CN218958390U - Splicing tool for prefabricated cabins of booster station - Google Patents

Splicing tool for prefabricated cabins of booster station Download PDF

Info

Publication number
CN218958390U
CN218958390U CN202223356524.3U CN202223356524U CN218958390U CN 218958390 U CN218958390 U CN 218958390U CN 202223356524 U CN202223356524 U CN 202223356524U CN 218958390 U CN218958390 U CN 218958390U
Authority
CN
China
Prior art keywords
traction rope
prefabricated
pulley
booster station
splicing tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223356524.3U
Other languages
Chinese (zh)
Inventor
吕逸旻
黄平
司文文
薛巨擘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202223356524.3U priority Critical patent/CN218958390U/en
Application granted granted Critical
Publication of CN218958390U publication Critical patent/CN218958390U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to the technical field of electric power installation equipment, and discloses a splicing tool for a prefabricated cabin of a booster station. According to the technical scheme, accurate positioning of the prefabricated cabin during splicing and installation can be realized rapidly, and meanwhile, the efficiency of splicing and installation of the prefabricated cabin can be improved.

Description

Splicing tool for prefabricated cabins of booster station
Technical Field
The utility model relates to the technical field of power installation equipment, in particular to a splicing tool for a prefabricated cabin of a booster station.
Background
The prefabricated cabin is an important embodiment of new technology, new materials and new equipment applied to the intelligent substation, and is composed of a prefabricated cabin body, a secondary equipment screen cabinet (or a rack), cabin body auxiliary facilities and the like, and the construction of the booster station can be completed only by simply constructing the prefabricated cabin prefabricated in the factory together at a working site.
The conventional booster station is built by a plurality of prefabricated cabins, when the booster station is built, a plurality of prefabricated cabins are required to be spliced together, a section of distance is reserved between two prefabricated cabins in the conventional prefabricated cabin during splicing installation, two prefabricated cabins are spliced together in a mode of a chain block at two ends, and the splicing position cannot be accurately positioned during splicing, so that the position of the prefabricated cabin is required to be adjusted back and forth, and the efficiency of splicing installation of the prefabricated cabin is greatly reduced.
Disclosure of Invention
The utility model aims to provide a splicing tool for a prefabricated cabin of a booster station, so as to improve splicing and installing efficiency of the prefabricated cabin.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a prefabricated cabin concatenation instrument of booster station, includes two hangers and roll adjustment unit, and the roll adjustment unit sets up between two hangers, and the distance between two hangers can be adjusted to the roll adjustment unit.
The beneficial effect of this scheme is: when the prefabricated cabin is installed in a spliced mode, two hanging pieces are hung on the hanging pieces of the two adjacent prefabricated cabins respectively by means of the hanging pieces on the prefabricated cabins, the hanging pieces on the two adjacent prefabricated cabins are located on the same horizontal line, the distance between the two hanging pieces is adjusted through the distance adjusting unit, the two hanging pieces are close to each other, the two prefabricated cabins are driven to be close to each other, splicing and positioning of the two prefabricated cabins are completed rapidly, and splicing and installation of the prefabricated cabins are facilitated.
Because when installing the hanger, can hang the hanger on the lug of two prefabricated cabins same horizontal position, through adjusting the roll adjustment unit for two prefabricated cabins are close to each other, thereby the quick accurate location of accomplishing prefabricated cabin, the concatenation installation in prefabricated cabin of being convenient for has improved the concatenation installation effectiveness in prefabricated cabin.
Because when splicing and installing the prefabricated cabin, only need hang two hangers on the lug of the same horizontal position of adjacent prefabricated cabin, adjust the distance between two hangers through the roll adjustment unit, can accomplish the accurate location of prefabricated cabin, the operation is more convenient, also practice thrift the space more simultaneously.
Further, the distance adjusting unit comprises a pulley block and a traction rope, the pulley block is arranged between the two hanging pieces, and the traction rope is wound on the pulley block.
The beneficial effect of this scheme is: through the traction rope for winding the traction rope length on the assembly pulley shortens, makes two hangers be close to each other, thereby drives two prefabricated cabins and is close to each other, and the accurate positioning of two prefabricated cabins of completion that alright be quick is convenient for splice installation in prefabricated cabin, simultaneously, because the setting of assembly pulley for a staff alright accomplish the operation, has practiced thrift construction cost. Because this technical scheme comprises hanger, assembly pulley and haulage rope for this technical scheme's simple structure, portable.
Further, the roll adjustment unit still includes handle and a plurality of connecting seat, and every connecting seat is equal fixed connection in the hanger one side of keeping away from the couple, all rotates on every connecting seat and is connected with the round pin axle, and the assembly pulley includes a plurality of pulleys, and the pulley is coaxial to be fixed at the round pin epaxially, and handle fixed connection is on being close to the terminal pulley of haulage rope, and the terminal winding of haulage rope is on being close to the terminal pulley of haulage rope.
The beneficial effect of this scheme is: can twine the haulage rope on being close to the pulley of haulage rope free end when rotating the handle for when the prefabricated cabin of concatenation installation, the haulage rope can not be random put at the construction site, guaranteed the clean and tidy at construction site, simultaneously, also can not make and put the haulage rope on subaerial stumble constructor.
Further, the hanging piece is a hook.
The beneficial effect of this scheme is: the hanger is selected as the hanging piece, so that the hanger has simple structure, convenient use and easy manufacture.
Further, a threaded hole is formed in the connecting seat close to the tail end of the traction rope, and a bolt is connected in the threaded hole in a threaded mode.
The beneficial effect of this scheme is: when the prefabricated cabin is installed in a spliced mode, the pulleys close to the tail ends of the traction ropes are rotated through the handles, so that the length of the traction ropes between the pulley blocks is shortened, the two hanging pieces are close to each other, the two prefabricated cabins are pulled to be close to each other, and therefore accurate positioning of the prefabricated cabin is completed. At this moment, fix the bolt at the screw hole, the bolt alright be spacing to the handle, the concatenation installation in prefabricated cabin of being convenient for.
Drawings
FIG. 1 is a schematic structural diagram of embodiment 1 of the present utility model;
fig. 2 is a schematic structural diagram of embodiment 2 of the present utility model.
Detailed Description
The following is a further detailed description of the embodiments:
reference numerals in the drawings of the specification include: the device comprises a hanging piece 1, a connecting seat 2, a pin shaft 3, a pulley 4, a traction rope 5, a handle 6 and a threaded hole 7.
Example 1
The splicing tool for the prefabricated cabins of the booster station shown in fig. 1 comprises a hanging piece 1 and a distance adjusting unit.
As shown in fig. 1, the number of hanging pieces 1 is two, three connecting seats 2 are welded on one side, away from the hook, of each hanging piece 1, a U-shaped groove is formed on one side, away from the hanging piece 1, of each connecting seat 2, and a pin shaft 3 is rotatably connected between two side walls of the U-shaped groove. In this embodiment, the hanger 1 is a hanger.
As shown in fig. 1, the distance adjusting unit is arranged between two hanging pieces 1, specifically, the distance adjusting unit comprises a traction rope 5, a handle 6 and a pulley block, the pulley block comprises six pulleys 4, each pulley 4 is coaxially welded on a pin shaft 3, the front side of a left lower pin shaft 3 extends out of a connecting seat 2, the handle 6 is welded on the front side of the left lower pin shaft 3, the traction rope 5 is sequentially wound on the pulleys 4, one end of the traction rope 5 is fixed on the pulley 4 on the upper right, and the other end of the traction rope 5 is wound on the pulley 4 on the lower left.
The specific implementation process is as follows:
when splicing prefabricated cabins, two hanging pieces 1 are respectively hung on the hanging pieces on the two adjacent prefabricated cabins by means of the hanging pieces on the prefabricated cabins, the hanging pieces on the two adjacent prefabricated cabins are positioned on the same horizontal line, the handle 6 is rotated anticlockwise, the rotation of the handle 6 drives the pulley 4 at the lower left to rotate, the rotation of the pulley 4 at the lower left drives the traction rope 5 to move, the movement of the traction rope 5 drives other pulleys 4 to rotate, the length of the traction rope 5 between pulley blocks is shortened, the traction rope 5 is wound on the pulley 4 at the lower left, the distance between the two hanging pieces 1 is shortened, the two prefabricated cabins are driven to approach, the rapid splicing and positioning of the prefabricated cabins are completed, and splicing and installation of the prefabricated cabins can be completed.
Example 2
On the basis of the embodiment 1, as shown in fig. 2, a threaded hole 7 is formed in the connecting seat 2 at the lower left, and a bolt is connected in the threaded hole 7 in a threaded manner.
The specific implementation process comprises the following steps:
when splicing prefabricated cabins, the handle 6 is rotated, so that the length of the traction rope 5 between the pulley blocks is shortened, the two prefabricated cabins are close to each other, the traction rope 5 is wound on the pulley 4 at the lower left, when a gap between the two prefabricated cabins is small enough, the bolt is fixed in the threaded hole 7, the handle 6 is limited, and the prefabricated cabins are convenient to splice and install.
The foregoing is merely exemplary of the present utility model, and specific technical solutions and/or features that are well known in the art have not been described in detail herein. It should be noted that, for those skilled in the art, several variations and modifications can be made without departing from the technical solution of the present utility model, and these should also be regarded as the protection scope of the present utility model, which does not affect the effect of the implementation of the present utility model and the practical applicability of the patent. The scope of protection of the present application should be described in the specification and the like in the claims thereof for explaining the contents of the claims.

Claims (5)

1. Boost station prefabricated cabin splicing tool, its characterized in that: the device comprises two hanging pieces and a distance adjusting unit, wherein the distance adjusting unit is arranged between the two hanging pieces and can adjust the distance between the two hanging pieces.
2. The booster station capsule splicing tool of claim 1, wherein: the distance adjusting unit comprises a pulley block and a traction rope, the pulley block is arranged between the two hanging pieces, and the traction rope is wound on the pulley block.
3. The booster station capsule splicing tool of claim 2, wherein: the distance adjusting unit further comprises a handle and a plurality of connecting seats, each connecting seat is fixedly connected to one side, far away from the hook, of the hanging piece, each connecting seat is rotatably connected with a pin shaft, the pulley block comprises a plurality of pulleys, the pulleys are coaxially fixed on the pin shafts, the handle is fixedly connected to the pulley close to the tail end of the traction rope, and the tail end of the traction rope is wound on the pulley close to the tail end of the traction rope.
4. A booster station capsule splicing tool according to claim 3, wherein: the hanging piece is a hook.
5. The booster station pre-production compartment splicing tool of claim 4, wherein: a threaded hole is arranged on the connecting seat close to the tail end of the traction rope, and a bolt is connected in the threaded hole in a threaded manner.
CN202223356524.3U 2022-12-14 2022-12-14 Splicing tool for prefabricated cabins of booster station Active CN218958390U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223356524.3U CN218958390U (en) 2022-12-14 2022-12-14 Splicing tool for prefabricated cabins of booster station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223356524.3U CN218958390U (en) 2022-12-14 2022-12-14 Splicing tool for prefabricated cabins of booster station

Publications (1)

Publication Number Publication Date
CN218958390U true CN218958390U (en) 2023-05-02

Family

ID=86103128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223356524.3U Active CN218958390U (en) 2022-12-14 2022-12-14 Splicing tool for prefabricated cabins of booster station

Country Status (1)

Country Link
CN (1) CN218958390U (en)

Similar Documents

Publication Publication Date Title
CN111478230A (en) Cable laying equipment for urban rail transit
CN112110300A (en) Electric power communication construction pay off rack
CN210393169U (en) Portable cable unwrapping wire support
CN218958390U (en) Splicing tool for prefabricated cabins of booster station
CN106532557B (en) Across 10KV line construction platform tools devices
CN201215595Y (en) Remote controlled electric trolley for installing special optical cable on electric line
CN113998528B (en) Paying-off device for power transmission line
CN202004385U (en) Aloft crimping connecting device for power transmission lines
CN110748173A (en) Portable autoclaved aerated concrete strip installation device
CN101630049B (en) Aerial optical cable line construction machine
CN204205436U (en) Horizontal crane span structure inner cable laying apparatu
CN105293167A (en) Paying-off machine
CN212366652U (en) Be applied to draw gear of cable laying
CN212435264U (en) Ladder type galvanized cable bridge
CN210480481U (en) Be used for supply cable adjusting device that relaxes
CN209217586U (en) A kind of power line construction cable safety hitch
CN209455823U (en) A kind of combined type pay off rack for electric wire
CN216625109U (en) Erection device for power transmission and transformation engineering construction
CN202997427U (en) Portable electric cable pay-off rack
CN206720445U (en) A kind of electrical line releasing reel
CN206920566U (en) A kind of direct current generator real time data monitoring device
CN203230220U (en) Stand for assembling and disassembling electric pole
CN203466502U (en) Electric power mounting wire tightening device
CN113216359B (en) Disposable embedded connector for drainage of constructional engineering and construction method thereof
CN207794765U (en) A kind of prefabricated wind of electric power tower bar lateral conductor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant