CN218911015U - Sponge city water permeable brick - Google Patents
Sponge city water permeable brick Download PDFInfo
- Publication number
- CN218911015U CN218911015U CN202222936743.2U CN202222936743U CN218911015U CN 218911015 U CN218911015 U CN 218911015U CN 202222936743 U CN202222936743 U CN 202222936743U CN 218911015 U CN218911015 U CN 218911015U
- Authority
- CN
- China
- Prior art keywords
- brick body
- brick
- water permeable
- mounting bracket
- seted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to the technical field of water permeable bricks, in particular to a sponge city water permeable brick, which comprises a brick body, wherein an installation frame is arranged at the bottom of the brick body, connecting blocks are fixedly connected to two adjacent surfaces of the outer wall of the installation frame, connecting grooves are formed in the other two surfaces of the outer wall of the installation frame, storage grooves are formed in the left side and the right side of the inner wall of the installation frame, supporting plates are movably connected to the inner parts of the storage grooves, and a slot is formed in one surface, which is attached to the storage grooves, of the supporting plates. The utility model has the advantages that: through setting up connecting block and spread groove, reached through the mounting bracket can be with the purpose of a plurality of brick body coupling to effectively increase the stability after the brick body is laid, the interval after laying simultaneously is the unified size, effectively promotes the aesthetic property after laying, through setting up layer board and arm-tie, then separate layer board and the brick body in the lump with the mounting bracket through the through-hole, thereby change the brick body, and then reached the purpose that can be convenient for staff quick replacement brick body.
Description
Technical Field
The utility model relates to the technical field of water permeable bricks, in particular to a sponge urban water permeable brick.
Background
The sponge city is characterized in that the city can be like a sponge, has good elasticity in the aspects of adapting to environmental changes, coping with natural disasters and the like, absorbs water, stores water, permeates water and purifies water when in raining, and can release and utilize the stored water when in need, the sponge city construction is in accordance with the principles of ecological priority and the like, natural approaches are combined with manual measures, and the water permeable bricks are needed to be used in the construction of the sponge city under the premise of ensuring the safety of urban drainage and waterlogging prevention so as to furthest realize the accumulation, permeation and purification of rainwater in the urban area and promote the utilization of rainwater resources and ecological environment protection;
because the existing water permeable bricks are independent individuals after paving, when in use, part of the bricks can shake due to soil layer settlement, so that the stability after paving is poor, therefore, when pedestrians or two-wheeled vehicles can pass through the water permeable bricks, certain potential safety hazards exist, gaps among a plurality of bricks are inconvenient for staff to control, and the beautiful effect after paving is affected;
therefore, there is an urgent need to provide a sponge urban water permeable brick to solve the above problems.
Disclosure of Invention
The utility model aims to overcome the defects of the prior art and provides a sponge urban water permeable brick.
The aim of the utility model is achieved by the following technical scheme: the utility model provides a sponge city brick that permeates water, includes the brick body, the bottom of the brick body is equipped with the mounting bracket, the adjacent two-sided fixedly connected with connecting block of mounting bracket outer wall, the spread groove has been seted up to the other two sides of mounting bracket outer wall, the storage tank has all been seted up to the left and right sides of mounting bracket inner wall, the equal swing joint in inside of storage tank has the layer board, the slot has been seted up with the one side of storage tank laminating to the layer board, the inside sliding connection of slot has the arm-tie, the bottom fixedly connected with slider of arm-tie, the spout has been seted up to one side that the layer board is close to the slider.
Preferably, the shape of connecting block is isosceles trapezoid, the quantity of connecting block is four, connecting block and spread groove looks adaptation, the chamfer has all been seted up at the top of connecting block.
Through adopting above-mentioned technical scheme, can connect a plurality of mounting brackets as an organic wholely on the one hand to increase the stability after the brick body is laid, on the other hand can be convenient for the connecting block get into the spread groove through the chamfer.
Preferably, the shape of the supporting plate is L-shaped.
Through adopting above-mentioned technical scheme, can use the through-hole to separate layer board and the brick body with the mounting bracket altogether.
Preferably, the top of the pulling plate is embedded with magnetic blocks, and one side of the pulling plate, which is close to the magnetic blocks, is provided with through holes.
Through adopting above-mentioned technical scheme, use the magnetic path to attract the magnetic path at arm-tie top to let the arm-tie carry out longitudinal movement under the effect of magnetic force, and then can use the through-hole pulling arm-tie.
Preferably, the width of the sliding block is larger than the width of the pulling plate.
Through adopting above-mentioned technical scheme, when the layer board is at the inslot portion of accomodating, let the slider only can slide in the spout to when slider and spout top contact, the arm-tie can drive the layer board and move about.
Preferably, the sliding groove is communicated with the slot.
By adopting the technical scheme, the movement of the pulling plate can be controlled.
Preferably, a quartz sand layer is arranged on the surface of the brick body, the thickness of the quartz sand layer is three millimeters, and the brick body is made of aggregate ceramsite.
By adopting the technical scheme, the service life of the brick body can be prolonged, the water permeability of the brick body is very good, and the brick body is light in weight and convenient to pave.
The utility model has the following advantages:
1. this sponge city water permeable brick, through setting up connecting block and spread groove, the connecting block has been seted up to two adjacent sides of mounting bracket outer wall, the spread groove has been seted up to other two sides of mounting bracket outer wall, during laying, firstly through the spread groove lock joint of connecting block with another mounting bracket of mounting bracket, connect a plurality of mounting brackets again one by one this moment, then through putting into the mounting bracket with the brick body, finally fill out soil to gap department again, and then reached through the mounting bracket can connect a plurality of brick bodies a purpose, thereby effectively increase the stability after the brick body is laid, the interval after the while is laid is the unified size, aesthetic property after the effective promotion is laid;
2. this sponge city water permeable brick, through setting up layer board and arm-tie, the equal swing joint in inside of accomodating the groove has the layer board, the slot has been seted up with the one side of accomodating the groove laminating to the layer board, the inside sliding connection of slot has the arm-tie, when the wearing and tearing appear in single brick body when needing to be changed, attract the magnet at arm-tie top through using the magnet, thereby let the arm-tie carry out longitudinal movement under the effect of magnetic force, the through-hole of two arm-tie can be put into with the finger this moment, then separate layer board and brick body together with the mounting bracket through the through-hole, thereby change the brick body, and then reached the purpose that can be convenient for the quick change brick body of staff.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a second operating condition of the pulling plate of the present utility model;
FIG. 3 is a schematic view of the split structure of the brick body and the mounting frame of the present utility model;
FIG. 4 is a schematic view of the spliced mounting frame of the present utility model;
fig. 5 is a schematic structural view of the pallet of the present utility model.
In the figure: the brick comprises a brick body 1, a mounting frame 2, a connecting groove 201, a storage groove 202, a connecting block 3, a supporting plate 4, a slot 401, a sliding groove 402, a pulling plate 5, a sliding block 501, a magnetic block 502 and a through hole 503.
Detailed Description
The present utility model will be further described with reference to the accompanying drawings, but the scope of the present utility model is not limited to the following.
As shown in fig. 1-5, a sponge city water permeable brick, it includes the brick body 1, the bottom of the brick body 1 is equipped with mounting bracket 2, the adjacent two sides fixedly connected with connecting block 3 of mounting bracket 2 outer wall, the shape of connecting block 3 is isosceles trapezoid, the quantity of connecting block 3 is four, connecting block 3 and spread groove 201 looks adaptation, the chamfer has all been seted up at the top of connecting block 3, the spread groove 201 has been seted up to the other two sides of mounting bracket 2 outer wall, storage tank 202 has all been seted up to the left and right sides of mounting bracket 2 inner wall, the equal swing joint of storage tank 202 has layer board 4, the shape of layer board 4 is L shape, slot 401 has been seted up with the one side of storage tank 202 laminating, slot 401's inside sliding connection has arm-tie 5, the bottom fixedly connected with slider 501 of arm-tie 5, the width of slider 501 is greater than the width of arm-tie 5, spout 402 has been seted up to one side that layer board 4 is close to slider 501, spout 402 is linked together with slot 401.
As a preferable technical scheme of the utility model, the top of the pull plate 5 is embedded with the magnetic block 502, and one side of the pull plate 5 close to the magnetic block 502 is provided with the through hole 503.
As a preferable technical scheme of the utility model, the surface of the brick body 1 is provided with the quartz sand layer, the thickness of the quartz sand layer is three millimeters, the brick body 1 is made of aggregate ceramsite, on one hand, the quartz sand layer can promote the wear-resisting effect of the surface of the brick body 1, thereby prolonging the service life of the brick body 1, on the other hand, the aggregate ceramsite is light aggregate ceramsite, the water permeability is very good, and the paving is more convenient due to light weight.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "configured to," "engaged with," "connected to," and the like are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
The working process of the utility model is as follows:
s1, during laying, firstly buckling a connecting block 3 of one mounting frame 2 with a connecting groove 201 of the other mounting frame 2, and then connecting a plurality of mounting frames 2 one by one;
s2, placing the brick bodies 1 into the mounting frame 2, and finally filling soil into the gaps, so that a plurality of brick bodies 1 can be connected together through the mounting frame 2;
s3, when the single brick body 1 is worn and needs to be replaced, the magnet blocks 502 at the top of the pulling plate 5 are attracted by using the magnet blocks, so that the pulling plate 5 longitudinally moves under the action of magnetic force;
s4, fingers of two hands are respectively placed into the through holes 503 of the two pull plates 5, and then the supporting plate 4 and the brick body 1 are separated from the mounting frame 2 through the through holes 503, so that the brick body 1 is replaced.
To sum up, through setting up connecting block 3 and spread groove 201, the adjacent two-sided fixedly connected with connecting block 3 of mounting bracket 2 outer wall, the spread groove 201 has been seted up on the other two sides of mounting bracket 2 outer wall, during laying, earlier through the spread groove 201 lock joint with connecting block 3 and another mounting bracket 2 of mounting bracket 2, this moment again connect a plurality of mounting brackets 2 one by one, then the rethread is put into mounting bracket 2 with brick body 1, last the gap department is filled with earth again, and then the purpose that can connect a plurality of brick bodies 1 through mounting bracket 2, thereby effectively increase the stability after the brick body 1 is laid, the interval after laying is the unified size simultaneously, the aesthetic property after effectively promoting laying, through setting up layer board 4 and arm-tie 5, the equal swing joint in inside of storage groove 202 has layer board 4, slot 401 has been seted up with the one side of storage groove 202 laminating, the inside sliding connection of slot 401 has arm-tie 5, when the wearing and tearing need be changed in the back appears in single brick body 1, then, through using the magnetic path 502 at the top of arm-tie 5 attracts, thereby let arm-tie 5 carry out longitudinal movement under the effect that can connect a plurality of brick bodies 1, can be with two through-tie body 503 and the effect of the through-tie body 1 can be replaced with the through-tie body 503, thereby the effect of the through-tie body 1 can be replaced with the through-tie body 503, the purpose of the people can be fast-down with the brick body 1.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a sponge city brick that permeates water which characterized in that: including the brick body (1), the bottom of the brick body (1) is equipped with mounting bracket (2), adjacent two-sided fixedly connected with connecting block (3) of mounting bracket (2) outer wall, spread groove (201) have been seted up to other two sides of mounting bracket (2) outer wall, accomodate groove (202) have all been seted up to the left and right sides of mounting bracket (2) inner wall, accomodate the equal swing joint of inside of groove (202) and have layer board (4), slot (401) have been seted up with the one side of accomodating groove (202) laminating to layer board (4), the inside sliding connection of slot (401) has arm-tie (5), the bottom fixedly connected with slider (501) of arm-tie (5), spout (402) have been seted up to one side that layer board (4) is close to slider (501).
2. The sponge urban water permeable brick as defined in claim 1, wherein: the shape of connecting block (3) is isosceles trapezoid, the quantity of connecting block (3) is four, connecting block (3) and spread groove (201) looks adaptation, the chamfer has all been seted up at the top of connecting block (3).
3. The sponge urban water permeable brick as defined in claim 1, wherein: the shape of the supporting plate (4) is L-shaped.
4. The sponge urban water permeable brick as defined in claim 1, wherein: the top of arm-tie (5) all is inlayed and is had magnetic path (502), through-hole (503) have all been seted up to one side that arm-tie (5) are close to magnetic path (502).
5. The sponge urban water permeable brick as defined in claim 1, wherein: the width of the sliding block (501) is larger than that of the pulling plate (5).
6. The sponge urban water permeable brick as defined in claim 1, wherein: the sliding groove (402) is communicated with the slot (401).
7. The sponge urban water permeable brick as defined in claim 1, wherein: the surface of the brick body (1) is provided with a quartz sand layer, the thickness of the quartz sand layer is three millimeters, and the brick body (1) is made of aggregate ceramsite.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222936743.2U CN218911015U (en) | 2022-11-04 | 2022-11-04 | Sponge city water permeable brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222936743.2U CN218911015U (en) | 2022-11-04 | 2022-11-04 | Sponge city water permeable brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218911015U true CN218911015U (en) | 2023-04-25 |
Family
ID=86048202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222936743.2U Active CN218911015U (en) | 2022-11-04 | 2022-11-04 | Sponge city water permeable brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218911015U (en) |
-
2022
- 2022-11-04 CN CN202222936743.2U patent/CN218911015U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110700038A (en) | Underground pipe gallery sponge city municipal road surface with load resistance and drainage function | |
CN218911015U (en) | Sponge city water permeable brick | |
CN215055836U (en) | Ecological sponge parking area | |
CN110593445A (en) | Environmental protection brick convenient to lay closely and water permeability is good | |
CN202559206U (en) | Kerb system of road central reserve | |
CN206052490U (en) | It is a kind of suitable for footpath, the rainwater regulating pondage system of bicycle lane | |
CN210797153U (en) | Sponge urban road drainage structure | |
CN208056442U (en) | A kind of building energy conservation heat insulation brick that stability is high | |
CN206902904U (en) | A kind of sponge city drainage module | |
CN207685622U (en) | It is a kind of to can be used for the permeable floor tile in part | |
CN206052915U (en) | A kind of rainwater water-retention suitable for footpath, bicycle lane is regulated and stored system | |
CN203346758U (en) | Pervious sidewalk structure | |
CN209602919U (en) | The porous pavement of Double-layer water-filtering under a kind of sponge city | |
CN205387654U (en) | Structure of mating formation of permeating water | |
CN109629372B (en) | A road structure of permeating water for construction of sponge city | |
CN209609320U (en) | A kind of roof afforestation structure | |
CN201952701U (en) | Water-permeability paving board | |
CN218711882U (en) | Composite construction brick that permeates water for blind way | |
CN102182131A (en) | Water permeable paving plate and construction method thereof | |
CN110593041A (en) | Connect stable and pleasing to eye environmental protection brick | |
CN213114167U (en) | Night light path flat brick for sponge city construction | |
CN213114148U (en) | Highway subgrade landslide prevention device with automatic alarm function | |
CN212611790U (en) | Novel ecological permeable road structure | |
CN215289553U (en) | Synthesize square sharing platform's ground structure of mating formation | |
CN214882673U (en) | Luminous path face brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |