CN219112771U - Pile foundation reinforcement cage post footpath strutting arrangement - Google Patents

Pile foundation reinforcement cage post footpath strutting arrangement Download PDF

Info

Publication number
CN219112771U
CN219112771U CN202223533121.1U CN202223533121U CN219112771U CN 219112771 U CN219112771 U CN 219112771U CN 202223533121 U CN202223533121 U CN 202223533121U CN 219112771 U CN219112771 U CN 219112771U
Authority
CN
China
Prior art keywords
reinforcement cage
adjusting nut
screw rod
pile foundation
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223533121.1U
Other languages
Chinese (zh)
Inventor
王涛
徐永增
李民航
魏虎成
赵贤安
覃智斌
孙海坡
李阳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Original Assignee
China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Three Gorges Construction Engineering Co Ltd filed Critical China Gezhouba Group Three Gorges Construction Engineering Co Ltd
Priority to CN202223533121.1U priority Critical patent/CN219112771U/en
Application granted granted Critical
Publication of CN219112771U publication Critical patent/CN219112771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a pile foundation steel reinforcement cage post footpath strutting arrangement, includes the screw rod, and screw rod one end is fixed with the jacking, and the jacking is jacked on the steel reinforcement cage, and the screw rod other end and adjusting nut threaded connection, connecting pipe both ends cup joint with a screw rod respectively and through adjusting nut spacing. The pile foundation reinforcement cage column diameter supporting device provided by the utility model meets the quality requirements of reinforcement cage processing.

Description

Pile foundation reinforcement cage post footpath strutting arrangement
Technical Field
The utility model relates to a reinforcement cage, in particular to a pile foundation reinforcement cage column diameter supporting device.
Background
In the processing of a large-scale bridge engineering pier stud reinforcement cage, according to the requirements of a design drawing, a reinforcement ring is arranged on the reinforcement cage every 2 meters, and because the distance between the two reinforcement rings is larger, the rotating speed of a roller welding machine is faster in the processing process of the reinforcement cage, the roller welding machine is influenced by the tightening degree of coiled stirrups, and the processing forming reinforcement cage has the condition of smaller diameter.
Disclosure of Invention
The utility model aims to solve the technical problems of small diameter, low machining precision and unsatisfied quality requirements in the machining process of a pile foundation reinforcement cage.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a pile foundation steel reinforcement cage post footpath strutting arrangement, includes the screw rod, and screw rod one end is fixed with the jacking, and the jacking is jacked on the steel reinforcement cage, and the screw rod other end and adjusting nut threaded connection, connecting pipe both ends cup joint with a screw rod respectively and through adjusting nut spacing.
The end of the adjusting nut is provided with a limit groove, and two ends of the connecting pipe are propped in the limit groove of the adjusting nut.
The side wall of the adjusting nut is provided with a handle or is a hexagonal prism surface.
The connecting pipes are two groups, and the two groups of connecting pipes are fixedly connected into a whole through bolts.
The jacking is an arc-shaped rod matched with the inner wall of the reinforcement cage.
The utility model relates to a pile foundation reinforcement cage column diameter supporting device, which has the following technical effects:
1) By installing the supporting device between the reinforcement rings of the reinforcement cage, the problem of small diameter in the processing process of the reinforcement cage can be avoided, the processing precision can be improved, and the processing quality can be ensured.
2) The adjustable jacking is adopted, the adjusting nut is installed and removed, the rotation is completed, the operation is simple, the turnover and the recycling of the supporting device are realized, and the labor and the material cost are saved.
3) The adjusting nut is used for adjusting, the screw rod is sleeved with the connecting pipe, the threaded sleeve is arranged in the connecting pipe, the adjusting nut belongs to a manufacturer shaping product, the connecting pipe is a common welded steel pipe, and the processing and the manufacturing are simple. Because the two groups of connecting pipes are connected together, the overall shape of the reinforcement cage can be finely adjusted by rotating the handle on the side wall of the adjusting nut.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
fig. 1 is a schematic view of the installation of the present utility model.
Fig. 2 is a schematic view of a partial structure of the present utility model.
In the figure: jacking 1, screw rod 2, adjusting nut 3, spacing groove 3.1, connecting pipe 4, bolt 5, steel reinforcement cage 6, stirrup 6.1, indulge muscle 6.2.
Detailed Description
As shown in fig. 1-2, a pile foundation reinforcement cage column diameter supporting device comprises a screw rod 2, wherein a jacking 1 is welded at one end of the screw rod 2, the jacking 1 is jacked on the inner wall of a reinforcement cage 6, the other end of the screw rod 2 is in threaded connection with an adjusting nut 3, and two ends of a connecting pipe 4 are respectively sleeved with the screw rod 2 and limited through the adjusting nut 3. During assembly, the jacking 1 and the screw rod 2 are welded together, the screw rod 2 is screwed with the adjusting nut 3, the screw rod 2 is sleeved at two ends of the connecting pipe 4, part of the screw rod 2 extends into the connecting pipe 4, and the extending length of the screw rod 2 is limited by the adjusting nut 3. After the two screws 2 are sleeved into the connecting pipe 4, the length formed by the two screws 2 and the connecting pipe 4 is slightly smaller than the inner diameter of the reinforcement cage 6. The screw rod 2 is held by hand, the adjusting nut 3 is rotated, the screw rod 2 extends out, and the jacking 1 is contacted with the longitudinal ribs 6.2.
The end of the adjusting nut 3 is provided with a limit groove 3.1, and two ends of the connecting pipe 4 are propped in the limit groove 3.1 of the adjusting nut 3. The end of the adjusting nut 3 can be a plane as shown in fig. 1 or a limit groove 3.1 as shown in fig. 2. The limiting groove 3.1 is arranged to position the center of the connecting pipe 4.
The side wall of the adjusting nut 3 is provided with a handle 3.2 or the side wall of the adjusting nut 3 is a hexagonal prism surface. The hexagonal prism surface is convenient to rotate by a wrench, and the handle is convenient to directly rotate.
The two groups of connecting pipes 4 are fixedly connected into a whole through bolts 5. The two groups of connecting pipes 4 can be arranged at 90 degrees, so that four jacking supports the reinforcement cage circumferentially together, and stability is improved. The bolts 5 can be replaced by pins, so that the two groups of connecting pipes 4 can be adjusted to any angle, and can be folded after being disassembled.
The jacking 1 is an arc-shaped rod matched with the inner wall of the reinforcement cage 6.
The jacking 1 is an HRB400 steel bar, the length is 200mm, and the diameter is 25mm.
The connecting pipe 4 is a common welded steel pipe, and the specification is phi 48.3 multiplied by 3.6mm.
The specification of the bolt 5 is M10mm.
The inner ring of the longitudinal rib 6.2 is welded with a reinforcing ring, the reinforcing ring is a supporting reinforcing steel bar in the steel reinforcement cage design, and 1 group is arranged at each interval of 2 m.
The exposed length of the screw 2 should not exceed 300mm, and the depth of the screw 2 into the connecting pipe 4 should not be less than 150mm.
Working principle and process: a sufficient number of support means are made in the field before the reinforcement cage 6 begins to be worked. After the installation of the main reinforcement (longitudinal reinforcement 6.2) of the reinforcement cage and the spot welding of the main reinforcement (longitudinal reinforcement 6.2) of the reinforcement cage and the reinforcing rings are completed, a pile foundation reinforcement cage column diameter supporting device is installed between the two reinforcing rings to form an integral support. Before the finished steel reinforcement cage leaves the factory, the pile foundation steel reinforcement cage column diameter supporting device is completely removed and is used for the next construction cycle.

Claims (5)

1. Pile foundation steel reinforcement cage post footpath strutting arrangement, its characterized in that: including screw rod (2), screw rod (2) one end is fixed with jacking (1), and jacking (1) top is on steel reinforcement cage (6), screw rod (2) other end and adjusting nut (3) threaded connection, connecting pipe (4) both ends cup joint with a screw rod (2) respectively and are spacing through adjusting nut (3).
2. The pile foundation reinforcement cage column diameter support device of claim 1, wherein: the end of the adjusting nut (3) is provided with a limit groove (3.1), and two ends of the connecting pipe (4) are propped in the limit groove (3.1) of the adjusting nut (3).
3. The pile foundation reinforcement cage column diameter support device of claim 1, wherein: the side wall of the adjusting nut (3) is provided with a handle (3.2) or the side wall of the adjusting nut (3) is a hexagonal prismatic surface.
4. The pile foundation reinforcement cage column diameter support device of claim 1, wherein: the two groups of connecting pipes (4) are fixedly connected into a whole through bolts (5).
5. The pile foundation reinforcement cage column diameter support device of claim 1, wherein: the jacking (1) is an arc-shaped rod matched with the inner wall of the reinforcement cage (6).
CN202223533121.1U 2022-12-29 2022-12-29 Pile foundation reinforcement cage post footpath strutting arrangement Active CN219112771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223533121.1U CN219112771U (en) 2022-12-29 2022-12-29 Pile foundation reinforcement cage post footpath strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223533121.1U CN219112771U (en) 2022-12-29 2022-12-29 Pile foundation reinforcement cage post footpath strutting arrangement

Publications (1)

Publication Number Publication Date
CN219112771U true CN219112771U (en) 2023-06-02

Family

ID=86526068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223533121.1U Active CN219112771U (en) 2022-12-29 2022-12-29 Pile foundation reinforcement cage post footpath strutting arrangement

Country Status (1)

Country Link
CN (1) CN219112771U (en)

Similar Documents

Publication Publication Date Title
CN202787968U (en) Changeable-angle adjusting type template inclined support
CN215035666U (en) Clamp for machining flange plate
CN217151399U (en) Adjustable support device for assembling net rack lower chord ball
CN219112771U (en) Pile foundation reinforcement cage post footpath strutting arrangement
CN104942050B (en) Pipe orifice adjustment device for building construction pipe
CN212025254U (en) Bending correction tool for hydraulic decoking drill rod
CN113309347A (en) Adjustable jacking quick adjustment instrument
CN210253997U (en) Circular stirrup processingequipment
CN202985316U (en) Simple rotating device for steel pipes
CN206567576U (en) The frock clamp processed beneficial to cylinder part
CN220202671U (en) Square pile positioning device
RU2800346C1 (en) Device for eliminating ovality of shells
CN220881229U (en) Multipurpose anti-deformation clamp for pipe fitting welding
CN219692465U (en) Municipal pipeline fixing device
CN111001732A (en) Auxiliary device for forming cylindrical stirrups with adjustable diameters
CN111119064B (en) Prefabricated supporting device for reinforcement cage of pier body of cross-sea bridge and supervision method of prefabricated supporting device
CN219805599U (en) Deformation preventing device for girth welding
CN219074241U (en) Conical filling column reinforcement cage processingequipment
CN214942445U (en) Adjustable jacking quick adjustment instrument
CN219851833U (en) Steel bar bending machine with bending module
CN116586902A (en) Novel fixed-length telescopic socket type disc buckle scaffold machining process
CN216110014U (en) Connecting structure for correcting position of steel pipe pole foundation bolt
CN220869858U (en) Cantilever eccentric wheel structure and gate
CN218964566U (en) Adjustable pipeline group misalignment correction tool
CN219933630U (en) Equipment for monitoring deformation of foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant