CN219060399U - Post-pouring strip for building and construction joint plugging concrete device - Google Patents
Post-pouring strip for building and construction joint plugging concrete device Download PDFInfo
- Publication number
- CN219060399U CN219060399U CN202320086153.7U CN202320086153U CN219060399U CN 219060399 U CN219060399 U CN 219060399U CN 202320086153 U CN202320086153 U CN 202320086153U CN 219060399 U CN219060399 U CN 219060399U
- Authority
- CN
- China
- Prior art keywords
- plate
- construction joint
- post
- construction
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model belongs to the technical field of building construction, in particular to a post-pouring strip and a construction joint plugging concrete device for a building, which comprises a concrete body and a plugging component arranged on the concrete body; the utility model provides a concrete body, the construction joint, the shutoff subassembly is in including setting up the bottom plate of concrete body lower surface and setting up the roof of concrete body upper surface, the bottom plate with the construction joint both sides between the roof all are provided with two upper and lower symmetrical arrangement's connecting block, set up the shutoff subassembly on this device, the user can prevent the problem that the construction joint leaks thick liquid through this shutoff subassembly, improve structure main part construction work efficiency, accelerate the construction progress, convenient to detach moreover, the turnover number of times has been increased in order to practice thrift construction cost, and joining assembly has been added to this mechanism, can further improve the stability that roof and bottom plate are connected, improve the shutoff effect to post-cast strip and construction joint department.
Description
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a post-pouring strip for a building and a device for plugging concrete at a construction joint.
Background
At present, in construction engineering, if a member such as a concrete wall or a concrete slab is required to be cast in two parts, if one part of the member is not plugged, the problem that concrete will flow and leak at will exists, and the construction method aims at post-cast strip and construction joint construction of a building, and the leakage at the post-cast strip and the construction joint is one of common engineering quality common problems.
Through investigation publication (bulletin) number: CN201943047U discloses a compressive stress water stop plate, and in this technology, the technical schemes of "comprising a fork-shaped glue plate, a conical glue plate, an upper base plate, a lower base plate, a plurality of fastening bolts a and a plurality of fastening bolts B" are disclosed, which have the technical effects of closing the gap and avoiding leakage;
although the compressive stress water stop plate can prevent leakage of the concrete deformation joint to a certain extent, the compressive stress water stop plate has the problems of complicated manufacturing and installation and higher cost because of complex structure, and is difficult to meet the requirements of actual building construction operation;
in order to solve the problems, the application provides a post-pouring belt for a building and a construction joint plugging concrete device.
Disclosure of Invention
In order to solve the problems in the prior art, the utility model provides a post-pouring belt for a building and a construction joint plugging concrete device, which can prevent slab joint from leaking, reduce construction cost, improve construction efficiency of a structural main body, accelerate construction progress, facilitate disassembly, increase turnover times, reduce loss and save construction cost.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the post-pouring belt for the building and the construction joint plugging concrete device comprise a concrete body and a plugging assembly arranged on the concrete body;
the plugging assembly comprises a bottom plate and a top plate, wherein the bottom plate is arranged on the lower surface of the concrete body, the top plate is arranged on the upper surface of the concrete body, two sides of a construction joint between the bottom plate and the top plate are respectively provided with two connecting blocks which are arranged in a vertical symmetrical mode, one sides of the connecting blocks, which are close to each other, are respectively provided with three integrally formed inserting plates, the connecting blocks are provided with inserting grooves for accommodating the inserting plates, the inserting plates are movably arranged in the inserting grooves, grooves for accommodating inserting rods are formed in the inclined edges of the inserting plates, and the inserting rods are movably arranged in the grooves.
As the post-pouring belt and the construction joint plugging concrete device for the building, the utility model is preferable, the outer side wall of the inserted link is fixedly connected with the anti-slip pad, and the anti-slip pad is in contact connection with the inserting plate.
As the post-pouring belt and the construction joint plugging concrete device for the building, the utility model is preferable, and one end of the inserted link, which is far away from the plugboard, is fixedly connected with a pull ring.
The building post-pouring belt and the construction joint plugging concrete device are preferably arranged, and further comprise a connecting assembly, wherein the connecting assembly comprises a connecting plate fixedly connected to the upper surface of the bottom plate and a fixing plate fixedly connected to the lower surface of the top plate, the connecting plate and the fixing plate are positioned between the connecting blocks on two sides, and the connecting plate is in contact connection with the fixing plate.
As the post-pouring belt and the construction joint plugging concrete device for the building, the utility model is preferable, the upper surface of the connecting plate is fixedly connected with the limiting plate, the lower surface of the fixing plate is provided with the containing groove for containing the limiting plate, and the limiting plate is movably arranged in the containing groove.
As the post-pouring belt and the construction joint plugging concrete device for the building, the utility model is preferable, the joint of the two sides of the fixed plate and the limiting plate is provided with the clamping groove, and the inserted link is movably arranged in the clamping groove.
Compared with the prior art, the utility model has the beneficial effects that:
set up the shutoff subassembly on this device, the user can prevent the problem that the construction joint leaks thick liquid through this shutoff subassembly, improves structure main part construction work efficiency for the construction progress, convenient to detach moreover, but increase turnover number of times is with practicing thrift construction cost to joining component has been added in this mechanism, the stability of roof and bottom plate connection can be further improved, the shutoff effect to post-cast strip and construction joint department is improved.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic illustration of the structure of the plugging assembly and the connection assembly of the present utility model;
FIG. 3 is a schematic view of a plugging assembly according to the present utility model;
FIG. 4 is a schematic view of the structure of the connecting block and the board according to the present utility model;
FIG. 5 is a schematic view of a connecting assembly according to the present utility model;
fig. 6 is a schematic view of an exploded structure of the connection assembly of the present utility model.
In the figure:
1. a concrete body;
2. a plugging assembly; 21. a bottom plate; 22. a top plate; 23. a connecting block; 24. inserting plate; 25. a rod; 26. a pull ring; 27. an anti-slip pad;
3. a connection assembly; 31. a connecting plate; 32. a fixing plate; 33. and a limiting plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Fig. 1 shows:
a post-pouring belt for building and a device for plugging construction joints comprise a concrete body.
In this embodiment: existing device { public (announcement) number }: CN201943047U, which discloses a compressive stress water stop plate, in which concrete is disclosed, and the concrete body in the present application adopts the same technical means in the prior art, which are not described in detail herein, and regarding the present fork-shaped glue plate, the present application is further improved, and the details refer to the following disclosure technology; in order to solve the technical problem existing in the prior art, the compressive stress water stop plate disclosed in the background art can prevent leakage of a concrete deformation joint to a certain extent, but has the problems of complicated manufacturing and installation and higher cost because of complex structure, and is difficult to meet the requirements of actual building construction operation.
Further, the method comprises the following steps:
as shown in fig. 1-4:
the concrete plugging device also comprises a plugging component arranged on the concrete body; the plugging component comprises a bottom plate arranged on the lower surface of the concrete body and a top plate arranged on the upper surface of the concrete body, two sides of a construction joint between the bottom plate and the top plate are respectively provided with two connecting blocks which are arranged in a vertical symmetrical mode, one sides of the connecting blocks, which are close to each other, are respectively provided with three plugboards which are integrally formed, slots for accommodating the plugboards are formed in the connecting blocks, the plugboards are movably arranged in the slots, grooves for accommodating the plugboards are formed in the bevel edges of the plugboards, and the plugboards are movably arranged in the grooves.
In an alternative embodiment, the outer side wall of the insert rod is fixedly connected with a non-slip mat, and the non-slip mat is in contact connection with the insert plate.
In an alternative embodiment, a pull ring is fixedly connected to the end of the plunger remote from the insert plate.
In this embodiment: when the construction joint is used, an operator places the top plate above the construction joint when building post-pouring strips and the construction joint are plugged and coagulated, places the bottom plate below the construction joint, inserts the inserting plate of the connecting block on the bottom plate into the inserting groove of the connecting block on the top plate at the moment, inserts the inserting rod into the groove on the inserting plate, and can complete the connection of the inserting plate and the inserting rod and the groove by using a woodworking hammer in a knocking way, so that the inserting of the inserting rod can mutually splice the inserting plates of the upper connecting block and the lower connecting block, thereby forming a block for filling the construction joint, improving the stability of connection by utilizing the anti-slip pad, and when the anti-slip pad needs to be disassembled, pulling the pulling ring outwards can enable the inserting rod to outwards move so as to realize quick disassembly, prevent the problem of slurry leakage of the construction joint, improve the construction efficiency of a structural main body, accelerate the construction progress and facilitate disassembly, and increase the turnover times so as to save the construction cost.
It should be noted that: after the plugboards of the upper connecting block and the lower connecting block are mutually spliced together, square inserting rods are inserted, grooves on the plugboards corresponding to each other can be spliced to form a square groove, so that two groups of plugboards can be mutually spliced together by using the square inserting rods, and a block can be spliced.
It should be noted that: the anti-slip pad is made of elastic materials, so that the direct friction force between the inserted link and the plugboard can be increased, and the inserted link is more stable.
As shown in fig. 5 and 6:
the building post-pouring belt and construction joint plugging concrete device further comprises a connecting component, wherein the connecting component comprises a connecting plate fixedly connected to the upper surface of a bottom plate and a fixing plate fixedly connected to the lower surface of a top plate, the connecting plate and the fixing plate are located between connecting blocks on two sides, and the connecting plate and the fixing plate are in contact connection.
In an alternative embodiment, the upper surface of the connecting plate is fixedly connected with a limiting plate, the lower surface of the fixing plate is provided with a containing groove for containing the limiting plate, and the limiting plate is movably arranged in the containing groove.
In an alternative embodiment, the connection parts of the two sides of the fixing plate and the limiting plate are provided with clamping grooves, and the inserted bars are movably arranged in the clamping grooves.
In this embodiment: through inserting the limiting plate on the connecting plate into the holding tank of fixed plate, can make the connection of connecting plate and fixed plate more stable to in utilizing the inserted bar to insert the draw-in groove on fixed plate and the limiting plate, utilize the inserted bar to carry out spacingly to fixed plate and limiting plate again, can further improve the stability that roof and bottom plate are connected like this, improve the shutoff effect to post-cast strip and construction joint department.
The working flow is as follows: when the construction post-pouring strip and the construction joint are plugged and coagulated, an operator places the top plate above the construction joint, places the bottom plate below the construction joint, inserts the inserting plate of the connecting block on the bottom plate into the inserting groove of the connecting block on the top plate at the moment, inserts the inserting rod into the groove on the inserting plate, completes the connection of the inserting plate and the inserting groove and the connection of the inserting rod and the groove by using a woodworking hammer, and enables the inserting plate of the upper connecting block and the lower connecting block to be spliced together with each other, thereby forming a block for filling the construction joint, improving the connection stability by utilizing the anti-skid pad, and pulling the pull ring outwards when the connection is needed.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (6)
1. The utility model provides a post-cast strip of building and construction joint shutoff concrete device, includes concrete body (1), its characterized in that: the concrete block also comprises a blocking component (2) arranged on the concrete body (1);
the plugging assembly (2) comprises a bottom plate (21) arranged on the lower surface of the concrete body (1) and a top plate (22) arranged on the upper surface of the concrete body (1), two connecting blocks (23) which are arranged symmetrically up and down are arranged on two sides of a construction joint between the bottom plate (21) and the top plate (22), three plugboards (24) which are integrally formed are arranged on one sides, close to each other, of the connecting blocks (23), slots for accommodating the plugboards (24) are arranged on the connecting blocks (23), the plugboards (24) are movably arranged in the slots, grooves for accommodating plugboards (25) are formed in the bevel edges of the plugboards (24), and the plugboards (25) are movably arranged in the grooves.
2. The post-pouring strip and construction joint plugging concrete device for a building according to claim 1, wherein: the outer side wall of the inserted link (25) is fixedly connected with an anti-slip pad (27), and the anti-slip pad (27) is in contact connection with the plugboard (24).
3. The post-pouring strip and construction joint plugging concrete device for a building according to claim 1, wherein: one end of the inserted link (25) far away from the plugboard (24) is fixedly connected with a pull ring (26).
4. The post-pouring strip and construction joint plugging concrete device for a building according to claim 1, wherein: the connecting assembly (3) comprises a connecting plate (31) fixedly connected to the upper surface of the bottom plate (21) and a fixing plate (32) fixedly connected to the lower surface of the top plate (22), the connecting plate (31) and the fixing plate (32) are located between the connecting blocks (23) on two sides, and the connecting plate (31) and the fixing plate (32) are in contact connection.
5. The post-pouring strip and construction joint plugging concrete device for a building according to claim 4, wherein: the upper surface fixedly connected with limiting plate (33) of connecting plate (31), the lower surface of fixed plate (32) is provided with the holding tank that is used for holding limiting plate (33), limiting plate (33) movable setting is in this holding tank.
6. The post-pouring strip and construction joint plugging concrete device for a building according to claim 5, wherein: the fixed plate (32) and the connecting parts of the two sides of the limiting plate (33) are respectively provided with a clamping groove, and the inserting rod (25) is movably arranged in the clamping grooves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320086153.7U CN219060399U (en) | 2023-01-30 | 2023-01-30 | Post-pouring strip for building and construction joint plugging concrete device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320086153.7U CN219060399U (en) | 2023-01-30 | 2023-01-30 | Post-pouring strip for building and construction joint plugging concrete device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219060399U true CN219060399U (en) | 2023-05-23 |
Family
ID=86375365
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320086153.7U Active CN219060399U (en) | 2023-01-30 | 2023-01-30 | Post-pouring strip for building and construction joint plugging concrete device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219060399U (en) |
-
2023
- 2023-01-30 CN CN202320086153.7U patent/CN219060399U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110284704B (en) | Assembled floor post-pouring strip template joint structure and construction method thereof | |
CN213774450U (en) | Concrete building template for civil engineering | |
CN213417740U (en) | Precast block channel structure | |
CN219060399U (en) | Post-pouring strip for building and construction joint plugging concrete device | |
CN109989516B (en) | Building block and construction process thereof | |
CN209637149U (en) | Light energy saving brick | |
CN216429013U (en) | Concrete pouring template for building construction engineering construction | |
CN213174794U (en) | Novel reserved hole formwork tool | |
CN213114344U (en) | Crack reinforcing apparatus for road and bridge | |
CN211201997U (en) | Split-type spliced model structure for pouring inverted arch and filling of highway tunnel | |
CN211396605U (en) | Adjustable template reinforcing apparatus | |
CN108824819B (en) | Modular building structure building system | |
CN210195239U (en) | Combined building splicing template for building | |
CN210552005U (en) | Wallboard type assembled side form structure | |
CN219060870U (en) | Shaping template for shear wall construction at deformation joint | |
CN114411798B (en) | Fan foundation structure | |
CN206385559U (en) | It is a kind of that there is the quick concrete pedestal for splicing function | |
CN217602681U (en) | Bury formula waterstop fixing device in | |
CN220555907U (en) | Novel outer frame cantilever I-steel fixing anchor ring device | |
CN219387201U (en) | Concrete building template assembly | |
CN217581184U (en) | Building multipurpose steel mould | |
CN220643759U (en) | Highway asphalt concrete template | |
CN218029201U (en) | Concrete column's antidetonation strengthening mechanism | |
CN210658971U (en) | Energy-efficient reinforcing bar grout sleeve | |
CN207211131U (en) | A kind of underground continuous wall connector processing unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |