CN218879211U - Sculpture protective moving device - Google Patents

Sculpture protective moving device Download PDF

Info

Publication number
CN218879211U
CN218879211U CN202223498289.3U CN202223498289U CN218879211U CN 218879211 U CN218879211 U CN 218879211U CN 202223498289 U CN202223498289 U CN 202223498289U CN 218879211 U CN218879211 U CN 218879211U
Authority
CN
China
Prior art keywords
base
sculpture
secondary beam
sculptured
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223498289.3U
Other languages
Chinese (zh)
Inventor
郑德福
朱朝阳
寇明明
张春广
任庆红
李松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aobo Xingye Steel Structure Co ltd
Original Assignee
Beijing Aobo Xingye Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Aobo Xingye Steel Structure Co ltd filed Critical Beijing Aobo Xingye Steel Structure Co ltd
Priority to CN202223498289.3U priority Critical patent/CN218879211U/en
Application granted granted Critical
Publication of CN218879211U publication Critical patent/CN218879211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a sculpture protectiveness moves shipping unit relates to the sculpture and moves fortune technical field, and it includes sculpture, first base, second base, places the base of sculpture, sets up the leveling subassembly that lifts by crane the subassembly and be connected with the subassembly that lifts by crane on the base. The mounting groove has been seted up on the base top, lifts by crane the subassembly including inserting the secondary beam of locating in the mounting groove, the girder of being connected with the secondary beam and the first stand of being connected with the girder, the both ends of secondary beam all surpass the edge of base. When the sculpture needs to be moved and transported, the leveling component is installed, the first stand column and the second stand column are connected, the secondary beam is installed, the main beam is adjusted by the adjusting component and is connected with the secondary beam, the crane is connected with the hoisting component to move upwards, at the moment, the first stand column and the second stand column are separated, meanwhile, the main beam, the secondary beam and the sculpture are hoisted and then placed on the plate trailer to be transported, and the base is left on the ground. The arrangement of the sculpture protective transporting device improves the problem that the base is large in volume and weight and inconvenient to transport.

Description

Sculpture protective moving device
Technical Field
The application relates to a sculpture moves fortune technical field, especially relates to sculpture protectiveness moves fortune device.
Background
The sculpture is a kind of modeling art, and is a visual art with three-dimensional space image made of material and means. The sculptures were first created by carving (modeling by removing material) and molding (modeling by adding material) on materials such as stone, metal, wood, ceramics, etc., but modern sculptures have high freedom in material and creation technique, and can be created on different materials by carving, welding, molding or casting, and the sculptures are made from a wide variety of materials including clay, stone, wood, metal, plaster, resin, ivory, etc.
In places such as squares and museums, large sculptures are usually placed on large concrete bases for display, and when the squares or the museums need to be renovated, the sculptures need to be moved to other places. In order to ensure that the sculpture is intact, the base is generally moved together with the sculpture, in a specific process, the sculpture and the base are integrally lifted by a crane and then placed on a lath to be transported to other places.
In view of the above-mentioned related art, the inventor believes that the base has a large weight and volume, which causes inconvenience in the lifting and transferring processes.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that the sculpture technology is inconvenient to move due to the fact that a base is large in the overall sculpture moving technology, the application provides a sculpture protective moving device.
The application provides a sculpture protectiveness moves fortune device adopts following technical scheme:
the sculpture protective moving and transporting device comprises a sculpture, a first base, a second base, a lifting assembly and a leveling assembly, wherein the first base and the second base are sequentially arranged under the sculpture; the top end of the base is provided with an installation groove, and the hoisting assembly comprises a secondary beam inserted in the installation groove, a main beam connected with the secondary beam and a first upright post connected with the main beam; first stand detachably install in on the leveling subassembly, the both ends of secondary beam all surpass the edge of base.
By adopting the technical scheme, the hoisting assembly is used for leveling the main beam and improving the installation site for the first upright post. When the sculpture needs to be moved and transported, the secondary beam is inserted into the mounting groove, two ends of the secondary beam are connected with the main beam, the first stand column is connected with the main beam, and the connection between the first stand column and the leveling component is released. The crane is connected with the hoisting component, and when the sculpture is hoisted, the first upright column rises to drive the main beam to rise, and the top end of the main beam is abutted against the bottom end of the second base so as to hoist the sculpture. At the moment, the sculpture, the first base and the second base which are arranged on the base are hoisted to move, and the base is still remained on the ground, so that the problem that the base is inconvenient to move due to large weight and size is solved.
Optionally, the leveling subassembly include with the second stand of connection can be dismantled to first stand bottom, level set up in mounting panel on the second stand and install in regulating part on the mounting panel.
Through adopting above-mentioned technical scheme, the second stand can be dismantled with first stand and be connected, can break off the connection between first stand and the second stand when lifting by crane, and then directly lifts by crane sculpture, first base and second base.
Optionally, an inserting column is arranged at the top end of the second upright column, a receiving groove for mounting the inserting column is formed in the bottom end of the first upright column, and the inserting column is in clearance fit with the receiving groove.
Through adopting above-mentioned technical scheme, the plug column is installed in accepting the groove, can realize the dismantlement of first stand and second stand simply and conveniently and connect.
Optionally, a second yielding hole is formed in the insertion column, two first yielding holes are correspondingly formed in the wall of the receiving groove, when the insertion column is installed in the receiving groove, the second yielding hole is communicated with the first yielding hole, and a reinforcing pin is inserted into the first yielding hole and the first yielding hole.
Through adopting above-mentioned technical scheme, the inserted connection post is installed and is accepted the inslot and connect first stand and second stand, through inserting the reinforcement round pin and locate the second hole of stepping down and the first hole of stepping down, has further strengthened the stability of being connected between first stand and the second stand.
Optionally, the main beam and the secondary beam are connected by a bolt.
Through adopting above-mentioned technical scheme, bolted connection is all more convenient when installation and dismantlement, also can not break the structure that can secondary beam and girder, is favorable to the reuse of secondary beam and girder.
Optionally, a first limiting plate and a second limiting plate are arranged at the top end of the main beam, and the first limiting plate and the second limiting plate are respectively arranged on two sides of one end of the secondary beam.
Through adopting above-mentioned technical scheme, having restricted secondary beam and rocked about on the girder, and then improved the stability of lifting by crane the in-process sculpture, further reduce the probability that the sculpture dropped lifting by crane the in-process.
Optionally, the secondary beams are uniformly provided with multiple groups.
Through adopting above-mentioned technical scheme, along with the increase of secondary beam figure, at the in-process that lifts by crane, the sculpture born by every secondary beam weight reduces, and then effectively reduces lifting by crane the in-process, and the secondary beam fracture causes the sculpture to drop and the probability of damaging.
Optionally, a cross beam is arranged at the top ends of two adjacent first stand columns, reinforcing plates are arranged on the cross beam and the connecting column of the first stand column, and lifting lugs are arranged at the top ends of the reinforcing plates.
Through adopting above-mentioned technical scheme, the lifting hook that sets up for the crane of stiffening plate and lug provides the attachment site.
Optionally, a shielding piece is arranged in a frame formed by the first upright column and the cross beam, the shielding piece comprises four side plates, and a filler is filled between the shielding piece and a gap between the shielding piece and the sculpture.
Through adopting above-mentioned technical scheme, the shielding part provides the place for the packing of filler, and the filler is filled in the gap between shielding part and sculpture, further reduces the sculpture and shakes, collide and take place the phenomenon of damage.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the first upright column is detachably connected with the second upright column, so that only the part above the base can be lifted, and the base is left on the ground, thereby solving the problem of inconvenient transportation due to large mass and volume of the base;
2. the arrangement of the first limiting plate and the second limiting plate limits the secondary beam to shake left and right on the main beam, so that the stability of the sculpture in the lifting process is improved, and the falling probability of the sculpture in the lifting process is further reduced;
3. the arrangement of the shielding piece and the filling of the filler further reduce the phenomenon that the sculpture is shaken and collided to be damaged.
Drawings
FIG. 1 is a schematic structural view of an embodiment of the present application after a covering is hidden;
FIG. 2 is an exploded view showing the positional relationship of features during the lifting process;
figure 3 is a schematic view of the construction and mounting location of the shield.
Description of reference numerals: 1. sculpturing; 2. a first base; 3. a second base; 4. a base; 41. mounting grooves; 5. a hoisting assembly; 51. a first upright post; 511. a receiving groove; 5111. a first abdicating hole; 52. a secondary beam; 53. a main beam; 531. a first limit plate; 532. a second limiting plate; 54. a cross beam; 55. stiffening plate, 56, lug; 57. a reinforcing pin; 58. an inclined support rod; 6. a leveling assembly; 61. a second upright post; 611. a mounting seat; 612. inserting the column; 6121. a second abdicating hole; 62. mounting a plate; 63. an adjustment member; 7. a shield; 71. a side plate; 72. a base plate; 721. a position yielding port; 8. and (6) balancing the frame.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses sculpture protectiveness moves shipping unit.
Referring to fig. 1, the protective transporting device for the sculpture 1 comprises the sculpture 1, a first base 2 and a second base 3 which are integrally formed with the bottom of the sculpture 1, a cubic concrete base 4 for placing the sculpture 1, a lifting assembly 5 for lifting the sculpture 1, and a leveling assembly 6 detachably connected with the lifting assembly 5. First base 2 and second base 3 set gradually in 1 bottom of sculpture, the 3 bottom surfaces level of second base, being provided with of first base 2 and second base 3 does benefit to laying of sculpture 1, and the bottom of second base 3 and the top looks butt of base 4 realize laying sculpture 1 on base 4 and display.
The lifting assembly 5 comprises a first upright 51, a secondary beam 52, a main beam 53, a cross beam 54, a reinforcing plate 55 and a lifting lug 56. The top end of the base 4 is provided with a mounting groove 41, so that a cavity is formed between the second base 3 and the base 4, the secondary beam 52 is inserted into the cavity, the bottom end of the secondary beam 52 is abutted against the bottom wall of the mounting groove 41, and the top end of the secondary beam 52 is abutted against the bottom end of the second base 3. Both ends of the secondary beam 52 extend beyond the edge of the base plate 4. Two main beams 53 are respectively arranged at the bottom ends of the two ends of the secondary beam 52 exceeding the edge of the base 4, and the bottom end of the secondary beam 52 is fixedly connected with the top end of the main beam 53 through bolts, so that the installation and the disassembly are both convenient, and the disassembled secondary beam 52 and main beam 53 can be reused; the first limiting plate 531 and the second limiting plate 532 are perpendicularly welded at the top end of the main beam 53, the first limiting plate 531 and the second limiting plate 532 are respectively located on two sides of the end portion of one secondary beam 52, the secondary beam 52 is limited to slide on the main beam 53, the stability of the sculpture 1 in the lifting process is further improved, and the probability that the sculpture 1 falls off in the lifting process is further reduced. Four first upright posts 51 are welded on one end of the main beam 53 respectively, and the direction of the first upright posts 51 is vertical to the ground; the bottom end of the first upright post 51 is provided with a bearing groove 511; a first abdicating hole 5111 is arranged on the groove wall of the bearing. The number of the cross beams 54 is four, and the cross beams are respectively welded at the top ends of two adjacent first upright columns 51; the stiffening plate 55 is welded at the joint of the top end of the first upright 51 and the cross beam 54, and the lifting lug 56 is welded at the top ends of the four stiffening plates 55.
Referring to fig. 1 and 2, leveling assembly 6 includes a second column 61, a mounting plate 62, and an adjustment member 63. The bottom of the second upright post 61 is integrally formed with a mounting seat 611 made of square plate. The second upright posts 61 are four groups in total and are respectively fixed on the ground near four sides around the base 4, a cylindrical pin inserting column 612 is integrally formed at the top end of the second upright post 61, and a second abdicating hole 6121 penetrating through the inserting column 612 is formed. When the inserting column 612 is installed in the receiving groove 511, the first abdicating hole 5111 is communicated with the second abdicating hole 6121, and the reinforcing pin 57 can be inserted into the first abdicating hole 5111 and the second abdicating hole 6121, so as to further reinforce the connection between the first upright column 51 and the second upright column 61. A mounting plate 62 is welded to the second upright 61, the mounting plate 62 is positioned below both ends of the secondary beam 52, an adjusting member 63 is fixed to the mounting plate 62, and the adjusting member 63 is used to adjust the height of the main beam 53 and keep the main beam 53 horizontal until the top end of the main beam 53 is completely in contact with and connected to the bottom end of the secondary beam 52. The adjusting member 63 may be a jack, a cylinder, or the like.
The number of the mounting grooves 41 and the sub-beams 52 may be determined according to the weight of the sculpture 1, the size of the area where the base 4 and the second base 3 contact. In this embodiment, four sets of mounting grooves 41 and secondary beams 52 are uniformly arranged, so as to increase the number of secondary beams 52, thereby effectively reducing the probability of fracture of the secondary beams 52 caused by the heavy weight of each secondary beam 52 during lifting, and further improving the safety of moving the sculpture 1. According to the height of the first upright post 51, the number of the cross beams 54 can be added at the top ends of the main beams 53 and the cross beams 54, and an inclined support rod 58 can be welded between the first upright post 51 and the cross beams 54, so that the stability of the frame formed by the upright posts and the cross beams 54 is improved. The provision of the pillars and the beams 54 effectively prevents the sculpture 1 from being inclined and falling to the ground to be damaged. A shield 7 (see fig. 3) is also inserted into the frame formed by the vertical columns and the cross beams 54, and the shield 7 is a coverless bottomless cube formed by welding four side plates 71. The gap between the shield 7 and the statue 1 is filled with a filler such as plastic foam, thereby further reducing the damage of the statue 1 caused by shaking and colliding. In this embodiment, when hoisting, the balance frame 8 (refer to fig. 3) is connected below the hook of the crane, the lifting rope is connected below the balance frame 8, the lifting rope is connected with the lifting lug 56 to hoist, and the arrangement of the balance frame 8 enables the hoisting assembly 5 to be only subjected to axial force, thereby reducing the probability of deformation of the hoisting assembly 5.
The implementation principle of sculpture 1 protectiveness moving device of this application embodiment does: when the sculpture 1 needs to be moved and transported, the leveling component 6 is installed, the second upright post 61 is installed at the bottom end of the first upright post 51, the secondary beam 52 is inserted into the installation groove 41, and the main beam 53 is horizontally moved to the bottom end of the secondary beam 52 and fixedly connected with the secondary beam 52 under the adjustment of the adjusting component 63; installation shielding member 7, the filler is filled, and then the crane is connected with hoisting assembly 5, extract reinforcing pin 57 this moment, in the process that the crane drives hoisting assembly 5 to move up, first stand 51 and second stand 61 break away from, girder 53 simultaneously, fixed secondary beam 52 with girder 53, with secondary beam 52 bottom butt second base 3, together with first base 2 and sculpture 1 of installing on second base 3 all by the hoist and place the transportation on the pallet truck, and base 4 remains subaerial. This application sculpture 1 protectiveness moves the setting of fortune device for move the fortune in-process at sculpture 1, both can realize moving the protection sculpture when transporting the sculpture, improved 4 volumes of base again and weight great and inconvenient problem of shifting.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. Sculpture protectiveness moves fortune device, including sculpture (1), set gradually first base (2) and second base (3) under sculpture (1), its characterized in that: the device comprises a base (4) which is abutted with the bottom end of the second base (3), a hoisting component (5) which is arranged on the base (4) and a leveling component (6) which is connected with the hoisting component (5) and is arranged on the ground; the top end of the base (4) is provided with a mounting groove (41), the hoisting component (5) comprises a secondary beam (52) inserted into the mounting groove (41), a main beam (53) connected with the secondary beam (52) and a first upright column (51) connected with the main beam (53); the first upright post (51) is detachably mounted on the leveling component (6), and two ends of the secondary beam (52) exceed the edge of the base (4).
2. The sculptured protective transporter according to claim 1, wherein: leveling subassembly (6) including with first stand (51) bottom can be dismantled second stand (61) of being connected, level set up in mounting panel (62) on second stand (61) and install in regulating part (63) on mounting panel (62).
3. The sculptured protective transporter according to claim 2, wherein: the top end of the second upright post (61) is provided with an inserting post (612), the bottom end of the first upright post (51) is provided with a bearing groove (511) for mounting the inserting post (612), and the inserting post (612) is in clearance fit with the bearing groove (511).
4. The sculptured protective transfer device of claim 3, wherein: the socket post (612) is provided with a second abdicating hole (6121), the wall of the socket groove (511) is correspondingly provided with two first abdicating holes (5111), when the socket post (612) is installed in the socket groove (511), the second abdicating hole (6121) is communicated with the first abdicating hole (5111), and a reinforcing pin (57) is inserted into the first abdicating hole (5111).
5. The sculptured protective transporter according to claim 1, wherein: the main beam (53) and the secondary beam (52) are connected through bolts.
6. The sculptured protective transporter according to claim 1, wherein: the top end of the main beam (53) is provided with a first limiting plate (531) and a second limiting plate (532), and the first limiting plate (531) and the second limiting plate (532) are respectively arranged on two sides of one end of the secondary beam (52).
7. The sculptured protective transporter according to claim 1, wherein: the secondary beams (52) are uniformly provided with a plurality of groups.
8. The sculptured protective transporter according to claim 1, wherein: the top ends of two adjacent first upright columns (51) are provided with a cross beam (54), a connecting column of the cross beam (54) and the first upright columns (51) is provided with a reinforcing plate (55), and the top ends of the reinforcing plate (55) are provided with lifting lugs (56).
9. The sculptured protective transporter according to claim 8, wherein: a shielding piece (7) is arranged in a frame formed by the first upright post (51) and the cross beam (54), the shielding piece (7) comprises four side plates (71), and a filler is filled in a gap between the shielding piece (7) and the sculpture (1).
CN202223498289.3U 2022-12-27 2022-12-27 Sculpture protective moving device Active CN218879211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223498289.3U CN218879211U (en) 2022-12-27 2022-12-27 Sculpture protective moving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223498289.3U CN218879211U (en) 2022-12-27 2022-12-27 Sculpture protective moving device

Publications (1)

Publication Number Publication Date
CN218879211U true CN218879211U (en) 2023-04-18

Family

ID=85946032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223498289.3U Active CN218879211U (en) 2022-12-27 2022-12-27 Sculpture protective moving device

Country Status (1)

Country Link
CN (1) CN218879211U (en)

Similar Documents

Publication Publication Date Title
US5980160A (en) Apparatus and method for a modular lifting and shoring system
US10738488B2 (en) Lift truck operated stacking formwork table system and a method of operation thereof
CN1258452C (en) Transportation and installation assist device for at least one pre-cast concrete tilt panel
CN112585320B (en) Grid equipment and use and manufacturing method thereof
CN218879211U (en) Sculpture protective moving device
CN201321603Y (en) Bearing frame for assembling bridge erecting machine
CN110748155B (en) Support device for large-diameter silo conical hopper concrete construction template and construction method thereof
CN208826606U (en) A kind of pin-connected panel prefabricated components piling bin
JP3166899B2 (en) Inner formwork for caisson construction and its lift-up method
CN210308361U (en) Self-contraction type inner formwork structure for caisson prefabrication
KR20130117171A (en) Cone mounting method of top side deck
CN203359067U (en) Tobacco leaf frame fence easy to stack
CN217256238U (en) Assembled material strorage device
CN210651197U (en) Assembled prefabricated plate multilayer platform mould
CN116904688A (en) Installation method of converter steelmaking high-level bin
CN218286084U (en) Vertical prefabricated pier stud turnover device
KR200161668Y1 (en) Foundation pile
CN210710410U (en) Tilting mechanism suitable for prefabricated utility tunnel section of jurisdiction of piecemeal formula
CN217579798U (en) Prefabricated bent cap high accuracy mounting structure
CN214819499U (en) Concrete air entrainment piece production facility
CN220097086U (en) Harmonious locomotive motor suspension beam transferring tool
CN218753099U (en) Turnover mechanism for aviation transportation tray production line
CN210794983U (en) Loading attachment for sign indicating number brick production line
KR100921254B1 (en) Silo constructing method
CN112192984A (en) Construction method for rapid integral migration of large-scale cultural relic sculpture

Legal Events