Disclosure of Invention
In order to solve the technical problems, the utility model provides the prefabricated furnace top of the heating furnace, which is convenient and quick to install and long in service life.
The utility model provides a prefabricated furnace top of a heating furnace, which comprises a plurality of prefabricated furnace top modules which are combined together, wherein each prefabricated furnace top module comprises a plurality of furnace top hanging structures and a furnace top masonry lining, each furnace top hanging structure comprises a hanging brick, a hanging lantern ring and a lifting hook, each hanging brick comprises a hanging end and an anchoring end, each anchoring end is anchored in the furnace top masonry lining, each hanging end is connected with each hanging lantern ring, the upper end of each hanging lantern ring is connected with a lifting hook, and the upper end of each lifting hook is connected with a furnace top girder of the heating furnace.
Preferably, the furnace top masonry lining comprises a furnace top heat insulation layer, a furnace top heat insulation layer and a furnace top fire resistant layer in sequence from far to near from the inside of the furnace chamber, and the anchoring end of the hanging brick is anchored in the furnace top heat insulation layer, the furnace top heat insulation layer and the furnace top fire resistant layer.
Further preferably, the surface of the anchoring end of the hanging brick is provided with a plurality of grooves, one side of the hanging end, which is close to the anchoring end, is provided with two hanging clamping grooves, two hanging lantern rings are arranged, the lower ends of the two hanging lantern rings are clamped on the hanging clamping grooves, and the upper ends of the two hanging lantern rings are connected with the lifting hooks.
Further preferably, the lower end of the lifting hook is of a hook structure, the upper end of the lifting hook is of a vertical section, threads are arranged on the vertical section, after the upper end of the lifting hook penetrates through the furnace roof girder, a gasket is sleeved, and a nut is arranged on the threads of the vertical section of the lifting hook.
Further preferably, a plurality of prefabricated furnace top modules are arranged and combined to form a prefabricated furnace top of the heating furnace, a first cuboid notch is formed in the upper edge of the furnace top masonry lining of each prefabricated furnace top module, an expansion gap is formed between adjacent prefabricated furnace top modules, expansion gap filler is arranged in the expansion gap, and compaction bricks are arranged above the expansion gap and in the first cuboid notches of the two prefabricated furnace top modules.
Further preferably, the side wall of the prefabricated furnace roof module located inside the prefabricated furnace roof of the heating furnace is of a wave-shaped structure.
Further preferably, a second cuboid notch is formed in the lower edge of the furnace top masonry lining of the prefabricated furnace top module, wherein the lower edge is located at the periphery of the prefabricated furnace top of the heating furnace.
Compared with the prior art, the utility model has the advantages that:
the prefabricated furnace top of the heating furnace is formed by arranging and combining a plurality of prefabricated furnace top modules, the construction process is convenient, the prefabricated furnace top can be spliced and used on site, the overhaul is convenient, the furnace stopping time is reduced, the arrangement of each layer of the furnace top masonry lining is reasonable, and the service life of the furnace top is prolonged.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Referring to fig. 1, 2, 3, 4 and 5, the utility model provides a prefabricated furnace top of a heating furnace, which comprises a plurality of prefabricated furnace top modules 1 combined together, each prefabricated furnace top module 1 comprises a plurality of furnace top hanging structures 11 and a furnace top masonry lining 12, each furnace top hanging structure 11 comprises a hanging brick 1101, a hanging sleeve ring 1102 and a hanging hook 1103, each hanging brick 1101 comprises a hanging end and an anchoring end, the anchoring end is anchored in the furnace top masonry lining 12, the hanging end is connected with the hanging sleeve ring 1102, the upper end of the hanging sleeve ring 1102 is connected with the hanging hook 1103, and the upper end of the hanging hook 1103 is connected with a heating furnace top girder 3.
In the construction process of the furnace roof, the novel, improved and expanded heating furnace uses the heating furnace provided by the utility model to prefabricate the furnace roof, and the prefabricated furnace roof module 1 is installed on the heating furnace in a blocking manner. In the installation process, the traveling hydraulic lifting platform 2 is adopted to transport the prefabricated furnace top module 1 to an installation position, the hydraulic lifting function of the traveling hydraulic lifting platform 2 is started, the prefabricated furnace top module 1 is lifted to the furnace top elevation position of a furnace hearth on the heating furnace, and furnace top alignment installation is carried out.
In order to increase the performance of the furnace roof and prolong the service life of the furnace roof, as an improvement of the technical scheme, the furnace roof masonry lining 12 comprises a furnace roof heat insulation layer 1201, a furnace roof heat insulation layer 1202 and a furnace roof fire-resistant layer 1203 from far to near to the interior of a furnace chamber, and the anchoring ends of the hanging bricks 1101 are anchored in the furnace roof heat insulation layer 1201, the furnace roof heat insulation layer 1202 and the furnace roof fire-resistant layer 1203.
The furnace top heat insulation layer 1201 is usually made of light castable, perlite and the like; the furnace top heat-insulating layer 1202 is laid by fiber materials, and aluminum silicate fiber blankets, ceramic fiber felts, aluminum silicate fiber plates and the like are generally selected; the furnace top refractory layer 1203 is a heavy casting material layer, and is generally made of refractory materials such as low cement casting material, explosion-proof quick-drying casting material, plastic and the like.
Before the furnace top masonry lining 12 is manufactured, the furnace top hanging structure 11 is assembled in advance and arranged and fixed, and then the furnace top refractory layer 1203 is prefabricated and poured; the multi-piece roof suspension structure 11 in the single-piece prefabricated roof module 1 must be arranged vertically, in rows and columns. After pouring the furnace top refractory layer 1203, paving a furnace top heat insulation layer 1202 and a furnace top heat insulation layer 1201 in sequence, and paving the furnace top heat insulation layer and the furnace top heat insulation layer vertically in a crossing manner; the heat insulating layers of the fiber blanket, the fiber mat and the like can be cut into widths with the same space between the anchoring bricks, paved between the central lines of two adjacent anchoring bricks, sheared and erected by the anchoring bricks and stuck around the anchoring bricks.
In order to increase the stability of the roof hanging structure 11, as an improvement of the technical scheme, a plurality of grooves are formed on the surface of the anchoring end of the hanging brick 1101, so that the anchoring strength and the tensile strength of the anchoring brick are increased; two hanging clamping grooves are formed in one side, close to the anchoring end, of the hanging end, two hanging lantern rings 1102 are arranged, the lower ends of the two hanging lantern rings 1102 are clamped on the hanging clamping grooves, and the upper ends of the two hanging lantern rings 1102 are connected with the hanging hooks 1103.
The hanging collar 1102 is made of round steel and is in an isosceles triangle ring shape, the non-isosceles sides of the triangle are connected with the hanging end of the hanging brick 1101 to play a role in hanging the anchoring brick, and the sharp corner positions of the isosceles sides are connected with the hanging hook 1103. The hanging hook 1103 is made of round steel, the lower part is in a hook shape to hang the hanging lantern ring 1102, the upper part is in a vertical state, and the upper part is of screw round steel. In the construction and installation process of the movable detachable prefabricated furnace roof, the prefabricated furnace roof module 1 is installed on the heating furnace roof girder 3 in a bolt connection mode through a plurality of hanging structures 11, and the example furnace roof girder 3 adopts a double-groove mode and is only a single example. Therefore, the triangular hanging lantern ring is simple in structure and convenient to manufacture.
For convenient installation, the lower end of the lifting hook 1103 is of a hook structure, the upper end of the lifting hook 1103 is of a vertical section, threads are arranged on the vertical section, after the upper end of the lifting hook 1103 passes through the furnace top girder 3, a gasket 1104 is sleeved, and a nut 1105 is arranged on the threads of the vertical section of the lifting hook 1103.
The single roof hanging structure 11 is provided with a plurality of layers of gaskets 1104, and the gasket combination generally adopts 4-5 layers in order to ensure the installation precision and the installation stability of the movable roof. Adopt threaded connection, convenient dismantlement.
In order to facilitate butt joint connection, a plurality of prefabricated furnace top modules 1 are arranged and combined to form a prefabricated furnace top of the heating furnace, a first cuboid notch 4 is formed in the upper edge of a furnace top masonry lining 12 of each prefabricated furnace top module 1, an expansion joint 5 is formed between adjacent prefabricated furnace top modules 1, expansion joint filler is arranged in the expansion joint 5, and compacted bricks 6 are arranged above the expansion joint 5 and in the first cuboid notches 4 of the two prefabricated furnace top modules 1.
The prefabricated furnace top modules 1 are transported and lifted to the installation position of the furnace top through the walking type hydraulic lifting platform 2, the first cuboid notch 4 at the boundary of the furnace top masonry lining 12 is positioned, two adjacent prefabricated furnace top modules 1 are installed in an aligned mode, an expansion joint 5 and a compaction brick 6 for pressing the expansion joint are reserved between the two prefabricated furnace top modules 1 after being in place, and most of the prefabricated furnace top modules are clay bricks. And (5) laying and filling a zirconium-containing fiber blanket at the position of the expansion joint 5.
In order to increase the stability of butt joint, as an improvement of the technical scheme, the side wall of the prefabricated furnace top module 1 positioned in the prefabricated furnace top of the heating furnace is of a wave-shaped structure. The wavy structures on the two side walls of the two adjacent prefabricated furnace roof modules 1, which are close to each other, are in a mutually matched butt joint mode, and a zirconium-containing fiber blanket is filled between the wavy structures.
In order to facilitate the installation of the prefabricated furnace top module 1 around, as an improvement of the technical scheme, the lower edge of the furnace top masonry lining 12 of the prefabricated furnace top module 1 positioned around the prefabricated furnace top of the heating furnace is provided with a second cuboid notch 7.
The prefabricated furnace top module 1 near the peripheral edge position of the heating furnace is a movable top with a specific size, for example, the lower part of the edge of the prefabricated furnace top module 1 at the position of the charging end wall is manufactured into a second cuboid gap 7, the lower part and the charging end wall of the hanging installation of the boundary prefabricated furnace top module 1 are tightly pressed and meshed by utilizing the rectangular gap positions, a central expansion gap 8 of about 40mm is reserved between the furnace top and the end wall, and the preferred central expansion gap is compacted and filled by a zirconium-containing fiber blanket.
The embodiments of the present utility model have been described in detail with reference to the drawings, but the present utility model is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present utility model.