CN218952005U - Bridge pier top hanging basket installation process tool - Google Patents

Bridge pier top hanging basket installation process tool Download PDF

Info

Publication number
CN218952005U
CN218952005U CN202223209346.1U CN202223209346U CN218952005U CN 218952005 U CN218952005 U CN 218952005U CN 202223209346 U CN202223209346 U CN 202223209346U CN 218952005 U CN218952005 U CN 218952005U
Authority
CN
China
Prior art keywords
bearing
groups
rods
rod
outer end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223209346.1U
Other languages
Chinese (zh)
Inventor
秦松
李春秋
付瑶
顾升启
柯成林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical First Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN202223209346.1U priority Critical patent/CN218952005U/en
Application granted granted Critical
Publication of CN218952005U publication Critical patent/CN218952005U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge pier top hanging basket installation process tool, relates to the technical field of railway bridge construction equipment, and aims to solve the problems of low efficiency, poor operability, time and labor waste and high potential safety hazard in the use process of the existing bridge pier top hanging basket installation process tool, and comprises a pier body and a walking table; a group of supporting bearing platforms are respectively and fixedly arranged at the two ends of the top surface of the pier body, each supporting bearing platform comprises two groups of bearing rods and two groups of connecting rods, connecting blocks are respectively arranged at the outer ends of the bearing rods and the mounting plates, and eight groups of hydraulic telescopic rods are arranged between each supporting bearing platform and each traveling platform; the bearing rod is convenient to install on the top end of the pier body quickly, the connecting rod is convenient to install on the bearing rod, the connection strength between the two bearing rods is improved, the hydraulic telescopic rod of the device is convenient to disassemble and assemble, and the walking table of the device is convenient to move in height according to the needs through the hydraulic telescopic rod, so that the device has better adjustable performance.

Description

Bridge pier top hanging basket installation process tool
Technical Field
The utility model belongs to the technical field of railway bridge construction equipment, and particularly relates to a bridge pier top hanging basket installation process tool.
Background
In the construction process of the pier top hanging basket of the bridge, an elevator mode is generally used at present for installing the pier top hanging basket, and the requirements of a relatively flat ground and a relatively good foundation are met; however, in the construction process of the pier top hanging basket, a plurality of pier columns are limited by soft foundations, terrains, pier body heights and the like, and the lifter cannot be directly adopted, so that the ground needs to be leveled or large-sized equipment is adopted, the construction cost is greatly increased, the equipment can only operate partial areas and cannot be covered on the whole surface, the equipment needs to be moved for many times, the construction operation is inconvenient, and great potential safety hazards exist; thus, the simple and practical process tool for the railway bridge pier top hanging basket is provided; the existing similar bridge pier top hanging basket installation process tool has low efficiency, poor operability, time and labor waste and high potential safety hazard in the using process.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a bridge pier top hanging basket installation process tool which solves the problems of low efficiency, poor operability, time and labor waste and high potential safety hazard in the using process of the existing similar existing bridge pier top hanging basket installation process tool.
The utility model discloses a bridge pier top hanging basket installation process tool, which aims at achieving the following specific technical means:
a bridge pier top hanging basket installation process tool comprises a pier body and a walking table;
the top of pier shaft is fixed and is equipped with two sets of cushion, and the top outside fixed mounting of pier shaft has a set of top platform, and the inner fixed mounting of top platform has the mount pad, and the mount pad passes through bolt fixed mounting in the top outside of pier shaft, and the top surface both ends of pier shaft respectively fixed mounting have a set of support bearing platform, support bearing platform is including two sets of bearing bars and two sets of connecting rods, and two sets of connecting rods are installed respectively in the both ends of two sets of bearing bars, and the both ends of walking platform are fixed mounting respectively has four sets of mounting panels, and the connecting block is installed respectively to the outer end of bearing bar and mounting panel, installs eight sets of hydraulic telescoping rods between support bearing platform and the walking platform.
Further, a group of inserting cavities are formed in the connecting block, a group of first connecting holes are formed in the outer end of the bearing rod, the inserting cavities formed in the connecting block at the top end are sleeved and mounted on the outer end of the bearing rod, the outer end of the connecting block is fixedly mounted on the first connecting holes at the outer end of the bearing rod through bolts, a group of connecting holes are also formed in the outer end of the mounting plate, the inserting cavities formed in the connecting block at the bottom end are sleeved and mounted on the outer end of the mounting plate, and the outer end of the connecting block is fixedly mounted on the connecting holes at the outer end of the mounting plate through bolts.
Further, the left end and the right end of the connecting rod are respectively provided with a group of connecting groove bodies, the connecting groove bodies at the left end and the right end of the connecting rod are respectively sleeved on the two groups of bearing rods, and the two groups of connecting rods are respectively arranged at the front end and the rear end of the two groups of bearing rods.
Further, a group of connecting plates are fixedly arranged on the connecting rods, a group of bolts are installed on the connecting plates, a group of second connecting holes are respectively formed in two ends of the bearing rods, and the bottom ends of the bolts on the connecting plates are installed on the second connecting holes of the bearing rods in a threaded mode.
Further, two groups of butt joint grooves are formed in the inner end of the connecting block, a group of installation blocks are fixedly arranged at the top end and the bottom end of the hydraulic telescopic rod respectively, the installation blocks at the top end and the bottom end of the hydraulic telescopic rod are respectively inserted and installed on the butt joint grooves in the inner end of the connecting block, two groups of through holes are formed in the outer end of the butt joint grooves, and the through holes in the outer end of the connecting block are fixedly installed on the installation blocks at the two ends of the hydraulic telescopic rod through bolts.
Further, three sets of screw holes are respectively formed in two sides of the pier body top cushion block, three sets of fixed lug plates are fixedly arranged in the middle section of the bearing rod, a set of through holes are formed in the fixed lug plates, and the three sets of fixed lug plates in the middle section of the bearing rod are fixedly mounted on the screw holes in two sides of the cushion block through bolts respectively.
Compared with the prior art, the utility model has the following beneficial effects:
1. the setting of bearing rod is favorable to through the fixed otic placode of three groups in bearing rod middle section respectively through bolt fixed mounting on the screw of the both sides of cushion, the spread groove body of connecting rod left and right sides end cup joints respectively and installs on two sets of bearing rods, and the bolt bottom screw thread on the connecting plate installs in the second connecting hole of bearing rod to make the bearing rod of this device be convenient for install fast in the top of pier shaft, and the connecting rod is convenient for install on the bearing rod, has improved the joint strength between two bearing rods.
2. The connecting block is matched with the setting of the hydraulic telescopic rod, the outer end of the connecting block is fixedly arranged on a first connecting hole of the outer end of the bearing rod through bolts, the outer end of the connecting block is fixedly arranged on the outer end of the bearing rod, the outer end of the connecting block is fixedly arranged on a connecting hole of the outer end of the mounting plate through bolts, the mounting blocks at the top and the bottom of the hydraulic telescopic rod are respectively inserted and arranged on a butt joint groove at the inner end of the connecting block, and the through holes at the outer end of the connecting block are fixedly arranged on the mounting blocks at the two ends of the hydraulic telescopic rod through bolts, so that the hydraulic telescopic rod of the device is convenient to disassemble and assemble, and the traveling table of the device is convenient to move according to requirements through the hydraulic telescopic rod, so that the device has better adjustable performance, and the device changes the phenomena of low efficiency, poor operability, time and labor waste and great hanging basket and potential safety hazard in the traditional bridge pier top mounting process; the application of the bridge pier top hanging basket installation process tool adopted by the device has strong operability, is simple in construction, can meet the safety and quality requirements of a construction site, and greatly reduces the construction cost; meanwhile, the efficiency of installing the hanging basket at the top of the bridge pier is improved, the time is saved, the construction quality is guaranteed, the safety risk is reduced, and meanwhile, the labor force is saved; can be widely popularized and used.
Drawings
Fig. 1 is a front side schematic view of the present utility model.
Fig. 2 is a schematic view of the installation of the support load bearing platform of the present utility model.
Fig. 3 is a schematic installation view of the top platform of the present utility model.
Fig. 4 is a schematic view of the support load bearing platform of the present utility model.
Fig. 5 is a schematic view of the installation of the hydraulic telescoping rod of the present utility model.
In the figure, the correspondence between the component names and the drawing numbers is:
1. a pier body; 101. a cushion block; 2. a top platform; 201. a mounting base; 3. supporting a bearing platform; 301. a load-bearing rod; 3011. fixing the ear plate; 3012. a first connection hole; 3013. a second connection hole; 302. a connecting rod; 3021. a connecting groove body; 3022. a connecting plate; 4. a connecting block; 401. inserting a cavity; 402. a butt joint groove; 5. a hydraulic telescopic rod; 501. a mounting block; 6. a walking board; 601. and (3) mounting a plate.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples.
Examples:
as shown in fig. 1 to 5:
the utility model provides a bridge pier top hanging basket installation process tool which comprises a pier body 1 and a walking table 6;
the top of pier body 1 is fixed and is equipped with two sets of cushion 101, the top outside fixed mounting of pier body 1 has a set of top platform 2, the inner fixed mounting of top platform 2 has mount pad 201, and mount pad 201 passes through bolt fixed mounting in the top outside of pier body 1, the top surface both ends of pier body 1 are fixed mounting respectively and are had a set of support bearing platform 3, support bearing platform 3 is including two sets of bearing bars 301 and two sets of connecting rods 302, two sets of connecting rods 302 are installed respectively in the both ends of two sets of bearing bars 301, the both ends of walking platform 6 are fixed mounting respectively and are had four sets of mounting panels 601, connecting block 4 is installed respectively to the outer end of bearing bar 301 and mounting panel 601, install eight sets of hydraulic telescoping rods 5 between support bearing platform 3 and the walking platform 6.
As shown in fig. 2 and fig. 4, three sets of screw holes are respectively formed on two sides of a cushion block 101 at the top end of the pier body 1, three sets of fixed ear plates 3011 are fixedly arranged in the middle section of the bearing rod 301, a set of through holes are formed in the fixed ear plates 3011, the three sets of fixed ear plates 3011 at the middle section of the bearing rod 301 are respectively and fixedly arranged on the screw holes on two sides of the cushion block 101 through bolts, a set of connecting groove 3021 is respectively arranged at the left end and the right end of the connecting rod 302, the connecting groove 3021 at the left end and the right end of the connecting rod 302 is respectively sleeved on the two sets of bearing rods 301, the two sets of connecting rods 302 are respectively arranged at the front end and the rear end of the two sets of bearing rods 301, a set of connecting plates 3022 are fixedly arranged on the connecting rods 3022, a set of bolts are arranged on the connecting plates 3022, a set of second connecting holes 3013 are respectively formed at two ends of the bearing rods 301, and the bottom ends of the bolts on the connecting plates 3022 are threadedly arranged on the second connecting holes 3013 of the bearing rods 301; specifically, three fixed otic placodes 3011 in the middle section of the bearing rod 301 are respectively fixedly installed on the screw holes on two sides of the cushion block 101 through bolts, the connecting groove 3021 at the left end and the right end of the connecting rod 302 are respectively sleeved and installed on two groups of bearing rods 301, and the bottom threads of the bolts on the connecting plate 3022 are installed on the second connecting holes 3013 of the bearing rods 301, so that the bearing rods 301 of the device are convenient to quickly install on the top ends of the pier body 1, and the connecting rod 302 is convenient to install on the bearing rods 301, so that the connecting strength between the two bearing rods 301 is improved.
As shown in fig. 5, a group of inserting cavities 401 are formed on the connecting block 4, a group of first connecting holes 3012 are formed at the outer end of the bearing rod 301, the inserting cavities 401 formed on the connecting block 4 at the top end are sleeved and mounted on the outer end of the bearing rod 301, the outer end of the connecting block 4 is fixedly mounted on the first connecting holes 3012 at the outer end of the bearing rod 301 through bolts, a group of connecting holes are also formed at the outer end of the mounting plate 601, the inserting cavities 401 formed on the connecting block 4 at the bottom end are sleeved and mounted on the outer end of the mounting plate 601, the outer end of the connecting block 4 is fixedly mounted on the connecting holes at the outer end of the mounting plate 601 through bolts, two groups of abutting grooves 402 are formed at the inner end of the connecting block 4, a group of mounting blocks 501 are fixedly arranged at the top end and the bottom end of the hydraulic telescopic rod 5 respectively, the mounting blocks 501 at the inner end of the connecting block 4 are respectively sleeved and mounted on the abutting grooves 402 at the outer end of the hydraulic telescopic rod 4, two groups of through holes at the outer end of the connecting block 4 are fixedly mounted on the mounting blocks 501 through bolts; specifically, the outer end of the bearing rod 301 is sleeved and mounted in the outer end of the bearing rod 301 through the inserting cavity 401 formed in the top connecting block 4, the outer end of the connecting block 4 is fixedly mounted on the first connecting hole 3012 of the outer end of the bearing rod 301 through bolts, the inserting cavity 401 formed in the bottom connecting block 4 is sleeved and mounted on the outer end of the mounting plate 601, the outer ends of the connecting block 4 are fixedly mounted on the connecting holes of the outer end of the mounting plate 601 through bolts, the mounting blocks 501 at the top end and the bottom end of the hydraulic telescopic rod 5 are respectively inserted and mounted on the butt joint grooves 402 at the inner end of the connecting block 4, and through holes at the outer end of the connecting block 4 are fixedly mounted on the mounting blocks 501 at the two ends of the hydraulic telescopic rod 5 through bolts, so that the hydraulic telescopic rod 5 of the device is convenient to disassemble and assemble, and the traveling table 6 of the device is convenient to move in height according to needs through the hydraulic telescopic rod 5, and the device has better adjustable performance.
Specific use and action of the embodiment:
when the device is used, three groups of fixed ear plates 3011 in the middle section of the bearing rod 301 are respectively and fixedly arranged on screw holes on two sides of the cushion block 101 through bolts, the connecting groove bodies 3021 at the left end and the right end of the connecting rod 302 are respectively sleeved on the two groups of bearing rods 301, and the bottom ends of the bolts on the connecting plate 3022 are arranged on the second connecting holes 3013 of the bearing rods 301 in a threaded manner, so that the bearing rods 301 of the device are convenient to rapidly install on the top ends of the pier body 1, the connecting rod 302 is convenient to install on the bearing rods 301, and the connecting strength between the two bearing rods 301 is improved; the outer end of the connecting block 4 is fixedly arranged on the first connecting hole 3012 of the outer end of the bearing rod 301 through bolts, the outer end of the connecting block 4 is fixedly arranged on the outer end of the bearing rod 301, the outer end of the connecting block 4 is fixedly arranged on the connecting hole of the outer end of the mounting plate 601 through bolts, the mounting blocks 501 at the top end and the bottom end of the hydraulic telescopic rod 5 are respectively inserted and arranged on the butt joint groove 402 at the inner end of the connecting block 4, and the through holes at the outer end of the connecting block 4 are fixedly arranged on the mounting blocks 501 at the two ends of the hydraulic telescopic rod 5 through bolts, so that the hydraulic telescopic rod 5 of the device is convenient to disassemble and assemble, and the walking table 6 of the device is convenient to move in height according to requirements through the hydraulic telescopic rod 5, so that the device has better adjustable performance.

Claims (6)

1. A bridge pier top hanging basket installation process tool is characterized in that: comprises a pier body (1) and a walking table (6);
the novel hydraulic telescopic support is characterized in that two groups of cushion blocks (101) are fixedly arranged at the top end of the pier body (1), a group of top platforms (2) are fixedly arranged at the outer sides of the top end of the pier body (1), mounting seats (201) are fixedly arranged at the inner ends of the top platforms (2) and are fixedly arranged at the outer sides of the top end of the pier body (1) through bolts, a group of supporting bearing platforms (3) are fixedly arranged at the two ends of the top surface of the pier body (1) respectively, the supporting bearing platforms (3) comprise two groups of bearing rods (301) and two groups of connecting rods (302), the two groups of connecting rods (302) are respectively arranged at the two ends of the two groups of bearing rods (301), four groups of mounting plates (601) are respectively fixedly arranged at the two ends of the walking platform (6), connecting blocks (4) are respectively arranged at the outer ends of the bearing rods (301) and the mounting plates (601), and eight groups of hydraulic telescopic rods (5) are arranged between the supporting bearing platforms (3) and the walking platform (6).
2. The bridge pier top hanging basket installation process tool as claimed in claim 1, wherein: three groups of screw holes are respectively formed in two sides of the cushion block (101) at the top end of the pier body (1), three groups of fixed lug plates (3011) are fixedly arranged in the middle section of the bearing rod (301), a group of through holes are formed in the fixed lug plates (3011), and the three groups of fixed lug plates (3011) in the middle section of the bearing rod (301) are fixedly mounted on the screw holes in two sides of the cushion block (101) through bolts respectively.
3. The bridge pier top hanging basket installation process tool as claimed in claim 1, wherein: the left end and the right end of the connecting rod (302) are respectively provided with a group of connecting groove bodies (3021), the connecting groove bodies (3021) at the left end and the right end of the connecting rod (302) are respectively sleeved on the two groups of bearing rods (301), and the two groups of connecting rods (302) are respectively arranged at the front end and the rear end of the two groups of bearing rods (301).
4. The bridge pier top hanging basket installation process tool as claimed in claim 1, wherein: a group of connecting plates (3022) are fixedly arranged on the connecting plates (302), a group of bolts are arranged on the connecting plates (3022), a group of second connecting holes (3013) are respectively formed in two ends of the bearing rod (301), and the bottom ends of the bolts on the connecting plates (3022) are arranged on the second connecting holes (3013) of the bearing rod (301) in a threaded mode.
5. The bridge pier top hanging basket installation process tool as claimed in claim 1, wherein: a group of inserting cavities (401) are formed in the connecting block (4), a group of first connecting holes (3012) are formed in the outer end of the bearing rod (301), the inserting cavities (401) formed in the top connecting block (4) are sleeved and mounted on the outer end of the bearing rod (301), the outer end of the connecting block (4) is fixedly mounted on the first connecting holes (3012) in the outer end of the bearing rod (301) through bolts, a group of connecting holes are also formed in the outer end of the mounting plate (601), the inserting cavities (401) formed in the bottom connecting block (4) are sleeved and mounted on the outer end of the mounting plate (601), and the outer end of the connecting block (4) is fixedly mounted on the connecting holes in the outer end of the mounting plate (601) through bolts.
6. The bridge pier top hanging basket installation process tool as claimed in claim 1, wherein: two groups of butt joint grooves (402) are formed in the inner end of the connecting block (4), a group of installation blocks (501) are fixedly arranged at the top end and the bottom end of the hydraulic telescopic rod (5) respectively, the installation blocks (501) at the top end and the bottom end of the hydraulic telescopic rod (5) are installed on the butt joint grooves (402) in the inner end of the connecting block (4) in an inserted mode respectively, two groups of through holes are formed in the outer end of the butt joint groove (402), and the through holes in the outer end of the connecting block (4) are fixedly installed on the installation blocks (501) at the two ends of the hydraulic telescopic rod (5) through bolts.
CN202223209346.1U 2022-12-01 2022-12-01 Bridge pier top hanging basket installation process tool Active CN218952005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223209346.1U CN218952005U (en) 2022-12-01 2022-12-01 Bridge pier top hanging basket installation process tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223209346.1U CN218952005U (en) 2022-12-01 2022-12-01 Bridge pier top hanging basket installation process tool

Publications (1)

Publication Number Publication Date
CN218952005U true CN218952005U (en) 2023-05-02

Family

ID=86135546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223209346.1U Active CN218952005U (en) 2022-12-01 2022-12-01 Bridge pier top hanging basket installation process tool

Country Status (1)

Country Link
CN (1) CN218952005U (en)

Similar Documents

Publication Publication Date Title
CN110565984A (en) Bearing structure is used in building engineering construction
CN215664930U (en) Adjustable steel structure supporting frame
CN218952005U (en) Bridge pier top hanging basket installation process tool
CN214828579U (en) Self-elevating tower crane automatic leveling support leg system
CN111498735A (en) Auxiliary moving supporting device for prefabricated part for constructional engineering
CN108166379B (en) Replaceable transverse wind-resistant structure and method suitable for cable-stayed bridge and suspension bridge
CN213682846U (en) Crossbeam structure of steel construction factory building
CN214575611U (en) Anti-falling device for steel structure engineering construction and fixing support thereof
CN107060348B (en) Jacking and adjusting device for high-altitude net rack
CN214575464U (en) Stable structure type scaffold
CN219973485U (en) Building steel structure convenient to installation
CN218581153U (en) Detachable girder steel bracket support
CN215801027U (en) Integral bridge deck of landing stage platform
CN220183984U (en) Foundation pit backfilling compaction device
CN216974280U (en) Spandrel girder reinforcing apparatus suitable for building structure design
CN220014437U (en) Temporary support assembly for steel bar truss floor support plate
CN215947874U (en) Multidirectional comb-shaped telescoping device that shifts
CN216640955U (en) Upper end fixing structure of inclined support
CN219711104U (en) Adjustable centering jacking of steel pipe scaffold
CN219670037U (en) Tower crane fixing auxiliary bracket for assembly type building construction
CN218508179U (en) Collapse-preventing supporting device
CN111776960A (en) Jacking section mechanism for standard section of tower crane equipment
CN213569180U (en) Levelness-adjustable movable portal frame
CN220598197U (en) Hanging basket traction limiting device
CN210562909U (en) Supporting structure for connecting beam plate of assembly type structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant