diagram of the climbing assembly of the present invention.
图6是本实用新型搭载组件的结构示意图。Fig. 6 is a schematic structural view of the mounting assembly of the present invention.
图中,部件名称与附图编号的对应关系为:In the figure, the corresponding relationship between component names and drawing numbers is:
1、支撑组件;101、支撑座;102、空心管;103、支撑杆;104、支撑框;1041、连接槽孔;105、限位杆;106、稳定块;2、连接组件;201、连接杆;202、连接板;203、把手;3、攀爬组件;301、L型卡板;302、攀爬框;303、攀爬杆;4、搭载组件;401、搭载杆;402、加固杆;403、搭载板;4031、通槽。1. Support assembly; 101. Support seat; 102. Hollow pipe; 103. Support rod; 104. Support frame; 1041. Connection slot; 105. Limit rod; 106. Stability block; Rod; 202, connecting plate; 203, handle; 3, climbing component; 301, L-shaped clamp; 302, climbing frame; 303, climbing rod; 4, carrying component; 401, carrying rod; 402, reinforcing rod ; 403, carrying plate; 4031, through groove.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型的实施方式作进一步详细描述。The implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings and examples.
实施例:Example:
如附图1至附图6所示:As shown in accompanying
本实用新型提供施工搭载架,包括支撑组件1、连接组件2、攀爬组件3和搭载组件4;The utility model provides a construction carrying frame, including a supporting
连接组件2共设有两组,且两组连接组件2安装在支撑组件1的左右两侧;攀爬组件3安装在支撑组件1的前侧;搭载组件4安装在支撑组件1的顶部。There are two groups of
如图3所示,支撑组件1包括:支撑座101、空心管102、支撑杆103、支撑框104和连接槽孔1041;空心管102共设有四个,且四个空心管102固定安装在支撑座101的顶部;支撑杆103共设有四个,且四个支撑杆103滑动安装在四个空心管102的内部;支撑框104设置在四个支撑杆103的顶部,且支撑框104上设置有连接槽孔1041;支撑组件1还包括:限位杆105和稳定块106;限位杆105共设有四个,且四个限位杆105固定安装在四个支撑杆103的顶部,并且四个限位杆105插入在支撑框104中;稳定块106共设有四个,且四个稳定块106固定安装在支撑座101的底部,其具体作用为:因四个支撑杆103滑动安装在四个空心管102的内部,且四个限位杆105固定安装在四个支撑杆103的顶部,并且四个限位杆105插入在支撑框104中,从而方便工作人员进行组装,不使用时占用空间更小。As shown in Figure 3, the
如图4所示,连接组件2包括:连接杆201、连接板202和把手203;连接杆201共设有两个,且两个连接杆201分别插入在支撑座101和支撑框104的内部;连接板202固定安装在两个连接杆201的外侧;把手203固定安装在连接板202的外侧,其具体作用为:因两个连接杆201分别插入在支撑座101和支撑框104的内部,且连接板202固定安装在两个连接杆201的外侧,从而使得支撑组件1组装后更加牢固。As shown in Figure 4, the
如图5所示,攀爬组件3包括:L型卡板301和攀爬框302;L型卡板301滑动安装在连接槽孔1041的内部;攀爬框302固定安装在L型卡板301的底部,且攀爬框302的底部与支撑座101接触;攀爬组件3还包括:攀爬杆303;攀爬杆303共设有五个,且五个攀爬杆303固定安装在攀爬框302上,其具体作用为:因五个攀爬杆303固定安装在攀爬框302上,从而方便工作人员进行攀爬。As shown in Figure 5, the climbing assembly 3 includes: an L-
如图6所示,搭载组件4包括:搭载杆401和加固杆402;搭载杆401共设有两个,且两个搭载杆401滑动安装在支撑框104的顶部;加固杆402共设有六个,且六个加固杆402固定安装在两个搭载杆401的内侧;搭载组件4还包括:搭载板403和通槽4031;搭载板403固定安装在两个搭载杆401和六个加固杆402的顶部,且搭载板403上设置有通槽4031,其具体作用为:因搭载板403固定安装在两个搭载杆401和六个加固杆402的顶部,且搭载板403上设置有通槽4031,从而方便工作人员进行组装,起到了搭载作用。As shown in Figure 6, the carrying assembly 4 includes: a
本实施例的具体使用方式与作用:The specific usage and function of this embodiment:
本实用新型使用时,首先工作人员将四个支撑杆103滑动安装在四个空心管102的内部,再将四个限位杆105插入在支撑框104中,方便工作人员进行组装,不使用时占用空间更小,然后将两个连接杆201分别插入在支撑座101和支撑框104的内部,使得支撑组件1组装后更加牢固,然后将L型卡板301滑动安装在连接槽孔1041的内部,方便工作人员进行攀爬,然后将两个搭载杆401滑动安装在支撑框104的顶部,方便工作人员进行组装,起到了搭载作用。When the utility model is in use, at first the staff slides and installs the four
本实用新型未详述之处,均为本领域技术人员的公知技术。The parts of the utility model that are not described in detail are the known techniques of those skilled in the art.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320333093.4U CN219219754U (en) | 2023-02-28 | 2023-02-28 | Construction carrying frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320333093.4U CN219219754U (en) | 2023-02-28 | 2023-02-28 | Construction carrying frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219219754U true CN219219754U (en) | 2023-06-20 |
Family
ID=86746312
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320333093.4U Expired - Fee Related CN219219754U (en) | 2023-02-28 | 2023-02-28 | Construction carrying frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219219754U (en) |
-
2023
- 2023-02-28 CN CN202320333093.4U patent/CN219219754U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210152208U (en) | A multifunctional scaffold | |
| CN219219754U (en) | Construction carrying frame | |
| CN211229343U (en) | Floor keel system | |
| CN221957157U (en) | Assembled tool rack | |
| CN216689811U (en) | Steel construction rack easy to assemble dismantlement | |
| CN220800397U (en) | A combined filing table | |
| CN221808603U (en) | Multifunctional reagent rack | |
| CN216196420U (en) | Interior decoration auxiliary equipment | |
| CN213975305U (en) | Plate placing rack | |
| CN212088701U (en) | Detachable shoe rack with adjustable length | |
| CN209284508U (en) | A kind of architecture Multifunctional drawing desk | |
| CN217871993U (en) | Building supporting structure | |
| CN222207367U (en) | Assembled building girder supporting steel frame structure for green building | |
| CN221053149U (en) | Building high-rise scaffold erecting plate | |
| CN221865182U (en) | Easel | |
| CN219088706U (en) | Bookshelf | |
| CN210918380U (en) | Temporary stage convenient to dismantle and build | |
| CN222003897U (en) | Same-condition concrete and mortar test block curing frame | |
| CN218990844U (en) | A support frame for interior decoration | |
| CN221386511U (en) | A universal experimental bracket | |
| CN221957238U (en) | Installation and positioning structure of a new type of building material | |
| CN223899171U (en) | A photovoltaic panel support structure for photovoltaic power station installation | |
| CN219145319U (en) | A waterproof guide | |
| CN219431075U (en) | Positioning wallboard for assembled building | |
| CN222161567U (en) | House building structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |