CN219175825U - Building scaffold frame edge protector - Google Patents

Building scaffold frame edge protector Download PDF

Info

Publication number
CN219175825U
CN219175825U CN202320286694.4U CN202320286694U CN219175825U CN 219175825 U CN219175825 U CN 219175825U CN 202320286694 U CN202320286694 U CN 202320286694U CN 219175825 U CN219175825 U CN 219175825U
Authority
CN
China
Prior art keywords
sides
shell
personnel
frame
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320286694.4U
Other languages
Chinese (zh)
Inventor
郑智元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320286694.4U priority Critical patent/CN219175825U/en
Application granted granted Critical
Publication of CN219175825U publication Critical patent/CN219175825U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to the technical field of building scaffolds, in particular to a building scaffold edge protection device, which solves the problems that in the prior art, if a worker needs to spend more time in the process of assembling the edge protection device, the use burden of the worker on the device is possibly increased, the learning use cost is increased for new workers, and convenience is reduced for the workers. The utility model provides a building scaffold frame edge protector, includes the protection frame, and the both sides of protection frame all are provided with two montants, and the jack has all been seted up to the both sides of the both sides outer wall of protection frame, and the both sides of the one side outer wall of montant are all fixedly connected with shell. The utility model can enable personnel to more rapidly carry out assembly and use operations in the assembly process of the device, saves the time of the personnel for assembling the device, reduces the learning and use cost of new personnel and provides a convenient and comfortable use mode.

Description

Building scaffold frame edge protector
Technical Field
The utility model relates to the technical field of building scaffolds, in particular to a building scaffold edge protection device.
Background
The scaffold is a working platform which is erected to ensure that each construction process is carried out smoothly. The scaffold is divided into an outer scaffold and an inner scaffold according to the set-up positions; the wooden scaffold, the bamboo scaffold and the steel pipe scaffold can be divided according to different materials; the construction forms of the scaffold are upright type scaffold, bridge type scaffold, door type scaffold, suspension type scaffold, hanging type scaffold, picking type scaffold and climbing type scaffold. The scaffold has a certain height influence, and personnel can selectively match with the edge protection device to remove a part of potential safety hazards caused by high-altitude operation.
In the actual process that personnel used edge protector, in order to make things convenient for personnel to carry edge protector, personnel can dismantle edge protector, transport to use place after again assemble and use, if under the circumstances that the staff needs to spend more time at equipment edge protector in-process, probably can lead to personnel to increase to the use burden of device, to novice personnel, study use cost also will follow the improvement, provide the convenience for the personnel and can reduce, and this provides a building scaffold edge protector.
Disclosure of Invention
The utility model aims to provide a building scaffold edge protection device, which solves the problems that in the prior art, if a worker needs to spend more time in the process of assembling the edge protection device, the use burden of the worker on the device is possibly increased, the learning use cost is also increased for new workers, and convenience is reduced for the workers.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a building scaffold frame edge protector, includes the protection frame, the both sides of protection frame all are provided with two montants, the jack has all been seted up to the both sides of the both sides outer wall of protection frame, the equal fixedly connected with shell in both sides of one side outer wall of montant, the inner chamber level of shell is provided with the inserted bar, the one end of inserted bar runs through adjacent montant lateral wall and peg graft mutually with corresponding jack, the other end of inserted bar runs through adjacent shell lateral wall and extends to one side of shell.
Preferably, the buckle is all fixedly connected with in both sides of one side outer wall of montant, the spacing groove has been seted up to one side of buckle, four corners of one side surface of protection frame offset with adjacent spacing groove inside wall respectively.
Preferably, a metal net is installed in the inner cavity of the protective outer frame.
Preferably, the outer ring of the inserted link and the inner cavity positioned on the shell are sleeved with the baffle plates, the outer ring of the inserted link is provided with the springs, and one side of each baffle plate is elastically connected with the inner side wall of the adjacent shell through the springs.
Preferably, one end of the spring is fixedly connected with one side of the baffle plate, the other end of the spring is fixedly connected with the inner wall of one side of the shell, and the other side of the baffle plate abuts against one side of the vertical rod.
Preferably, the end of the inserted bar far away from the vertical rod is fixedly connected with an anti-slip cap.
The utility model has at least the following beneficial effects:
when personnel use, personnel accessible bolt etc. other modes are fixed montant and scaffold frame, then personnel can place the protective outer frame between two montants, make four corners of protective outer frame all get into adjacent spacing inslot, reach preliminary fixed spacing effect, personnel pulling inserted bar later, make the inner chamber of spacing groove do not have any hindrance, promote protective outer frame thoroughly get into spacing groove inner chamber, personnel unclamp the inserted bar afterwards, receive the elasticity influence of spring, the effort of spring is passed to on the separation blade, transmit to on the inserted bar via the separation blade, cause the inserted bar to resume initial position, and then make the inserted bar get into inside the adjacent jack, reach perfect spacing effect to the protective outer frame, through structural design, make personnel assemble the operation in the equipment in-process to the device more fast, personnel's time of equipment has been saved, new personnel staff study use cost has been reduced, convenient comfortable use mode has been provided, potential safety hazard under the personnel high altitude construction has been reduced.
The utility model also has the following beneficial effects:
through the setting of montant, guaranteed the balanced state of protection frame, through the setting of metal mesh, the cooperation protects the frame, strengthens the protective capacities to personnel under the high altitude construction state, through the setting of spring for under the circumstances that someone was not pulling the inserted bar, inserted bar and jack inseparable are connected, through the setting of separation blade, make the effort of spring can transmit to on the inserted bar, through the setting of anti-skidding cap, reduced the circumstances that personnel pulling the inserted bar was slipped.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings required for the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the protective outer frame of the present utility model;
fig. 3 is a cross-sectional view of the housing of the present utility model.
In the figure: 1. a vertical rod; 2. a protective outer frame; 3. a metal mesh; 4. a buckle; 5. a housing; 6. a limit groove; 7. a rod; 8. a spring; 9. a baffle; 10. an anti-slip cap; 11. and a jack.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Referring to fig. 1-3, a building scaffold frame edge protector, including protecting the frame 2, protecting the both sides of frame 2 and all being provided with two montants 1, jack 11 has all been seted up to the both sides of protecting the both sides outer wall of frame 2, the equal fixedly connected with shell 5 of both sides of one side outer wall of montant 1, the inner chamber level of shell 5 is provided with inserted bar 7, the one end of inserted bar 7 runs through adjacent montant 1 lateral wall and corresponding jack 11 looks grafting, the other end of inserted bar 7 runs through adjacent shell 5 lateral wall and extends to one side of shell 5, specifically, when personnel use, personnel's accessible bolt other modes are fixed montant 1 and scaffold, then personnel can place protecting the frame 2 between two montants 1, make four corners of protecting the frame 2 all get into adjacent spacing inslot 6, reach preliminary fixed spacing effect, personnel later stimulate inserted bar 7, make the inner chamber of spacing groove 6 not have any hindrance, promote protecting the frame 2 thoroughly get into spacing inslot 6 inner chamber, personnel loosen inserted bar 7 afterwards, receive spring 8's elasticity influence, on the baffle 9 runs through adjacent shell 5 lateral wall and extends to one side of shell 5, concrete, personnel's accessible bolt other modes are fixed montant 1 and scaffold frame 2 is used to jack 7, the improvement cost is reached to the improvement of the side-by the equipment that can be used to the side of the frame, and the improvement of personnel's side of life-saving, and the equipment is convenient for the improvement, and the personnel's life-saving the cost is high-saving to use, and can use the equipment to the side 11 to the equipment is convenient to use.
The scheme comprises the following working processes:
when personnel use, personnel accessible bolt etc. other modes are fixed montant 1 and scaffold frame, then personnel can place protective outer frame 2 between two montants 1 for four corners of protective outer frame 2 all get into adjacent spacing groove 6's inside, reach preliminary fixed spacing effect, personnel later pulling inserted bar 7, make the inner chamber of spacing groove 6 do not have any hindrance, promote protective outer frame 2 thoroughly get into spacing groove 6 inner chamber, then personnel loosen inserted bar 7, receive spring 8's elasticity influence, spring 8's effort is transmitted to on the separation blade 9, on the separation blade 9 transmits to inserted bar 7 via separation blade 9, cause inserted bar 7 to resume initial position, and then make inserted bar 7 get into adjacent jack 11 inside, reach perfect spacing effect to protective outer frame 2.
The working process can be as follows:
through structural design for personnel can assemble the use operation more fast to the equipment in-process of device, saved personnel at the time to the equipment, reduced new personnel staff and learn use cost, provided convenient comfortable use, reduced the potential safety hazard under the personnel high altitude construction.
Further, the buckle 4 is fixedly connected to both sides of one side outer wall of the vertical rod 1, the limit groove 6 is formed in one side of the buckle 4, four corners of one side surface of the protection outer frame 2 are respectively propped against the inner side wall of the adjacent limit groove 6, and specifically, the balance state of the protection outer frame 2 is guaranteed through the arrangement of the vertical rod 1.
Further, the inner cavity of the protective outer frame 2 is provided with the metal net 3, and specifically, the protective capability of personnel in an overhead working state is enhanced by the arrangement of the metal net 3 and the cooperation of the protective outer frame 2.
Further, the baffle 9 is sleeved on the outer ring of the inserted link 7 and is positioned in the inner cavity of the shell 5, the spring 8 is installed on the outer ring of the inserted link 7, one side of the baffle 9 is elastically connected with the inner side wall of the adjacent shell 5 through the spring 8, and specifically, under the condition that no person pulls the inserted link 7, the inserted link 7 is tightly connected with the jack 11 through the arrangement of the spring 8.
Further, one end of the spring 8 is fixedly connected with one side of the baffle plate 9, the other end of the spring 8 is fixedly connected with the inner wall of one side of the shell 5, the other side of the baffle plate 9 abuts against one side of the vertical rod 1, and specifically, through the arrangement of the baffle plate 9, acting force of the spring 8 can be transmitted to the inserting rod 7.
Further, the one end fixedly connected with slipcap 10 that the montant 1 was kept away from to inserted bar 7, specifically, through the setting of slipcap 10, has reduced the condition that personnel pulled inserted bar 7 and skid.
To sum up: when personnel use, personnel accessible bolt and other modes are fixed montant 1 and scaffold, then personnel can place protective frame 2 between two montants 1, make four corners of protective frame 2 all get into the inside of adjacent spacing groove 6, reach preliminary fixed spacing effect, personnel later stimulate inserted bar 7, make the inner chamber of spacing groove 6 do not have any hindrance, promote protective frame 2 thoroughly get into spacing groove 6 inner chamber, personnel loosen inserted bar 7 afterwards, receive spring 8's elastic influence, spring 8's effort transmission is to on the separation blade 9, transmit to inserted bar 7 via separation blade 9, cause inserted bar 7 to resume to initial position, and then make inserted bar 7 get into inside the jack 11 that is adjacent, reach perfect spacing effect to protective frame 2, through the setting of montant 1, guaranteed protective frame 2's balanced state, through the setting of metal mesh 3, strengthen the guard capacity to personnel under the high altitude construction state, under the circumstances of having no personnel pulling inserted bar 7, make inserted bar 7 and the inseparable connection of separation blade 11, make the effort of personnel through setting up through spring 8, the setting up to the side cap that makes personnel's the equipment cost of having reduced, the personnel's the equipment cost is reduced to use in the equipment that can use in the equipment is convenient to use, personnel's the equipment is convenient to use, the cost is reduced to the equipment is convenient to use, personnel's equipment is convenient to use.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made therein without departing from the spirit and scope of the utility model, which is defined by the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a building scaffold frame edge protector, includes protection frame (2), its characterized in that, the both sides of protection frame (2) all are provided with two montants (1), jack (11) have all been seted up to the both sides of the both sides outer wall of protection frame (2), the both sides of the both sides outer wall of one side of montant (1) are all fixedly connected with shell (5), the inner chamber level of shell (5) is provided with inserted bar (7), the one end of inserted bar (7) runs through adjacent montant (1) lateral wall and peg graft mutually with corresponding jack (11), the other end of inserted bar (7) runs through adjacent shell (5) lateral wall and extends to one side of shell (5).
2. The edge protection device for the building scaffold according to claim 1, wherein two sides of one side outer wall of the vertical rod (1) are fixedly connected with buckles (4), one side of each buckle (4) is provided with a limiting groove (6), and four corners of one side surface of the protection outer frame (2) are respectively propped against the inner side walls of the adjacent limiting grooves (6).
3. A building scaffolding edge protection device according to claim 1, characterized in that the inner cavity of the protective casing (2) is fitted with a metal mesh (3).
4. The edge protection device for the building scaffold according to claim 1, wherein a baffle (9) is sleeved on the outer ring of the inserted link (7) and positioned in the inner cavity of the shell (5), a spring (8) is installed on the outer ring of the inserted link (7), and one side of the baffle (9) is elastically connected with the inner side wall of the adjacent shell (5) through the spring (8).
5. The edge protection device for the building scaffold according to claim 4, wherein one end of the spring (8) is fixedly connected with one side of the baffle plate (9), the other end of the spring (8) is fixedly connected with one side inner wall of the shell (5), and the other side of the baffle plate (9) is propped against one side of the vertical rod (1).
6. The edge protection device for the building scaffold according to claim 1, wherein an anti-slip cap (10) is fixedly connected to one end of the inserted link (7) away from the vertical bar (1).
CN202320286694.4U 2023-02-22 2023-02-22 Building scaffold frame edge protector Active CN219175825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320286694.4U CN219175825U (en) 2023-02-22 2023-02-22 Building scaffold frame edge protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320286694.4U CN219175825U (en) 2023-02-22 2023-02-22 Building scaffold frame edge protector

Publications (1)

Publication Number Publication Date
CN219175825U true CN219175825U (en) 2023-06-13

Family

ID=86676504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320286694.4U Active CN219175825U (en) 2023-02-22 2023-02-22 Building scaffold frame edge protector

Country Status (1)

Country Link
CN (1) CN219175825U (en)

Similar Documents

Publication Publication Date Title
CN219175825U (en) Building scaffold frame edge protector
CN210217098U (en) Improved scaffold
CN205532243U (en) Electric power overhauls with support of ascending a height
CN114082118B (en) High-altitude anti-falling tool and using method
CN214785757U (en) Scaffold frame that building engineering used
CN209780180U (en) Insulating scaffold for power transmission line construction
CN212689494U (en) Construction platform for building construction
CN218375051U (en) Construction platform for interior decoration
CN208456185U (en) A kind of tower crane wall-connecting piece safe walkway
CN221194215U (en) Climbing form safety anti-falling device
CN207749848U (en) A kind of fall arrest construction holder
CN215331396U (en) Supporting frame structure of attached scaffold
CN217680414U (en) Hanging basket for outer wall construction engineering
CN215167761U (en) High scaffold frame of security for construction
CN215711279U (en) Safety protection device for people on tower crane
CN219080920U (en) Scaffold frame that construction was used is taken
CN215926668U (en) Climb frame anti-falling device safety cover
CN217518135U (en) Automatic extending type climbing frame operating platform for building structure
CN217353502U (en) Scaffold pedal
CN215291282U (en) Scaffold frame for building engineering convenient to build
CN214615326U (en) Scaffold for building engineering construction
CN220117726U (en) Ascending ladder for building construction
CN215631411U (en) Quick assembly disassembly scaffold frame is used in construction in room
CN220645108U (en) Construction frame with multiple protections for construction
CN211596451U (en) Hanging flower basket device for bridge construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant