CN219010880U - Vibrating equipment for road construction - Google Patents

Vibrating equipment for road construction Download PDF

Info

Publication number
CN219010880U
CN219010880U CN202223527939.2U CN202223527939U CN219010880U CN 219010880 U CN219010880 U CN 219010880U CN 202223527939 U CN202223527939 U CN 202223527939U CN 219010880 U CN219010880 U CN 219010880U
Authority
CN
China
Prior art keywords
bottom plate
road construction
hose
worm
vibrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223527939.2U
Other languages
Chinese (zh)
Inventor
林明学
李晓锋
王茹嵌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Nuohong Construction Engineering Co ltd
Original Assignee
Hainan Nuohong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Nuohong Construction Engineering Co ltd filed Critical Hainan Nuohong Construction Engineering Co ltd
Priority to CN202223527939.2U priority Critical patent/CN219010880U/en
Application granted granted Critical
Publication of CN219010880U publication Critical patent/CN219010880U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model discloses vibrating equipment for road construction, which has the technical scheme that: including bottom plate, vibrator and hose, the vibrator is installed in bottom plate top one side, the vibrator is equipped with the striking off mechanism through hose connection, the bottom plate top is equipped with striking off mechanism, striking off mechanism includes the worm, the worm wheel, the siphunculus, the backup pad, two spliced poles, two half section of thick bamboo and two fixed plates, two fixed plate bottoms respectively with bottom plate top both sides fixed connection, the worm both ends are respectively through bearing and two fixed plate top swing joint, backup pad bottom and bottom plate fixed connection, siphunculus one end runs through backup pad top and with backup pad fixed connection, the beneficial effect of vibrating equipment for the road construction is: according to the utility model, the scraping mechanism is arranged, and the scraping cylinder can be driven to rotate under the drive of the motor, so that the threaded scraper can comprehensively and rotatably scrape the hose, the time of manual processing is greatly saved, the time and the labor are saved, and the operation is simple.

Description

Vibrating equipment for road construction
Technical Field
The utility model relates to the technical field of road construction equipment, in particular to vibrating equipment for road construction.
Background
In road construction, vibration rod and concrete member are required to generate resonance to discharge bubbles in the member rapidly, so that cement, sand and stone and steel bar frame are tightly connected into a whole, and the purposes of improving the compactness of concrete and having high surface smoothness are achieved.
The existing vibrator hose can extend into concrete along with the vibrating rod, so that concrete can remain on the hose after the vibration is finished, and the hose can be solidified to affect the use if the hose is not cleaned timely, but the existing vibrator is not provided with a device for removing the concrete on the hose, so that manual treatment is needed, and the vibrator is time-consuming and labor-consuming.
Disclosure of Invention
To this end, the present utility model provides a vibrating apparatus for road construction, which solves the problems mentioned in the background art by providing a scraping assembly.
In order to achieve the above object, the present utility model provides the following technical solutions: the vibrator is connected with a vibrating rod through a hose, and a scraping mechanism is arranged at the top of the bottom plate;
the scraping mechanism comprises a worm, a worm wheel, a through pipe, a supporting plate, two connecting columns, two half cylinders and two fixing plates, wherein the bottoms of the fixing plates are fixedly connected with two sides of the top of a bottom plate respectively, two ends of the worm are movably connected with the tops of the two fixing plates respectively through bearings, the bottom of the supporting plate is fixedly connected with the bottom plate, one end of the through pipe penetrates through the top of the supporting plate and is fixedly connected with the supporting plate, the outer wall of the through pipe is movably connected with the middle part of the worm wheel through the bearings, the bottom of the worm wheel is meshed with the worm, two ends of the connecting columns are fixedly connected with two connecting plates at two ends of the side face of the worm wheel respectively, two half cylinders are respectively arranged between the two connecting plates, and two half cylinders are mutually attached to form a complete scraping cylinder.
Preferably, a groove is formed in one side, far away from the vibrator, of the top of the bottom plate, and a collecting box with an upward opening is arranged in the groove.
Preferably, a motor is installed at one end of the top of the bottom plate, and an output shaft of the motor is fixedly connected with one end of the worm.
Preferably, two opposite sides of the half cylinder are fixedly connected with mounting plates, and the two mounting plates are respectively positioned at the tops of the two connecting plates and are attached to the connecting plates.
Preferably, bolts are arranged at the tops of the two mounting plates, and penetrate through the mounting plates and the connecting plates and are in threaded connection with the mounting plates and the connecting plates.
Preferably, the inner wall of the scraping cylinder is fixedly connected with a threaded scraping plate, and the outer wall of the hose is tightly attached to the scraping plate.
Preferably, the inner wall of the through pipe is fixedly connected with a wiping pad, and the outer wall of the hose is tightly attached to the wiping pad.
Preferably, universal wheels are arranged at four corners of the bottom plate, and one end of the top of the bottom plate is fixedly connected with a bracket.
The embodiment of the utility model has the following advantages:
1. according to the utility model, the scraping mechanism is arranged, and the scraping cylinder can be driven to rotate under the drive of the motor, so that the threaded scraper can comprehensively and rotatably scrape the hose, the time of manual processing is greatly saved, the time and the labor are saved, and the operation is simple.
2. According to the utility model, the wiping pad is arranged, so that the scraped surface of the hose can be wiped, and the cleaned hose can be directly stored, so that the hose can be reused, and the practicability is extremely high.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It will be apparent to those skilled in the art from this disclosure that the drawings described below are merely exemplary and that other embodiments may be derived from the drawings provided without undue effort.
The structures, proportions, sizes, etc. shown in the present specification are shown only for the purposes of illustration and description, and are not intended to limit the scope of the utility model, which is defined by the claims, so that any structural modifications, proportional changes, or adjustments of size, which do not affect the efficacy of the utility model or the objects achieved, should fall within the scope of the utility model.
FIG. 1 is a schematic view of the overall structure provided by the present utility model;
FIG. 2 is an exploded view of a partial structure according to the present utility model;
FIG. 3 is a schematic side view of the present utility model;
fig. 4 is a cross-sectional view of the overall structure provided by the present utility model.
In the figure: 1. a bottom plate; 2. a vibrator; 3. a hose; 4. a vibrating bar; 5. a worm; 6. a worm wheel; 7. a through pipe; 8. a support plate; 9. a scraping cylinder; 10. a connecting column; 11. a fixing plate; 12. a connecting plate; 13. a collection box; 14. a motor; 15. a mounting plate; 16. a bolt; 17. a scraper; 18. a wiping pad; 19. a universal wheel; 20. a bracket; 91. and a half cylinder.
Detailed Description
Other advantages and advantages of the present utility model will become apparent to those skilled in the art from the following detailed description, which, by way of illustration, is to be read in connection with certain specific embodiments, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the vibrating equipment for road construction provided by the utility model comprises a base plate 1, a vibrator 2 and a hose 3, wherein the vibrator 2 is arranged on one side of the top of the base plate 1, the vibrator 2 is connected with a vibrating rod 4 through the hose 3, and a scraping mechanism is arranged on the top of the base plate 1.
The scraping mechanism comprises a worm 5, a worm wheel 6, a through pipe 7, a supporting plate 8, two connecting columns 10, two half cylinders 91 and two fixing plates 11, wherein the bottoms of the two fixing plates 11 are fixedly connected with two sides of the top of a bottom plate 1 respectively, two ends of the worm 5 are movably connected with the tops of the two fixing plates 11 respectively through bearings, the bottom of the supporting plate 8 is fixedly connected with the bottom plate 1, one end of the through pipe 7 penetrates through the top of the supporting plate 8 and is fixedly connected with the supporting plate 8, the outer wall of the through pipe 7 is movably connected with the middle part of the worm wheel 6 through bearings, the bottom of the worm wheel 6 is meshed with the worm 5, one ends of the two connecting columns 10 are fixedly connected with two ends of the side face of the worm wheel 6 respectively, the other ends of the two connecting columns 10 are fixedly connected with connecting plates 12, the two half cylinders 91 are respectively arranged between the two connecting plates 12, the two half cylinders 91 are mutually attached to form a complete scraping cylinder 9, and a hose 3 sequentially penetrates through the through pipe 7 and the inside of the scraping cylinder 9.
In this embodiment, the connection of the vibrator 2, the hose 3 and the vibrating rod 4 is well known in the art, and thus will not be described in detail.
Wherein, the recess has been seted up to one side that vibrator 2 was kept away from at bottom plate 1 top, is equipped with the ascending collecting box 13 of opening in the recess, through setting up collecting box 13, can collect the concrete of being scraped off on the hose 3, realizes unified management. A motor 14 is arranged at one end of the top of the bottom plate 1, and an output shaft of the motor 14 is fixedly connected with one end of the worm 5.
Two half barrels 91 are all fixedly connected with mounting panel 15 on opposite one side, and two mounting panels 15 are located two connecting plates 12 tops respectively and paste mutually with connecting plate 12, and two mounting panel 15 tops all are equipped with bolt 16, and bolt 16 runs through mounting panel 15 and connecting plate 12 and with mounting panel 15 and connecting plate 12 threaded connection, through setting up bolt 16, the quick assembly disassembly of two half barrels 91 of being convenient for to scrape the inside clearance of a section of thick bamboo 9 of being convenient for.
The inner wall of the scraping cylinder 9 is fixedly connected with a threaded scraping plate 17, the outer wall of the hose 3 is tightly attached to the scraping plate 17, the inner wall of the through pipe 7 is fixedly connected with a wiping pad 18, the outer wall of the hose 3 is tightly attached to the wiping pad 18, the threaded scraping plate 17 is respectively fixedly connected with two half cylinders 91, when the two half cylinders 91 are combined together, a complete threaded scraping plate 17 can be formed, and the surface of the scraped hose 3 can be wiped through the wiping pad 18.
Universal wheels 19 are arranged at four corners of the bottom plate 1, and a bracket 20 is fixedly connected with one end of the top of the bottom plate 1.
The application process of the utility model is as follows: firstly, the concrete mixer can be moved to a use place through the bracket 20 and the universal wheel 19, then the concrete can be vibrated through the vibrator 2, the hose 3 and the vibrating rod, after the vibration is finished, a user can pull the hose 3 at one side of the vibrator 2, the hose 3 is recovered towards the position of the vibrator 2, meanwhile, the motor 14 is started, the output shaft of the motor 14 drives the worm 5 to rotate, the worm 5 drives the worm wheel 6 to rotate, the worm wheel 6 drives the two connecting columns 10 and the two connecting plates 12 to rotate, the two mounting plates 15 and the half cylinder 91 are driven to rotate, the threaded scraper rotates, the scraped concrete can effectively and fully rotate and scrape the outer wall of the hose 3, the scraped concrete falls into the collecting box 13 along with the fact that the hose 3 is pulled through the wiping pad 18, and finally is contained after being wiped clean, and the scraping operation is finished.
The above description is of the preferred embodiments of the present utility model, and any person skilled in the art may modify the present utility model or make modifications to the present utility model with the technical solutions described above. Therefore, any simple modification or equivalent made according to the technical solution of the present utility model falls within the scope of the protection claimed by the present utility model.

Claims (8)

1. The utility model provides a road construction is with vibrating equipment, includes bottom plate (1), vibrator (2) and hose (3), its characterized in that: the vibrator (2) is arranged on one side of the top of the bottom plate (1), the vibrator (2) is connected with a vibrating rod (4) through a hose (3), and a scraping mechanism is arranged on the top of the bottom plate (1);
the utility model provides a scraper mechanism includes worm (5), worm wheel (6), siphunculus (7), backup pad (8), two spliced pole (10), two half section of thick bamboo (91) and two fixed plates (11), two fixed plate (11) bottom respectively with bottom plate (1) top both sides fixed connection, worm (5) both ends respectively through bearing and two fixed plate (11) top swing joint, backup pad (8) bottom and bottom plate (1) fixed connection, siphunculus (7) one end runs through backup pad (8) top and with backup pad (8) fixed connection, the outer wall of siphunculus (7) passes through the middle part swing joint of bearing and worm wheel (6), worm wheel (6) bottom and worm (5) meshing are connected, two spliced pole (10) one end respectively with the both ends fixed connection of worm wheel (6) side, two spliced pole (10) other end equal fixedly connected with connecting plate (12), two half section of thick bamboo (91) set up respectively between two connecting plate (12), two half section of thick bamboo (91) paste one piece (9) and pass through complete section of thick bamboo (9) in proper order in order from scraping in a section of thick bamboo (7).
2. The vibrating device for road construction according to claim 1, wherein: a groove is formed in one side, far away from the vibrator (2), of the top of the bottom plate (1), and a collecting box (13) with an upward opening is arranged in the groove.
3. The vibrating device for road construction according to claim 1, wherein: a motor (14) is installed at one end of the top of the bottom plate (1), and an output shaft of the motor (14) is fixedly connected with one end of the worm (5).
4. The vibrating device for road construction according to claim 1, wherein: the two opposite sides of the half cylinders (91) are fixedly connected with mounting plates (15), and the two mounting plates (15) are respectively positioned at the tops of the two connecting plates (12) and are attached to the connecting plates (12).
5. The vibrating device for road construction according to claim 4, wherein: the tops of the two mounting plates (15) are respectively provided with a bolt (16), and the bolts (16) penetrate through the mounting plates (15) and the connecting plates (12) and are in threaded connection with the mounting plates (15) and the connecting plates (12).
6. The vibrating device for road construction according to claim 1, wherein: the inner wall of the scraping cylinder (9) is fixedly connected with a threaded scraping plate (17), and the outer wall of the hose (3) is tightly attached to the scraping plate (17).
7. The vibrating device for road construction according to claim 1, wherein: the inner wall of the through pipe (7) is fixedly connected with a wiping pad (18), and the outer wall of the hose (3) is tightly attached to the wiping pad (18).
8. The vibrating device for road construction according to claim 1, wherein: universal wheels (19) are arranged at four corners of the bottom plate (1), and one end of the top of the bottom plate (1) is fixedly connected with a bracket (20).
CN202223527939.2U 2022-12-29 2022-12-29 Vibrating equipment for road construction Active CN219010880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223527939.2U CN219010880U (en) 2022-12-29 2022-12-29 Vibrating equipment for road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223527939.2U CN219010880U (en) 2022-12-29 2022-12-29 Vibrating equipment for road construction

Publications (1)

Publication Number Publication Date
CN219010880U true CN219010880U (en) 2023-05-12

Family

ID=86230985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223527939.2U Active CN219010880U (en) 2022-12-29 2022-12-29 Vibrating equipment for road construction

Country Status (1)

Country Link
CN (1) CN219010880U (en)

Similar Documents

Publication Publication Date Title
CN212978740U (en) Fixed production line mould platform concrete clearance recovery unit
CN107237513A (en) Device is filled up in a kind of wall gap for building
CN219010880U (en) Vibrating equipment for road construction
CN210712461U (en) Vibration device that town road construction was used
CN219560645U (en) Mould cleaning equipment for casting
CN210010765U (en) Steel pipe inner wall rust cleaning device for building field convenient to fix
CN112064440B (en) Efficient and energy-saving road construction method
CN214459384U (en) Road roller for non-stick soil road roller
CN211922221U (en) Little table department preventive maintenance device in road surface
CN212095803U (en) Building pipe rust cleaning device
CN113338124A (en) Concrete vibrating device for highway engineering
CN210946399U (en) Pre-cleaning device of road roller
CN210067465U (en) Device for cleaning sundries on surface of template
CN113530249A (en) Concrete floating device for civil engineering that less bubble produced
CN219430547U (en) Accurate receipts face device is pour to railway steel case roof beam concrete bridge floor
CN215760525U (en) Concrete floating device for building engineering
CN215800818U (en) Highway construction is with road surface compaction device
CN214863199U (en) Equipment for producing high-speed rail ballastless track slab crack repair material
CN220538649U (en) Wall pouring equipment for subway station construction
CN219547599U (en) Bridge deck repair equipment
CN215631717U (en) Building construction's floor is pour construction and is used support body platform structure
CN220908080U (en) Concrete vibrating equipment
CN220813313U (en) Bridge floor concrete vibration surface finishing device
CN211850917U (en) Based on civil engineering is with floating device
CN218175499U (en) Road surface evener

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant