CN208634598U - Pipeline overcurrent Quick Connect Kit - Google Patents

Pipeline overcurrent Quick Connect Kit Download PDF

Info

Publication number
CN208634598U
CN208634598U CN201821087495.6U CN201821087495U CN208634598U CN 208634598 U CN208634598 U CN 208634598U CN 201821087495 U CN201821087495 U CN 201821087495U CN 208634598 U CN208634598 U CN 208634598U
Authority
CN
China
Prior art keywords
connector
block plate
supervisor
cushion rubber
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821087495.6U
Other languages
Chinese (zh)
Inventor
张振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Huaqing Environmental Protection Science And Technology Co Ltd
Original Assignee
Hebei Huaqing Environmental Protection Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Huaqing Environmental Protection Science And Technology Co Ltd filed Critical Hebei Huaqing Environmental Protection Science And Technology Co Ltd
Priority to CN201821087495.6U priority Critical patent/CN208634598U/en
Application granted granted Critical
Publication of CN208634598U publication Critical patent/CN208634598U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a kind of pipeline overcurrent Quick Connect Kits, it includes a connector supervisor, the right end of connector supervisor is provided with lock-joint, multiple positioning screws are provided on connector supervisor, the left end of positioning screw, upper bolt, which is responsible for, in connector is fixed with multiple fixed links, the left side of fixed link is a block plate with holes, the left side of block plate with holes is a gas-flow closure cushion rubber, the left side of gas-flow closure cushion rubber is a block plate, the left side of block plate is multiple fixed links, and air inflation nozzle is provided on gas-flow closure cushion rubber, and air inflation nozzle passes through block plate with holes.When the utility model is used, it is inflated by external inflation device into air inflation nozzle, make gas-flow closure cushion rubber rapid expanding, thus by outer carrier pipe road inner sealing, it is oppositely arranged by two pipeline overcurrent Quick Connect Kits, and connected between two pipeline overcurrent Quick Connect Kits by sebific duct, it is realized with this and reaches overcurrent purpose in the state of not stopping production, not stopping work.

Description

Pipeline overcurrent Quick Connect Kit
Technical field
The utility model relates to technical field of pipeline connection more particularly to a kind of pipeline overcurrent Quick Connect Kits.
Background technique
It is known, it is lauched or domestic water and oil field medium-long range transmission field in municipal administration, on long distance delivery pipeline Well is perhaps repaired when these observation wells by the junction setting observation well in fixed length pipeline or repairs well when something goes wrong, It is usually closed by the way that liquid will be conveyed in pipeline, maintenance or part replacement, but such behaviour then is carried out to observation well again It will affect liquid in pipeline normally to convey, be impacted to supplying water or normally producing, it is existing to occur a kind of lead on the market It crosses bolt and tightens a kind of connection overflow means for squeezing cushion rubber to reach sealing, but such device connects in observation well When, efficiency is slow in such a way that bolt is tightened, and connects caused by being easy to appear because of cinch bolt force unevenness inclined Pendulum problem.
For the drawback in the prior art, as industry technical staff, it is highly desirable in existing built-in company Technology improvement is carried out on the basis of binding structure, a pipeline overcurrent Quick Connect Kit is designed, to solve the disadvantage in the prior art End.
Summary of the invention
The purpose of this utility model is to provide a kind of pipeline overcurrent Quick Connect Kits, to solve to deposit in the prior art Foregoing problems.
To achieve the goals above, the technical solution adopted in the utility model is as follows: a kind of pipeline overcurrent quickly connects dress It setting comprising connector supervisor, on the connector supervisor, right end is provided with lock-joint, on connector supervisor, outside Multiple positioning screws are provided through on wall, the left end of positioning screw is responsible for upper bolt in connector and is fixed with multiple fixed links, The left side of fixed link is a block plate with holes, and the left side of block plate with holes is a gas-flow closure cushion rubber, a left side for gas-flow closure cushion rubber Side is a block plate, and the left side of block plate is multiple fixed links, is provided with air inflation nozzle on the gas-flow closure cushion rubber, air inflation nozzle is worn Cross block plate with holes, the exposed right side in block plate with holes of air inflation nozzle.
The fixed link is threadedly secured on connector supervisor, and is arranged in more at left and right sides of gas-flow closure cushion rubber A fixed link is all uniformly arranged using connector supervisor's center line as axis.
The positioning screw is multiple, and multiple positioning screws are all laid using connector supervisor's center line as axis It sets, positioning screw runs through setting from connector main pipe outward, is arranged outside connector supervisor by nut check.
The beneficial effects of the utility model are: the utility model uses block plate and block plate with holes will by designing above Gas-flow closure cushion rubber is fixed on centre, and is fixed the position of block plate with holes and block plate by multiple fixed links, in use, passing through External inflation device is inflated into air inflation nozzle, makes gas-flow closure cushion rubber rapid expanding, thus by outer carrier pipe road inner sealing, It is oppositely arranged by two pipeline overcurrent Quick Connect Kits, and passes through sebific duct between two pipeline overcurrent Quick Connect Kits Connection, is realized with this and reaches overcurrent purpose in the state of not stopping production, not stopping work, to not influence to observe well or repair well Normal service work.
Detailed description of the invention
Fig. 1 is the utility model schematic perspective view;
Fig. 2 is the utility model schematic diagram of main cross-sectional structure;
Fig. 3 is the utility model use state diagram;
Appended drawing reference: 1- connector supervisor, 2- lock-joint, 3- positioning screw, 4- block plate with holes, 5- fixed link, 6- inflation are close Sealing rubber ring, 7- block plate, 8- air inflation nozzle, 9- nut, 10- sebific duct.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing, to this reality It is further elaborated with novel.It should be appreciated that the specific embodiments described herein are only used to explain that this is practical It is novel, it is not used to limit the utility model.
A kind of pipeline overcurrent Quick Connect Kit comprising a connector supervisor 1, the connector is responsible on 1, Right end is provided with lock-joint 2, and connector is responsible on 1, and multiple positioning screws 3, the effect of positioning screw are provided through on outer wall It is the insertion position of restriction sebific duct 10, meanwhile, if any special circumstances, prevent connector from entering pipeline depths and can not take out, from And it causes the accident;The left end of positioning screw 3, bolt is fixed with multiple fixed links 5, the left side of fixed link 5 on connector supervisor 1 For a block plate 4 with holes, block plate 4 with holes is squeezed by fixed link 5, prevents it from deviating to the right with this, the left side of block plate 4 with holes is The left side of one gas-flow closure cushion rubber 6, gas-flow closure cushion rubber 6 is a block plate 7, and the left side of block plate 7 is also equipped with multiple fixations Bar 5 is provided with air inflation nozzle 8 on the gas-flow closure cushion rubber 6, and air inflation nozzle 8 passes through block plate 4 with holes, and air inflation nozzle 8 is exposed with holes The right side of block plate 4.
On the basis of the above structure, uniform force when to make fixed link squeeze block plate 7 or block plate 4 with holes, fixed link 5 It is threadedly secured on connector supervisor 1, and multiple fixed links 5 of 6 left and right sides of gas-flow closure cushion rubber is set all with connection The center line of device supervisor is uniformly arranged for axis.
Further, the positioning screw 3 is multiple, and multiple positioning screws 3 are all with the center of connector supervisor 1 Line is uniformly arranged for axis, and positioning screw 3, outward through setting, passes through from 1 inside of connector supervisor outside connector supervisor Nut check setting guarantees that positioning screw 3 connects firm with this.
When the utility model is implemented to use: it uses block plate 4 and block plate 7 with holes that gas-flow closure cushion rubber 6 is fixed on centre, And fixed the position of block plate 4 with holes and block plate 7 by multiple fixed links 5, in use, passing through external inflation device to air inflation nozzle Interior inflation makes 6 rapid expanding of gas-flow closure cushion rubber, thus by outer carrier pipe road inner sealing, because external inflation device is fast Speed gas supply, gas-flow closure cushion rubber 6 expansion unevenness will not occur because of local pressure unevenness, more be not in poorly sealed disadvantage End;As shown in figure 3, being oppositely arranged by two pipeline overcurrent Quick Connect Kits, and dress is quickly connected in two pipeline overcurrents It is connected between setting by sebific duct 10, is realized with this and reach overcurrent purpose in the state of not stopping production, not stopping work, to not influence to see Cha Jing or the normal service work for repairing well.

Claims (3)

1. a kind of pipeline overcurrent Quick Connect Kit comprising a connector supervisor, it is characterised in that: the connector master Guan Shang, right end are provided with lock-joint, and connector is provided through multiple positioning screws on being responsible on outer wall, positioning screw Left end is responsible for upper bolt in connector and is fixed with multiple fixed links, and the left side of fixed link is a block plate with holes, block plate with holes Left side is a gas-flow closure cushion rubber, and the left side of gas-flow closure cushion rubber is a block plate, and the left side of block plate is multiple fixed links, institute Air inflation nozzle is provided on the gas-flow closure cushion rubber stated, air inflation nozzle passes through block plate with holes, the exposed right side in block plate with holes of air inflation nozzle.
2. pipeline overcurrent Quick Connect Kit as described in claim 1, it is characterised in that: the fixed link is threadedly secured in On connector supervisor, and multiple fixed links at left and right sides of gas-flow closure cushion rubber are set and are all with connector supervisor's center line Axis is uniformly arranged.
3. pipeline overcurrent Quick Connect Kit as described in claim 1, it is characterised in that: the positioning screw be it is multiple, And multiple positioning screws are all uniformly arranged using connector supervisor's center line as axis, positioning screw from connector main pipe to It is outer to run through setting, pass through nut check outside connector supervisor and is arranged.
CN201821087495.6U 2018-07-10 2018-07-10 Pipeline overcurrent Quick Connect Kit Expired - Fee Related CN208634598U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821087495.6U CN208634598U (en) 2018-07-10 2018-07-10 Pipeline overcurrent Quick Connect Kit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821087495.6U CN208634598U (en) 2018-07-10 2018-07-10 Pipeline overcurrent Quick Connect Kit

Publications (1)

Publication Number Publication Date
CN208634598U true CN208634598U (en) 2019-03-22

Family

ID=65736689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821087495.6U Expired - Fee Related CN208634598U (en) 2018-07-10 2018-07-10 Pipeline overcurrent Quick Connect Kit

Country Status (1)

Country Link
CN (1) CN208634598U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190568A (en) * 2019-06-28 2019-08-30 广东海洋大学 It is a kind of convenient for fixed electrical engineering location and installation casing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110190568A (en) * 2019-06-28 2019-08-30 广东海洋大学 It is a kind of convenient for fixed electrical engineering location and installation casing

Similar Documents

Publication Publication Date Title
CN208967043U (en) A kind of pipeline transportation large scale reducer pipe temporarily connects sealing device
CN208634598U (en) Pipeline overcurrent Quick Connect Kit
CN205896554U (en) Flexible pipeline under pressure leaking stoppage connecting device
CN204831736U (en) Mould water -cooling pipeline equipment
CN202612770U (en) Connecting pipe for opening ball valve with double blow off mouths
CN204126853U (en) Residual heat of air compressor reclaims unit waterway structure
CN206973154U (en) Leakage point capping tools with pressure
CN206017815U (en) A kind of coal gas push-pull valve
CN204805839U (en) Pipeline bell and spigot port leaking stoppage ware
CN207584269U (en) Gas pipeline plugging device
CN103148245B (en) Multifunctional electric control pressure release device, as well as electric control system and electric control method thereof
CN203176631U (en) Pipeline rapid plugging device
CN217153491U (en) Oil and natural gas long distance pipeline presses plugging device in area
CN205860306U (en) Water-cooling air conditioning unit and water route assembly thereof
CN105603934A (en) Totally-closed water gate and use method thereof
CN206956779U (en) A kind of water supply project overhauls valve well construction
CN205047920U (en) Valve is broken to hose
CN208417906U (en) Wide-range cassette diverging device
CN205824472U (en) Structural gas channel
CN206889905U (en) A kind of connection mounting flange pipe of wash tub pipe
CN205938334U (en) Valve leakage prosthetic devices
CN209146440U (en) A kind of check-valves used for air compressor easy to repair
CN205191025U (en) Connector of gas pipeline
CN205371933U (en) Take gas to repair gas piping device
CN207437924U (en) Natural gas line isolating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20210710