CN211495406U - Open-close type tower crane brick bucket - Google Patents

Open-close type tower crane brick bucket Download PDF

Info

Publication number
CN211495406U
CN211495406U CN201922048226.XU CN201922048226U CN211495406U CN 211495406 U CN211495406 U CN 211495406U CN 201922048226 U CN201922048226 U CN 201922048226U CN 211495406 U CN211495406 U CN 211495406U
Authority
CN
China
Prior art keywords
lateral wall
bottom plate
long
short
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922048226.XU
Other languages
Chinese (zh)
Inventor
杨焕中
熊飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Original Assignee
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang 20 Smelter Construction Co ltd, China MCC20 Group Corp Ltd filed Critical Zhejiang 20 Smelter Construction Co ltd
Priority to CN201922048226.XU priority Critical patent/CN211495406U/en
Application granted granted Critical
Publication of CN211495406U publication Critical patent/CN211495406U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the construction machinery field provides an open-close type tower crane brick fill, include: bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall install on the bottom plate, two long lateral wall set up both sides around the bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with the central point symmetry of long lateral wall is cut apart, and cuts apart long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot. Compared with the prior art, the utility model has the advantages of be equipped with long lateral wall on this bottom plate and carry out the protection to the material with short lateral wall, during the goods uninstallation, open the safety on the long lateral wall of both sides and detain, the long lateral wall top of both sides is opened and shut through the hinge mode and is unloaded the brick, has shortened the uninstallation time of goods, has improved discharge efficiency.

Description

Open-close type tower crane brick bucket
Technical Field
The utility model belongs to the construction machinery field, concretely relates to open-close type tower crane brick fill.
Background
Along with the rapid development of modernized building engineering, the tower crane has been indispensable building machinery equipment in the building trade, in present building engineering construction, building materials such as the overwhelming majority fragment of brick, wooden stupefied and fastener need use the tower crane to transport, traditional hopper is unloaded and needs the manual work to support the balanced and the direction of unloading of materials such as assurance fragment of brick, it needs the longer time to unload inefficiency, and the personnel of unloading support hopper transportation fragment of brick in-process of unloading have certain safety hazard, the form of empting when unloading simultaneously causes the damage of fragment of brick easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that to prior art's current situation, and provide a handling efficiency is high, and the hopper need not the manual work and supports, and the fragment of brick is difficult to cause the open-close type tower crane brick fill that the fragment of brick damaged when the hopper is unloaded.
The utility model provides a technical scheme that above-mentioned technical problem adopted does: the utility model provides an open-close type tower crane brick fill, includes: tower crane lifting hook and the brick fill of setting in tower crane lifting hook below, its characterized in that, the brick fill has bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall are installed on the bottom plate, two long lateral walls set up in the front and back both sides of bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with long lateral wall's central point department symmetry is cut apart, and cuts apart long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot.
In foretell open-close type tower crane brick fill, two the top both ends of short lateral wall all are equipped with rings, be equipped with wire rope in the rings, wire rope one end is connected with rings, the wire rope other end links to each other with the tower crane lifting hook.
In foretell open-close type tower crane brick fill, long lateral wall, short lateral wall and bottom plate are the steel material, the plate thickness of long lateral wall, short lateral wall and bottom plate is 5 mm.
In the open-close type tower crane brick bucket, the long side wall and the short side wall are connected with the bottom plate in a welding mode.
Compared with the prior art, the utility model has the advantages of this brick fill adopts open-close type structure, be equipped with long lateral wall on the bottom plate and carry out the protection to the material with short lateral wall, when the goods is uninstalled, open the safety on the long lateral wall of both sides and detain, long lateral wall top of both sides is opened and shut through the hinge mode and is unloaded the brick, the uninstallation time of goods has been shortened, the efficiency of unloading has been improved, fragment of brick on the bottom plate slowly flows downwards, the breakage rate of fragment of brick has been reduced, also need not the workman and support the brick fill, the accident has been reduced, staff's safety when having guaranteed the construction.
Drawings
FIG. 1 is a top view of the open-close type tower crane brick bucket of the present invention;
FIG. 2 is a front view of the open-close type tower crane brick bucket of the present invention when closed during transportation;
FIG. 3 is the utility model relates to a brick fill is opened to open-close type tower crane brick fill's the in-process of unloading main view.
In the figure, a tower crane lifting hook 1, a brick bucket 2, a bottom plate 3, a long side wall 4, a short side wall 5, a safety buckle 6, a lifting ring 7 and a steel wire rope 8.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1-3, an open-close type tower crane brick bucket 2 comprises: tower crane lifting hook 1 with set up the brick fill 2 in tower crane lifting hook 1 below, a serial communication port, brick fill 2 has bottom plate 3, long lateral wall 4, short lateral wall 5 and safety are detained 6, long lateral wall 4 and short lateral wall 5 all are equipped with two, and long lateral wall 4 and short lateral wall 5 install on bottom plate 3, two long lateral wall 4 set up both sides around bottom plate 3, two short lateral wall 5 set up in the left and right sides of bottom plate 3, long lateral wall 4 installs with short lateral wall 5 and forms no apron box on bottom plate 3, bottom plate 3 is cut apart with long lateral wall 4's center department symmetry, and cut apart 4 central line tops of long lateral wall after continuous through hinge mode activity, 4 central line bottoms of long lateral wall after cutting apart are detained 6 through safety and are connected.
The brick bucket 2 is formed by splicing two long side walls 4, two short side walls 5 and a bottom plate 3, the shapes and the sizes of the two long side walls 4 are the same, the sizes of the two short side walls 5 are also the same, the bottom plate 3, the long side walls 4 and the short side walls 5 are connected and spliced to form the brick bucket 2 without a cover plate, because the long side walls 4 and the short side walls 5 on two sides form fence type protection, bricks or other building materials on the bottom plate 3 cannot fall out of the bottom plate 3 due to the left and right swinging of a lifting hook, the materials are ensured not to be damaged by external factors, manual work is not needed to support the bricks or other building materials below the hopper or on the bottom plate 3, the safety of operation constructors is ensured, the top of the central line of the segmented long side walls 4 is connected in a hinge mode, the bottom of the central line of the segmented long side walls 4 is connected through a safety buckle 6, the brick bucket 2 falls to a designated stockpiling place during, the safety buckles 6 on the front long side wall 4 and the rear long side wall 4 are opened, the steel cable is conveyed upwards through the tower crane, the bucket body of the brick bucket 2 automatically separates the cut long side walls 4 around the hinge, an included angle of 50-60 degrees is formed between the cut long side walls and the ground level, the bricks slide downwards to the ground along with the opening in the middle of the brick bucket 2, the brick bucket 2 shortens the unloading time of the bricks or other materials, the brick unloading efficiency is improved, a block does not need to be carried or one side does not incline to overturn, and the breakage rate of the bricks is effectively reduced.
Preferably, both ends of the tops of the two short side walls 5 are provided with hanging rings 7, a steel wire rope 8 is arranged in each hanging ring 7, one end of each steel wire rope 8 is connected with each hanging ring 7, and the other end of each steel wire rope 8 is connected with the tower crane lifting hook 1.
Rings 7 on brick fill 2 are totally four, and four rings 7 shape size are all the same, wire rope 8 wear resistance is strong, tensile elasticity is good, be not afraid of the humidity, can bear impact load, and the flexibility is better uses in a flexible way, wire rope 8 one end is connected with rings 7, the wire rope 8 other end links to each other with tower crane lifting hook 1, when needing to rise the brick transportation material such as fragment of brick, lift by crane lifting hook pulling wire rope 8 and control the removal to the brick fill 2 pulling of below, transport to the needs construction site and unload or feed, the transport of fragment of brick material has been made things convenient for greatly to use rings 7 and wire rope 8, the workman cost is reduced, the efficiency of construction has been promoted.
Preferably, the long side walls 4, the short side walls 5 and the bottom plate 3 are all made of steel material, and the plate thickness of the long side walls 4, the short side walls 5 and the bottom plate 3 is 5 mm.
Long lateral wall 4, short lateral wall 5 and bottom plate 3 are the steel material, and long lateral wall 4, short lateral wall 5 and 3 thickness of bottom plate are 5mm, and the plate that the steel material was made has fine bearing nature, and the steel material plate is high temperature resistant, and is not fragile, and brick fill 2 can bear great weight when transporting the fragment of brick, has both guaranteed the efficiency of transportation and has also guaranteed construction site staff's safety.
Preferably, the long side walls 4 and the short side walls 5 are welded to the base plate 3.
The long side wall 4, the short side wall 5 and the bottom plate 3 are made of steel structure materials, steel plate blocks are fixedly connected with the plate blocks in a welding mode, the compactness of the plate blocks welded by the welding gun is good, and the waste of the steel materials is greatly reduced by using the welding mode.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein will be apparent to those skilled in the art without departing from the scope and spirit of the invention as defined in the accompanying claims.

Claims (4)

1. The utility model provides an open-close type tower crane brick fill which characterized in that includes: tower crane lifting hook and the brick fill of setting in tower crane lifting hook below, the brick fill has bottom plate, long lateral wall, short lateral wall and safe knot, long lateral wall and short lateral wall all are equipped with two, just long lateral wall and short lateral wall are installed on the bottom plate, two long lateral walls set up both sides around the bottom plate, two short lateral walls set up in the left and right sides of bottom plate, long lateral wall with short lateral wall installs and forms no apron box on the bottom plate, the bottom plate with the central point department symmetry of long lateral wall is cut apart, and cuts apart the long lateral wall central line top after and link to each other through hinge mode activity, long lateral wall central line bottom after cutting apart is connected through safe the knot.
2. The open-close type tower crane brick bucket according to claim 1, wherein two ends of the top of each of the two short side walls are provided with hanging rings, steel wire ropes are arranged in the hanging rings, one ends of the steel wire ropes are connected with the hanging rings, and the other ends of the steel wire ropes are connected with a tower crane lifting hook.
3. The open-close type tower crane brick bucket according to claim 1, wherein the long side wall, the short side wall and the bottom plate are all made of steel materials, and the plate thickness of the long side wall, the short side wall and the bottom plate is 5 mm.
4. The tower crane brick bucket of claim 3, wherein the long side wall and the short side wall are welded to the bottom plate.
CN201922048226.XU 2019-11-22 2019-11-22 Open-close type tower crane brick bucket Active CN211495406U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922048226.XU CN211495406U (en) 2019-11-22 2019-11-22 Open-close type tower crane brick bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922048226.XU CN211495406U (en) 2019-11-22 2019-11-22 Open-close type tower crane brick bucket

Publications (1)

Publication Number Publication Date
CN211495406U true CN211495406U (en) 2020-09-15

Family

ID=72411171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922048226.XU Active CN211495406U (en) 2019-11-22 2019-11-22 Open-close type tower crane brick bucket

Country Status (1)

Country Link
CN (1) CN211495406U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112319987A (en) * 2020-11-09 2021-02-05 山西四建集团有限公司 Waterproofing membrane transports hanging flower basket upright

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112319987A (en) * 2020-11-09 2021-02-05 山西四建集团有限公司 Waterproofing membrane transports hanging flower basket upright

Similar Documents

Publication Publication Date Title
CN105888294B (en) A kind of chain saw is inverse to tear floor construction method open
CN203889909U (en) Bottom-opening cargo hopper lifting appliance for bulk cargo loading operation
CN211495406U (en) Open-close type tower crane brick bucket
CN110065884B (en) Pile feeding hoisting method and hoisting tool of pile pressing machine
CN204388090U (en) Slag removing system
CN205932883U (en) Pitshaft driving cage
CN216272046U (en) Calcium hypochlorite raw and other materials feeding bag and feedway
CN211895679U (en) Earth and stone square vertical transportation device of tyre type wharf crane
CN213950352U (en) Double-rope multi-petal nickel ore grab bucket
JP7370213B2 (en) Concrete pouring hopper
CN103241481A (en) Arch-breaking and blockage-cleaning ore bin
CN211893979U (en) Unpacking and conveying production line
CN208758887U (en) Grab bucket shovel mouth welding tooling
KR200485150Y1 (en) Bucket device for loading and unloading
CN205366937U (en) Transfer chain that peripheral material is stacked to centre
CN214495382U (en) Self-unloading small material hoisting container
CN206108453U (en) Movable raw materials unloader in bulk
CN217264304U (en) Low gravity center prevents side formula grab bucket of cutting
CN215099644U (en) Hopper for deep foundation pit deslagging
KR200415147Y1 (en) Bucket for aerial cable way
CN204310687U (en) Change the suspender of bucket type belt
CN210594934U (en) Leakage-proof grab bucket
CN211437963U (en) Feeding basket and feeding system
CN218908602U (en) Ore bin overhauling room
CN112096439B (en) Synchronous mounting method for forepoling support and reversed loader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant