CN213651628U - Suspension device for overhauling bogie of motor train unit - Google Patents

Suspension device for overhauling bogie of motor train unit Download PDF

Info

Publication number
CN213651628U
CN213651628U CN202022726632.XU CN202022726632U CN213651628U CN 213651628 U CN213651628 U CN 213651628U CN 202022726632 U CN202022726632 U CN 202022726632U CN 213651628 U CN213651628 U CN 213651628U
Authority
CN
China
Prior art keywords
suspension
bogie
plate
base
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022726632.XU
Other languages
Chinese (zh)
Inventor
李达
Original Assignee
李达
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李达 filed Critical 李达
Priority to CN202022726632.XU priority Critical patent/CN213651628U/en
Application granted granted Critical
Publication of CN213651628U publication Critical patent/CN213651628U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a EMUs bogie overhauls and uses hanging device, the on-line screen storage device comprises a base, the last fixed surface of base is connected with the support column, the top fixedly connected with roof of support column, the middle part swing joint of base has the hanging plate, one side swing joint of hanging plate has the baffle, the spacing groove has been seted up to one side of hanging plate upper surface in midair, hang the last fixed surface of hanging plate and be connected with rings, the last fixed surface of roof is connected with double-shaft motor, double-shaft motor's output fixedly connected with line wheel. This EMUs bogie overhauls and uses hanging device sets up through the cooperation of baffle and suspension plate, can put the baffle on the rail, moves the bogie from the baffle to the suspension plate on, sets up through the cooperation of rings and biax motor, and the motor can draw rings to fold up the suspension plate, after hanging the suspension plate, can hang the bogie on the suspension plate together, and is more convenient when overhauing.

Description

Suspension device for overhauling bogie of motor train unit
Technical Field
The utility model relates to a bogie overhauls equipment technical field, specifically is a EMUs bogie overhauls and uses hanging device.
Background
The bogie is one of the most important parts in the structure of the railway vehicle, mainly plays a role in increasing the load of the vehicle, improving the running speed of the train so as to meet the requirement of railway transportation development, supports the vehicle body, bears and transmits various loads and forces from the vehicle body to wheels or from a wheel rail to the vehicle body, and enables the axle weight to be uniformly distributed.
Use need overhaul the bogie after a period of time, because the height of bogie is generally lower, be not convenient for look over the condition of bogie bottom, need the maintainer to look over the condition of bogie, strengthened maintainer's burden, this just needs an equipment to satisfy above-mentioned demand.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a EMUs bogie overhauls and uses hanging device has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a EMUs bogie overhauls and uses hanging device, includes the base, the last fixed surface of base is connected with the support column, the top fixedly connected with roof of support column, the middle part swing joint of base has the suspension board, one side swing joint of suspension board has the baffle, the spacing groove has been seted up to one side of suspension board upper surface, the last fixed surface of suspension board is connected with rings, the last fixed surface of roof is connected with double-shaft motor, double-shaft motor's output fixedly connected with line wheel.
Optionally, a sliding groove is formed in the supporting column, and a sliding block is fixedly connected to one side of the suspension plate.
Optionally, one side of the sliding block is fixedly connected with a guide wheel, and the guide wheel is movably connected with the sliding groove.
Optionally, the outer surface of the wire wheel is movably connected with a steel cable, and one end of the steel cable is fixedly connected with the hanging ring.
Optionally, a maintenance hole is formed in the middle of the upper surface of the suspension plate, and a reinforcing plate is fixedly connected to one side of the supporting column.
Optionally, the lower surface of base is fixedly connected with the universal wheel, the quantity of universal wheel is four.
(III) advantageous effects
The utility model provides a EMUs bogie overhauls and uses hanging device possesses following beneficial effect:
1. this EMUs bogie overhauls and uses hanging device sets up through the cooperation of baffle and suspension plate, can put the baffle on the rail, moves the bogie from the baffle to the suspension plate on, and one side of baffle is provided with the bolt, and the bogie moves the suspension plate and goes up the back, can pack up the baffle to screw up the bolt, sets up through the cooperation of baffle and spacing groove, can carry on spacingly to the bogie on the suspension plate, in order to prevent the landing during maintenance.
2. This hanging device for motor train unit bogie overhaul sets up through the cooperation of rings and biax motor, and the motor can pull rings and receive the board that suspends in midair, after the board that suspends in midair is hung up, can hang up the bogie on the board that suspends in midair together, and is more convenient when overhauing.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the suspension plate structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a support pillar; 3. a top plate; 4. a suspension plate; 5. a baffle plate; 6. a limiting groove; 7. a hoisting ring; 8. a double-shaft motor; 9. a wire wheel; 10. a chute; 11. a slider; 12. a guide wheel; 13. a steel cord; 14. a repair hole; 15. a reinforcing plate; 16. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a suspension device for overhauling a bogie of a motor train unit comprises a base 1, universal wheels 16 are fixedly connected to the lower surface of the base 1, the number of the universal wheels 16 is four, supporting columns 2 are fixedly connected to the upper surface of the base 1, sliding grooves 10 are formed in the supporting columns 2, a sliding block 11 is fixedly connected to one side of a suspension plate 4, guide wheels 12 are fixedly connected to one side of the sliding block 11, the guide wheels 12 are movably connected with the sliding grooves 10, the suspension plate 4 can drive the sliding block 11 to move in the sliding grooves 10 in the up-and-down moving process to prevent the suspension plate 4 from shaking left and right in the hoisting process, friction between the sliding block 11 and the sliding grooves 10 can be reduced by the guide wheels 12 arranged on one side of the sliding block 11, and the service life is prolonged;
the top of the supporting column 2 is fixedly connected with a top plate 3, the middle of the base 1 is movably connected with a suspension plate 4, the middle of the upper surface of the suspension plate 4 is provided with a maintenance hole 14, one side of the supporting column 2 is fixedly connected with a reinforcing plate 15, one side of the suspension plate 4 is movably connected with a baffle plate 5, one side of the upper surface of the suspension plate 4 is provided with a limiting groove 6, the width of the baffle plate 5 is consistent with that of a rail, after the baffle plate 5 and the rail are attached to each other, the bogie can be moved into the limiting groove 6 from the baffle plate 5, and after the baffle plate 5 is moved into the limiting groove 6;
hang upper surface fixedly connected with rings 7 of hanger plate 4, the upper surface fixedly connected with double shaft motor 8 of roof 3, double shaft motor 8's output fixedly connected with line wheel 9, the surface swing joint of line wheel 9 has cable wire 13, the one end and rings 7 fixed connection of cable wire 13, when double shaft motor 8 rotated, drive line wheel 9 and rotate, tighten up cable wire 13, and then will hang hanger plate 4 lifting and get up, double shaft motor 8 is driven by external power source, because of double shaft motor 8 belongs to current well-known technology, the event is here not done too much to be repeated.
The utility model discloses in, the device's working procedure as follows:
1. when the device is used, the base 1 is moved to the two sides of the rail, the suspension plate 4 is put down, the bolt on one side of the baffle 5 is loosened, and the baffle 5 is attached to the rail;
2. moving the bogie from the baffle 5 to the limiting groove 6, loosening the bolt after moving the bogie to the limiting groove 6, and retracting the baffle 5;
3. starting the double-shaft motor 8 to lift the suspension plate 4 by the double-shaft motor 8, and examining and repairing the bogie by inspectors;
4. after the maintenance is finished, the suspension plate 4 is put down, the baffle 5 is put down together, and the bogie is slid downwards from the other side of the limiting groove 6.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a EMUs bogie overhauls and uses suspension device, includes base (1), its characterized in that: the utility model discloses a suspension plate, including base (1), upper surface fixedly connected with support column (2), top fixedly connected with roof (3) of support column (2), the middle part swing joint of base (1) has suspension plate (4), one side swing joint of suspension plate (4) has baffle (5), spacing groove (6) have been seted up to one side of suspension plate (4) upper surface, the last fixed surface of suspension plate (4) is connected with rings (7), the last fixed surface of roof (3) is connected with double-shaft motor (8), the output fixedly connected with line wheel (9) of double-shaft motor (8).
2. The suspension device for overhauling of the bogie of the motor train unit as claimed in claim 1, wherein the suspension device comprises: the inside of support column (2) has been seted up spout (10), one side fixedly connected with slider (11) of hanging board (4).
3. The suspension device for overhauling the bogie of the motor train unit as claimed in claim 2, wherein the suspension device comprises: one side of the sliding block (11) is fixedly connected with a guide wheel (12), and the guide wheel (12) is movably connected with the sliding groove (10).
4. The suspension device for overhauling of the bogie of the motor train unit as claimed in claim 1, wherein the suspension device comprises: the outer surface of the wire wheel (9) is movably connected with a steel cable (13), and one end of the steel cable (13) is fixedly connected with the hanging ring (7).
5. The suspension device for overhauling of the bogie of the motor train unit as claimed in claim 1, wherein the suspension device comprises: maintenance hole (14) have been seted up at the middle part of hang plate (4) upper surface, one side fixedly connected with reinforcing plate (15) of support column (2).
6. The suspension device for overhauling of the bogie of the motor train unit as claimed in claim 1, wherein the suspension device comprises: the lower surface fixedly connected with universal wheel (16) of base (1), the quantity of universal wheel (16) is four.
CN202022726632.XU 2020-11-23 2020-11-23 Suspension device for overhauling bogie of motor train unit Active CN213651628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022726632.XU CN213651628U (en) 2020-11-23 2020-11-23 Suspension device for overhauling bogie of motor train unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022726632.XU CN213651628U (en) 2020-11-23 2020-11-23 Suspension device for overhauling bogie of motor train unit

Publications (1)

Publication Number Publication Date
CN213651628U true CN213651628U (en) 2021-07-09

Family

ID=76685331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022726632.XU Active CN213651628U (en) 2020-11-23 2020-11-23 Suspension device for overhauling bogie of motor train unit

Country Status (1)

Country Link
CN (1) CN213651628U (en)

Similar Documents

Publication Publication Date Title
CN205346760U (en) Hoist overhauls uses elevating platform
CN201250064Y (en) Front launching nose type bridge girder erection machine for bridge erection
CN206288905U (en) A kind of portable auto lift with two-sided props
CN106938824B (en) A kind of boom hoisting of electric equipment maintenance
CN202296907U (en) Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction
CN206955487U (en) It is exclusively used in lifting steel pipes and the crane device of welding
CN103848360B (en) A kind of group tower tower crane being provided with packaged type balance weight system
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN213651628U (en) Suspension device for overhauling bogie of motor train unit
CN206328062U (en) A kind of novel cantilever is hung
CN211141352U (en) Combined type track dismantling device used in shield construction method
CN209815481U (en) Electromechanical device maintenance hoist and mount frame
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN209227397U (en) A kind of stride pushing tow jack dismounting device
CN206901613U (en) A kind of section bar special mobile formula gantry
CN207890921U (en) A kind of boom hoisting for overhead traveling crane
CN206955528U (en) A kind of novel labour saving hoisting mechanism
CN2057658U (en) Self-lifting type crane
CN208022601U (en) A kind of Novel electric block bridge crane
CN206232337U (en) A kind of lifting appliance of electric equipment maintenance
CN206172897U (en) On -vehicle lift platform
CN212769642U (en) Device is changed to vertical rolling mill cardan shaft
CN212799368U (en) Large-scale power equipment hoisting mounting frame
CN102118085A (en) Coil inserting device of simple mechanical hoisting motor stator
CN206927543U (en) A kind of tunnel rock bolting jumbo slip casting machine movable lifting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant