CN219034619U - Assembled building construction device - Google Patents

Assembled building construction device Download PDF

Info

Publication number
CN219034619U
CN219034619U CN202320340509.5U CN202320340509U CN219034619U CN 219034619 U CN219034619 U CN 219034619U CN 202320340509 U CN202320340509 U CN 202320340509U CN 219034619 U CN219034619 U CN 219034619U
Authority
CN
China
Prior art keywords
screw
frame
bearing
building construction
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320340509.5U
Other languages
Chinese (zh)
Inventor
李阳
章阳
申威强
汪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Design Group Co ltd
Original Assignee
Huawei Design Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Design Group Co ltd filed Critical Huawei Design Group Co ltd
Priority to CN202320340509.5U priority Critical patent/CN219034619U/en
Application granted granted Critical
Publication of CN219034619U publication Critical patent/CN219034619U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of building construction pit digging, in particular to an assembled building construction device which comprises a movable bottom frame, wherein a bearing vertical frame is fixedly welded in the middle of the surface of the movable bottom frame, a fixing equipment box is fixedly arranged on the inner wall of the bearing vertical frame, a motor I is arranged in the fixing equipment box, a screw rod I is arranged at the output end of the motor I, and the screw rod I is rotatably arranged in the bearing vertical frame. According to the utility model, the worm is meshed with the worm wheel in a rotating way, the worm wheel rotates to drive the spiral digging rod to rotate, the spiral digging rod rotates on the ground to perform soil digging operation, the first motor is started to drive the first screw to rotate, the first screw is meshed with the bearing screw block, the bearing screw block slowly descends along the first screw, the descending bearing screw block slowly moves the spiral digging rod in the soil of the box, the soil is gradually moved to the inner side of the blocking inner cylinder through the spiral digging rod, and the overflow blocking inner cylinder is accommodated in the ground-contacting frame, so that soil digging is achieved, and meanwhile, the soil is accommodated and cleaned.

Description

Assembled building construction device
Technical Field
The utility model relates to the technical field of building construction pit digging, in particular to an assembled building construction device.
Background
The assembled building is formed by transferring a large amount of field operation work in a traditional building mode to a factory, processing and manufacturing building components and accessories in the factory, transporting to a building construction site, and assembling and installing on site through a reliable connection mode. The fabricated building mainly comprises a prefabricated assembled concrete structure, a steel structure, a modern wood structure building and the like. The Chinese patent discloses an assembled building construction device (grant bulletin number CN 113882446B), and the patent technology discloses an assembled building construction device, which comprises a beam, a motor I, spiral blades and plugboards, wherein the middle part of the beam is fixedly connected with the motor I, the spiral blades are arranged on an output shaft of the motor I, and plugboards are arranged at the left end and the right end of the beam. The lower end of the plugboard is in a blade shape. The assembly type building construction device further comprises tooth points, and a plurality of tooth points are arranged on the lower side of each plugboard from front to back. The assembly type building construction device further comprises vertical seats, wherein the two vertical seats are respectively connected to the left end and the right end of the cross beam in a sliding mode, and the two plugboards are respectively connected to the lower sides of the two vertical seats in a sliding mode in the front-rear direction. Pit can be dug out, then the support concrete column of the prefabricated building is convenient to set up. The technology solves the problem that when the fabricated building is installed, a plurality of concrete columns for supporting are required to be poured on the ground, so that a pit is required to be dug on the ground for construction.
However, in the prior art, after a pit is dug out of the construction ground, soil in the pit remains on the ground, and the soil remaining on the ground needs to be cleaned when a concrete model column is placed.
The problem of soil clearance in the pit is excavated to construction storefront among the prior art needs to be solved.
Accordingly, a person skilled in the art provides an assembled building construction device to solve the problems set forth in the background art.
Disclosure of Invention
In order to solve the technical problems, the utility model provides:
the assembled building construction device comprises a movable bottom frame, wherein a bearing vertical frame is fixedly welded in the middle of the surface of the movable bottom frame, a fixed equipment box is fixedly arranged on the inner wall of the bearing vertical frame, a first motor is installed in the fixed equipment box, a first screw is installed at the output end of the first motor, and a first screw is rotatably installed in the bearing vertical frame; the bottom wall of the fixed equipment box is rotatably provided with a second screw rod, the bottom end of the second screw rod is connected with a second motor, and the second motor is arranged on the inner wall of the movable bottom frame; the bearing vertical frame is provided with a construction pit digging mechanism and a soil containing mechanism; the construction pit digging mechanism comprises a bearing screw block, wherein the bearing screw block is movably positioned on the bearing vertical frame and is meshed and sleeved outside the screw rod I.
Preferably: one end of the bearing screw block is fixedly provided with a mounting disc box, and the bottom of the mounting disc box is rotatably provided with a spiral digging rod.
Preferably: the top end of the spiral digging rod rotates to penetrate through the inside of the installation disc box, and a worm wheel is fixedly installed on the outer wall of the spiral digging rod.
Preferably: the worm wheel is meshed with a worm, the worm is rotatably arranged in the mounting disc box, and one end of the worm is connected with a motor III.
Preferably: the soil containing mechanism comprises a ground contact frame body, a movable screw block is fixedly arranged on the outer wall of the ground contact frame body, and the movable screw block is movably positioned inside the bearing vertical frame and is meshed with the outside of the screw rod II.
Preferably: the middle wall of the grounding frame body is fixedly provided with a blocking inner cylinder in a penetrating mode, and the front side of the grounding frame body is rotatably provided with a frame door.
Preferably: the power supply is installed on the inner wall of the movable bottom frame, and movable wheels are installed at four corners of the bottom of the movable bottom frame.
Preferably: the fixing equipment box is provided with a controller, and the outer wall of the bearing vertical frame is provided with a handle.
The utility model has the technical effects and advantages that:
according to the utility model, the worm is meshed with the worm wheel in a rotating way, the worm wheel rotates to drive the spiral digging rod to rotate, the spiral digging rod rotates on the ground to perform soil digging operation, the first motor is started to drive the first screw to rotate, the first screw is meshed with the bearing screw block, the bearing screw block slowly descends along the first screw, the descending bearing screw block slowly moves the spiral digging rod in the soil of the box, the soil is gradually moved to the inner side of the blocking inner cylinder through the spiral digging rod, and the overflow blocking inner cylinder is accommodated in the ground-contacting frame, so that soil digging is achieved, and meanwhile, the soil is accommodated and cleaned.
Drawings
Fig. 1 is a schematic structural view of an assembled building construction device according to an embodiment of the present application;
FIG. 2 is a schematic view of a handle in an assembled building construction device according to an embodiment of the present disclosure;
fig. 3 is a schematic structural view of a first screw in an assembled building construction device according to an embodiment of the present disclosure;
fig. 4 is a schematic structural view of a grounding frame in an assembled building construction device according to an embodiment of the present disclosure;
fig. 5 is a schematic structural view of a load-bearing screw block in an assembled building construction device according to an embodiment of the present application;
fig. 6 is a schematic structural view of a spiral digging rod in an assembled building construction device according to an embodiment of the present application;
in the figure:
1. moving the bottom frame; 2. a load-bearing vertical frame; 3. fixing the equipment box; 4. a first screw; 5. a first motor; 6. a second screw; 7. a second motor;
8. constructing a pit digging mechanism; 801. a bearing screw block; 802. a mounting plate box; 803. a spiral digging rod; 804. a worm wheel; 805. a worm; 806. a third motor;
9. a soil storage mechanism; 901. a ground contact frame; 902. blocking the inner barrel; 903. a frame door; 904. moving the screw block;
10. a power supply; 11. a handle; 12. a controller; 13. and (5) moving the wheel.
Description of the embodiments
The utility model will be described in further detail with reference to the drawings and the detailed description. The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.
Examples
Referring to fig. 1-6, in this embodiment, there is provided an assembled building construction device, including a movable bottom frame 1, a bearing vertical frame 2 is welded and fixed in the middle of the surface of the movable bottom frame 1, a fixed equipment box 3 is fixed on the inner wall of the bearing vertical frame 2, a motor 5 is installed inside the fixed equipment box 3, a screw 4 is installed at the output end of the motor 5, the screw 4 is rotatably installed inside the bearing vertical frame 2, a screw 6 is rotatably installed at the bottom wall of the fixed equipment box 3, a motor 7 is connected with the bottom end of the screw 6, the motor 7 is installed on the inner wall of the movable bottom frame 1, a construction pit digging mechanism 8 and a soil containing mechanism 9 are installed on the bearing vertical frame 2, the construction pit digging mechanism 8 includes a bearing screw block 801, the bearing screw block 801 is movably located outside the bearing vertical frame 2 and is engaged with the screw 4, a mounting disc box 802 is fixedly installed at one end of the bearing screw block 801, the bottom of the installation disc box 802 is rotatably provided with a spiral digging rod 803, the top end of the spiral digging rod 803 rotates to penetrate through the inside of the installation disc box 802, the outer wall of the installation disc box 802 is fixedly provided with a worm wheel 804, the worm wheel 804 is meshed with a worm 805, the worm 805 is rotatably installed inside the installation disc box 802, one end of the worm 805 is connected with a motor III 806, the soil containing mechanism 9 comprises a grounding frame 901, the outer wall of the grounding frame 901 is fixedly provided with a movable screw block 904, the movable screw block 904 is movably positioned inside a bearing vertical frame 2 and is meshed and sleeved outside a screw II 6, the middle wall of the grounding frame 901 is fixedly provided with a blocking inner cylinder 902 in a penetrating manner, the front side of the grounding frame 901 is rotatably provided with a frame door 903, the inner wall of the movable bottom frame 1 is provided with a power supply 10, four corners of the bottom of the movable bottom frame 1 are respectively provided with a movable wheel 13, the fixed equipment box 3 is provided with a controller 12, the outer wall of the bearing vertical frame 2 is provided with a handle 11;
when the movable bottom frame 1 is moved to the construction ground through the movable wheels 13, the spiral digging rod 803 of the construction pit digging mechanism 8 is positioned to the digging position;
the motor II 7 is started, the motor II 7 is started and then rotates to drive the screw II 6 to rotate, the screw II 6 rotates to engage the movable screw block 904, the movable screw block 904 descends along the screw II 6 at the inner side of the bearing vertical frame 2, the ground contact frame 901 is contacted with the ground, the movable wheel 13 is positioned, and the device is more stable in the soil digging operation;
the pit digging mechanism 8 is constructed, and a motor III 806 and a motor I5 are started at the same time, and the motor III 806 and the motor I5 work cooperatively to perform the soil digging operation;
the third motor 806 starts and then drives the worm 805 to rotate, the worm 805 rotates and meshes with the worm wheel 804 to rotate, the worm wheel 804 rotates and drives the spiral digging rod 803 to rotate, the spiral digging rod 803 rotates on the ground to carry out soil digging operation, the first motor 5 starts and then drives the first screw 4 to rotate, the first screw 4 is meshed with the bearing screw block 801, the bearing screw block 801 slowly descends along the first screw 4, the descending bearing screw block 801 moves the spiral digging rod 803 in the soil of a slow box, the soil is gradually moved to the inner side of the blocking inner cylinder 902 through the spiral digging rod 803, and the overflow blocking inner cylinder 902 is contained in the ground contact frame 901, so that soil digging is achieved and meanwhile the soil is contained and cleaned.
It will be apparent that the described embodiments are only some, but not all, embodiments of the utility model. All other embodiments, which can be made by those skilled in the art and which are included in the embodiments of the present utility model without the inventive step, are intended to be within the scope of the present utility model. Structures, devices and methods of operation not specifically described and illustrated herein, unless otherwise indicated and limited, are implemented according to conventional means in the art.

Claims (8)

1. The assembled building construction device comprises a movable bottom frame (1) and is characterized in that a bearing vertical frame (2) is fixedly welded in the middle of the surface of the movable bottom frame (1), a fixed equipment box (3) is fixedly arranged on the inner wall of the bearing vertical frame (2), a motor I (5) is arranged in the fixed equipment box (3), a screw I (4) is arranged at the output end of the motor I (5), and the screw I (4) is rotatably arranged in the bearing vertical frame (2);
the bottom wall of the fixed equipment box (3) is rotatably provided with a second screw rod (6), the bottom end of the second screw rod (6) is connected with a second motor (7), and the second motor (7) is arranged on the inner wall of the movable bottom frame (1);
the bearing vertical frame (2) is provided with a construction pit digging mechanism (8) and a soil containing mechanism (9);
the construction pit digging mechanism (8) comprises a bearing screw block (801), wherein the bearing screw block (801) is movably arranged on the bearing vertical frame (2) and is meshed and sleeved outside the screw rod I (4).
2. The fabricated building construction device according to claim 1, wherein a mounting disc box (802) is fixedly installed at one end of the bearing screw block (801), and a spiral digging rod (803) is rotatably installed at the bottom of the mounting disc box (802).
3. The fabricated building construction device according to claim 2, wherein the top end of the spiral digging rod (803) rotates to penetrate through the inside of the mounting disc box (802), and a worm wheel (804) is fixedly installed on the outer wall.
4. A fabricated building construction device according to claim 3, wherein the worm wheel (804) is meshed with a worm (805), the worm (805) is rotatably mounted inside the mounting plate box (802), and one end of the worm (805) is connected with a motor III (806).
5. The assembly type building construction device according to claim 1, wherein the soil containing mechanism (9) comprises a grounding frame body (901), a movable screw block (904) is fixedly arranged on the outer wall of the grounding frame body (901), and the movable screw block (904) is movably arranged in the bearing vertical frame (2) and is meshed and sleeved outside the screw rod II (6).
6. The assembly type building construction device according to claim 5, wherein a blocking inner cylinder (902) is fixedly arranged on the middle wall of the grounding frame body (901) in a penetrating manner, and a frame door (903) is rotatably arranged on the front side of the grounding frame body (901).
7. The fabricated building construction device according to claim 1, wherein a power supply (10) is installed on the inner wall of the movable bottom frame (1), and movable wheels (13) are installed at four corners of the bottom of the movable bottom frame (1).
8. The fabricated building construction device according to claim 1, wherein the fixing equipment box (3) is provided with a controller (12), and the outer wall of the bearing vertical frame (2) is provided with a handle (11).
CN202320340509.5U 2023-02-28 2023-02-28 Assembled building construction device Active CN219034619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320340509.5U CN219034619U (en) 2023-02-28 2023-02-28 Assembled building construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320340509.5U CN219034619U (en) 2023-02-28 2023-02-28 Assembled building construction device

Publications (1)

Publication Number Publication Date
CN219034619U true CN219034619U (en) 2023-05-16

Family

ID=86279409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320340509.5U Active CN219034619U (en) 2023-02-28 2023-02-28 Assembled building construction device

Country Status (1)

Country Link
CN (1) CN219034619U (en)

Similar Documents

Publication Publication Date Title
CN216476441U (en) Auxiliary device is used in installation of building curtain
CN112482394A (en) Strutting arrangement that foundation ditch construction was used
CN219034619U (en) Assembled building construction device
CN217782047U (en) Precast tubular pile stake core cleaning device
CN215479557U (en) Building engineering lift platform
CN213928234U (en) Perforating device for constructional engineering
CN110561604B (en) Maintenance bin construction method for PC component assembly line
CN112360185A (en) Prefabricated supporting seat structure of assembly type structure
CN217299900U (en) Assembled assembly platform that construction used
CN220888651U (en) Pile foundation engineering slag removal device
CN217079603U (en) Automatic assembly platform for assembly type steel structure
CN221030217U (en) Foundation pit reinforcing structure
CN216042604U (en) Fixing support for building engineering template
CN110565647A (en) compound maintenance bin construction method for PC component assembly line
CN214852694U (en) Digging device for garden construction
CN219411746U (en) Construction installation hanging basket
CN217352554U (en) Hydraulic engineering construction cofferdam
CN217494197U (en) Combined door sleeve machining device
CN219507568U (en) Temporary support frame for assembled building
CN214220714U (en) Prefabricated supporting seat structure of assembly type structure
CN219080900U (en) Supporting device is built to assembled building construction wallboard
CN216197883U (en) Drilling tool for hole forming and pipe following of slope reinforcing anchor cable
CN218204298U (en) Foundation leveling equipment for building engineering technology
CN211898933U (en) Movable light steel house
CN213709651U (en) Device is raised with supplementary to foundation pile for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant