CN219009771U - Article overhead hoist is used in house construction - Google Patents

Article overhead hoist is used in house construction Download PDF

Info

Publication number
CN219009771U
CN219009771U CN202320105601.3U CN202320105601U CN219009771U CN 219009771 U CN219009771 U CN 219009771U CN 202320105601 U CN202320105601 U CN 202320105601U CN 219009771 U CN219009771 U CN 219009771U
Authority
CN
China
Prior art keywords
cable
cotton
main part
ring
davit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320105601.3U
Other languages
Chinese (zh)
Inventor
李福彬
魏建甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320105601.3U priority Critical patent/CN219009771U/en
Application granted granted Critical
Publication of CN219009771U publication Critical patent/CN219009771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a lifting device for articles for building, which comprises a bottom plate, wherein a lubricating main body is arranged at the top of the bottom plate, when a worker uses the device, a cover plate is opened to pour lubricating oil into the inner side of a liquid storage shell, then the lubricating oil slowly flows into the sponge through an oil hole, the lubricating oil absorbed by the sponge slowly wets a cotton rod, and then the lubricating oil is conveyed to the surface of a cotton brush cylinder through the cotton rod.

Description

Article overhead hoist is used in house construction
Technical Field
The utility model relates to the technical field of lifting devices, in particular to a lifting device for articles for building construction.
Background
The overhead hoist is the indispensable device in the work is built in the room, and the staff uses the device to hang the object to the height, and the cable can produce the friction with the pulley during the use to and also can produce the friction between the cable when the cable winding is retrieved, and in view of this traditional device is not perfect enough, does not have the facility that can lubricate the cable, leads to the wearing and tearing of cable for a long time to reduce the life of cable, it is more troublesome, and a article overhead hoist is built in the room can provide convenience for the staff.
The defects of the lifting device in the prior art are that:
patent document: CN216038305U is panel overhead hoist for building construction, "including chassis, main box and davit, the chassis top is equipped with trapezoidal base, trapezoidal base top is equipped with the carousel, be equipped with the main shaft in the carousel, be equipped with the main box on the main shaft, main box upper surface is equipped with the support frame, be equipped with first metal sleeve on the support frame, be equipped with first piston in the first metal sleeve, the main box is equipped with the davit in front, be equipped with the second metal sleeve on the davit, the davit below is equipped with the steel cable, steel cable below is equipped with the equipment box. The utility model has the advantages of simple operation and reliable bearing, is suitable for hoisting large plates, has strong reliability and effectively improves the working efficiency of building construction.
However, the overhead hoist of the above publication mainly considers how to solve the problems of low practicality and inability to hoist large plates, and the conventional apparatus is only provided with a cable, and does not consider that the conventional overhead hoist has no facility capable of lubricating the cable, resulting in long-time wear of the cable, thereby reducing the service life of the cable, which is troublesome.
In view of this, it is necessary to develop a lifting device for articles for building construction, which can lubricate the surface of the cable when using the device, reduce friction between the cable and other objects, and thus prolong the service life of the cable.
Disclosure of Invention
The utility model aims to provide a lifting device for articles for building construction, which aims to solve the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a house is built with article overhead hoist, includes the bottom plate, the top of bottom plate installs lubricated main part;
the apron is installed at the top of lubricated main part, the stock solution shell is installed to the top inner wall of lubricated main part, the baffle is installed to the inboard of stock solution shell, the oilhole has been seted up in the inside of baffle running through, the sponge is installed to the bottom of baffle, a set of fixed plate is installed to the bottom of stock solution shell, the inside of fixed plate runs through and installs the bull stick, cotton brush section of thick bamboo is installed in the outside of bull stick, and the bull stick runs through cotton brush section of thick bamboo.
Preferably, a rope collecting device is arranged at the top of the bottom plate, a cable is wound on the inner side of the rope collecting device, the cable penetrates through the lubricating main body, and a lifting hook is arranged at one end of the cable.
Preferably, the supporting body is installed at the top of bottom plate, and the supporting body is located the front of receipts rope device, and the bedplate is installed at the top of supporting body, and the bearing is installed in the top mosaic of bedplate.
Preferably, the pillar is installed to the inboard of bearing, and the hydraulic stem is installed to the bottom inner wall of pillar, and the pulley is installed at the top of hydraulic stem, and the hawser is located the inboard of pulley, and a set of backup pad is installed to one side of hydraulic stem, and the dwang is installed in the inside penetration of backup pad, and the davit is installed in the outside of dwang, and the dwang runs through the davit to another pulley is installed respectively at the top of davit.
Preferably, the front and the back of the support column are respectively provided with a placing groove, the inner walls of the two sides of the placing groove are respectively provided with a sliding groove, and the inner sides of the back of the placing groove are provided with a plurality of fixing holes.
Preferably, the support ring is installed to the outside dress cover of pillar, and a set of dead lever is installed respectively to the positive inner wall of support ring and back inner wall, and the ring is installed to the one end of dead lever, and the connecting rod is installed respectively to the both sides of ring, and the slider is installed to one side of connecting rod, and the slider is located the inboard of spout, and the fixed pin is installed in the inside run-through of support ring, and the fixed pin runs through the ring to be located the inboard of fixed orifices, and branch is installed to one side of support ring, and the bottom at the davit is installed to the one end of branch.
Preferably, the cotton stalk is installed in the bottom penetration of stock solution shell, and cotton stalk is located the top of cotton brush section of thick bamboo, and the spring head is installed to the bottom inner wall of lubricated main part, and the hawser is located between cotton brush section of thick bamboo and the spring head.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the device, when a worker uses the device, the cover plate is opened to pour lubricating oil into the inner side of the liquid storage shell, then the lubricating oil slowly flows into the sponge through the oil hole, the lubricating oil absorbed by the sponge slowly wets the cotton stalk, and then the lubricating oil is conveyed to the surface of the cotton brush cylinder through the cotton stalk, when the cable moves, the cotton brush cylinder is driven to rotate through friction action with the cotton brush cylinder, the cotton brush cylinder is coated with the lubricating oil adsorbed by the special material of the cable, and meanwhile, the spring head supports the cable against the bottom of the cotton brush cylinder through rebound action of the spring head, so that the lubricating oil can be coated on the cable when the worker uses the device in building construction, friction between the cable and other objects is reduced, and the service life of the cable is prolonged.
2. According to the device, the supporting rod is arranged, the hydraulic rod is started by a worker, the hydraulic rod drives the supporting plate and all parts arranged on one side of the supporting plate to move to the top, meanwhile, the fixed pin is moved out of the inner side of the fixed hole, the supporting ring is moved to the bottom, the supporting ring drives the supporting rod to move to the bottom, the suspension arm rotates anticlockwise under the rotating support of the rotating rod, meanwhile, the sliding block slides on the inner side of the sliding groove, after moving to a proper position, the fixed pin is moved into the inner side of the corresponding fixed hole, and the position of the supporting ring is fixed, so that when the device is used by the worker in building, the forward extending distance of the suspension arm can be adjusted according to actual conditions, and convenience is provided for the worker.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a schematic diagram of the front structure of the pillar according to the present utility model;
FIG. 3 is a schematic top view of the support ring of the present utility model;
FIG. 4 is a schematic perspective view of a ring according to the present utility model;
FIG. 5 is a schematic view of the front structure of the lubricating body of the present utility model;
fig. 6 is a schematic side view of a cotton brush holder according to the present utility model.
In the figure: 1. a bottom plate; 101. a rope collecting device; 102. a cable; 103. a lifting hook; 2. a support body; 201. a seat plate; 202. a bearing; 3. a support post; 301. a hydraulic rod; 302. a pulley; 303. a support plate; 304. a rotating lever; 305. a suspension arm; 4. a placement groove; 401. a chute; 402. a fixing hole; 5. a support ring; 501. a fixed rod; 502. a circular ring; 503. a connecting rod; 504. a slide block; 505. a fixing pin; 506. a support rod; 6. a lubricating body; 601. a cover plate; 602. a liquid storage shell; 603. a partition plate; 604. an oil hole; 605. a sponge; 606. a fixing plate; 607. a rotating rod; 608. a cotton brush cylinder; 609. cotton stalk; 610. a spring head.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, 2, 3, 4, 5 and 6, a lifting device for building articles;
comprises a bottom plate 1, a rope collecting device 101 is arranged at the top of the bottom plate 1, a cable 102 is wound and arranged at the inner side of the rope collecting device 101, the cable 102 penetrates through a lubricating main body 6, a lifting hook 103 is arranged at one end of the cable 102, the bottom plate 1 can provide support for a part arranged at the top of the bottom plate, a worker hangs an object on the lifting hook 103, then the rope collecting device 101 is started, the rope collecting device 101 winds the cable 102 at the inner side of the rope collecting device, the lifting hook 103 and a hoisting object thereof are driven to move towards the top by the cable 102, a supporting main body 2 is arranged at the top of the bottom plate 1, the supporting main body 2 is positioned at the front of the rope collecting device 101, a seat plate 201 is arranged at the top of the supporting main body 2, a bearing 202 is embedded and arranged at the top of the seat plate 201, the supporting main body 2 can provide support for the seat plate 201, the seat plate 201 can provide support for the bearing 202, the bearing 202 can provide rotational support for the strut 3, the hydraulic rod 301 is installed to the bottom inner wall of the strut 3, the pulley 302 is installed at the top of the hydraulic rod 301, and the cable 102 is located the inboard of the pulley 302, a set of backup pad 303 is installed to one side of the hydraulic rod 301, the dwang 304 is installed to the inside of backup pad 303 run through, the davit 305 is installed to the outside of dwang 304, and the dwang 304 runs through davit 305, and another pulley 302 is installed respectively at the top of davit 305, the strut 3 can provide support for the hydraulic rod 301, the hydraulic rod 301 can provide support for pulley 302 and backup pad 303, pulley 302 can provide sliding support for the cable 102, backup pad 303 can provide support for the dwang 304, the dwang 304 can provide rotational support for davit 305, davit 305 can provide support for pulley 302 and lubricating body 6.
Referring to fig. 1, 5 and 6, a lifting device for building articles;
including lubrication body 6, apron 601 is installed at the top of lubrication body 6, stock solution shell 602 is installed to the top inner wall of lubrication body 6, baffle 603 is installed to the inboard of stock solution shell 602, oilhole 604 has been seted up in the inside of baffle 603, sponge 605 is installed to the bottom of baffle 603, a set of fixed plate 606 is installed to the bottom of stock solution shell 602, the bull stick 607 is installed in the inside of fixed plate 606, cotton brush section of thick bamboo 608 is installed in the outside of bull stick 607, and bull stick 607 runs through cotton brush section of thick bamboo 608, cotton rod 609 is installed in the bottom of stock solution shell 602 runs through, and cotton rod 609 is located the top of cotton brush section of thick bamboo 608, spring head 610 is installed to the bottom inner wall of lubrication body 6, and cable 102 is located between cotton brush section of thick bamboo 608 and spring head 610, lubrication body 6 can provide support for apron 601 and inboard installation component thereof, apron 601 can provide sealed space for lubrication body 6, stock solution shell 602 can provide support for baffle 603, the baffle 603 can provide support for the oil hole 604, the sponge 605 is used for absorbing lubricating oil, the fixed plate 606 can provide support for the rotating rod 607, the rotating rod 607 can provide rotating support for the cotton brush cylinder 608, when a worker uses the device, the cover plate 601 is opened to pour lubricating oil into the inner side of the liquid storage shell 602, then the lubricating oil can slowly flow into the sponge 605 through the oil hole 604, the lubricating oil absorbed by the sponge 605 can slowly wet the cotton rod 609, then the lubricating oil is conveyed to the surface of the cotton brush cylinder 608 through the cotton rod 609, when the cable 102 moves, the cotton brush cylinder 608 can be driven to rotate under the friction effect with the cotton brush cylinder 608, the lubricating oil is smeared on the cable 102 through the lubricating oil adsorbed by special materials of the cotton brush cylinder 608, meanwhile, the spring head 610 supports the cable 102 to the bottom of the cotton brush cylinder 608 through the rebound effect of the spring head 610, when using the device in building construction, workers can smear lubricating oil on the cable 102, so that friction between the cable 102 and other objects is reduced, and the service life of the cable 102 is prolonged.
Referring to fig. 1, 2, 3 and 4, a lifting device for building articles;
the hydraulic lifting support comprises a support ring 5, a placing groove 4 is respectively formed in the front and the back of a strut 3, a sliding groove 401 is respectively formed in the inner walls of the two sides of the placing groove 4, a plurality of fixing holes 402 are respectively formed in the inner sides of the back of the placing groove 4, a group of fixing rods 501 are respectively arranged in the inner walls of the front and the back of the support ring 5, a circular ring 502 is arranged at one end of the fixing rods 501, connecting rods 503 are respectively arranged at the two sides of the circular ring 502, a sliding block 504 is arranged at one side of the connecting rods 503, the sliding blocks 504 are arranged at the inner sides of the sliding groove 401, fixing pins 505 penetrate through the circular ring 502 and are arranged at the inner sides of the fixing holes 402, a supporting rod 506 is arranged at one side of the supporting ring 5, one end of the supporting rod 506 is arranged at the bottom of a suspension arm 305, the placing groove 4 can provide a moving space for the circular ring 502, the sliding groove 401 can provide a sliding space for the sliding rod 504, the sliding hole 402 can fix the position of the supporting ring 5 through matching with the fixing pins 505, the supporting ring 5 can provide a support for the supporting rod 501, the fixing rods 501, the supporting rods 502 can provide a support for the circular ring 502, the supporting rod 502 can provide a support for the supporting rod 502, the sliding rod, the circular ring 502 is positioned at the inner sides, the inner sides of the sliding rod 401, the supporting rod 506 can move the supporting rod, the rod 301 and move down the sliding rod 301, simultaneously, and move the supporting rod 506 can move to the top part 301 to the top of the suspension arm 305, and move to the supporting rod 301, and move the sliding rod 301, simultaneously, move the supporting rod 301 and move the supporting rod 301 to the sliding rod 301, and move the supporting rod 301, and move the sliding rod 301, simultaneously, move the supporting rod 301 and move the supporting rod and move the supporting rod. After moving to the proper position, the fixing pin 505 is moved into the inner side of the corresponding fixing hole 402 to fix the position of the supporting ring 5, so that when a worker uses the device in building construction, the distance of the forward extending of the suspension arm 305 can be adjusted according to actual conditions, thereby providing convenience for the worker.
Working principle: when a worker needs to use the device, the device is placed at a working point, then a motor arranged on one side of the rope collecting device 101 is started, so that a cable 102 wound on the inner side of the rope collecting device is loosened, a lifting hook 103 is placed at a proper position, then an object to be lifted is hung on the lifting hook 103, then the motor arranged on one side of the rope collecting device 101 is started to reverse, the cable 102 is recovered, the motor is wound on the inner side of the rope collecting device 101, and the object is lifted to a proper position.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. Article overhead hoist is used in room construction, including bottom plate (1), its characterized in that: the top of the bottom plate (1) is provided with a lubricating main body (6);
apron (601) are installed at the top of lubricated main part (6), stock solution shell (602) are installed to the top inner wall of lubricated main part (6), baffle (603) are installed to the inboard of stock solution shell (602), oil hole (604) have been seted up in the inside of baffle (603) run through, sponge (605) are installed to the bottom of baffle (603), a set of fixed plate (606) are installed to the bottom of stock solution shell (602), the inside of fixed plate (606) runs through and installs bull stick (607), cotton brush section of thick bamboo (608) are installed in the outside of bull stick (607), and bull stick (607) run through cotton brush section of thick bamboo (608).
2. A building service trolley according to claim 1, wherein: the top of the bottom plate (1) is provided with a rope collecting device (101), the inner side of the rope collecting device (101) is wound with a cable (102), the cable (102) penetrates through the lubricating main body (6), and one end of the cable (102) is provided with a lifting hook (103).
3. A building service trolley according to claim 2, wherein: the top of bottom plate (1) is installed and is supported main part (2), and support main part (2) are located the front of receipts rope device (101), and bedplate (201) is installed at the top of support main part (2), and bearing (202) are installed in the top mosaic of bedplate (201).
4. A building service trolley according to claim 3, wherein: the inner side of bearing (202) is installed pillar (3), hydraulic stem (301) is installed to the bottom inner wall of pillar (3), pulley (302) is installed at the top of hydraulic stem (301), and cable (102) are located the inboard of pulley (302), a set of backup pad (303) are installed to one side of hydraulic stem (301), the inside of backup pad (303) runs through and installs dwang (304), davit (305) are installed in the outside of dwang (304), and dwang (304) run through davit (305), and another pulley (302) are installed respectively at the top of davit (305).
5. A building service trolley according to claim 4, wherein: the front and the back of the support column (3) are respectively provided with a placement groove (4), the inner walls of the two sides of the placement groove (4) are respectively provided with a sliding groove (401), and the inner sides of the back of the placement groove (4) are provided with a plurality of fixing holes (402).
6. A building service trolley according to claim 4, wherein: the outside dress cover of pillar (3) is installed supporting ring (5), a set of dead lever (501) are installed respectively to supporting ring (5) front inner wall and back inner wall, ring (502) are installed to one end of dead lever (501), connecting rod (503) are installed respectively to the both sides of ring (502), slider (504) are installed to one side of connecting rod (503), and slider (504) are located the inboard of spout (401), fixed pin (505) are installed in the inside run through of supporting ring (5), and fixed pin (505) run through ring (502) to be located the inboard of fixed orifices (402), branch (506) are installed to one side of supporting ring (5), and the bottom at davit (305) is installed to one end of branch (506).
7. A building service trolley according to claim 1, wherein: the cotton pole (609) is installed in the bottom penetration of stock solution shell (602), and cotton pole (609) are located the top of cotton brush section of thick bamboo (608), and spring head (610) are installed to the bottom inner wall of lubricated main part (6), and hawser (102) are located between cotton brush section of thick bamboo (608) and spring head (610).
CN202320105601.3U 2023-02-03 2023-02-03 Article overhead hoist is used in house construction Active CN219009771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320105601.3U CN219009771U (en) 2023-02-03 2023-02-03 Article overhead hoist is used in house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320105601.3U CN219009771U (en) 2023-02-03 2023-02-03 Article overhead hoist is used in house construction

Publications (1)

Publication Number Publication Date
CN219009771U true CN219009771U (en) 2023-05-12

Family

ID=86235215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320105601.3U Active CN219009771U (en) 2023-02-03 2023-02-03 Article overhead hoist is used in house construction

Country Status (1)

Country Link
CN (1) CN219009771U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118003019A (en) * 2024-04-10 2024-05-10 济南梓桂数控设备有限公司 Automatic change welding production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118003019A (en) * 2024-04-10 2024-05-10 济南梓桂数控设备有限公司 Automatic change welding production line

Similar Documents

Publication Publication Date Title
CN219009771U (en) Article overhead hoist is used in house construction
CN110775836A (en) Engineering machine tool structure hangs commentaries on classics device
CN220485071U (en) Lifting mechanism of portal crane
CN111591904A (en) Support arrangement that power equipment lifted by crane
CN112158738B (en) Environment-friendly and energy-saving bridge crane
CN216549212U (en) High-stability hoisting tool for tower of wind driven generator
CN210103345U (en) Building machinery hoist engine
CN213738292U (en) Steel construction section bar lifting device
CN212441840U (en) Oil immersion device with suspension assembly
CN210319899U (en) Lamp bracket for construction site
CN212669035U (en) High altitude construction auxiliary device for building
CN221343650U (en) Crane pulley for hoisting equipment
CN207710766U (en) A kind of coupling type bent axle rack
CN219056381U (en) Engineering machinery frame hinging device
CN2057658U (en) Self-lifting type crane
CN212740494U (en) Safe type single armed loop wheel machine
CN214935630U (en) Hydraulic winch of traction hydraulic winch machine with self-rescue function
CN217076700U (en) Large-scale roller bearing installation lifting device
CN220265079U (en) Auxiliary lifting device for steel wire rope of bridge girder erection machine
CN213898185U (en) Apply to reinforcing bar transportation lifting device on steel bar truss building carrier plate
CN219990926U (en) Hoisting tool for steel structural member
CN220116063U (en) Casting crane convenient to change anchor clamps
CN213651628U (en) Suspension device for overhauling bogie of motor train unit
CN210735913U (en) Universal car top wheel
CN221343695U (en) Walking hanging bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant