CN219175856U - Building construction template anchor clamps - Google Patents
Building construction template anchor clamps Download PDFInfo
- Publication number
- CN219175856U CN219175856U CN202223273313.3U CN202223273313U CN219175856U CN 219175856 U CN219175856 U CN 219175856U CN 202223273313 U CN202223273313 U CN 202223273313U CN 219175856 U CN219175856 U CN 219175856U
- Authority
- CN
- China
- Prior art keywords
- splint
- clamping plate
- hole
- fixing
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to the technical field of construction tools, in particular to a building construction template clamp which comprises a main body, wherein a first fixing mechanism is arranged at the top of the main body, a second fixing mechanism is arranged on the outer surface of the main body, the first fixing mechanism comprises a first clamping plate, a first connecting groove is formed in the side end of the first clamping plate, a first connecting hole is formed in the outer surface of the first clamping plate and communicated with the first connecting groove, a first extension rod is arranged in the first connecting groove, a first fixing hole is formed in the outer surface of the first extension rod, the position of the first fixing hole corresponds to that of the first connecting hole, and a first fixing pin is arranged in the first fixing hole. The utility model has reasonable structure, and can increase the length of the first clamping plate and the second clamping plate according to the specific condition of the building beam when in use, thereby clamping and fixing the building beam and facilitating the construction of the building beam.
Description
Technical Field
The utility model relates to the field of construction tools, in particular to a building construction template clamp.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like.
In the process of building construction, after the steel bar is pricked in pouring of building beam, need install the plank in the outside of steel bar and assist the concrete of pouring at the back to take shape, current anchor clamps splint length can not be adjusted, need increase rectangular billet between splint and building beam when carrying out the centre gripping to building beam and improve the atress between anchor clamps and the building beam, but the plank of centre gripping has the problem that drops at the in-process of construction, leads to partial anchor clamps not to play the fixed effect of using.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a building construction template clamp.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a construction template anchor clamps, includes the main part, first fixed establishment is installed at the top of main part, the second fixed establishment is installed to the surface of main part, first fixed establishment includes first splint, first spread groove has been seted up to the side of first splint, first connecting hole has been seted up to the surface of first splint, and first connecting hole is linked together with first spread groove, the internally mounted of first spread groove has first extension rod, first fixed orifices has been seted up to the surface of first extension rod, the position of first fixed orifices corresponds with the position of first connecting hole, the internally mounted of first fixed orifices has first fixed pin.
As a further description of the above technical solution:
the main part includes the metal pole, first splint are fixed at the top of metal pole, the draw-in groove has been seted up to the surface of metal pole, the inside swing joint of draw-in groove has the wedge.
As a further description of the above technical solution:
the second fixing mechanism comprises a second clamping plate, a mounting hole is formed in the second clamping plate, the metal rod is located in the mounting hole, and the upper surface of the wedge-shaped block is attached to the inner surface of the mounting hole.
As a further description of the above technical solution:
the side of second splint has seted up the second spread groove, the surface of second splint has seted up the second connecting hole, the second connecting hole is linked together with the second spread groove.
As a further description of the above technical solution:
the second connecting groove is internally provided with a second extension rod, and the outer surface of the second extension rod is provided with a second fixing hole.
As a further description of the above technical solution:
the position of the second fixing hole corresponds to the position of the second connecting hole, and a second fixing pin is arranged in the second fixing hole.
As a further description of the above technical solution:
the second clamping plate is positioned below the first clamping plate.
As a further description of the above technical solution:
the structure of the metal rod is a flat strip-shaped structure.
The utility model has the following beneficial effects:
1. compared with the prior art, this building construction template clamp, through first fixed establishment and second fixed establishment, make the device can increase the length of first splint and second splint through the installation extension rod when using, make the device can be to the better applied pressure of building beam structure of being under construction, compare in conventional anchor clamps splint length can not adjust, need increase rectangular billet between splint and building beam when carrying out the centre gripping to the building beam and improve the atress between anchor clamps and the building beam, but the problem that drops exists in the plank of centre gripping of in-process of construction, result in partial anchor clamps not playing the fixed effect of using, the device can be according to the specific condition increase first splint of building beam and the length of second splint, thereby carry out the centre gripping to the building beam and fix, the building beam of being convenient for is under construction.
2. Compared with the prior art, this building construction template anchor clamps through draw-in groove, wedge for the device can be through beating the wedge when using, lets the wedge move forward in the draw-in groove, fixes the second splint of installing on the metal pole, avoids the second splint to appear not hard up problem in the work progress.
Drawings
FIG. 1 is a schematic view of a first view overall structure of a construction formwork clamp according to the present utility model;
FIG. 2 is a cross-sectional view of the internal structure of a construction formwork clamp according to the present utility model;
FIG. 3 is a schematic view of the overall structure of a second view of a formwork clamp for construction of the present utility model;
fig. 4 is a schematic diagram of the overall structure of a third view angle of the formwork clamp for building construction according to the present utility model.
Legend description:
1. a main body; 101. a metal rod; 102. a clamping groove; 103. wedge blocks; 2. a first fixing mechanism; 201. a first clamping plate; 202. a first connection groove; 203. a first connection hole; 204. a first extension rod; 205. a first fixing hole; 206. a first fixing pin; 3. a second fixing mechanism; 301. a second clamping plate; 302. a mounting hole; 303. a second connecting groove; 304. a second connection hole; 305. a second extension rod; 306. a second fixing hole; 307. and a second fixing pin.
Detailed Description
Referring to fig. 1-4, the present utility model provides a construction template clamp: including main part 1, first fixed establishment 2 is installed at the top of main part 1, second fixed establishment 3 is installed to the surface of main part 1, promote second fixed establishment 3 forward during the use, fix the plank of building roof beam surface through second fixed establishment 3 and first fixed establishment 2, reach the effect of supplementary building roof beam pouring, first fixed establishment 2 includes first splint 201, first spread groove 202 has been seted up to the side of first splint 201, first connecting hole 203 has been seted up to the surface of first splint 201, and first connecting hole 203 is linked together with first connecting groove 202, first extension rod 204 has been seted up to the internally mounted of first connecting groove 202, first fixed hole 205 has been seted up to the surface of first extension rod 204, the position of first fixed hole 205 corresponds with the position of first connecting hole 203, the internally mounted of first fixed hole 205 has first fixed pin 206, insert the inside of first extension rod 204 to first connecting groove 202, adjust the position of first extension rod 204, let first connecting hole 203 and first fixed hole 205 align, afterwards insert first extension rod 206 and first extension rod 201 and accomplish the extension of first splint 201.
The main part 1 includes metal pole 101, and first splint 201 is fixed at the top of metal pole 101, and draw-in groove 102 has been seted up to the surface of metal pole 101, and the inside swing joint of draw-in groove 102 has wedge 103, can let wedge 103 move forward in draw-in groove 102 when using through beating wedge 103, fixes the second splint 301 of installing on metal pole 101, avoids second splint 301 to appear not hard up problem in the work progress, and the construction is accomplished the back and is exposed outside part through beating wedge 103, alright take out wedge 103.
The second fixing mechanism 3 comprises a second clamping plate 301, a mounting hole 302 is formed in the second clamping plate 301, the metal rod 101 is located in the mounting hole 302, the second clamping plate 301 is convenient to move on the metal rod 101, a wood board outside a building beam is convenient to install, the upper surface of the wedge-shaped block 103 is attached to the inner surface of the mounting hole 302, a second connecting groove 303 is formed in the side end of the second clamping plate 301, a second connecting hole 304 is formed in the outer surface of the second clamping plate 301, the second connecting hole 304 is communicated with the second connecting groove 303, a second extension rod 305 is mounted in the second connecting groove 303, a second fixing hole 306 is formed in the outer surface of the second extension rod 305, the position of the second fixing hole 306 corresponds to the position of the second connecting hole 304, a second fixing pin 307 is mounted in the second fixing hole 306, during use, the second extension rod 305 is inserted into the second connecting groove 303, the position of the second extension rod 305 is adjusted, the second connecting hole 304 is aligned with the second fixing hole 306, then the second extension rod 307 is inserted into the second fixing pin 307, and the second clamping plate 301 is fixed by the second fixing pin 301.
The second clamping plate 301 is located below the first clamping plate 201, and the metal rod 101 is of a flat strip-shaped structure, so that the device is convenient to use.
Working principle: during the use, through first fixed establishment 2 and second fixed establishment 3 for the device can increase the length of first splint 201 and second splint 301 through the installation extension rod when using, make the device can be to the better exerting pressure of building beam structure of being under construction, compare in conventional anchor clamps splint length can not adjust, need increase rectangular billet between splint and building beam when carrying out the centre gripping to the building beam and improve the atress between anchor clamps and the building beam, but the plank of centre gripping has the problem that drops at the in-process of construction, result in partial anchor clamps not playing the fixed effect of using, the device can be according to the concrete circumstances of building beam increase the length of first splint 201 and second splint 301, thereby carry out the centre gripping to the building beam and fix, the building beam of being convenient for is under construction.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.
Claims (8)
1. Building construction template anchor clamps, including main part (1), its characterized in that: the utility model discloses a fixing device for a bicycle, including main part (1), first fixed establishment (2) are installed at the top of main part (1), second fixed establishment (3) are installed to the surface of main part (1), first fixed establishment (2) include first splint (201), first spread groove (202) have been seted up to the side of first splint (201), first connecting hole (203) have been seted up to the surface of first splint (201), and first connecting hole (203) are linked together with first spread groove (202), the internally mounted of first spread groove (202) has first extension pole (204), first fixed orifices (205) have been seted up to the surface of first extension pole (204), the position of first fixed orifices (205) corresponds with the position of first connecting hole (203), internally mounted of first fixed orifices (205) has first fixed pin (206).
2. A construction formwork clamp as claimed in claim 1, wherein: the main body (1) comprises a metal rod (101), the first clamping plate (201) is fixed at the top of the metal rod (101), a clamping groove (102) is formed in the outer surface of the metal rod (101), and a wedge-shaped block (103) is movably connected inside the clamping groove (102).
3. A construction formwork clamp as claimed in claim 2, wherein: the second fixing mechanism (3) comprises a second clamping plate (301), a mounting hole (302) is formed in the second clamping plate (301), the metal rod (101) is located in the mounting hole (302), and the upper surface of the wedge-shaped block (103) is attached to the inner surface of the mounting hole (302).
4. A construction formwork clamp as claimed in claim 3, wherein: the side of second splint (301) has seted up second spread groove (303), second connecting hole (304) have been seted up to the surface of second splint (301), second connecting hole (304) are linked together with second spread groove (303).
5. A construction formwork clamp as defined in claim 4, wherein: and a second extension rod (305) is arranged in the second connecting groove (303), and a second fixing hole (306) is formed in the outer surface of the second extension rod (305).
6. A construction formwork clamp as defined in claim 5, wherein: the position of the second fixing hole (306) corresponds to the position of the second connecting hole (304), and a second fixing pin (307) is installed inside the second fixing hole (306).
7. A construction formwork clamp as claimed in claim 3, wherein: the second clamping plate (301) is positioned below the first clamping plate (201).
8. A construction formwork clamp as claimed in claim 2, wherein: the metal rod (101) is of a flat strip-shaped structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223273313.3U CN219175856U (en) | 2022-12-07 | 2022-12-07 | Building construction template anchor clamps |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223273313.3U CN219175856U (en) | 2022-12-07 | 2022-12-07 | Building construction template anchor clamps |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219175856U true CN219175856U (en) | 2023-06-13 |
Family
ID=86665333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223273313.3U Active CN219175856U (en) | 2022-12-07 | 2022-12-07 | Building construction template anchor clamps |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219175856U (en) |
-
2022
- 2022-12-07 CN CN202223273313.3U patent/CN219175856U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN219175856U (en) | Building construction template anchor clamps | |
CN218320344U (en) | Steel construction stand hoist and mount construction alignment device | |
CN216042637U (en) | Embedded part for electric embedded pipe | |
CN216664970U (en) | Aluminum alloy wall template convenient to embedded steel bar | |
CN210597642U (en) | Anchor bar invisible structure | |
CN211143754U (en) | Supporting structure for aluminum template | |
CN211396605U (en) | Adjustable template reinforcing apparatus | |
CN209144820U (en) | Plate device for side wall gunite concrete with mould rapid construction | |
CN211775765U (en) | Novel beam clamp | |
CN216196610U (en) | Integral fixture for beam side wall | |
CN215859091U (en) | Aluminum-wood combined clamp | |
CN212534648U (en) | Point-connection type built-in heat-preservation composite shear wall tie assembly | |
CN219509161U (en) | Concrete placement formwork device and wall system | |
CN215291491U (en) | Quick mounting fixture of both sides wood | |
CN218264003U (en) | Basement external wall panel horizontal construction joint formwork structure | |
CN220599139U (en) | Pre-buried adjustable easy installation even wall spare instrument | |
CN215858678U (en) | Cornice and roof connecting structure | |
CN218758735U (en) | Beam column template reinforcing apparatus | |
CN202969929U (en) | Corner clamp for building operations | |
CN219952768U (en) | Leveling device suitable for assembled large-span prestressed hollow slab | |
CN214532051U (en) | Steel member for reinforcing beam bottom | |
CN218479548U (en) | Assembled side form reinforcing fastener | |
CN217580826U (en) | Prefabricated constructional column | |
CN212613710U (en) | Shear wall structure building of construction steel bar formwork concrete | |
CN217461489U (en) | Building concrete outer wall or roof beam template top are with consolidating anchor clamps |