CN219001839U - Combined bridge for fire-fighting pipe layout - Google Patents
Combined bridge for fire-fighting pipe layout Download PDFInfo
- Publication number
- CN219001839U CN219001839U CN202223504132.7U CN202223504132U CN219001839U CN 219001839 U CN219001839 U CN 219001839U CN 202223504132 U CN202223504132 U CN 202223504132U CN 219001839 U CN219001839 U CN 219001839U
- Authority
- CN
- China
- Prior art keywords
- fire
- fixedly connected
- support frame
- control pipe
- tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model relates to the technical field of fire-fighting bridges, in particular to a combined bridge for arranging fire-fighting pipes, which comprises a support frame, a connecting plate and the fire-fighting pipes, wherein the lower end of the support frame is fixedly connected with a support seat, the inner side of the support frame is fixedly connected with a wiring baffle, and the connecting plate is fixedly connected with a wall body. This a combination crane span structure for fire control pipe lays, can lay the recess seat inside with the fire control pipe earlier, then twist the bolt and fix the arm-tie, two arm-tie are parallel to each other, the below fixedly connected with pressure pad of arm-tie, the arm-tie drives the pressure pad and presses in the top of fire control pipe, the pressure pad adopts elasticity good carry out the alloy make can, then twist the bolt with the slant support piece fixed, utilize the slant of top to prop and horizontal arm-tie, the installation thickness has reserved the space for the fire control pipe, can make the combination crane span structure for fire control pipe lays be applicable to the fire control pipe of more sizes.
Description
Technical Field
The utility model relates to the technical field of fire-fighting bridges, in particular to a combined bridge for fire-fighting pipe layout.
Background
The fire-fighting pipeline is a pipeline material for connecting fire-fighting equipment and conveying fire-fighting water, gas or other mediums, and has special requirements on thickness and materials due to special requirements, and is sprayed with red paint and conveys fire-fighting water.
For example, the name of the authorized bulletin number CN216045810U is a combined bridge for laying fire-fighting pipes, although the combined bridge can be convenient for laying fire-fighting pipes, and the stability of triangle is utilized, the stability of the combined bridge in use is improved, and the combined bridge is convenient for heating the fire-fighting pipes in cold weather in winter through a miniature air pump and a placement plate, and prevents fire-fighting water in the fire-fighting pipes from freezing, thereby improving the versatility, but still exists, the existing combined bridge for laying fire-fighting pipes is auxiliary-supported, because a pull plate and a pressing pad are adopted above the pipes, the obliquely-arranged pull plate and the pressing pad are arranged, so that the pressing pad occupies excessive space on the whole fire-fighting bridge, however, the fire-fighting pipes are comparatively thick for the requirement of water supply, so that the combined bridge for laying fire-fighting pipes is difficult to adapt to the thicker fire-fighting pipes after occupying excessive space.
Disclosure of Invention
The utility model aims to solve the problem that the existing combined bridge for fire-fighting pipe layout is difficult to adapt to thicker pipelines, and provides a combined bridge for fire-fighting pipe layout.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a combination crane span structure for fire control pipe lays, includes support frame, connecting plate and fire control pipe, two connecting plates of upper end fixedly connected with of support frame, the lower extreme fixedly connected with supporting seat of support frame, the inboard fixedly connected with wiring baffle of support frame, the connecting plate links to each other with the wall body is fixed.
Preferably, the two sides above the support frame are fixedly connected with a plurality of diagonal braces through bolts, the angles between the diagonal braces and the support frame are the same, the two sides of the support frame are fixedly connected with pull plates through bolts, and the two pull plates are parallel to each other.
Preferably, the lower part of the pulling plate is fixedly connected with a pressing pad, the upper part of the supporting seat is fixedly connected with a groove seat, and a fire fighting pipe is movably connected between the pressing pad and the groove seat.
Preferably, the lower end of the supporting seat is movably connected with a movable plate through a pin shaft, and a through hole is fixedly formed in the inner side of the supporting seat.
Preferably, the movable plate and the through hole are oppositely arranged, and the end part of the movable plate is movably connected with the supporting seat through a pin.
The utility model provides a combined bridge for fire tube layout, which has the beneficial effects that: this a combination crane span structure for fire control pipe lays, can lay the recess seat inside with the fire control pipe earlier, then twist the bolt and fix the arm-tie, two arm-tie are parallel to each other, the below fixedly connected with pressure pad of arm-tie, the arm-tie drives the pressure pad and presses in the top of fire control pipe, the pressure pad adopts elasticity good carry out the alloy make can, then twist the bolt with the slant support piece fixed, utilize the slant of top to prop and horizontal arm-tie, the installation thickness has reserved the space for the fire control pipe, can make the combination crane span structure for fire control pipe lays be applicable to the fire control pipe of more sizes.
Drawings
Fig. 1 is a schematic perspective view of the present utility model.
Fig. 2 is a schematic front view of fig. 1.
Fig. 3 is a schematic side view of fig. 2.
Fig. 4 is an enlarged sectional view of the portion a in fig. 2.
In the figure: 1. the fire fighting device comprises a supporting frame, 2, a connecting plate, 3, an inclined support, 4, bolts, 5, a pull plate, 6, a pressing pad, 7, a fire fighting pipe, 8, a groove seat, 9, a through hole, 10, a movable plate, 11, a pin, 12, a wiring baffle, 13 and a supporting seat.
Detailed Description
The utility model is further described below with reference to the accompanying drawings:
referring to fig. 1-4, a combined bridge for arranging fire-fighting pipes comprises a support frame 1, connecting plates 2 and fire-fighting pipes 7, wherein the upper end of the support frame 1 is fixedly connected with two connecting plates 2, the connecting plates 2 are used for fixing the support frame 1, the lower end of the support frame 1 is fixedly connected with a support seat 13, the support frame 1 is used for fixing the support seat 13, the inner side of the support frame 1 is fixedly connected with a wiring baffle 12, the two sides of the wiring baffle 12 extending out of the support frame 1 are protected by the fire-fighting pipes 7, and the connecting plates 2 are fixedly connected with a wall body.
Referring to fig. 1-3, two sides above a support frame 1 are fixedly connected with a plurality of diagonal braces 3 through bolts 4, a fire tube 7 can be placed inside a groove seat 8 firstly, angles between the diagonal braces 3 and the support frame 1 are the same, then the bolts 4 are screwed to fix pull plates 5, then the bolts 4 are screwed to fix diagonal braces 3, two sides of the support frame 1 are fixedly connected with pull plates 5 through bolts 4, the two pull plates 5 are parallel to each other, a pressing pad 6 is fixedly connected below the pull plates 5, the pull plates 5 drive the pressing pad 6 to press the upper part of the fire tube 7, the pressing pad 6 is made of an alloy with good elasticity, the groove seat 8 is fixedly connected above the support seat 13, and the fire tube 7 is movably connected between the pressing pad 6 and the groove seat 8;
the fire fighting pipe 7 can be placed in the groove seat 8 firstly, then the bolts 4 are screwed to fix the pull plates 5, the two pull plates 5 are parallel to each other, the pressing pad 6 is fixedly connected to the lower portion of the pull plates 5, the pull plates 5 drive the pressing pad 6 to press the upper portion of the fire fighting pipe 7, the pressing pad 6 is made of an alloy with good elasticity, then the bolts 4 are screwed to fix the inclined support 3, and space is reserved for the installation thickness of the fire fighting pipe 7 by using the inclined support 3 and the transverse pull plates 5 above, so that the combined bridge frame for arranging the fire fighting pipe is applicable to fire fighting pipes with more sizes.
Referring to fig. 1-4, the lower end of the supporting seat 13 is movably connected with a movable plate 10 through a pin, a through hole 9 is fixedly formed in the inner side of the supporting seat 13, the through hole 9 can repair a leakage point which is not visible to the fire-fighting pipe 7, the movable plate 10 and the through hole 9 are oppositely arranged, the end part of the movable plate 10 is movably connected with the supporting seat 13 through a pin 11, and the movable plate 10 can be opened along the supporting seat 13 by pulling out the pin 11.
Working principle:
the connecting plate 2 is used for fixing the support frame 1, the support frame 1 is used for fixing the supporting seat 13, the wiring baffle 12 extends out the support frame 1 both sides and protects for fire tube 7, the connecting plate 2 links to each other with the wall body is fixed, can lay fire tube 7 inside recess seat 8 earlier, then twist bolt 4 and fix arm-tie 5, two arm-tie 5 are parallel to each other, the below fixedly connected with pressure pad 6 of arm-tie 5, arm-tie 5 drives pressure pad 6 and presses in fire tube 7's top, pressure pad 6 adopts the good alloy of elasticity to make can, then twist bolt 4 will slant prop 3 fixed, pull out pin 11 can open fly leaf 10 along supporting seat 13, set up relatively between fly leaf 10 and the through-hole 9, through-hole 9 can maintain the leak source that fire tube 7 is invisible.
While the utility model has been shown and described with reference to a preferred embodiment, it will be understood by those of ordinary skill in the art that various changes in form and details may be made therein without departing from the scope of the utility model.
Claims (5)
1. A combination crane span structure for fire control pipe is laid, includes support frame (1), connecting plate (2) and fire control pipe (7), its characterized in that: the upper end fixedly connected with two connecting plates (2) of support frame (1), the lower extreme fixedly connected with supporting seat (13) of support frame (1), the inboard fixedly connected with wiring baffle (12) of support frame (1), connecting plate (2) are fixed with the wall body and are linked to each other.
2. A composite bridge for fire tube deployment according to claim 1, wherein: the two sides above the support frame (1) are fixedly connected with a plurality of inclined struts (3) through bolts (4), the angles between the inclined struts (3) and the support frame (1) are the same, two sides of the support frame (1) are fixedly connected with pull plates (5) through bolts (4), and the two pull plates (5) are parallel to each other.
3. A composite bridge for fire tube deployment according to claim 2, wherein: the lower part of the pull plate (5) is fixedly connected with a pressing pad (6), the upper part of the supporting seat (13) is fixedly connected with a groove seat (8), and a fire fighting pipe (7) is movably connected between the pressing pad (6) and the groove seat (8).
4. A composite bridge for fire tube deployment according to claim 1, wherein: the lower end of the supporting seat (13) is movably connected with a movable plate (10) through a pin shaft, and a through hole (9) is fixedly formed in the inner side of the supporting seat (13).
5. The composite bridge for fire tube deployment of claim 4, wherein: the movable plate (10) and the through hole (9) are oppositely arranged, and the end part of the movable plate (10) is movably connected with the supporting seat (13) through the pin (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223504132.7U CN219001839U (en) | 2022-12-28 | 2022-12-28 | Combined bridge for fire-fighting pipe layout |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223504132.7U CN219001839U (en) | 2022-12-28 | 2022-12-28 | Combined bridge for fire-fighting pipe layout |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219001839U true CN219001839U (en) | 2023-05-12 |
Family
ID=86237366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223504132.7U Active CN219001839U (en) | 2022-12-28 | 2022-12-28 | Combined bridge for fire-fighting pipe layout |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219001839U (en) |
-
2022
- 2022-12-28 CN CN202223504132.7U patent/CN219001839U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111188440B (en) | ETFE membrane structure curtain wall installation and construction method | |
CN219001839U (en) | Combined bridge for fire-fighting pipe layout | |
CN206992626U (en) | A kind of assembled cable protecting sleeve | |
CN203609789U (en) | Clamp type fire hose dragging and fixing device on high-rise building wall | |
CN210128899U (en) | Shield tunnel segment joint waterproof performance test device | |
CN209262419U (en) | Rectangular air duct para-seismic support | |
CN207499310U (en) | Indoor glass facing mounting assembly | |
CN206916638U (en) | A kind of closed tunnel structure sound barrier | |
CN208634598U (en) | Pipeline overcurrent Quick Connect Kit | |
CN209484803U (en) | A kind of mounting structure of air-conditioning duct | |
CN207740610U (en) | A kind of anticorrosion steam conveying pipe being easily installed | |
CN207196844U (en) | A kind of integrated air-line system | |
CN203488857U (en) | Combined ventilation air duct | |
CN107906258A (en) | A kind of pipeline fixing bracket | |
CN217234669U (en) | Non-excavation local steel lantern ring device of pipeline | |
CN206398180U (en) | A kind of heavy grade thermal pipeline support pipe portion structure | |
CN213268101U (en) | Temporary emergency water supply guarantee device for mobile low area | |
CN216045810U (en) | Combined bridge frame for laying fire fighting pipes | |
CN110735990A (en) | split wedge type pipeline water plugging equipment and plugging method thereof | |
CN212776273U (en) | Pipeline protection mechanism for laying water supply system pipeline | |
CN216555719U (en) | Supporting and fixing device for increasing interval of heat supply pipelines | |
CN213117825U (en) | High-rigidity steel belt reinforced polyethylene spiral corrugated pipe with inner wall corrosion prevention structure | |
CN220303072U (en) | Flexible connecting device for glass fiber reinforced plastic chimney | |
CN215804951U (en) | Wind power generation curved surface forming flange | |
CN213106613U (en) | Fastening device for pipe fitting joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |