CN217256238U - Assembled material strorage device - Google Patents

Assembled material strorage device Download PDF

Info

Publication number
CN217256238U
CN217256238U CN202220403656.8U CN202220403656U CN217256238U CN 217256238 U CN217256238 U CN 217256238U CN 202220403656 U CN202220403656 U CN 202220403656U CN 217256238 U CN217256238 U CN 217256238U
Authority
CN
China
Prior art keywords
support column
bracing piece
chassis
storage unit
material storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220403656.8U
Other languages
Chinese (zh)
Inventor
吴成刚
刘淋
覃锰
李志勇
苏增华
李阳
张渊
白太君
姚忠龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202220403656.8U priority Critical patent/CN217256238U/en
Application granted granted Critical
Publication of CN217256238U publication Critical patent/CN217256238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a technical field is deposited to the material, and specifically speaking relates to an assembled material strorage device. It includes a plurality of support column, and the even array of a plurality of support column is arranged, and the position that is close to the bottom between a plurality of support column is provided with the connecting rod, and a plurality of support column sets up to the multilayer, and the support column is fixed with the chassis including the bracing piece that is worker's shape, the bottom of bracing piece, and the position annular arrangement that is close to the chassis on the lateral wall of bracing piece is fixed with a plurality of connecting plate. The utility model discloses a connection is assembled to a plurality of support column and the connecting rod that sets up, and equipment that can be quick is the platform of mode material, compares with the integral pedestal of depositing of traditional welding, and simple to operate, transportation are light, have repeatedly usable economic effect, and it is nimble to wait mounting dimension when the installation simultaneously, makes the device can deposit the material of different grade type according to the type of material.

Description

Assembled material strorage device
Technical Field
The utility model relates to a technical field is deposited to the material, and specifically speaking relates to an assembled material strorage device.
Background
In the process of building use, a large amount of materials are needed, standard tapering along with building construction is continuously improved, an owner strongly pushes standardized construction and civilized construction, standardized construction is highly emphasized by the whole project under the action of various factors inside and outside, the aim is to enable the site image to reach the normality of civilized construction, the materials for site construction restrict the image appearance of a construction site to the greatest extent, and the materials are the materials except people and machines in the construction site.
At present, the stacking of materials on the construction site is mostly placed on a welded storage table, the size cannot be adjusted after the welding is completed, the materials are troublesome to disassemble in the later period, the welded storage table cannot be adjusted in height when heavy rain weather occurs, the materials placed on the storage table are easily wetted by rainwater and cannot be used, and further the material waste is caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled material strorage device to solve the problem that proposes among the above-mentioned background art.
In order to realize the above-mentioned purpose, the utility model provides an assembled material strorage device, including a plurality of support column, a plurality of the even array arrangement of support column, a plurality of the position that is close to the bottom between the support column is provided with the connecting rod, and a plurality of the support column sets up to the multilayer, the support column is including being the bracing piece of worker's shape, the bottom of bracing piece is fixed with the chassis, sets up at the bracing piece top of the support column of bottom and the chassis bottom contact of the support column of setting on upper portion, the position annular arrangement that is close to the chassis on the lateral wall of bracing piece is fixed with a plurality of connecting plate, bolted connection is led to the one end of connecting plate and connecting rod.
As a further improvement of the technical scheme, two bolts are arranged at the connecting positions of the connecting plate and the connecting rod, and the mounting directions of the two bolts are opposite.
As a further improvement of the technical scheme, a plurality of jacks are formed in the supporting rods along the height direction of the supporting rods, and cross rods with two ends inserted into the jacks are arranged between every two supporting rods.
As a further improvement of the technical scheme, a connecting block is fixed at the bottom of the base plate and arranged between the inner side walls of the supporting rods.
As a further improvement of the technical scheme, the middle part of the connecting block is provided with an inserting groove, and the end part of the supporting rod close to the middle part is inserted in the inserting groove.
As a further improvement of the technical scheme, positioning columns are fixed at four corners of the bottom of the base plate, and the bottoms of the positioning columns are flush with the bottom of the connecting block.
As a further improvement of the technical scheme, a gap exists between the positioning columns and the connecting block, and the side walls between the positioning columns are in contact with the outer side wall of the supporting rod.
Compared with the prior art, the beneficial effects of the utility model are that:
in this assembled material strorage device, assemble the connection through a plurality of support column and the connecting rod that sets up, the equipment that can be quick is the platform of mode material, compare with the integral storage pedestal of traditional welding, simple to operate, the transportation is light, but have reuse economic benefits, it is nimble to wait mounting dimension when the installation simultaneously, make the device can deposit the material of different grade type according to the type of material, simultaneously when the rainwater is big, through with the pile together between a plurality of support column, make the device form multilayer structure, make when using to cover the device and cover the material, the rainwater can not soak the material from the downside of device, guarantee the normal use in material later stage.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic diagram of a structure of the support column of the utility model.
The various reference numbers in the figures mean:
1. a support pillar; 11. a support bar; 12. a chassis; 13. a connecting plate; 14. a jack; 15. connecting blocks; 16. inserting grooves; 17. a positioning column; 2. a connecting rod; 3. a bolt; 4. a cross bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Example 1
Please refer to fig. 1-2, this embodiment provides an assembled material storage device, which includes a plurality of support columns 1, a plurality of support columns 1 are uniformly arranged in an array, a connecting rod 2 is disposed between the plurality of support columns 1 near the bottom, and the plurality of support columns 1 are arranged in multiple layers, the support columns 1 include an i-shaped support rod 11, a chassis 12 is fixed at the bottom of the support rod 11, the top of the support rod 11 of the support column 1 at the bottom contacts with the bottom of the chassis 12 of the support column 1 at the upper part, a plurality of connecting plates 13 are fixed on the side wall of the support rod 11 near the chassis 12 in an annular arrangement, and the connecting plates 13 are connected with one end of the connecting rod 2 through bolts 3.
The bottom of chassis 12 is fixed with connecting block 15, and connecting block 15 sets up between the inside wall of bracing piece 11, and inserting groove 16 has been seted up to connecting block 15's middle part position, and the position that the bracing piece 11 tip is close to the centre is pegged graft in inserting groove 16's inside.
The working principle is as follows:
placing a plurality of supporting columns 1 at appointed installation positions, leveling the site at the installation positions only by firstly leveling the site, cutting and prolonging the length of a connecting rod 2 according to the size and shape of the opposite side material as required after conditionally hardening by adopting stone slag bedding to prevent slurry accumulation and uniformly arranging a plurality of supporting columns 1 in an array, connecting the connecting rod 13 and the connecting rod 2 by using a bolt 3 to connect the connecting rods 2 of the plurality of supporting columns 1 into a frame, simultaneously placing other supporting columns 1 on the installed supporting columns 1 when rainwater protection is required, inserting a connecting block 15 into the supporting rods 11, inserting the middle positions of the supporting rods 11 into an insertion groove 16 to connect the upper supporting columns 1 with the lower supporting columns 1, and connecting the connecting rods 2 to connect the upper supporting columns 1 together, make the device form a multilayer structure, when raining, lay the portion of keeping off the rain at the device upside of putting up the completion, make the mode can not receive the erosion of rainwater at the material in inside, guarantee the normal use of material.
In order to increase the number of layers of the material placed by the device, a plurality of jacks 14 are formed in the supporting rods 11 along the height direction of the supporting rods 11, cross rods 4 with two ends inserted into the jacks 14 are arranged between every two supporting rods 11, and the cross rods 4 are installed on the supporting rods 11 to form a new placing platform for the two cross rods 4, so that the placing platforms for different materials are increased.
In order to improve the stability of being connected between connecting rod 2 and the connecting plate 13, make the stability of connecting between a plurality of support columns 1, the position that connecting plate 13 and connecting rod 2 are connected is provided with two bolts 3, and two bolts 3 installation opposite direction, through installing two bolts 3 are reverse, makes the device when receiving vibrations, and two bolts 3 can not drop simultaneously, the security that the reinforcing device used.
In order to make the support column 1 of installing at the lower floor can be stable stand, the bottom four corners department of chassis 12 is fixed with reference column 17, reference column 17's bottom and connecting block 15's bottom parallel and level, leave the space between with chassis 12 and ground through reference column 17, also avoid simultaneously because of connecting block 15 is to chassis 12's support, make bracing piece 11 to slope all around in the installation, improve the stability of device installation, there is the gap simultaneously between reference column 17 and connecting block 15, and the lateral wall of lateral wall between a plurality of reference column 17 and bracing piece 11 contacts, laminating through reference column 17 and bracing piece 11 lateral wall, improve the stability of two support column 1 vertical installations, guarantee the stability of device use.
When the assembly type material storage device is used specifically, a plurality of supporting columns 1 are placed at designated installation positions, the connecting blocks 15, the positioning columns 17 are in contact with the ground, the installation positions only need to be leveled off at first, stone slag bedding can be adopted to harden under certain conditions, slurry accumulation and mud accumulation are prevented, the supporting columns 1 are placed in an even array mode, after the supporting columns 1 are placed, the supporting columns 1 and the connecting rods 2 are connected through bolts 3, the connecting rods 2 of the supporting columns 1 are connected to form a frame, when the bolts 3 are installed, the two bolts 3 are installed oppositely, and the bolts 3 are prevented from falling off from the supporting columns 1 and the connecting rods 2 when the device is vibrated;
meanwhile, the flexibly installed support columns 1 and the connecting rods 2 are convenient to transfer in the later period and transport in the earlier period, and meanwhile, materials can be recycled, so that materials for manufacturing the platform are saved;
when the rainwater protection is needed, other supporting columns 1 are placed on the installed supporting columns 1, connecting blocks 15 are inserted into the supporting columns 11, the middle positions of the supporting columns 11 are inserted into the insertion grooves 16, so that the upper supporting columns 1 are connected with the lower supporting columns 1, and the connecting rods 2 are used for connecting the upper supporting columns 1 together, so that the device forms a multilayer structure;
when the types of the placed materials are too many, the cross rods 4 are inserted into the insertion holes 14, so that two opposite cross rods 4 form a platform, and the other materials can be conveniently placed on the other side.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides an assembled material strorage device, includes a plurality of support column (1), a plurality of the even array of support column (1) is arranged its characterized in that: a plurality of the position that is close to the bottom between support column (1) is provided with connecting rod (2), and a plurality of support column (1) sets up to the multilayer, support column (1) is including bracing piece (11) that is worker shape, the bottom of bracing piece (11) is fixed with chassis (12), sets up bracing piece (11) top at the support column (1) of bottom and sets up chassis (12) bottom contact at the support column (1) on upper portion, the position ring-type arrangement that is close to chassis (12) on the lateral wall of bracing piece (11) is fixed with a plurality of connecting plate (13), bolt (3) are led to one end of connecting plate (13) and connecting rod (2) and are connected.
2. The modular material storage unit of claim 1, wherein: two bolts (3) are arranged at the connecting positions of the connecting plate (13) and the connecting rod (2), and the mounting directions of the two bolts (3) are opposite.
3. The modular material storage unit of claim 1, wherein: a plurality of jacks (14) are formed in the supporting rods (11) along the height direction of the supporting rods (11), and cross rods (4) with two ends inserted into the jacks (14) are arranged between every two supporting rods (11).
4. The modular material storage unit of claim 1, wherein: the bottom of chassis (12) is fixed with connecting block (15), connecting block (15) set up between the inside wall of bracing piece (11).
5. The modular material storage unit of claim 4, wherein: the middle position of the connecting block (15) is provided with an inserting groove (16), and the end part of the supporting rod (11) close to the middle is inserted in the inserting groove (16).
6. The modular material storage unit of claim 1, wherein: and positioning columns (17) are fixed at four corners of the bottom of the base plate (12), and the bottoms of the positioning columns (17) are flush with the bottom of the connecting block (15).
7. The modular material storage unit of claim 6, wherein: a gap exists between the positioning columns (17) and the connecting block (15), and the side walls between the positioning columns (17) are in contact with the outer side wall of the supporting rod (11).
CN202220403656.8U 2022-02-25 2022-02-25 Assembled material strorage device Active CN217256238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220403656.8U CN217256238U (en) 2022-02-25 2022-02-25 Assembled material strorage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220403656.8U CN217256238U (en) 2022-02-25 2022-02-25 Assembled material strorage device

Publications (1)

Publication Number Publication Date
CN217256238U true CN217256238U (en) 2022-08-23

Family

ID=82859751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220403656.8U Active CN217256238U (en) 2022-02-25 2022-02-25 Assembled material strorage device

Country Status (1)

Country Link
CN (1) CN217256238U (en)

Similar Documents

Publication Publication Date Title
CA2508040C (en) Tower foundation made up of slabs with sloping edges
CN209799167U (en) Pre-buried column base reinforcing system
CN217256238U (en) Assembled material strorage device
CN112609735A (en) Semi-embedded column base positioning and mounting device and construction method thereof
CN110963174A (en) Assembled prefabricated staircase stacking rack and construction method
CN112095659B (en) Recyclable single-side formwork system and construction method
KR102140729B1 (en) Suppoting device of water tank
CN210173529U (en) Fixing device is deposited to reinforcing bar for construction
CN210684764U (en) Tower crane crossover sub
CN220051798U (en) Socket joint type steel bar storage rack
CN214833755U (en) Assembled grit material storehouse partition wall
CN219566123U (en) Fabricated building laminated slab finished product stacking support
CN220783903U (en) Pile foundation construction pipe storage rack
CN211568613U (en) Laminated prefabricated floor slab goods shelf capable of being stacked in multiple layers
CN211850940U (en) Prefabricated floor multilayer conveyer
CN215753594U (en) Three-dimensional storage frame of prefabricated component
CN218759211U (en) Prefabricated enclosure wall stake of modularization
CN218912307U (en) Temporary material storage platform for slope protection construction
CN212405236U (en) Prefabricated retaining wall
CN219138485U (en) Steel pipe cluster roof returning device for basement reinforcement
CN220014599U (en) Foundation pit construction ladder
CN216003599U (en) Heavy equipment storage box and heavy equipment warehousing system
CN218714995U (en) Combined base for upright rod of external scaffold
CN217204201U (en) Assembled independent foundation connection node unit
CN220132938U (en) Anchor rod supporting structure applied in gravity type retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant