CN206956779U - A kind of water supply project overhauls valve well construction - Google Patents

A kind of water supply project overhauls valve well construction Download PDF

Info

Publication number
CN206956779U
CN206956779U CN201720514338.8U CN201720514338U CN206956779U CN 206956779 U CN206956779 U CN 206956779U CN 201720514338 U CN201720514338 U CN 201720514338U CN 206956779 U CN206956779 U CN 206956779U
Authority
CN
China
Prior art keywords
valve
well
maintenance
anchor block
well body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720514338.8U
Other languages
Chinese (zh)
Inventor
王全锋
高小涛
于明学
马浩
蒋爱辞
董滇红
马会珍
仝战杨
董甲甲
韩岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201720514338.8U priority Critical patent/CN206956779U/en
Application granted granted Critical
Publication of CN206956779U publication Critical patent/CN206956779U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Valve Housings (AREA)

Abstract

The utility model discloses a kind of water supply project to overhaul valve well construction, including is provided with the well body of well lid, the maintenance valve on the basis of being arranged in well body;The water inlet valve port and tray short tube for overhauling valve are tightly connected, the water outlet valve port of maintenance valve is sealedly connected with telescopic joint, double flange short tubes with thrust wing ring and slotting disk short tube successively, double flange short tubes extend corresponding to well body outside side wall, thrust wing ring is located on the double flange short tube outer peripheral faces extended outside well body, anchor block is provided with thrust wing ring position, thrust wing ring is located inside anchor block.The utility model is based on the maintenance valve well of national standard drawings, by the feedwater piping affiliated facility Combination Design that maintenance valve pit and anchor block two are common, anchor block is set after Parallel to the flow direction overhauls valve well, anchor block is set effectively to bear to close maintenance valve caused hydrostatic pressure afterwards, prevent piping displacement caused by closing maintenance valve from taking off lip reflex, reduce maintenance valve well operation and maintenance cost.

Description

A kind of water supply project overhauls valve well construction
Technical field
Water supply project maintenance valve well is the utility model is related to, valve well knot is overhauled more particularly, to a kind of water supply project Structure.
Background technology
Water supply network is the important component of water-supply systems, is described as " main artery " in city.And water supply network System is in its running, due to the influence of the factor such as various unpredictable or even uncontrollable, inevitably by one Determine the damage of degree, cause the leakage of running water, increase operation and maintenance cost.
Ductile iron pipeline has the advantages that intensity height, good-extensibility, bears interior pressure, be anticorrosive, and pipe joint uses Flexible rubber circle seals, easy for installation, and necessary is complete, is widely used in water supply project, is the master of water supply project Want tubing.Water supply line circuit is divided into multiple segments by maintenance valve well, is easy to water supply line can be in a short time when damaging Repair, and reduce water resource waste as far as possible to reduce loss.《Urban water supply long distance water transfer pipe (canal) road engineering technology rule Journey》(CECS193-2005) provide:" 5.2.1 should set maintenance valve in the aqueduct of certain length.Overhaul valve Spacing should determine according to situations such as pipeline complex situations, tubing intensity, accident expected probability and accident draining difficulty or ease, every 5 ~ 10km is preferably set at one.”《Code for design of outdoor water supply engineering》(GB50013-2006) provide:" initial point of 7.4.5 aqueducts, end Point, crotch and river course, railway, highway division are passed through, valve should be set according to the concrete condition of engineering and the regulation of relevant department Door.Setting valve should be needed on aqueduct by emergency repair.”
At present, the design of water supply project maintenance valve well be with reference to national standard drawings 07MS101 municipal water supplies pipeline engineering and Affiliated facility, and as city tubular service problem in recent years increases, inspection is closed when operation maintenance personnel is rushed to repair pipeline Repair valve to find, the service valve after the valve of pass makes the connecting pipe at maintenance valve both ends produce displacement under acting by external hydrostatic pressure De- mouth, new trouble is brought to repairing work, while causing bigger water resource waste, has had a strong impact on the daily work of people again Make and live.
The content of the invention
The utility model purpose is to provide a kind of water supply project maintenance valve well construction, reaches and effectively improve water-carriage system Maintenance safety and convenience, reduce operation and maintenance cost, cost saving.
To achieve the above object, the utility model takes following technical proposals:
A kind of water supply project maintenance valve well construction described in the utility model, including the well body of well lid is provided with, set Maintenance valve on the basis of in the well body;The water inlet valve port of the maintenance valve is tightly connected with tray short tube, service valve The water outlet valve port of door is sealedly connected with telescopic joint, double flange short tubes with thrust wing ring and slotting disk short tube, double methods successively Blue short tube extends corresponding to well body outside side wall, and the thrust wing ring is located at the double flange short tube outer peripheral faces extended outside well body On, anchor block is provided with thrust wing ring position, thrust wing ring is located inside the anchor block.
The tray short tube, double flange short tubes with thrust wing ring and slotting disk short tube are nodular cast iron pipe fittings, tray short tube 500mm outside well body side wall corresponding to extending, is connected, double flange short tubes prolong with facilitating with the pipeline spigot-and-socket before valve well 500mm outside the anchor block is stretched out, is connected with facilitating with slotting disk short tube.
The link position of the tray short tube and double flange short tube and the maintenance valve to the well body madial wall away from From >=600mm, meet valve operation and maintenance needs.
The utility model will overhaul the two common feedwater of valve pit and anchor block based on the maintenance valve well of national standard drawings Pipeline affiliated facility Combination Design, anchor block is set after Parallel to the flow direction overhauls valve well, enables anchor block effectively to bear to close inspection Valve caused hydrostatic pressure afterwards is repaiied, prevents piping displacement caused by closing maintenance valve from taking off lip reflex.Reach elimination Service valve destruction caused by hydrostatic pressure behind the door is closed, improves maintenance safety and convenience, reduces maintenance valve well fortune Row maintenance cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the overlooking the structure diagram that Fig. 1 conceals the well lid.
Embodiment
Embodiments of the invention are elaborated below in conjunction with the accompanying drawings, the present embodiment using technical solution of the present invention before Put and implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to down State embodiment.
Such as Fig. 1,2, a kind of water supply project described in the utility model overhauls valve well construction, including is provided with well lid 1 Well body 2, it is arranged on the maintenance valve 4 on basis 3 in well body 2;The water inlet valve port of maintenance valve 4 is tightly connected with tray short tube 5, The water outlet valve port of maintenance valve 4 is sealedly connected with telescopic joint 6, double flange short tubes 8 with thrust wing ring 7 and slotting disk short tube successively 9, double flange short tubes 8 extend corresponding to well body 2 outside side wall, and thrust wing ring 7 is located at the double flange short tubes extended outside well body 2 On 8 outer peripheral faces, the opening position of thrust wing ring 7 is provided with anchor block 10, thrust wing ring 7 is fixed on the inside of anchor block 10.
Tray short tube 5, double flange short tubes 8 with thrust wing ring 7 and slotting disk short tube 9 are nodular cast iron pipe fittings, tray short tube 5 500mm outside well body side wall corresponding to extending, is connected, double flange short tubes 8 prolong with facilitating with the socket joint of pipeline 11 before valve well 500mm outside anchor block 10 is stretched out, is connected with facilitating with slotting disk short tube 9.
The link position of tray short tube 5 and double flange short tube 8 and maintenance valve 4 to the madial wall of well body 2 distance >= 600mm, meet valve operation and maintenance needs.

Claims (3)

1. a kind of water supply project overhauls valve well construction, including is provided with the well body of well lid, on the basis of being arranged in the well body Maintenance valve;It is characterized in that:The water inlet valve port of the maintenance valve is tightly connected with tray short tube, overhauls the water outlet of valve Valve port is sealedly connected with telescopic joint, double flange short tubes with thrust wing ring and slotting disk short tube successively, and double flange short tubes prolong Stretch out outside well body side wall, the thrust wing ring is located on the double flange short tube outer peripheral faces extended outside well body, positioned at thrust Anchor block is provided with wing ring position, thrust wing ring is located inside the anchor block.
A kind of 2. water supply project maintenance valve well construction according to claim 1, it is characterised in that:The tray short tube prolongs 500mm outside well body side wall corresponding to stretching, double flange short tubes extend 500mm outside the anchor block.
A kind of 3. water supply project maintenance valve well construction according to claim 1 or 2, it is characterised in that:The tray is short Distance >=600mm of pipe and double flange short tubes and the link position for overhauling valve to the well body madial wall.
CN201720514338.8U 2017-05-10 2017-05-10 A kind of water supply project overhauls valve well construction Active CN206956779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720514338.8U CN206956779U (en) 2017-05-10 2017-05-10 A kind of water supply project overhauls valve well construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720514338.8U CN206956779U (en) 2017-05-10 2017-05-10 A kind of water supply project overhauls valve well construction

Publications (1)

Publication Number Publication Date
CN206956779U true CN206956779U (en) 2018-02-02

Family

ID=61374532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720514338.8U Active CN206956779U (en) 2017-05-10 2017-05-10 A kind of water supply project overhauls valve well construction

Country Status (1)

Country Link
CN (1) CN206956779U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930325A (en) * 2017-05-10 2017-07-07 黄河勘测规划设计有限公司 A kind of water supply project overhauls valve well construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930325A (en) * 2017-05-10 2017-07-07 黄河勘测规划设计有限公司 A kind of water supply project overhauls valve well construction

Similar Documents

Publication Publication Date Title
CN204988368U (en) Utility tunnel intelligence drainage monitoring devices
CN206956779U (en) A kind of water supply project overhauls valve well construction
CN105586986A (en) Urban underground intelligent comprehensive pipe rack quakeproof device
CN2826124Y (en) Pipeline leakage blocking device
CN106930325A (en) A kind of water supply project overhauls valve well construction
CN209975621U (en) Open caisson formula water hammer protective equipment
CN204826089U (en) Soil stack negative pressure balancing unit
CN208105382U (en) A kind of lift fire hydrant applied to fire-fighting
CN208501733U (en) A kind of integrated drainage system of Urban Underground pipe gallery
CN214947340U (en) Wharf sewage pipeline leakage stoppage construction tool
CN205314233U (en) Multi -functional sump pit structure in power station
CN108589774A (en) A kind of integrated drainage system of Urban Underground pipe gallery
CN209115882U (en) Fuel gas pipeline, which is not stopped the supple of gas or steam, changes the inicdental bypath connecting tooling of pipe
CN209384316U (en) A kind of desulfurization municipal water supply system
CN107013810A (en) The water lute drainer of adjustable water seal height
CN106049597A (en) Anchor-block drain tap well applicable to long-distance large-diameter exposed-laying water pipe
CN203082450U (en) Prestressed concrete cylinder pipe (PCCP) engineering accident reserve pipe
CN205804467U (en) Be suitable to the anchor block formula drain tap well of long-distance large-caliber surface aqueduct
CN208571081U (en) Trough pipe double-bellmouth connector
CN207279103U (en) It is conveniently replaceable the connection structure of water meter
CN203295535U (en) Corrosion prevention device of gas pipe network
CN206889905U (en) A kind of connection mounting flange pipe of wash tub pipe
CN213361399U (en) Municipal administration water supply and drainage pipeline connection structure
CN220644512U (en) Concealed pipe drainage device suitable for water collecting well
CN216112503U (en) Seepage-proofing water-stopping structure based on water supply and drainage engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee before: Yellow River Engineering Consulting Co., Ltd.