CN211495406U - Open-close type tower crane brick bucket - Google Patents
Open-close type tower crane brick bucket Download PDFInfo
- Publication number
- CN211495406U CN211495406U CN201922048226.XU CN201922048226U CN211495406U CN 211495406 U CN211495406 U CN 211495406U CN 201922048226 U CN201922048226 U CN 201922048226U CN 211495406 U CN211495406 U CN 211495406U
- Authority
- CN
- China
- Prior art keywords
- lateral wall
- bottom plate
- long
- short
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to the construction machinery field provides an open-close type tower crane brick fill, include: bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall install on the bottom plate, two long lateral wall set up both sides around the bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with the central point symmetry of long lateral wall is cut apart, and cuts apart long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot. Compared with the prior art, the utility model has the advantages of be equipped with long lateral wall on this bottom plate and carry out the protection to the material with short lateral wall, during the goods uninstallation, open the safety on the long lateral wall of both sides and detain, the long lateral wall top of both sides is opened and shut through the hinge mode and is unloaded the brick, has shortened the uninstallation time of goods, has improved discharge efficiency.
Description
Technical Field
The utility model belongs to the construction machinery field, concretely relates to open-close type tower crane brick fill.
Background
Along with the rapid development of modernized building engineering, the tower crane has been indispensable building machinery equipment in the building trade, in present building engineering construction, building materials such as the overwhelming majority fragment of brick, wooden stupefied and fastener need use the tower crane to transport, traditional hopper is unloaded and needs the manual work to support the balanced and the direction of unloading of materials such as assurance fragment of brick, it needs the longer time to unload inefficiency, and the personnel of unloading support hopper transportation fragment of brick in-process of unloading have certain safety hazard, the form of empting when unloading simultaneously causes the damage of fragment of brick easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that to prior art's current situation, and provide a handling efficiency is high, and the hopper need not the manual work and supports, and the fragment of brick is difficult to cause the open-close type tower crane brick fill that the fragment of brick damaged when the hopper is unloaded.
The utility model provides a technical scheme that above-mentioned technical problem adopted does: the utility model provides an open-close type tower crane brick fill, includes: tower crane lifting hook and the brick fill of setting in tower crane lifting hook below, its characterized in that, the brick fill has bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall are installed on the bottom plate, two long lateral walls set up in the front and back both sides of bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with long lateral wall's central point department symmetry is cut apart, and cuts apart long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot.
In foretell open-close type tower crane brick fill, two the top both ends of short lateral wall all are equipped with rings, be equipped with wire rope in the rings, wire rope one end is connected with rings, the wire rope other end links to each other with the tower crane lifting hook.
In foretell open-close type tower crane brick fill, long lateral wall, short lateral wall and bottom plate are the steel material, the plate thickness of long lateral wall, short lateral wall and bottom plate is 5 mm.
In the open-close type tower crane brick bucket, the long side wall and the short side wall are connected with the bottom plate in a welding mode.
Compared with the prior art, the utility model has the advantages of this brick fill adopts open-close type structure, be equipped with long lateral wall on the bottom plate and carry out the protection to the material with short lateral wall, when the goods is uninstalled, open the safety on the long lateral wall of both sides and detain, long lateral wall top of both sides is opened and shut through the hinge mode and is unloaded the brick, the uninstallation time of goods has been shortened, the efficiency of unloading has been improved, fragment of brick on the bottom plate slowly flows downwards, the breakage rate of fragment of brick has been reduced, also need not the workman and support the brick fill, the accident has been reduced, staff's safety when having guaranteed the construction.
Drawings
FIG. 1 is a top view of the open-close type tower crane brick bucket of the present invention;
FIG. 2 is a front view of the open-close type tower crane brick bucket of the present invention when closed during transportation;
FIG. 3 is the utility model relates to a brick fill is opened to open-close type tower crane brick fill's the in-process of unloading main view.
In the figure, a tower crane lifting hook 1, a brick bucket 2, a bottom plate 3, a long side wall 4, a short side wall 5, a safety buckle 6, a lifting ring 7 and a steel wire rope 8.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1-3, an open-close type tower crane brick bucket 2 comprises: tower crane lifting hook 1 with set up the brick fill 2 in tower crane lifting hook 1 below, a serial communication port, brick fill 2 has bottom plate 3, long lateral wall 4, short lateral wall 5 and safety are detained 6, long lateral wall 4 and short lateral wall 5 all are equipped with two, and long lateral wall 4 and short lateral wall 5 install on bottom plate 3, two long lateral wall 4 set up both sides around bottom plate 3, two short lateral wall 5 set up in the left and right sides of bottom plate 3, long lateral wall 4 installs with short lateral wall 5 and forms no apron box on bottom plate 3, bottom plate 3 is cut apart with long lateral wall 4's center department symmetry, and cut apart 4 central line tops of long lateral wall after continuous through hinge mode activity, 4 central line bottoms of long lateral wall after cutting apart are detained 6 through safety and are connected.
The brick bucket 2 is formed by splicing two long side walls 4, two short side walls 5 and a bottom plate 3, the shapes and the sizes of the two long side walls 4 are the same, the sizes of the two short side walls 5 are also the same, the bottom plate 3, the long side walls 4 and the short side walls 5 are connected and spliced to form the brick bucket 2 without a cover plate, because the long side walls 4 and the short side walls 5 on two sides form fence type protection, bricks or other building materials on the bottom plate 3 cannot fall out of the bottom plate 3 due to the left and right swinging of a lifting hook, the materials are ensured not to be damaged by external factors, manual work is not needed to support the bricks or other building materials below the hopper or on the bottom plate 3, the safety of operation constructors is ensured, the top of the central line of the segmented long side walls 4 is connected in a hinge mode, the bottom of the central line of the segmented long side walls 4 is connected through a safety buckle 6, the brick bucket 2 falls to a designated stockpiling place during, the safety buckles 6 on the front long side wall 4 and the rear long side wall 4 are opened, the steel cable is conveyed upwards through the tower crane, the bucket body of the brick bucket 2 automatically separates the cut long side walls 4 around the hinge, an included angle of 50-60 degrees is formed between the cut long side walls and the ground level, the bricks slide downwards to the ground along with the opening in the middle of the brick bucket 2, the brick bucket 2 shortens the unloading time of the bricks or other materials, the brick unloading efficiency is improved, a block does not need to be carried or one side does not incline to overturn, and the breakage rate of the bricks is effectively reduced.
Preferably, both ends of the tops of the two short side walls 5 are provided with hanging rings 7, a steel wire rope 8 is arranged in each hanging ring 7, one end of each steel wire rope 8 is connected with each hanging ring 7, and the other end of each steel wire rope 8 is connected with the tower crane lifting hook 1.
Preferably, the long side walls 4, the short side walls 5 and the bottom plate 3 are all made of steel material, and the plate thickness of the long side walls 4, the short side walls 5 and the bottom plate 3 is 5 mm.
Long lateral wall 4, short lateral wall 5 and bottom plate 3 are the steel material, and long lateral wall 4, short lateral wall 5 and 3 thickness of bottom plate are 5mm, and the plate that the steel material was made has fine bearing nature, and the steel material plate is high temperature resistant, and is not fragile, and brick fill 2 can bear great weight when transporting the fragment of brick, has both guaranteed the efficiency of transportation and has also guaranteed construction site staff's safety.
Preferably, the long side walls 4 and the short side walls 5 are welded to the base plate 3.
The long side wall 4, the short side wall 5 and the bottom plate 3 are made of steel structure materials, steel plate blocks are fixedly connected with the plate blocks in a welding mode, the compactness of the plate blocks welded by the welding gun is good, and the waste of the steel materials is greatly reduced by using the welding mode.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein will be apparent to those skilled in the art without departing from the scope and spirit of the invention as defined in the accompanying claims.
Claims (4)
1. The utility model provides an open-close type tower crane brick fill which characterized in that includes: tower crane lifting hook and the brick fill of setting in tower crane lifting hook below, the brick fill has bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall are installed on the bottom plate, two long lateral walls set up both sides around the bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with the central point department symmetry of long lateral wall is cut apart, and cuts apart the long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot.
2. The open-close type tower crane brick bucket according to claim 1, wherein two ends of the top of each of the two short side walls are provided with hanging rings, steel wire ropes are arranged in the hanging rings, one ends of the steel wire ropes are connected with the hanging rings, and the other ends of the steel wire ropes are connected with a tower crane lifting hook.
3. The open-close type tower crane brick bucket according to claim 1, wherein the long side wall, the short side wall and the bottom plate are all made of steel materials, and the plate thickness of the long side wall, the short side wall and the bottom plate is 5 mm.
4. The tower crane brick bucket of claim 3, wherein the long side wall and the short side wall are welded to the bottom plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922048226.XU CN211495406U (en) | 2019-11-22 | 2019-11-22 | Open-close type tower crane brick bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922048226.XU CN211495406U (en) | 2019-11-22 | 2019-11-22 | Open-close type tower crane brick bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211495406U true CN211495406U (en) | 2020-09-15 |
Family
ID=72411171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922048226.XU Active CN211495406U (en) | 2019-11-22 | 2019-11-22 | Open-close type tower crane brick bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211495406U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112319987A (en) * | 2020-11-09 | 2021-02-05 | 山西四建集团有限公司 | Waterproofing membrane transports hanging flower basket upright |
-
2019
- 2019-11-22 CN CN201922048226.XU patent/CN211495406U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112319987A (en) * | 2020-11-09 | 2021-02-05 | 山西四建集团有限公司 | Waterproofing membrane transports hanging flower basket upright |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888294B (en) | A kind of chain saw is inverse to tear floor construction method open | |
CN203889909U (en) | Bottom-opening cargo hopper lifting appliance for bulk cargo loading operation | |
CN211495406U (en) | Open-close type tower crane brick bucket | |
CN110065884B (en) | Pile feeding hoisting method and hoisting tool of pile pressing machine | |
CN204388090U (en) | Slag removing system | |
CN205932883U (en) | Pitshaft driving cage | |
CN216272046U (en) | Calcium hypochlorite raw and other materials feeding bag and feedway | |
CN211895679U (en) | Earth and stone square vertical transportation device of tyre type wharf crane | |
CN213950352U (en) | Double-rope multi-petal nickel ore grab bucket | |
JP7370213B2 (en) | Concrete pouring hopper | |
CN103241481A (en) | Arch-breaking and blockage-cleaning ore bin | |
CN211893979U (en) | Unpacking and conveying production line | |
CN208758887U (en) | Grab bucket shovel mouth welding tooling | |
KR200485150Y1 (en) | Bucket device for loading and unloading | |
CN205366937U (en) | Transfer chain that peripheral material is stacked to centre | |
CN214495382U (en) | Self-unloading small material hoisting container | |
CN206108453U (en) | Movable raw materials unloader in bulk | |
CN217264304U (en) | Low gravity center prevents side formula grab bucket of cutting | |
CN215099644U (en) | Hopper for deep foundation pit deslagging | |
KR200415147Y1 (en) | Bucket for aerial cable way | |
CN204310687U (en) | Change the suspender of bucket type belt | |
CN210594934U (en) | Leakage-proof grab bucket | |
CN211437963U (en) | Feeding basket and feeding system | |
CN218908602U (en) | Ore bin overhauling room | |
CN112096439B (en) | Synchronous mounting method for forepoling support and reversed loader |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |