CN218992592U - Support for construction of electromechanical pipeline of building - Google Patents

Support for construction of electromechanical pipeline of building Download PDF

Info

Publication number
CN218992592U
CN218992592U CN202222964970.6U CN202222964970U CN218992592U CN 218992592 U CN218992592 U CN 218992592U CN 202222964970 U CN202222964970 U CN 202222964970U CN 218992592 U CN218992592 U CN 218992592U
Authority
CN
China
Prior art keywords
fixedly connected
construction
bottoms
tops
electromechanical pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222964970.6U
Other languages
Chinese (zh)
Inventor
聂新敬
陈慧茹
李龙华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222964970.6U priority Critical patent/CN218992592U/en
Application granted granted Critical
Publication of CN218992592U publication Critical patent/CN218992592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a support for construction of an electromechanical pipeline of a building, which comprises an extension frame, wherein the bottoms of four first connecting rods are fixedly connected with first fixing rings, the tops of four second connecting rods are fixedly connected with second fixing rings, the bottoms of two extension frames are penetrated through and are connected with connecting frames in a sliding manner, the four second through holes and the two first through holes at the top are respectively connected with a first bolt in a sliding manner, and sliding blocks are penetrated through and connected in the middle positions of the left side and the right side of the top of a second supporting plate in a sliding manner. According to the utility model, under the combined action of the connecting frame, the first through hole, the second through hole, the first bolt, the first nut, the sliding block and the third bolt, the fixing position can be adjusted according to the size of the wire passing channel, and under the matched use of two rows of fixing rings, the connecting blocks, the second nut and the second bolt with different sizes, pipelines with different sizes can be fixed, so that diversified mountability is effectively improved.

Description

Support for construction of electromechanical pipeline of building
Technical Field
The utility model relates to the technical field of construction of electromechanical pipelines of buildings, in particular to a support for construction of electromechanical pipelines of buildings.
Background
The building electromechanical engineering is an important component in the building engineering, the quality of the electromechanical engineering directly influences the overall quality of the building engineering, and the building electromechanical engineering comprises an operation effect, energy conservation or not and practicability or not when a building is actually put into use, in the modern building electromechanical engineering construction process, pipeline arrangement work is required according to actual topography, part of pipelines are required to be limited on a wall surface, and support auxiliary construction is adopted.
The existing support for pipeline construction can only be used for installing one type of pipeline or two types of pipelines in the actual use process, so that diversified installation cannot be realized, the actual usability of the pipeline support is reduced, and the support cannot be adjusted according to the size of a line passing channel when the support is combined with the line passing channel.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a support for construction of an electromechanical pipeline of a building.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a support is used in construction of building electromechanical pipeline, includes extension frame, two the equal fixedly connected with of one side top that the extension frame corresponds is first backup pad, four the equal fixedly connected with of first backup pad bottom intermediate position has four head rods of evenly distributed, four the equal fixedly connected with of head rod bottom is first solid fixed ring, two the equal fixedly connected with of one side bottom that the extension frame corresponds is third backup pad, the equal fixedly connected with of third backup pad top intermediate position has four evenly distributed's second connecting rod, four the equal fixedly connected with of second connecting rod top is second solid fixed ring, four the equal fixedly connected with of second solid fixed ring top intermediate position and first solid fixed ring bottom intermediate position is two connecting blocks, four both ends all run through and sliding connection have the second bolt around the connecting block left side, two the equal run through and sliding connection have the second through-hole in both ends bottom intermediate position, two the equal run through and sliding connection have the link of extension frame bottom, two the equal run through and are provided with five first through-holes of evenly distributed in intermediate position, four the equal fixedly connected with of second through-hole is left side top and right side support plate, the equal fixedly connected with two corresponding top sliding connection has two through-bolts to have the first backup pad, the equal left side top is left side and right side.
As a further description of the above technical solution:
the tops of the two extension frames are fixedly connected with first mounting plates.
As a further description of the above technical solution:
and the left side and the right side of the outer diameter of the four second bolts are respectively connected with second nuts in a threaded manner.
As a further description of the above technical solution:
and the front end and the rear end of the outer diameter of the four first bolts are respectively connected with a first nut in a threaded manner.
As a further description of the above technical solution:
the tops of the two supporting legs are fixedly connected with second mounting plates.
As a further description of the above technical solution:
both the sliding blocks slide in the sliding grooves.
As a further description of the above technical solution:
the two sliding blocks are fixed with the wire passing channel and the second supporting plate through third bolts.
The utility model has the following beneficial effects:
according to the utility model, the distance between the second support plate and the third support plate can be adjusted according to the height of the wire passing channel by arranging the connecting frame, the first through hole, the second through hole, the first bolt and the first nut, the sliding block slides in the sliding groove, the sliding block and the third bolt can be adjusted according to the width of the wire passing channel, and pipelines with different sizes can be fixed under the matched use of two rows of fixing rings, connecting blocks, the second nut and the second bolt with different sizes, so that the diversified mountability is effectively improved.
Drawings
FIG. 1 is a perspective view of a bracket for construction of an electromechanical pipeline of a building, which is provided by the utility model;
fig. 2 is a first bolt structure diagram of a bracket for construction of an electromechanical pipeline of a building, which is provided by the utility model;
FIG. 3 is a first fixing ring structure diagram of a bracket for construction of an electromechanical pipeline of a building;
FIG. 4 is a second ring-fixing split view of a bracket for construction of an electromechanical pipeline of a building according to the present utility model;
fig. 5 is a structure diagram of a wire passage of a bracket for construction of an electromechanical pipeline of a building.
Legend description:
1. an extension frame; 2. support legs; 3. a first mounting plate; 4. a first fixing ring; 5. a first connecting rod; 6. a first support plate; 7. a second mounting plate; 8. a first bolt; 9. a first through hole; 10. a second support plate; 11. a wire passing channel; 12. a connecting frame; 13. a third support plate; 14. a chute; 15. a first nut; 16. a second through hole; 17. a second fixing ring; 18. a second connecting rod; 19. a connecting block; 20. a second bolt; 21. a second nut; 22. a sliding block; 23. and a third bolt.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on directions or positional relationships shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the apparatus or element to be referred to must have a specific direction, be constructed and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," "third," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "coupled," and the like are to be construed broadly, and may be fixedly coupled, detachably coupled, or integrally coupled, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1-5, one embodiment provided by the present utility model is: the bracket for the construction of the electromechanical pipeline of the building comprises extension frames 1, wherein the top parts of one side corresponding to the two extension frames 1 are fixedly connected with a first supporting plate 6, the middle positions of the bottoms of the first supporting plates 6 are fixedly connected with four first connecting rods 5 which are uniformly distributed, the bottoms of the four first connecting rods 5 are fixedly connected with a first fixing ring 4, the bottoms of one side corresponding to the two extension frames 1 are fixedly connected with a third supporting plate 13, the middle positions of the tops of the third supporting plates 13 are fixedly connected with four second connecting rods 18 which are uniformly distributed, the tops of the four second connecting rods 18 are fixedly connected with a second fixing ring 17, the two fixing rings are different in size, the middle positions of the tops of the four second fixing rings 17 and the middle positions of the bottoms of the first fixing rings 4 are fixedly connected with two connecting blocks 19, the front ends and the rear ends of the left sides of the four connecting blocks 19 are penetrated and are slidably connected with second bolts 20, under the matched use of the first fixing ring 4, the second fixing ring 17, the connecting block 19, the second nuts 21 and the second bolts 20, pipelines with different sizes can be fixed, so that diversified installability is effectively improved, two second through holes 16 are formed in the middle positions of the bottoms of the front end and the rear end of the two extension frames 1 in a penetrating manner, the bottoms of the two extension frames 1 are connected with connecting frames 12 in a penetrating manner in a sliding manner, five first through holes 9 which are uniformly distributed are formed in the middle positions of the front ends of the two connecting frames 12 in a penetrating manner, first bolts 8 are connected on the four second through holes 16 and the two first through holes 9 on the top in a sliding manner, the distance between the second supporting plate 10 and the third supporting plate 13 can be adjusted according to the height of the wire passing channel 11 through the connecting frames 12, the first through holes 9, the second through holes 16, the first bolts 8 and the first nuts 15, the center positions of one sides of the two extension frames 1 far away from the first support plate 6 are fixedly connected with support legs 2, the bottoms of one sides corresponding to the two connecting frames 12 are fixedly connected with a second support plate 10, the middle positions of the left side and the right side of the top of the second support plate 10 are penetrated and provided with sliding grooves 14, the middle positions of the left side and the right side of the top of the second support plate 10 are penetrated and slidably connected with sliding blocks 22, and one sides corresponding to the two sliding blocks 22 are provided with wire passing channels 11.
The first mounting plate 3 of equal fixedly connected with in two extension frame 1 tops, the equal threaded connection of four second bolts 20 external diameter left and right sides has second nut 21, both ends all threaded connection has first nut 15 around four first bolts 8 external diameters, the equal fixedly connected with second mounting plate 7 in two supporting leg 2 tops, through setting up first mounting plate 3 and second mounting plate 7, can fix this support and building object, two sliding blocks 22 all slide in spout 14, two sliding blocks 22 are all fixed through third bolt 23 with crossing between line passageway 11 and the second backup pad 10, through setting up sliding block 22 and third bolt 23, can adjust according to the width of line passageway 11.
Working principle: first, the first mounting plate 3 and the second mounting plate 7 are provided to fix the bracket to the building object, the connecting frame 12, the first through hole 9, the second through hole 16, the first bolt 8 and the first nut 15 are provided to adjust the distance between the second support plate 10 and the third support plate 13 according to the height of the wire passing channel 11, the sliding block 22 slides in the sliding groove 14, the sliding block 22 and the third bolt 23 are provided to adjust the distance according to the width of the wire passing channel 11, the first fixing ring 4 and the second fixing ring 17 are provided to have different sizes, and the pipelines of different sizes can be fixed under the cooperation of the first fixing ring 4, the second fixing ring 17, the connecting block 19, the second nut 21 and the second bolt 20, thereby effectively improving the diversified installability.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. The utility model provides a support for construction of building electromechanical pipeline, includes extension frame (1), its characterized in that: two the corresponding one side tops of the extension frames (1) are fixedly connected with a first supporting plate (6), four first connecting rods (5) which are uniformly distributed are fixedly connected to the middle positions of the bottoms of the first supporting plates (6), four first fixing rings (4) are fixedly connected to the bottoms of the first connecting rods (5), two third supporting plates (13) are fixedly connected to the bottoms of the corresponding one sides of the extension frames (1), four second connecting rods (18) which are uniformly distributed are fixedly connected to the middle positions of the tops of the third supporting plates (13), a second fixing ring (17) is fixedly connected to the tops of the four second connecting rods (18), two connecting blocks (19) are fixedly connected to the middle positions of the tops of the second fixing rings (17) and the middle positions of the bottoms of the first fixing rings (4), two second bolts (20) are respectively penetrated and slidingly connected to the front and back ends of the left sides of the four connecting blocks (19), two second through holes (16) are respectively penetrated and are respectively arranged at the middle positions of the bottoms of the front and back sides of the extension frames (1), two second through holes (16) are respectively penetrated and are uniformly connected to the bottoms of the two second through holes (12) which are respectively connected to the bottoms of the two extension frames (1), two the one side central point that first backup pad (6) was kept away from to extension frame (1) puts equal fixedly connected with supporting leg (2), two the corresponding one side bottom fixedly connected with second backup pad (10) of link (12), second backup pad (10) top left and right sides intermediate position all runs through and is provided with spout (14), second backup pad (10) top left and right sides intermediate position runs through and sliding connection has sliding block (22), two the corresponding one side of sliding block (22) all is provided with wire passageway (11).
2. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: the tops of the two extension frames (1) are fixedly connected with first mounting plates (3).
3. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: and second nuts (21) are in threaded connection with the left side and the right side of the outer diameter of the four second bolts (20).
4. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: the front end and the rear end of the outer diameter of each of the four first bolts (8) are respectively connected with a first nut (15) in a threaded manner.
5. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: the tops of the two supporting legs (2) are fixedly connected with second mounting plates (7).
6. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: both sliding blocks (22) slide in the sliding groove (14).
7. The bracket for construction of an electromechanical pipeline of a building according to claim 1, wherein: the two sliding blocks (22) are fixed with the wire passing channel (11) and the second supporting plate (10) through third bolts (23).
CN202222964970.6U 2022-11-06 2022-11-06 Support for construction of electromechanical pipeline of building Active CN218992592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222964970.6U CN218992592U (en) 2022-11-06 2022-11-06 Support for construction of electromechanical pipeline of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222964970.6U CN218992592U (en) 2022-11-06 2022-11-06 Support for construction of electromechanical pipeline of building

Publications (1)

Publication Number Publication Date
CN218992592U true CN218992592U (en) 2023-05-09

Family

ID=86223678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222964970.6U Active CN218992592U (en) 2022-11-06 2022-11-06 Support for construction of electromechanical pipeline of building

Country Status (1)

Country Link
CN (1) CN218992592U (en)

Similar Documents

Publication Publication Date Title
CN210920331U (en) Concatenation formula pipeline gallows
CN210695213U (en) Novel greenhouse skeleton structure
CN218992592U (en) Support for construction of electromechanical pipeline of building
CN214696972U (en) Embedded part leveling and positioning fixing frame
CN215484886U (en) Adjustable strutting arrangement for building
CN210313247U (en) Tower crane attaches wall connecting device
CN210007655U (en) adjustable base of solar support
CN212343291U (en) Composite material cable support for electric pipe well
CN210604195U (en) Compression testing device is used in HDPE bellows production
CN211331996U (en) Molten tin bath bottom plate steel constructs frame welding frock
CN111691703A (en) Supporting device for aluminum alloy template
CN106638184B (en) Multi-working-condition movable type traveling rail supporting device and using method
CN220320497U (en) Water conservancy hydropower construction is with quick installation formula support
CN221221709U (en) Novel adjustable movable support
CN220036118U (en) Novel beam bottom template fastening device
CN110571728B (en) Adjustable support frame is used in crane span structure installation
CN220504485U (en) Length-adjustable cross bar suite of disc buckle type scaffold
CN219327266U (en) Dry hanging large plate mounting seat with adjustable positioning position
CN220369681U (en) Supporting frame
CN216247482U (en) Four-point support test fixture for high-rise building toughened glass bending test
CN221720987U (en) Hanger with adjusting radian
CN218997586U (en) Adjustable cable installing support for polarimeter
CN216695921U (en) Labor-saving fatigue test device for metal corrugated pipe
CN219298831U (en) Positioning device convenient to adjust and used for installing inclined column steel structure
CN220318772U (en) Steel structural column connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant