CN219192511U - Steel buoyancy tank combined platform for water operation - Google Patents

Steel buoyancy tank combined platform for water operation Download PDF

Info

Publication number
CN219192511U
CN219192511U CN202223077898.1U CN202223077898U CN219192511U CN 219192511 U CN219192511 U CN 219192511U CN 202223077898 U CN202223077898 U CN 202223077898U CN 219192511 U CN219192511 U CN 219192511U
Authority
CN
China
Prior art keywords
box
tank
power
standard
buoyancy tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223077898.1U
Other languages
Chinese (zh)
Inventor
杨飞
何宾峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harzone Industry Corp Ltd
Original Assignee
China Harzone Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harzone Industry Corp Ltd filed Critical China Harzone Industry Corp Ltd
Priority to CN202223077898.1U priority Critical patent/CN219192511U/en
Application granted granted Critical
Publication of CN219192511U publication Critical patent/CN219192511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model discloses a steel buoyancy tank combined platform for water operation, which belongs to the field of water operation, and comprises a power tank and a cab, wherein the cab is positioned on the top surface of the power tank, a propulsion device hanging frame is fixedly arranged on the left side wall of the power tank, a plug-in propulsion device is arranged on the propulsion device hanging frame, a standard tank is arranged on the right side of the power tank, a diversion tank is arranged on the right side of the standard tank, piling equipment is arranged on the top surface of the diversion tank, connecting components are arranged among the power tank, the standard tank and the diversion tank, a power system, an anchor pile system, a hydraulic pump station and a fuel tank are arranged in the power tank.

Description

Steel buoyancy tank combined platform for water operation
Technical Field
The utility model relates to the field of water operation, in particular to a steel buoyancy tank combined platform for water operation.
Background
In the 20 th century, extreme weather frequently occurs, and various disasters such as dam loopholes, overflow, collapse, breach and the like caused by heavy rain in flood season occur, so that in order to meet the water transportation requirements of rescue equipment and materials, the steel buoyancy tank combined platform for water operation can be combined according to actual conditions to meet the rescue and relief, the steel buoyancy tank combined platform is mainly used as a bearing operation platform of a piling operation excavator, the piling operation excavator is carried by a piling ship to self-navigate to an operation point, and is anchored on site by using a self-contained anchoring device, and the construction platform with relatively stable travel ensures that the piling operation excavator carries out piling operation.
The existing water operation platform mainly forms a piling operation platform through a common box body, a vertical pile is installed on a fixed pile, the whole platform is connected with a similar water bank to form a static and stable operation platform for piling and other operations, the platform can meet the requirements of water operation, but does not have a power source, the requirements of emergency rescue and disaster relief can not be met according to the actual conditions of disaster areas, the flexibility of the platform is poor, the platform cannot be assembled into a proper size according to the requirements, and the platform cannot be used for local smaller rivers and has poor practicality.
Disclosure of Invention
1. Technical problem to be solved
Aiming at the problems existing in the prior art, the utility model aims to provide a steel buoyancy tank combined platform for water operation, which can realize that the water transportation operation can be carried out by arranging a power module on a power tank, has high practicability, can combine different modes according to disaster conditions, and can load piling equipment to carry out operations such as piling.
2. Technical proposal
In order to solve the problems, the utility model adopts the following technical scheme.
The utility model provides a steel buoyancy tank combination platform of operation on water, includes headstock and driver's cabin, the driver's cabin is located the headstock top surface, headstock left side wall fixed mounting has the thrust unit stores pylon, install on the thrust unit stores pylon and hang thrust unit, the headstock right side is provided with standard case, standard case right side is provided with the water conservancy diversion case, water conservancy diversion case top surface is provided with pile driving equipment, all be provided with coupling assembling between headstock, standard case and the water conservancy diversion case.
Furthermore, a power system, an anchor pile system, a hydraulic pump station and a fuel tank are arranged in the power box.
Further, the standard case comprises a deck and a bottom plate, a plurality of side plates are fixedly connected between the deck and the bottom plate, and end plates are respectively and fixedly connected with four side walls of the deck and the bottom plate.
Further, the movable springboard is movably connected to the position, close to the top surface, of the right side wall of the flow guide box, the springboard lifting device is installed to the position, close to the right side, of the top surface of the flow guide box, the right side wall of the flow guide box is of a wedge-shaped structure, and a cabin opening ring is formed in the top surface of the flow guide box.
Further, the coupling assembling includes a plurality of single journal stirrup, single journal stirrup is fixed connection respectively in headstock, standard case and water conservancy diversion case left side wall, headstock, standard case and water conservancy diversion case right side wall are fixed connection respectively two journal stirrup, peg graft between single journal stirrup and the two journal stirrup has the plug-in axle.
Further, a plurality of ground bells are movably arranged around the hatch ring.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
(1) The scheme is provided with the power box body, so that the water transportation requirement can be met, and water rescue and relief work can be performed; secondly, the combined type platform can bear the excavator, and can pile, fill soil, dredge a river channel and other operations at a breach or a river channel under a higher flow rate.
(2) According to the scheme, the power box, the standard box and the guide box can be combined into corresponding platform forms according to actual demands, such as 3×3 mode platforms, 4×4 mode platforms and the like, actual condition demands are met, and the power box, the standard box and the guide box can be used for water areas with different sizes.
(3) In practical application, pile driving equipment can be loaded according to construction requirements to perform pile driving operation, and stability of the platform in static construction is guaranteed through anchoring of anchor piles.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a top view of the present utility model;
FIG. 3 is a schematic diagram of a power box according to the present utility model;
FIG. 4 is a schematic view of a standard case according to the present utility model;
FIG. 5 is a top view of a standard case of the present utility model;
FIG. 6 is a schematic diagram of a baffle box according to the present utility model;
FIG. 7 is a top view of the baffle box of the present utility model;
FIG. 8 is a schematic view of a part of the structure of the connecting assembly of the present utility model;
FIG. 9 is a schematic view of the structure of the anchor pile system in a horizontal state according to the present utility model;
fig. 10 is a schematic view of the structure of the anchor pile system in the vertical state according to the present utility model.
The reference numerals in the figures illustrate:
1. externally hung propulsion device; 2. a propulsion plant pylon; 3. a power box; 4. a cab; 5. an anchor pile system; 6. a standard box; 7. a diversion box; 8. piling equipment; 9. a springboard lifting device; 10. a movable springboard; 11. a deck; 12. a bottom plate; 13. a fender; 14. an end plate; 15. a single support lug; 16. double lugs; 17. inserting a shaft; 18. a power system; 19. a ground bell; 20. a hydraulic pump station; 21. a fuel tank; 22. and a cabin mouth ring.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model; it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments, and that all other embodiments obtained by persons of ordinary skill in the art without making creative efforts based on the embodiments in the present utility model are within the protection scope of the present utility model.
Example 1:
referring to fig. 1-10, a steel buoyancy tank combined platform for water operation comprises a power tank 3 and a cab 4, wherein the cab 4 is positioned on the top surface of the power tank 3, a propulsion device hanging frame 2 is fixedly arranged on the left side wall of the power tank 3, a plug-in propulsion device 1 is arranged on the propulsion device hanging frame 2, a standard tank 6 is arranged on the right side of the power tank 3, a guide tank 7 is arranged on the right side of the standard tank 6, piling equipment 8 is arranged on the top surface of the guide tank 7, and connecting components are arranged among the power tank 3, the standard tank 6 and the guide tank 7.
The scheme can also be used for constructing a ferry gate bridge, transporting medium-large-sized Cheng Zhuangbei ferry and transporting personnel; the standard case 6, the power case 3 and the flow guide case 7 of the platform built by the scheme are provided with sliding rails at the bottoms, the special carrier vehicle can be used for transportation, the loading and unloading on water can be independently completed without the help of other equipment, the rapid flashing and the withdrawing of equipment are realized, and the platform has good transportability, guarantee and flexible expansion.
Referring to fig. 1 and 3, a power system 18, an anchor pile system 5, a hydraulic pump station 20 and a fuel tank 21 are installed in the power box 3, the power box 3 is a power module, the structural form is the same as that of the standard box 6, but a plurality of driving units are arranged on the power box 3, the total weight is heavier than that of the standard box 6, and the main scale is larger than that of the standard box 6 due to the existence of the cab 4, so that the empty average draft is deeper. The cab 4 and the anchor pile system 5 are removed when the power box 3 is transported by using a carrier vehicle.
Referring to fig. 4 and 5, the standard box 6 includes a deck 11 and a bottom plate 12, a plurality of side plates 13 are fixedly connected between the deck 11 and the bottom plate 12, and four side walls of the deck 11 and the bottom plate 12 are respectively and fixedly connected with end plates 14.
The standard box 6 module is a main bearing module and is a rectangular hexahedron, the vertical and horizontal connecting pieces of the standard box 6 and the upper and lower connecting pieces are single-double lugs 16 connectors, the upper inserting shaft 17 is a pin pulling device, and the lower inserting shaft 17 rotates to drive and insert. The box body is a closed box body formed by combining plate frame structures such as a deck 11, a bottom plate 12, a side plate 13, an end plate 14 and the like, and the materials and the structural strength of the components are not lower than those of China class society's construction Specification of small vessels of inland river' (2006).
Referring to fig. 6 and 7, a movable springboard 10 is movably connected to a position, close to the top surface, of the right side wall of the guide box 7, a springboard lifting device 9 is mounted to a position, close to the right side, of the top surface of the guide box 7, the right side wall of the guide box 7 is of a wedge-shaped structure, a plurality of hatch rings 22 are fixedly connected to the top surface of the guide box 7, a plurality of ground bells 19 are movably mounted around the hatch rings 22, the guide box 7 is of a wedge-shaped structure module, the wedge-shaped length is 1.5m, the wedge-shaped height is 1m, the left and right sides are symmetrical, and the lower part of the front end is wedge-shaped, so that water resistance acting on a piling ship is reduced; the front end is locally provided with a hatch ring 22 for loading the excavator, the framework of the hatch ring 22 is encrypted to bear the load of the excavator and the excavator during piling, and the ground bell 19 is distributed on the hatch ring. The tail end is partially covered by a hatch ring 22 for mounting an outboard motor.
After the operation is completed, the connecting plug shaft 17 among the power box 3, the standard box 6 and the guide box 7 can be decomposed into a single buoyancy tank module, and similarly, the externally hung propulsion device 1, the propulsion device hanging frame 2, the anchor piles and the anchor pile lifting and falling device can be decomposed into independent modules, and at the moment, the independent modules can be independently loaded and transported to another operation water area to be assembled again, so that new piling operation is performed.
Referring to fig. 8, the connection assembly includes a plurality of single lugs 15, the single lugs 15 are respectively and fixedly connected to the left side walls of the power box 3, the standard box 6 and the diversion box 7, the right side walls of the power box 3, the standard box 6 and the diversion box 7 are respectively and fixedly connected with double lugs 16, and an inserting shaft 17 is inserted between the single lugs 15 and the double lugs 16.
The platform is formed by connecting a power box 3, a standard box 6, a guide box 7 longitudinally, transversely, upper and lower single lugs 15, a double lugs 16 and an inserting shaft 17, and is a platform with a size matched with a load, then an anchor pile and an anchor pile lifting and lodging device are connected to a preset position of the power box 3 through lugs and bolts, finally a hanging frame 2 of the propelling device and a hanging propelling device 1 of the propelling device are mounted, and a piling construction water platform capable of loading piling equipment 8 and having self-navigation capacity can be formed by communicating a hydraulic pipeline, an electric cable and a control pipeline.
The outboard motor power system 18 is in the form of an outboard motor, and consists of 2 groups of 4 outboard motor and fuel systems, a steering connecting rod, a rack, a steering manual hydraulic pump, an accelerator control handle (linkage of two double motors), an oil pipe, a starting storage battery pack, a control cable and the like.
Auxiliary systems for the power system 18 include outboard engine pylons, and cabin ventilation and drainage systems, fire protection systems.
The anchoring systems are pile inserting type anchoring, each set of anchoring system comprises two anchor pile systems 5, and each anchor pile system 5 comprises an anchor pile, an anchor pile guide frame, an anchor pile lifting system and an anchor pile lodging system.
When in use: when dangerous situations such as river channel blockage or collapse of a burst opening occur, the water operation platform can be assembled by transporting the water operation platform to the vicinity of the river channel through a transport vehicle, a designated number of power boxes 3, standard boxes 6 and diversion boxes 7 are selected according to actual conditions, after a plurality of boxes are aligned, the boxes are inserted into the single lugs 15 and the double lugs 16 through the inserting shafts 17 to be fixed, then the platform is transported to the blockage or burst opening through the power system 18 in the power boxes 3, and operations such as piling and excavating are performed through a crane or piling equipment 8 on the water operation platform, so that emergency operation is performed.
The above description is only of the preferred embodiments of the present utility model; the scope of the utility model is not limited in this respect. Any person skilled in the art, within the technical scope of the present disclosure, may apply to the present utility model, and the technical solution and the improvement thereof are all covered by the protection scope of the present utility model.

Claims (6)

1. The utility model provides a steel buoyancy tank combination platform of operation on water, includes headstock (3) and driver's cabin (4), its characterized in that: the cab (4) is located the power box (3) top surface, power box (3) left side wall fixed mounting has thrust unit stores pylon (2), install on thrust unit stores pylon (2) and hang thrust unit (1), power box (3) right side is provided with standard case (6), standard case (6) right side is provided with water conservancy diversion case (7), water conservancy diversion case (7) top surface sets up loadable fixed pile equipment (8), all be provided with coupling assembling between power box (3), standard case (6) and water conservancy diversion case (7).
2. The steel buoyancy tank combination platform for water work according to claim 1, wherein: the power box (3) is internally provided with a power system (18), an anchor pile system (5), a hydraulic pump station (20) and a fuel tank (21).
3. The steel buoyancy tank combination platform for water work according to claim 1, wherein: the standard box (6) comprises a deck (11) and a bottom plate (12), a plurality of side plates (13) are fixedly connected between the deck (11) and the bottom plate (12), and end plates (14) are respectively and fixedly connected to four side walls of the deck (11) and the bottom plate (12).
4. The steel buoyancy tank combination platform for water work according to claim 1, wherein: the movable springboard (10) is movably connected to the position, close to the top surface, of the right side wall of the flow guide box (7), the springboard lifting device (9) is installed to the position, close to the right side, of the top surface of the flow guide box (7), the right side wall of the flow guide box (7) is of a wedge-shaped structure, and a plurality of cabin mouth rings (22) are fixedly connected to the top surface of the flow guide box (7).
5. The steel buoyancy tank combination platform for water work according to claim 1, wherein: the connecting assembly comprises a plurality of single lugs (15), the single lugs (15) are respectively and fixedly connected to the left side walls of the power box (3), the standard box (6) and the guide box (7), the right side walls of the power box (3), the standard box (6) and the guide box (7) are respectively and fixedly connected with double lugs (16), and an inserting shaft (17) is inserted between the single lugs (15) and the double lugs (16).
6. The steel buoyancy tank combination platform for water work according to claim 4, wherein: a plurality of ground bells (19) are movably arranged around the hatch ring (22).
CN202223077898.1U 2022-11-21 2022-11-21 Steel buoyancy tank combined platform for water operation Active CN219192511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223077898.1U CN219192511U (en) 2022-11-21 2022-11-21 Steel buoyancy tank combined platform for water operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223077898.1U CN219192511U (en) 2022-11-21 2022-11-21 Steel buoyancy tank combined platform for water operation

Publications (1)

Publication Number Publication Date
CN219192511U true CN219192511U (en) 2023-06-16

Family

ID=86703033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223077898.1U Active CN219192511U (en) 2022-11-21 2022-11-21 Steel buoyancy tank combined platform for water operation

Country Status (1)

Country Link
CN (1) CN219192511U (en)

Similar Documents

Publication Publication Date Title
US6450734B1 (en) Transportation underwater tunnel system
CN111877401A (en) Underwater traffic tunnel
CN108755644B (en) Transfer platform for cable traction in intertidal zone login and installation method thereof
GB2199791A (en) Method and apparatus for manoeuvering a superstructure element relative to a fixed construction arranged in water
CN104532876A (en) Deep see immersed type tunnel based on rigidity carrier
CN219192511U (en) Steel buoyancy tank combined platform for water operation
CN214401781U (en) Gripping mechanism suitable for large-tonnage underwater steel pipe pile clearing device
CN109244942A (en) A kind of dedicated floating body platform of River Network transmission line construction
CN206278238U (en) A kind of filling station system waterborne
CN116039853A (en) Steel buoyancy tank combined platform for water operation
CN216194417U (en) Steel assembled bottomless unloading caisson wharf structure
CN214401783U (en) Buoyancy tank platform suitable for large-tonnage underwater steel pipe pile clearing device
CN115744675A (en) Large member hoisting equipment for offshore shallow water area and hoisting method thereof
CN215205301U (en) Sunken ship fishing tool in navigation tunnel
CN112609695B (en) Large-tonnage underwater steel pipe pile removing device and construction method
CN212267797U (en) Quick launching system of boats and ships in dock
CN209492679U (en) A kind of dedicated floating body platform of River Network transmission line construction
EP4079620A1 (en) Offshore floating island
GB2114195A (en) Marine railroad
CN216739456U (en) Wharf construction device
CN201358438Y (en) Floating shore connection device
CN201095571Y (en) Door type floating crane
Michael et al. Fast-Constructed Marine and Port Structures
RU2784097C1 (en) Temporary crossing ferry