CN219933630U - Equipment for monitoring deformation of foundation pit - Google Patents
Equipment for monitoring deformation of foundation pit Download PDFInfo
- Publication number
- CN219933630U CN219933630U CN202321604333.6U CN202321604333U CN219933630U CN 219933630 U CN219933630 U CN 219933630U CN 202321604333 U CN202321604333 U CN 202321604333U CN 219933630 U CN219933630 U CN 219933630U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- fixed
- foundation pit
- pipe
- deformation monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 18
- 238000013016 damping Methods 0.000 claims abstract description 5
- 230000002787 reinforcement Effects 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 description 8
- 238000009434 installation Methods 0.000 description 5
- 238000012806 monitoring device Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Abstract
The utility model discloses equipment for monitoring foundation pit deformation, which comprises a bottom plate, wherein a fixed pipe is fixed at the top of the bottom plate, a connecting rod is arranged in the fixed pipe, the top of the connecting rod is connected with a connecting plate through a rotating shaft, the top of the connecting plate is connected with another connecting rod through the rotating shaft, the top of the other connecting rod is connected with a connecting ring through a bolt, the top of the connecting ring is connected with a containing box through a damping rotating shaft, a monitor is clamped in the containing box, the surfaces of the connecting parts of the two connecting rods and the connecting plate are sleeved with a fixed sleeve, two preformed holes are formed through the surfaces of the fixed sleeve, and screw holes are formed at the positions of the surfaces of the connecting rods, which are close to the top, and the positions of the surfaces of the other connecting rods, which are close to the bottom; the equipment for monitoring the deformation of the foundation pit can be conveniently installed and detached, and the height of a monitor can be conveniently adjusted.
Description
Technical Field
The utility model relates to the field of monitoring equipment, in particular to equipment for monitoring deformation of a foundation pit.
Background
The foundation pit is a large pit dug in building foundation construction, the foundation pit construction is an important ring in building construction, the foundation pit is required to be designed and constructed according to different terrains, engineering requirements and safety requirements, the foundation pit is required to be monitored through monitoring equipment in construction, whether the foundation pit is deformed or not is monitored, and therefore engineering quality is guaranteed.
Original foundation ditch monitoring facilities need only can put into use through comparatively complicated installation when using to work efficiency has been reduced, and the inconvenient height to the monitor of adjusting after the installation is accomplished, and is inconvenient when using.
Disclosure of Invention
The utility model mainly aims to provide equipment for monitoring foundation pit deformation, which can effectively solve the problems in the background technology.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a foundation ditch deformation monitoring's equipment, includes the bottom plate, the top of bottom plate is fixed with the fixed pipe, the internally mounted of fixed pipe has the connecting rod, the top of connecting rod is connected with the connecting plate through the pivot, the top of connecting plate is connected with another connecting rod through the pivot, the top of another connecting rod is connected with the go-between through the bolted connection, the top of go-between is connected with through the damping pivot and holds the box, the inside joint that holds the box has the monitor, and the fixed sleeve has been cup jointed on the surface of the junction of two connecting rods and connecting plate, two preformed holes have been seted up on the surface of running through the fixed sleeve, and the screw has all been seted up on the surface that the surface of connecting rod is close to the top and the surface that the surface of another connecting rod is close to the bottom, and two connecting rods pass through preformed hole threaded connection at the inside fixed connection of screw with the fixed sleeve.
As a further scheme of the utility model, the surface of the other connecting rod is clamped with a reinforcing pipe, a plurality of connecting blocks are fixed on the surface of the reinforcing pipe at equal intervals, and a supporting rod is connected between two adjacent connecting blocks through a rotating shaft.
As a further scheme of the utility model, threads are arranged on the surface of the connecting rod and the inside of the fixed pipe, and the connecting rod is connected in the inside of the fixed pipe through the threads.
As a further scheme of the utility model, a clamping block is fixed on the surface of the connecting rod, the radius of the clamping block is larger than that of the fixed sleeve, and the fixed sleeve is connected to the top of the clamping block.
As a further scheme of the utility model, four rows of limiting blocks are fixed at the top of the bottom plate, the limiting blocks are C-shaped, and the inner walls of the limiting blocks are tightly attached to the surface of the supporting rod.
As a further scheme of the utility model, square grooves are formed in the top of the connecting rod and the bottom of the other connecting rod, and the connecting plate is positioned in the square grooves.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the connecting rods are arranged, when the device is used, the fixed sleeve is sleeved on the surface of the joint of the two connecting rods and the connecting plate, the fixed sleeve is connected to the top of the clamping block, the preformed hole and the screw hole are in the same straight line, the bolt penetrates through the preformed hole and is connected to the inside of the screw hole in a threaded manner, the fixed sleeve is fixedly connected with the two connecting rods, the two connecting rods play a supporting role, the angle cannot be changed, the connecting rods are connected to the inside of the fixed pipe through the threads, the two connecting rods are connected with the bottom plate, and the height of the connecting rods can be adjusted through the threads, so that the effects of convenient disassembly and installation and convenient adjustment of the height of the monitor can be achieved;
through setting up the bracing piece, when using, will consolidate the surface of the connecting rod that the pipe is received in the top, will consolidate the pipe and move down until making the top of bracing piece contact bottom plate again, the angle of rethread adjustment bracing piece makes the surface of bracing piece hug closely the inner wall of stopper, so under the spacing of stopper, makes bracing piece and consolidate the pipe and carry out further reinforcement to two connecting rods and support, makes whole more stable.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a foundation pit deformation monitoring device according to the present utility model;
FIG. 2 is an exploded view of an apparatus for foundation pit deformation monitoring according to the present utility model;
fig. 3 is a partial structure diagram of a reinforcement pipe and a support rod of the foundation pit deformation monitoring device.
In the figure: 1. a bottom plate; 2. a fixed tube; 3. a connecting rod; 4. fixing the sleeve; 5. a connecting ring; 6. a storage case; 7. a monitor; 8. reinforcing the pipe; 9. a support rod; 10. a limiting block; 11. a clamping block; 12. a connecting block; 13. a preformed hole; 14. a screw hole; 15. and (5) connecting a plate.
Detailed Description
The utility model is further described in connection with the following detailed description, in order to make the technical means, the creation characteristics, the achievement of the purpose and the effect of the utility model easy to understand.
As shown in fig. 1-3, a foundation pit deformation monitoring device comprises a base plate 1, the top of bottom plate 1 is fixed with fixed pipe 2, the internally mounted of fixed pipe 2 has connecting rod 3, the top of connecting rod 3 is connected with connecting plate 15 through the pivot, the top of connecting plate 15 is connected with another connecting rod 3 through the pivot, the top of another connecting rod 3 is connected with go-between 5 through bolted connection, the top of go-between 5 is connected with through the damping pivot and holds box 6, the inside joint that holds box 6 has monitor 7, and the fixed sleeve 4 has been cup jointed on the surface of the junction of two connecting rods 3 and connecting plate 15, two preformed holes 13 have been seted up on the surface of running through fixed sleeve 4, and the position that the surface of connecting rod 3 is close to the top and the surface of another connecting rod 3 all seted up screw 14, and the inside fixed connection of two connecting rods 3 and fixed sleeve 4 at screw hole 13 threaded connection, when using, the accessible rotation connecting rod 3 adjusts the height of monitor 7, and fixed sleeve 4 makes two connecting rods 3 play the supporting role to monitor 7, and can not make its angle take place, and change the fixed sleeve 4, take out the fixed sleeve 3, thereby install the folding structure is more convenient, the whole, the convenient use is convenient to take down, and install the connecting rod is convenient.
The surface joint of another connecting rod 3 has the reinforcement pipe 8, and the surface equidistance of reinforcement pipe 8 is fixed with a plurality of connecting block 12, all is connected with bracing piece 9 through the pivot between two adjacent connecting blocks 12, supports connecting rod 3, makes whole more stable, is difficult for overturning.
The surface of connecting rod 3 and the inside of fixed pipe 2 are all offered the screw thread, and connecting rod 3 passes through threaded connection in the inside of fixed pipe 2, and accessible rotation connecting rod 3 to the height of the adjustment monitor 7 that makes can be convenient when using.
The surface fixing of connecting rod 3 has fixture block 11, and the radius of fixture block 11 is greater than the radius of fixed bolster 4, and fixed bolster 4 accept at the top of fixture block 11, makes more convenient when the installation, and the operation is simpler.
Four rows of limiting blocks 10 are fixed at the top of the bottom plate 1, the limiting blocks 10 are C-shaped, the inner walls of the limiting blocks 10 are clung to the surfaces of the supporting rods 9, the supporting rods 9 are limited, the angles of the supporting rods are fixed, and the connecting rods 3 are supported.
Square grooves are formed in the tops of the connecting rods 3 and the bottoms of the other connecting rods 3, and the connecting plates 15 are located in the square grooves, so that the two connecting rods 3 can be folded through the connecting plates 15, and the connecting rods are convenient to store.
When the foundation pit deformation monitoring device is used, the two connecting rods 3 are straightened through the connecting plates 15 connected with the rotating shafts of the two connecting rods 3, the fixing sleeve 4 is sleeved on the surface of the connecting positions of the two connecting rods 3 and the connecting plates 15, the fixing sleeve 4 is connected to the top of the clamping block 11 fixed on the surface of the connecting rods 3, the preformed hole 13 penetrating through the surface of the fixing sleeve 4 is in the same straight line with the screw hole 14 penetrating through the surface of the connecting rods 3, the bolts penetrate through the preformed hole 13 to be connected to the inside of the screw hole 14 in a threaded manner, the fixing sleeve 4 is fixedly connected with the two connecting rods 3, the two connecting rods 3 are kept in the same straight line, the connecting rods 3 are connected with the fixing tube 2 fixed on the top of the bottom plate 1 in a threaded manner through the threads formed on the surface, the two connecting rods 3 are connected with the bottom plate 1, the reinforcing pipe 8 is sleeved on the surface of the other connecting rod 3, the reinforcing pipe 8 is downwards moved, a plurality of connecting blocks 12 are fixed on the surface of the reinforcing pipe 8, supporting rods 9 are connected between every two adjacent connecting blocks 12 through rotating shafts, the reinforcing pipe 8 downwards moves until the supporting rods 9 contact the top of the bottom plate 1, the angle of the supporting rods 9 is adjusted, the surface of the supporting rods 9 is tightly attached to the inner wall of a limiting block 10 fixed on the top of the bottom plate 1, the supporting rods 9 and the reinforcing pipe 8 support the two connecting rods 3, the whole is more stable, then the connecting ring 5 is connected to the top of the other connecting rod 3 through bolts, the containing box 6 connected to the top of the connecting ring 5 through damping rotating shafts is connected with the two connecting rods 3, the whole is stably connected, the whole is moved to a position suitable for monitoring after the whole assembly is completed, finally, the monitor 7 is clamped into the accommodating box 6, the monitor 7 is restarted to monitor foundation pit deformation, and after the use is completed, the monitor 7 can be disassembled in sequence, so that the functions of convenient installation, disassembly and convenient storage are achieved.
The foregoing has shown and described the basic principles and main features of the present utility model and the advantages of the present utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a foundation ditch deformation monitoring's equipment which characterized in that: including bottom plate (1), the top of bottom plate (1) is fixed with fixed pipe (2), the internally mounted of fixed pipe (2) has connecting rod (3), the top of connecting rod (3) is connected with connecting plate (15) through the pivot, the top of connecting plate (15) is connected with another connecting rod (3) through the pivot, the top of another connecting rod (3) is connected with go-between (5) through bolted connection, the top of go-between (5) is connected with through the damping pivot holds box (6), the inside joint that holds box (6) has monitor (7), and the surface of the junction of two connecting rods (3) and connecting plate (15) has cup jointed fixed sleeve (4), two preformed holes (13) have been seted up on the surface of running through fixed sleeve (4), and the position that the surface of connecting rod (3) is close to the top and the surface of another connecting rod (3) are close to the position of bottom all offered screw (14), and two connecting rods (3) are passed through screw preformed hole (13) threaded connection in inside fixed connection at screw (14).
2. The apparatus for foundation pit deformation monitoring of claim 1, wherein: the surface joint of another connecting rod (3) has reinforcement pipe (8), and the surface equidistance of reinforcement pipe (8) is fixed with a plurality of connecting block (12), all is connected with bracing piece (9) through the pivot between two adjacent connecting blocks (12).
3. The apparatus for foundation pit deformation monitoring of claim 1, wherein: the surface of the connecting rod (3) and the inside of the fixed pipe (2) are provided with threads, and the connecting rod (3) is connected inside the fixed pipe (2) through threads.
4. The apparatus for foundation pit deformation monitoring of claim 1, wherein: the surface of the connecting rod (3) is fixedly provided with a clamping block (11), the radius of the clamping block (11) is larger than that of the fixed sleeve (4), and the fixed sleeve (4) is connected to the top of the clamping block (11).
5. An apparatus for foundation pit deformation monitoring according to claim 2, wherein: four rows of limiting blocks (10) are fixed at the top of the bottom plate (1), the limiting blocks (10) are C-shaped, and the inner walls of the limiting blocks (10) are tightly attached to the surface of the supporting rod (9).
6. The apparatus for foundation pit deformation monitoring of claim 1, wherein: square grooves are formed in the top of the connecting rod (3) and the bottom of the other connecting rod (3), and the connecting plate (15) is located in the square grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321604333.6U CN219933630U (en) | 2023-06-25 | 2023-06-25 | Equipment for monitoring deformation of foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321604333.6U CN219933630U (en) | 2023-06-25 | 2023-06-25 | Equipment for monitoring deformation of foundation pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219933630U true CN219933630U (en) | 2023-10-31 |
Family
ID=88487828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321604333.6U Active CN219933630U (en) | 2023-06-25 | 2023-06-25 | Equipment for monitoring deformation of foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219933630U (en) |
-
2023
- 2023-06-25 CN CN202321604333.6U patent/CN219933630U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111963224A (en) | Angle adjusting and supporting device of anchor rod machine and using method thereof | |
CN219933630U (en) | Equipment for monitoring deformation of foundation pit | |
CN207526137U (en) | A kind of adjusting locating rack | |
CN216076412U (en) | Steel stand straightness deviation of hanging down handles part | |
CN212671003U (en) | Self-positioning fixing device for steel structure stand column | |
CN209762442U (en) | Multifunctional supporting equipment for pipeline installation | |
CN209425306U (en) | The deflectable erection support of pressure vessels for the chemical industry internals | |
CN112901914B (en) | Foundation bolt group positioning and fixing device and method | |
CN218990825U (en) | Externally hung socket type disc buckle type steel pipe support scaffold for special-shaped cantilever structure | |
CN217352157U (en) | Support equipment for municipal bridge construction | |
CN220506022U (en) | Water conservancy pipeline connection structure | |
CN218478415U (en) | Elevator double-inclined pull rod fixing mechanism | |
CN219710328U (en) | Deep foundation pit steel pipe inclined support fixing device | |
CN219082435U (en) | Three-dimensional adjustable pipeline bracket | |
CN220166949U (en) | Shaft foundation pit supporting structure | |
CN214490436U (en) | Blind hole inner sleeve taking-out device | |
CN210025114U (en) | Operating means convenient to flange gasket installation | |
CN219196719U (en) | Cantilever support template for water inlet tower construction | |
CN220117232U (en) | Pipeline pit supporting structure for water plant grid connection | |
CN214653178U (en) | Hydraulic jacking balancing device | |
CN219535944U (en) | Special spiral grounding pile for photovoltaic support | |
CN215636218U (en) | Support structure for pipeline flaw detector with high flexibility | |
CN217205713U (en) | Main material reinforcing device of power transmission tower | |
CN219430785U (en) | Foundation pit slope supporting structure | |
CN219692465U (en) | Municipal pipeline fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |