CN212613710U - Shear wall structure building of construction steel bar formwork concrete - Google Patents

Shear wall structure building of construction steel bar formwork concrete Download PDF

Info

Publication number
CN212613710U
CN212613710U CN202021225285.6U CN202021225285U CN212613710U CN 212613710 U CN212613710 U CN 212613710U CN 202021225285 U CN202021225285 U CN 202021225285U CN 212613710 U CN212613710 U CN 212613710U
Authority
CN
China
Prior art keywords
steel bar
bar formwork
formwork
block
vertical connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021225285.6U
Other languages
Chinese (zh)
Inventor
骆洋滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021225285.6U priority Critical patent/CN212613710U/en
Application granted granted Critical
Publication of CN212613710U publication Critical patent/CN212613710U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a shear wall structure building of construction steel bar formwork concrete in the technical field of building, which comprises a lower layer steel bar formwork, wherein the left side and the right side of the top surface of the lower layer steel bar formwork are both provided with vertical connecting ribs, the bottom rear end of the vertical connecting ribs is connected with first horizontal steel bars, the top rear end of the vertical connecting ribs is provided with second horizontal steel bars, the top of the vertical connecting ribs is provided with an upper layer steel bar formwork, the middle of the top of the lower layer steel bar formwork is provided with a positioning block, the top of the positioning block is provided with a positioning column, the top of the positioning column is provided with a clamping block, the middle part of the bottom surface of the upper layer steel bar formwork is provided with a stop block, the right end of the upper layer steel bar formwork is provided with an end part formwork, the end part formwork can better fix the lower, the lower steel bar formwork and the upper steel bar formwork deviate due to the pressure of concrete.

Description

Shear wall structure building of construction steel bar formwork concrete
Technical Field
The utility model relates to a building technical field specifically is a shear wall structure building of construction steel bar formwork concrete.
Background
At present, when a concrete shear wall structure building is built, on-site reinforcement arrangement and formwork support are needed, the labor intensity is high, the workload is large, the working efficiency is low, the influence of human factors on the building quality is large, accurate positioning cannot be carried out when the formwork support is temporarily carried out on site, and the quality of a poured wall body is seriously influenced. Therefore, a shear wall structure building of the construction steel bar formwork concrete is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a shear wall structure building of construction steel bar formwork concrete to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a shear wall structure building of building reinforced formwork concrete comprises a lower-layer reinforced formwork, wherein vertical connecting ribs are arranged on the left side and the right side of the surface of the top of the lower-layer reinforced formwork, fixing rods are arranged on the two sides of the bottom of each vertical connecting rib, a first horizontal steel bar is connected to the rear end of the bottom of each vertical connecting rib, a middle connecting rib is arranged in the middle of each vertical connecting rib, a sleeve is arranged on the upper portion of each middle connecting rib, an anchor bar is arranged on the top of each sleeve, a second horizontal steel bar is arranged at the rear end of the top of each vertical connecting rib, an upper-layer reinforced formwork is arranged on the top of each vertical connecting rib, a positioning block is arranged in the middle of the top of the lower-layer reinforced formwork, a positioning column is arranged at the top of each positioning block, web member steel bars are arranged on the, the bottom surface middle part of upper steel bar formwork is provided with the dog, the middle part of dog is provided with the draw-in groove, the right-hand member of upper steel bar formwork is provided with the tip template, the left side middle part of tip template is provided with the edge connection muscle.
Preferably, the top left side of tip template is provided with the cantilever, the bottom of going up the cantilever is provided with first fixed block, the top of upper steel bar formwork is provided with the first fixed slot with first fixed block matched with, the bottom left side of tip template is provided with down the cantilever, the top of stretching out the arm down is provided with the second fixed block, the bottom of lower floor's steel bar formwork is provided with the second fixed slot with second fixed block matched with.
Preferably, the upper half parts of the two sides of the connecting block are provided with inclined planes, and a trapezoidal groove matched with the inclined planes is arranged in the middle of the bottom of the stop block.
Preferably, the stop block is fixedly connected to the bottom of the upper-layer steel bar formwork, and the depth of the clamping groove formed in the middle of the stop block is consistent with the thickness of the clamping block.
Preferably, the right end of the edge connecting rib is fixedly connected to the middle of the left side of the end portion template, and the left end of the edge connecting rib is connected with the middle of the vertical connecting rib.
Preferably, the positioning block is fixedly connected to the top of the lower layer steel bar formwork, and a placing groove matched with the positioning block is formed in the top of the lower layer steel bar formwork.
Compared with the prior art, the beneficial effects of the utility model are that: at first, install lower floor's steel bar formwork, after lower floor's steel bar formwork is fixed to be accomplished, when installing upper steel bar formwork, upper steel bar formwork's bottom is provided with the dog, the draw-in groove that the dog middle part set up is connected with the fixture block cooperation, fix a position the reference column and fix, thereby accomplish the location installation to upper steel bar formwork, realize upper steel bar formwork's quick installation, and the work efficiency is improved, the quality that the wall body was pour is improved, tip template carries out better fixed with lower floor's steel bar formwork and upper steel bar formwork, avoid carrying out the concrete placement in-process, lower floor's steel bar formwork and upper steel bar formwork produce the skew because of the pressure of concrete.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
FIG. 3 is a schematic view of the structure of the end portion template of the present invention;
fig. 4 is a schematic structural view of the positioning device of the present invention.
In the figure: 1 lower floor's steel bar formwork, 101 second fixed slot, 2 vertical splice bar, 3 dead levers, 4 first horizontal reinforcing bars, 5 middle part splice bar, 6 sleeves, 7 anchor bars, 8 second horizontal reinforcing bars, 9 upper steel bar formwork, 91 first fixed slot, 10 locating pieces, 11 reference columns, 12 web member reinforcing bars, 13 connecting blocks, 131 inclined planes, 14 fixture blocks, 15 dog, 151 dovetail groove, 16 draw-in grooves, 17 tip templates, stretch out the arm on 171, 172 first fixed block, 173 lower arm, 174 second fixed block, 18 edge joint muscle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a shear wall structure building of building reinforced formwork concrete comprises a lower-layer reinforced formwork 1, wherein vertical connecting ribs 2 are arranged on the left side and the right side of the top surface of the lower-layer reinforced formwork 1, fixing rods 3 are arranged on the two sides of the bottom of each vertical connecting rib 2, a first horizontal reinforcing steel bar 4 is connected to the rear end of the bottom of each vertical connecting rib 2, a middle connecting rib 5 is arranged in the middle of each vertical connecting rib 2, a sleeve 6 is arranged on the upper portion of each middle connecting rib 5, an anchor rib 7 is arranged on the top of each sleeve 6, a second horizontal reinforcing steel bar 8 is arranged on the rear end of the top of each vertical connecting rib 2, an upper-layer reinforced formwork 9 is arranged on the top of each vertical connecting rib 2, when in-situ construction is carried out, the lower-layer reinforced formwork 1 is firstly installed, the vertical connecting ribs 2 are fixed on the top surface of the lower-layer, then the anchor bars 7 are fixedly installed, the first horizontal steel bars 4 and the second horizontal steel bars 8 are respectively installed at the rear end of the bottom and the rear end of the upper portion of the vertical connecting bar 2, finally the upper layer steel bar formwork 9 is installed, the positioning block 10 is arranged in the middle of the top of the lower layer steel bar formwork 1, the positioning column 11 is arranged at the top of the positioning block 10, the web member steel bars 12 are arranged at the rear portion of the positioning column 11, the connecting block 13 is arranged at the top of the positioning column 11, the clamping block 14 is arranged at the top of the connecting block 13, the stop block 15 is arranged in the middle of the bottom surface of the upper layer steel bar formwork 9, the clamping groove 16 is arranged in the middle of the stop block 15, the clamping groove 16 is matched and connected with the clamping block 14 to position and fix the positioning column 11, so as to finish the positioning and installation of the upper layer steel, realize upper steel bar formwork 9's quick installation, improve work efficiency, upper steel bar formwork 9's right-hand member is provided with tip template 17, tip template 17's left side middle part is provided with edge connection muscle 18, tip template 17 carries out lower floor's steel bar formwork 1 and upper steel bar formwork 9 better fixed, prevents to carry out the concrete placement in-process, lower floor's steel bar formwork 1 and upper steel bar formwork 9 produce the skew because the pressure of concrete, influence the quality of wall body building.
Wherein, the left side of the top of the end part template 17 is provided with an upper extension arm 171, the bottom of the upper extension arm 171 is provided with a first fixed block 172, the top of the upper layer steel bar template 9 is provided with a first fixed slot 91 matched with the first fixed block 172, the left side of the bottom of the end part template 17 is provided with a lower extension arm 173, the top of the lower extension arm 173 is provided with a second fixed block 174, the bottom of the lower layer steel bar template 1 is provided with a second fixed slot 101 matched with the second fixed block 172, firstly, the second fixed slot 101 arranged on the lower layer steel bar template 1 is paired with the second fixed block 174, the lower layer steel bar template 1 is moved downwards, the second fixed slot 101 is clamped with the second fixed block 174, the lower layer steel bar template 1 is fixed, then, the first fixed slot 91 arranged on the upper layer steel bar template 9 is paired with the first fixed block 172, the upper layer steel bar template 9 is moved upwards, and the, fixing the upper layer steel bar formwork 9;
the upper half parts of the two sides of the connecting block 13 are respectively provided with an inclined surface 131, and the middle part of the bottom of the stop block 15 is provided with a trapezoidal groove 151 matched with the inclined surface 131, so that the connecting block 13 is more easily connected and fixed with the trapezoidal groove 151, and the positioning and mounting efficiency of the upper layer template 9 is improved;
the stop block 15 is fixedly connected to the bottom of the upper-layer steel bar formwork 9, and the depth of a clamping groove 16 formed in the middle of the stop block 15 is consistent with the thickness of the clamping block 14;
the right end of the edge connecting rib 18 is fixedly connected to the middle of the left side of the end part template 17, and the left end is connected with the middle of the vertical connecting rib 2;
locating piece 10 fixed connection is at the top of lower floor's steel bar formwork 1, and the top of lower floor's steel bar formwork 1 is provided with the standing groove with locating piece 10 matched with, fixes locating piece 10 better, makes locating piece 10 carry out the skew can not appear in the positioning process simultaneously.
The working principle is as follows: when the on-site construction is carried out, firstly, a lower layer steel bar formwork 1 is installed, a vertical connecting bar 2 is installed, the vertical connecting bar 2 is fixed on the top surface of the lower layer steel bar formwork 1 through a fixing rod 3, then a middle connecting bar 5 is installed in the middle of the vertical connecting bar 2, then an anchor bar 7 is fixedly installed, a first horizontal steel bar 4 and a second horizontal steel bar 8 are respectively installed at the rear end of the bottom and the rear end of the upper part of the vertical connecting bar 2, finally, an upper layer steel bar formwork 9 is installed, when the upper layer steel bar formwork 9 is installed, a stop block 15 is arranged at the bottom of the upper layer steel bar formwork 9, a clamping groove 16 arranged in the middle of the stop block 15 is matched and connected with a clamping block 14, a positioning column 11 is positioned and fixed, so that the positioning installation of the upper layer steel bar formwork 9 is completed, the quick installation of the upper layer steel bar formwork 9 is realized, the working efficiency is improved, the lower layer steel bar, prevent to carry out the concrete placement in-process, lower floor's steel bar formwork 1 and upper steel bar formwork 9 are because the pressure of concrete produces the skew, influence the quality of wall body building.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a shear wall structure building of construction steel bar formwork concrete, includes lower floor's steel bar formwork (1), its characterized in that: the steel bar formwork comprises a lower layer steel bar formwork (1), wherein vertical connecting ribs (2) are arranged on the left side and the right side of the top surface of the lower layer steel bar formwork (1), fixing rods (3) are arranged on the two sides of the bottom of each vertical connecting rib (2), the rear end of the bottom of each vertical connecting rib (2) is connected with a first horizontal steel bar (4), a middle connecting rib (5) is arranged in the middle of each vertical connecting rib (2), a sleeve (6) is arranged on the upper portion of each middle connecting rib (5), an anchor rib (7) is arranged at the top of each sleeve (6), a second horizontal steel bar (8) is arranged at the rear end of the top of each vertical connecting rib (2), an upper layer steel bar formwork (9) is arranged at the top of each vertical connecting rib (2), a positioning block (10) is arranged in the middle of the top of the lower layer steel bar formwork (1), a positioning column (11, the top of reference column (11) is provided with connecting block (13), the top of connecting block (13) is provided with fixture block (14), the bottom surface middle part of upper steel bar formwork (9) is provided with dog (15), the middle part of dog (15) is provided with draw-in groove (16), the right-hand member of upper steel bar formwork (9) is provided with tip template (17), the left side middle part of tip template (17) is provided with edge connection muscle (18).
2. A shear wall structure building of construction reinforced form concrete according to claim 1, wherein: the top left side of tip template (17) is provided with cantilever arm (171), the bottom of going up cantilever arm (171) is provided with first fixed block (172), the top of upper steel bar formwork (9) is provided with first fixed block (172) matched with first fixed slot (91), the bottom left side of tip template (17) is provided with down cantilever arm (173), the top of cantilever arm (173) is provided with second fixed block (174) down, the bottom of lower floor's steel bar formwork (1) is provided with second fixed block (174) matched with second fixed slot (101).
3. A shear wall structure building of construction reinforced form concrete according to claim 1, wherein: the upper half parts of the two sides of the connecting block (13) are both provided with inclined planes (131), and a trapezoidal groove (151) matched with the inclined planes (131) is arranged in the middle of the bottom of the stop block (15).
4. A shear wall structure building of construction reinforced form concrete according to claim 1, wherein: the stop block (15) is fixedly connected to the bottom of the upper-layer steel bar formwork (9), and the depth of a clamping groove (16) formed in the middle of the stop block (15) is consistent with the thickness of the clamping block (14).
5. A shear wall structure building of construction reinforced form concrete according to claim 1, wherein: the right end of the edge connecting rib (18) is fixedly connected to the middle of the left side of the end portion template (17), and the left end of the edge connecting rib is connected with the middle of the vertical connecting rib (2).
6. A shear wall structure building of construction reinforced form concrete according to claim 1, wherein: the positioning blocks (10) are fixedly connected to the top of the lower layer steel bar formwork (1), and placing grooves matched with the positioning blocks (10) are formed in the top of the lower layer steel bar formwork (1).
CN202021225285.6U 2020-06-29 2020-06-29 Shear wall structure building of construction steel bar formwork concrete Active CN212613710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021225285.6U CN212613710U (en) 2020-06-29 2020-06-29 Shear wall structure building of construction steel bar formwork concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021225285.6U CN212613710U (en) 2020-06-29 2020-06-29 Shear wall structure building of construction steel bar formwork concrete

Publications (1)

Publication Number Publication Date
CN212613710U true CN212613710U (en) 2021-02-26

Family

ID=74743255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021225285.6U Active CN212613710U (en) 2020-06-29 2020-06-29 Shear wall structure building of construction steel bar formwork concrete

Country Status (1)

Country Link
CN (1) CN212613710U (en)

Similar Documents

Publication Publication Date Title
CN104895279A (en) Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN111472540A (en) Integrated formwork system suitable for concrete pouring of pool wall and construction method thereof
CN110700319A (en) Comprehensive pipe gallery is with unilateral formwork frock
CN212613710U (en) Shear wall structure building of construction steel bar formwork concrete
CN212642115U (en) Clear water concrete indent arc roofing inner side roof beam hangs mould system
CN203640278U (en) Stair construction die shelf
CN113685024A (en) Frame post template strutting arrangement
CN107313587A (en) The template fixed system and the construction method of waterproof construction of buildings waterproof structure
CN109252879A (en) A kind of vcehicular tunnel gutter liner tool-typed formwork and construction method
CN214656409U (en) Bridge deck pavement formwork support and mounting tool
CN211057855U (en) Comprehensive pipe gallery is with unilateral formwork frock
CN213359377U (en) Building templates support frame
CN212002272U (en) Bidirectional adjustable frame beam template clamp structure
CN114837404A (en) Sunken type falling plate pouring mold and pouring method
CN213710401U (en) Can dismantle bottom plate support of steel bar quilting frame building carrier plate
CN211171938U (en) Quick distance instrument of stake owner muscle
CN209780242U (en) novel building modular fixture
CN210597642U (en) Anchor bar invisible structure
CN209163831U (en) A kind of vcehicular tunnel gutter liner tool-typed formwork
CN203213595U (en) Cast-in-place concrete fence plate supporting die structure
CN208288860U (en) A kind of apparatus for bending for truss bars concrete folding plate end reinforcing bar
CN112031403A (en) Detachable bottom plate support for steel bar quilting frame floor support plate
CN206233578U (en) Inner corner trim reinforcing template and its formwork system
CN214117527U (en) Wall location reinforcing apparatus is led to aluminum alloy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant