CN219118816U - House building material loading and unloading platform - Google Patents
House building material loading and unloading platform Download PDFInfo
- Publication number
- CN219118816U CN219118816U CN202320151961.7U CN202320151961U CN219118816U CN 219118816 U CN219118816 U CN 219118816U CN 202320151961 U CN202320151961 U CN 202320151961U CN 219118816 U CN219118816 U CN 219118816U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- hook
- building material
- fence
- material loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of loading and unloading, in particular to a house building material loading and unloading platform, wherein a fence is fixedly connected in the middle of the loading and unloading platform; the method is characterized in that: a steel rope is fixedly connected to the middle of the fence; a retention plate is fixedly connected to the end part of the steel rope; a hook is fixedly connected to the middle part of the retention plate; the end part of the hook is fixedly connected with a first empty groove; a stop lever is rotatably connected in the first empty groove; a second empty slot is formed in the middle of the hook; the stop lever is connected with the second empty slot in a sliding way; the step can be when the staff is connected couple and lifting hook, can realize fixing lifting hook and couple through rotating the pin, and then the time that the staff used when fixing the wide circle can be reduced, and then work efficiency when the staff transports building material can be improved.
Description
Technical Field
The utility model belongs to the technical field of loading and unloading, and particularly relates to a house building material loading and unloading platform.
Background
With the continuous development of China, urban construction is continuously perfected, meanwhile, the building industry is continuously developed, the number of high-rise buildings built at present is increased, and meanwhile, building facilities are also continuously perfected along with the continuous development of the industry;
in building construction, a large crane is generally required to transport building materials to a higher platform, and a material loading platform is required to contain and convey the building materials;
when the loading platform is used for conveying building materials, the large crane has larger action amplitude in the hoisting process, so the loading platform and the crane are required to be fixed, the fixing process is complicated, the time of workers is wasted in the fixing process, and the working efficiency is low;
to this end, the utility model provides a loading and unloading platform for house building materials.
Disclosure of Invention
In order to overcome the deficiencies of the prior art, at least one technical problem presented in the background art is solved.
The technical scheme adopted for solving the technical problems is as follows: the utility model relates to a house building material loading platform, which comprises a loading platform, wherein the middle part of the loading platform is fixedly connected with a fence; the method is characterized in that: a steel rope is fixedly connected to the middle of the fence; a retention plate is fixedly connected to the end part of the steel rope; a hook is fixedly connected to the middle part of the retention plate; the end part of the hook is fixedly connected with a first empty groove; a stop lever is rotatably connected in the first empty groove; a second empty slot is formed in the middle of the hook; and the stop lever is in sliding connection with the second empty slot.
Preferably, a chute is formed in the middle of the loading platform; a chute is formed in the middle of the fence; the inside sliding connection of spout has the baffle.
Preferably, a hole groove is formed in the middle of the baffle plate.
Preferably, the middle part of the steel rope is fixedly connected with a wide ring; the wide ring is fixedly connected with a plurality of groups of steel ropes.
Preferably, a limiting rod is arranged in the second empty groove; and the limiting rod is in sliding connection in the second empty groove.
Preferably, the side surface of the fence is fixedly connected with an alarm strip; the warning strips are arranged on the side face of the fence in a plurality of groups.
The beneficial effects of the utility model are as follows:
1. according to the house building material loading and unloading platform, when a worker connects the hook and the lifting hook, the lifting hook and the hook can be fixed by rotating the stop lever, so that the time for fixing a wide circle by the worker can be reduced, and the working efficiency of the worker in conveying building materials can be improved.
2. According to the house building material loading platform, when workers use the loading platform to transport building materials, the situation that the building materials are scattered in the transportation process is reduced, the waste of the building materials is reduced in the transportation process, and building material resources can be saved.
Drawings
The utility model is further described below with reference to the accompanying drawings.
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is an enlarged view at A of FIG. 1;
FIG. 3 is a rear view of the present utility model;
FIG. 4 is a schematic structural view of a gasket according to a second embodiment;
in the figure: 1. a loading platform; 11. a fence; 12. a steel rope; 13. a retention plate; 14. a hook; 15. a first empty slot; 16. a stop lever; 17. a second empty slot; 2. a chute; 21. a baffle; 3. a hole groove; 4. a wide ring; 5. a limit rod; 6. an alert bar; 7. a sealing gasket;
Detailed Description
The utility model is further described in connection with the following detailed description in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
Example 1
As shown in fig. 1 to 3, the loading and unloading platform for house building materials according to the embodiment of the utility model comprises a loading and unloading platform 1, wherein the middle part of the loading and unloading platform 1 is fixedly connected with a fence 11; the method is characterized in that: the middle part of the fence 11 is fixedly connected with a steel rope 12; a retention plate 13 is fixedly connected to the end part of the steel rope 12; the middle part of the retention plate 13 is fixedly connected with a hook 14; the end part of the hook 14 is fixedly connected with a first empty groove 15; a stop lever 16 is rotatably connected in the first empty groove 15; a second empty groove 17 is formed in the middle of the hook 14; the stop lever 16 is in sliding connection with the second empty slot 17; when working, when the staff needs to transport building materials to a higher platform through the loading platform 1, at the moment, the staff can place the materials to be transported in the loading platform 1, then the fence 11 can prevent the materials from falling to the periphery, then the staff can hang the hook 14 at the lifting hook, then the stop lever 16 can rotate in the first empty slot 15, one end of the stop lever 16 is placed in the second empty slot 17, when the staff connects the hook 14 with the lifting hook, the lifting hook and the hook 14 can be fixed through rotating the stop lever 16, the time for the staff to fix the wide ring 4 can be reduced, and the working efficiency of the staff in transporting the building materials can be improved.
A chute 2 is formed in the middle of the loading platform 1; a chute 2 is formed in the middle of the fence 11; a baffle 21 is connected inside the chute 2 in a sliding manner; through the effect of spout 2, after the staff places building material inside loading platform 1, the staff can insert the inside of spout 2 with baffle 21 this moment, and then can carry out the complete shutoff with the inside space of loading platform 1, and this step can reduce the condition that the building material appears spilling in the transportation appears when the staff uses loading platform 1 to transport building material, and then reduces building material's waste in the process of transportation, and then can practice thrift building material resource.
A hole groove 3 is formed in the middle of the baffle 21; through the effect of hole groove 3, when the staff need use baffle 21 to carry out the shutoff to the inside material of loading platform 1, the staff can use the hand to hold hole groove 3 and control baffle 21, and this step can be when the staff need carry out the shutoff to the inside material of loading platform 1, can make things convenient for the staff to control baffle 21, and then can reduce loading platform 1 inside material and lead to the condition that leaks to appear because of not in time carrying out the shutoff.
The middle part of the steel rope 12 is fixedly connected with a wide ring 4; the wide ring 4 is fixedly connected with a plurality of groups of steel ropes 12; through the effect of wide circle 4, when using the crane to hoist and mount the inside material of loading platform 1, can make multiunit steel cable 12 separate at hoist and mount in-process through the effect of wide circle 4, this step can be in the in-process of hoist and mount building material, reduces the condition that the waste time appears because of steel cable 12 appears dropping, and then can improve hoist and mount work efficiency.
A limiting rod 5 is arranged in the second empty groove 17; the limiting rod 5 is in sliding connection in the second empty groove 17; through the effect of gag lever post 5, after the staff uses pin 16 to fix couple 14 and hoist and mount hook, usable gag lever post 5 is fixed pin 16 tip, and this step can appear in the circumstances that the in-process of hoist and mount building material appears pin 16 roll-off, and then reducible couple 14 appears with hoist and mount hook and appears the circumstances that drops.
The side surface of the fence 11 is fixedly connected with an alarm strip 6; the side surface of the fence 11 of the warning strip 6 is provided with a plurality of groups; through the effect of warning strip 6, when using loading platform 1 to lift building material, accessible warning strip 6's effect alerts around to the workman, and this step can be in the in-process of hoist and mount building material, alerts around the workman, and then reduces the circumstances that personnel injury appears in the hoist and mount in-process and appear.
Example two
As shown in fig. 4, in comparative example one, another embodiment of the present utility model is: a sealing gasket 7 is fixedly connected inside the chute 2; by the action of the sealing gasket 7, if a worker uses the loading platform 1 to transport the fluid substance, the sealing gasket 7 can be used for sealing the joint of the chute 2 and the baffle plate 21, and the occurrence of the condition that the fluid substance flows out during the transportation of the fluid substance can be reduced.
When in operation, when a worker needs to transport building materials to a higher platform through the loading platform 1, the worker can place the materials to be transported in the loading platform 1, then the fence 11 can prevent the materials from falling to the periphery, then the worker can hang the hook 14 at the position of the lifting hook, then the stop lever 16 can rotate in the first empty slot 15, one end of the stop lever 16 is placed in the second empty slot 17, the step can fix the lifting hook and the hook 14 by rotating the stop lever 16 when the worker connects the hook 14 with the lifting hook, further the time used when the worker fixes the wide ring 4 can be reduced, further the work efficiency when the worker transports the building materials can be improved, through the action of the chute 2, after the worker places the building materials in the loading platform 1, the worker can insert the baffle 21 into the chute 2, further the space in the loading platform 1 can be completely blocked, the step can reduce the falling situation of the building materials in the transportation process by the worker when the worker uses the loading platform 1, the situation that the building materials fall down in the transportation process can be reduced, the situation that the worker holds the material in the loading platform 1 in the control hole 3 can be controlled, the material can be prevented from leaking to the material can be prevented from entering the loading platform 1, and the material can be prevented from leaking to the inner part of the loading platform 1 through the control hole 21, and the material can be prevented from being leaked by the loading platform 1, and the material can be prevented from being leaked by the operator in the control of the material can be prevented from the inner part 1, when the crane is used for hoisting materials in the loading platform 1, a plurality of groups of steel ropes 12 can be separated in the hoisting process through the action of the wide ring 4, the situation that time is wasted due to falling of the steel ropes 12 is reduced in the process of hoisting building materials, hoisting work efficiency is improved, through the action of the limiting rod 5, after a worker uses the stop lever 16 to fix the hook 14 with a hoisting hook, the end part of the stop lever 16 can be fixed through the limiting rod 5, the situation that the stop lever 16 slips out in the process of hoisting the building materials can be reduced, the situation that the hook 14 falls off from the hoisting hook can be reduced, and surrounding workers can be warned through the action of the warning strip 6 when the loading platform 1 is used for lifting the building materials, and the situation that personnel are injured in the hoisting process can be reduced.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. The house building material loading and unloading platform comprises a loading and unloading platform (1), wherein the middle part of the loading and unloading platform (1) is fixedly connected with a fence (11); the method is characterized in that: a steel rope (12) is fixedly connected to the middle of the fence (11); a retention plate (13) is fixedly connected to the end part of the steel rope (12); a hook (14) is fixedly connected to the middle part of the retention plate (13); the end part of the hook (14) is fixedly connected with a first empty groove (15); a stop lever (16) is rotatably connected in the first empty groove (15); a second empty groove (17) is formed in the middle of the hook (14); the stop lever (16) is in sliding connection with the second empty slot (17).
2. A building material loading dock according to claim 1, wherein: a chute (2) is formed in the middle of the loading platform (1); a chute (2) is formed in the middle of the fence (11); the inside of the chute (2) is connected with a baffle (21) in a sliding way.
3. A building material loading dock according to claim 2, wherein: the middle part of the baffle (21) is provided with a hole groove (3).
4. A building material loading dock according to claim 3 wherein: the middle part of the steel rope (12) is fixedly connected with a wide ring (4); the wide ring (4) is fixedly connected with a plurality of groups of steel ropes (12).
5. A building material loading dock according to claim 4, wherein: a limiting rod (5) is arranged in the second empty groove (17); the limiting rod (5) is in sliding connection in the second empty groove (17).
6. A building material loading dock according to claim 5, wherein: an alarm strip (6) is fixedly connected to the side surface of the fence (11); the warning strips (6) are provided with a plurality of groups on the side face of the fence (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320151961.7U CN219118816U (en) | 2023-02-02 | 2023-02-02 | House building material loading and unloading platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320151961.7U CN219118816U (en) | 2023-02-02 | 2023-02-02 | House building material loading and unloading platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219118816U true CN219118816U (en) | 2023-06-02 |
Family
ID=86530618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320151961.7U Active CN219118816U (en) | 2023-02-02 | 2023-02-02 | House building material loading and unloading platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219118816U (en) |
-
2023
- 2023-02-02 CN CN202320151961.7U patent/CN219118816U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204281112U (en) | Special lifting lifting system processed by a kind of wheel | |
CN219118816U (en) | House building material loading and unloading platform | |
CN207418112U (en) | A kind of lifting tool | |
CN207016183U (en) | A kind of quick weighing induction system of solid particulate matter | |
CN205708433U (en) | A kind of for aircraft material delivery apparatus | |
CN205973424U (en) | Spreader can tumble | |
CN211246439U (en) | Loading attachment of useless raw materials of danger | |
CN211893979U (en) | Unpacking and conveying production line | |
CN211846831U (en) | Automatic positioning roller lifting appliance | |
CN205932883U (en) | Pitshaft driving cage | |
CN211495406U (en) | Open-close type tower crane brick bucket | |
CN109052151B (en) | Device for reducing external scrap steel of scrap steel groove in scrap steel loading and transporting process and using method | |
CN206751270U (en) | A kind of construction device for discharging | |
CN207016182U (en) | A kind of weighing induction system for solid particulate matter | |
CN207973116U (en) | Dregs conveying equipment | |
CN202671030U (en) | Automatic bagged bulk cargo pouring device | |
CN210312298U (en) | Automatic feeding device of intelligent dosing machine | |
CN216301733U (en) | Bag opening device for bag type packaging materials | |
CN214527622U (en) | Steel hoisting tool for building | |
CN212687431U (en) | Conveying equipment | |
CN214934188U (en) | Quick discharging device | |
CN213651601U (en) | Special device for lifting ton bags by forklift | |
CN214495382U (en) | Self-unloading small material hoisting container | |
CN219341761U (en) | Material conveying vehicle | |
CN115110501B (en) | Enteromorpha salvage collection net bag capable of automatically unpacking and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |