CN219086687U - 10kv high-voltage cable middle head mounting tool - Google Patents

10kv high-voltage cable middle head mounting tool Download PDF

Info

Publication number
CN219086687U
CN219086687U CN202223286905.9U CN202223286905U CN219086687U CN 219086687 U CN219086687 U CN 219086687U CN 202223286905 U CN202223286905 U CN 202223286905U CN 219086687 U CN219086687 U CN 219086687U
Authority
CN
China
Prior art keywords
support column
screw rod
hole
plate
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202223286905.9U
Other languages
Chinese (zh)
Inventor
曹国记
郭俊勇
梁东洋
张栓增
安思
冉战胜
贺海燕
伍星玥
王子悦
马福红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Henan Electric Power Co Zhengzhou Power Supply Co
Zhongmu Power Supply Co Of State Grid Henan Electric Power Co
State Grid Corp of China SGCC
Original Assignee
State Grid Henan Electric Power Co Zhengzhou Power Supply Co
Zhongmu Power Supply Co Of State Grid Henan Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Henan Electric Power Co Zhengzhou Power Supply Co, Zhongmu Power Supply Co Of State Grid Henan Electric Power Co, State Grid Corp of China SGCC filed Critical State Grid Henan Electric Power Co Zhengzhou Power Supply Co
Priority to CN202223286905.9U priority Critical patent/CN219086687U/en
Application granted granted Critical
Publication of CN219086687U publication Critical patent/CN219086687U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a 10kv high-voltage cable middle head mounting tool which comprises a support column and a U-shaped clamp, wherein the end part of the support column is connected with the U-shaped clamp through a positioning sleeve, a vertical plate is arranged on the support column, the bottom of the vertical plate is connected with a transverse plate, a displacement through hole is dug in the middle of the vertical plate, a pressing plate penetrates through the displacement through hole, the end part of the pressing plate is sleeved on a screw rod, a limit nut is arranged above the screw rod, and guide wheels are respectively arranged on the top surface of the transverse plate and the bottom surface of the vertical plate. The utility model solves the problem that the cable end is not easy to fix after bending, and simultaneously, the cable is not required to be carried by staff for a long time, so that the utility model has the advantages of convenient use, simple operation, improved working efficiency, reduced burden of staff and easy popularization.

Description

10kv high-voltage cable middle head mounting tool
Technical field:
the utility model relates to an auxiliary tool for connecting a high-voltage cable end, in particular to a 10kv high-voltage cable middle head installation tool, and belongs to the technical field of cable installation.
The background technology is as follows:
when the high-voltage cable end is connected and manufactured in the cable trench, a plurality of workers are required to lift the end to be connected in a matched mode, when the cable end is manufactured, the cable end is required to be resistant to movement, the cable end is required to be bent for a certain radian, the cable end is kept stable, and the cable end can be connected; because the external diameter of the high-voltage cable is thicker, and the space in the cable trench is limited, the staff is hard to lift the cable end, and the bent cable is kept stable, so that the construction difficulty of the cable is increased undoubtedly.
The utility model comprises the following steps:
the technical problems to be solved by the utility model are as follows: the defect of the prior art is overcome, and the 10kv high-voltage cable middle head mounting tool is provided, so that the bent cable end can be fixed, and smooth connection of the cable end is ensured.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
the utility model provides a 10kv high tension cable middle head mounting tool, includes pillar and U type clamp, the pillar is two to be connected with the U type clamp through the spacer bush at the tip of every pillar, every cover is equipped with two risers respectively on the pillar, and is connected with the diaphragm on the bottom of riser on adjacent pillar, the middle part of riser is dug and is equipped with the displacement through-hole to run through there is the clamp plate in the displacement through-hole, the tip cover of clamp plate is established on the screw rod to be provided with stop nut in the top of screw rod, the screw rod is located the outside of riser, and runs through the tip of diaphragm, the top surface of diaphragm and the bottom surface of riser are provided with the leading wheel respectively.
The bottom of the locating sleeve is fixedly connected with the top surface of the U-shaped clamp, the support column penetrates through the locating sleeve, and a jacking bolt is arranged on the outer wall of the locating sleeve.
The upper part of the vertical plate is sleeved on the support column and is connected with the support column through a bolt.
The end part of the transverse plate extends out of the vertical plate, a through hole is dug at the end part of the transverse plate, a guide sleeve is arranged below the through hole, the lower end of the screw rod sequentially penetrates through the through hole and the guide sleeve, and the screw rod is fixedly connected with the guide sleeve through a bolt.
And the limit nut is positioned on the screw above the pressing plate.
The utility model has the positive beneficial effects that:
1. according to the utility model, the U-shaped clamps are arranged at the end parts of the support posts, so that the support posts and the precast slabs at the two ends of the cable pit can be fixed together, and a favorable support is provided for the use of the device; the supporting component formed by the vertical plate and the transverse plate is arranged on the support column to play a role in supporting the cable end, so that workers do not need to carry the cable for a long time during construction, and the burden of the workers is reduced; through setting up the clamp plate in diaphragm top, play the effect of chucking cable, when avoiding the preparation end, the cable is unstable because of being in bending state and bringing.
2. According to the utility model, the guide wheels are respectively arranged on the top surface of the transverse plate and the bottom surface of the pressing plate, so that the cable outer wall is prevented from being damaged by friction, and the cable end is conveniently pulled by workers, so that the cable end pulling device is convenient to use and simple to operate.
3. According to the utility model, the vertical plate is sleeved on the support column, and is fixedly connected with the support column through the bolt, so that the position of the cable end head can be adjusted according to the construction condition during use, the use is flexible, and the working efficiency is improved.
Description of the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of the structure of the risers and risers according to the present utility model;
FIG. 3 is a schematic view of a platen according to the present utility model;
wherein: the cable duct comprises a 1-pillar, a 2-locating sleeve, a 3-U-shaped clamp, a 4-vertical plate, a 5-transverse plate, a 6-guide wheel, a 7-displacement through hole, an 8-pressing plate, a 9-screw, a 10-limit nut and an A-cable duct.
The specific embodiment is as follows:
the utility model is further explained and illustrated below with reference to the drawings:
referring to fig. 1-3, a 10kv high-voltage cable middle head mounting tool comprises two support posts 1 and a U-shaped clamp 3, wherein the two support posts 1 are connected with the U-shaped clamp 3 through positioning sleeves 2 at the end parts of each support post 1, two vertical plates 4 are respectively sleeved on each support post 1, a transverse plate 5 is connected to the bottom of each vertical plate 4 on each adjacent support post 1, a displacement through hole 7 is dug in the middle of each vertical plate 4, a pressing plate 8 penetrates through the displacement through hole 7, the end parts of the pressing plates 8 are sleeved on a screw rod 9, limit nuts 10 are arranged above the screw rods 9, the screw rods 9 are located outside the vertical plates 4 and penetrate through the end parts of the transverse plates 5, and guide wheels 6 are respectively arranged on the top surfaces of the transverse plates 5 and the bottom surfaces of the vertical plates 4.
The locating sleeve 2 is fixedly connected with the top surface of the U-shaped clamp 3, the support column 1 penetrates through the locating sleeve 2, and a jacking bolt is arranged on the outer wall of the locating sleeve 2.
The upper part of the vertical plate 4 is sleeved on the support column 1 and is connected with the support column 1 through bolts.
The outside of riser 4 is stretched out to the tip of diaphragm 5, and the tip of diaphragm 5 is dug and is equipped with the through-hole to be provided with the uide bushing in the below of through-hole, the lower extreme of screw rod 9 runs through-hole, uide bushing in proper order, and is in the same place screw rod 9 and uide bushing fixed connection through the bolt.
The limit nut 10 is positioned on the screw 9 above the pressing plate 8.
In the above description, the dimensions of the U-shaped clip are matched with the thicknesses of the prefabricated plates at the two ends of the cable pit, and the length of the strut meets the following conditions: the two ends of the support column can penetrate through the positioning sleeve at the top of the U-shaped clamp.
In the above description, the size of the pressing plate is consistent with that of the end plate, and the pressing plate sequentially penetrates through the displacement through holes on the two vertical plates and is sleeved on the screw rod.
In the above description, the screw rod penetrates through the through hole and the guide sleeve, and is fixedly connected with the guide sleeve through the bolt outside the guide sleeve.
In the above description, the guide wheels of the top surface of the transverse plate and the bottom surface of the pressing plate are at least three.
In the above description, the two vertical plates and the two horizontal plates form two supporting frames which are distributed on the support posts.
Working principle:
the U-shaped clamps are respectively clamped on the corresponding precast slabs, one end of the support column penetrates through a positioning sleeve, then a supporting frame formed by a vertical plate and a transverse plate is sleeved on the support column, the other end of the support column penetrates through the positioning sleeve on the corresponding U-shaped frame, and finally the support column and the positioning sleeve are fixedly connected together through bolts;
lifting the cable and penetrating the transverse plate, and then compressing and limiting the cable through the pressing plate;
the two cable ends are manufactured and connected through a supporting frame formed by the movable vertical plate and the transverse plate, after the manufacturing is finished, the jacking nut at the upper end of the screw rod is removed, the bolt outside the guide sleeve is loosened, the screw rod is pulled out from the pressing plate, and then the pressing plate is pulled out;
and loosening the jacking bolts on the outer wall of the positioning sleeve, drawing out the support column, drawing out the supporting frame formed by the vertical plate and the transverse plate, placing the manufactured cable end in the cable trench, and covering the cable trench A with the precast slab.
The utility model solves the problem that the cable end is not easy to fix after being bent when the cable end is manufactured, so that workers do not need to carry the cable for a long time when in construction, the utility model has the advantages of convenient use, simple operation, improved working efficiency, reduced burden of the workers and easy popularization.

Claims (5)

1. The utility model provides a 10kv high tension cable middle head mounting tool, includes pillar (1) and U type clamp (3), its characterized in that: the support column (1) is two, and be connected with U type clamp (3) through position sleeve (2) at the tip of every support column (1), every cover is equipped with two riser (4) on support column (1) respectively, and the bottom of riser (4) is connected with diaphragm (5) on adjacent support column (1), the middle part of riser (4) is dug and is equipped with displacement through-hole (7), and runs through in displacement through-hole (7) clamp plate (8), the tip cover of clamp plate (8) is established on screw rod (9), and is provided with stop nut (10) in the top of screw rod (9), screw rod (9) are located the outside of riser (4), and run through the tip of diaphragm (5), the top surface of diaphragm (5) and the bottom surface of riser (4) are provided with leading wheel (6) respectively.
2. A 10kv high voltage cable intermediate head installation tool according to claim 1, wherein: the positioning sleeve (2) is fixedly connected with the top surface of the U-shaped clamp (3), the support column (1) penetrates through the positioning sleeve (2), and a jacking bolt is arranged on the outer wall of the positioning sleeve (2).
3. A 10kv high voltage cable intermediate head installation tool according to claim 1, wherein: the upper part of the vertical plate (4) is sleeved on the support column (1) and is connected with the support column (1) through bolts.
4. A 10kv high voltage cable intermediate head installation tool according to claim 1, wherein: the end part of the transverse plate (5) extends out of the vertical plate (4), a through hole is dug at the end part of the transverse plate (5), a guide sleeve is arranged below the through hole, the lower end of the screw rod (9) sequentially penetrates through the through hole and the guide sleeve, and the screw rod (9) is fixedly connected with the guide sleeve through a bolt.
5. A 10kv high voltage cable intermediate head installation tool according to claim 1, wherein: the limit nut (10) is positioned on the screw rod (9) above the pressing plate (8).
CN202223286905.9U 2022-12-08 2022-12-08 10kv high-voltage cable middle head mounting tool Withdrawn - After Issue CN219086687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223286905.9U CN219086687U (en) 2022-12-08 2022-12-08 10kv high-voltage cable middle head mounting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223286905.9U CN219086687U (en) 2022-12-08 2022-12-08 10kv high-voltage cable middle head mounting tool

Publications (1)

Publication Number Publication Date
CN219086687U true CN219086687U (en) 2023-05-26

Family

ID=86393846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223286905.9U Withdrawn - After Issue CN219086687U (en) 2022-12-08 2022-12-08 10kv high-voltage cable middle head mounting tool

Country Status (1)

Country Link
CN (1) CN219086687U (en)

Similar Documents

Publication Publication Date Title
CN109110616B (en) Overhead telescopic construction elevator roof beam for elevator shaft traction and installation and use method thereof
CN103291065B (en) A kind of assembly concrete bracing or strutting arrangement and lifting localization method
CN219086687U (en) 10kv high-voltage cable middle head mounting tool
CN104912191A (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN213199813U (en) Shallow for building erection engineering
CN212356305U (en) Prefabricated box girder prestressing force stretch-draw equipment
CN210885037U (en) Tower crane fixing structure
CN204753815U (en) Simple and easy assembly quality of assembled precast concrete post
CN219239021U (en) Hoisting tool for PC prefabricated part of assembled building
CN219098488U (en) Auxiliary machine tool convenient for hoisting and positioning installation of assembled building components
CN219304311U (en) Be used for transformer to overhaul safety device
CN219279395U (en) Auxiliary lifting trolley for mounting parts at bottom of equipment
CN215858240U (en) Energy-saving assembled steel structure frame
CN215437807U (en) Fixing device convenient to prefabricated component transportation
CN218622743U (en) Wall structure stable in installation
CN212198273U (en) Portable tower footing wall-attached frame inner support
CN219567447U (en) Maintenance device for climbing formwork jack
CN211759604U (en) Automatic beating mechanism
CN220566919U (en) Building supervisory equipment auxiliary installation structure
CN219509168U (en) Heat preservation template installation die carrier
CN221212196U (en) Cement pipe making machine
CN219543561U (en) Stop gear of automatic end mould mounting and dismounting platform
CN213571923U (en) Steel strand anchor mounting device and anchor seat thereof
CN219671108U (en) Stand spacing adjusting device
CN216341072U (en) Reinforcing bar fixing device of reinforcing bar bundling installation usefulness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20230526

Effective date of abandoning: 20231127

AV01 Patent right actively abandoned

Granted publication date: 20230526

Effective date of abandoning: 20231127

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned