CN218871940U - Green high temperature resistant cementing material preparation facilities - Google Patents

Green high temperature resistant cementing material preparation facilities Download PDF

Info

Publication number
CN218871940U
CN218871940U CN202221009764.3U CN202221009764U CN218871940U CN 218871940 U CN218871940 U CN 218871940U CN 202221009764 U CN202221009764 U CN 202221009764U CN 218871940 U CN218871940 U CN 218871940U
Authority
CN
China
Prior art keywords
high temperature
blending tank
temperature resistant
dwang
green high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221009764.3U
Other languages
Chinese (zh)
Inventor
许英
周广宇
张文成
覃剑
成斌
程亚敏
曹中艳
周康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Beidou Zhongchuang High Tech Research Institute Co ltd
Original Assignee
Henan Beidou Zhongchuang High Tech Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Beidou Zhongchuang High Tech Research Institute Co ltd filed Critical Henan Beidou Zhongchuang High Tech Research Institute Co ltd
Priority to CN202221009764.3U priority Critical patent/CN218871940U/en
Application granted granted Critical
Publication of CN218871940U publication Critical patent/CN218871940U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/10Production of cement, e.g. improving or optimising the production methods; Cement grinding

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The utility model discloses a green high temperature resistant cementitious material preparation facilities, including the blending tank, its characterized in that: the inner bottom wall of blending tank rotates through the bearing and is connected with the dwang, and the surface of dwang is provided with the puddler, and the bottom fixed mounting of blending tank has drive dwang pivoted servo motor, and the top fixedly connected with of dwang accepts the dish, accepts the last fixed surface of dish and is connected with the abrasive disc, and the top of blending tank is provided with to tight mechanism. This green high temperature resistant cementitious material preparation facilities moves down through electric putter drive push plate, and push plate supports solid material and abrasive disc tightly, when servo motor drives the dwang and rotates, accepts dish and abrasive disc and follows the rotation to reach the purpose of grinding cubic raw materials into powder, the powder after the grinding exposes from the gap between standpipe and the abrasive disc, and it is when mixing with the inside liquid of blending tank, and the solution rate is fast, thereby can reach the purpose that improves this green high temperature resistant cementitious material preparation efficiency.

Description

Green high temperature resistant cementitious material preparation facilities
Technical Field
The utility model relates to a material preparation equipment technical field specifically is a green high temperature resistant cementitious material preparation facilities.
Background
In the building material, through a series of physical and chemical actions, the slurry can be changed into the firm Dan Zhuangti, and other solid materials can be cemented into a whole to form a substance with certain mechanical strength, which is collectively called as a cementing material.
The green high temperature resistant cementing material preparation facilities who uses at present need dispose the thick liquid earlier when the cementing material is made, and when thick liquid configuration, often need drop into the thick liquid configuration jar with the solid to make it dissolve and original thick liquid mixing reaction, but directly drop into jar with big group of solid after, can appear the slow shortcoming of dissolving speed, influence the efficiency of cementing material preparation.
Therefore, the utility model provides a green high temperature resistant cementitious material preparation facilities.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green high temperature resistant cementitious material preparation facilities to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a green high temperature resistant cementitious material preparation facilities, includes the blending tank, its characterized in that: the inner diapire of blending tank rotates through the bearing and is connected with the dwang, the surface of dwang is provided with the puddler, the bottom fixed mounting of blending tank has drive dwang pivoted servo motor, the dish is accepted to the top fixedly connected with of dwang, the last fixed surface who accepts the dish is connected with the abrasive disc, the top of blending tank is provided with supports tight mechanism, support tight mechanism including inlaying the standpipe of establishing on the blending tank top, the standpipe is corresponding with the position of abrasive disc, and it has the gap to reserve between the bottom of standpipe and the abrasive disc, the top of standpipe is inlayed and is equipped with electric putter, electric putter's flexible end fixedly connected with push plate, the lateral wall of standpipe inlays and is equipped with the assistance inlet pipe, the top of blending tank inlays and is equipped with main inlet pipe.
Preferably, the discharging pipe is embedded in the bottom end of the mixing tank, and the surfaces of the main feeding pipe, the auxiliary feeding pipe and the discharging pipe are provided with valves.
Preferably, the inner wall of the mixing tank is embedded with a temperature control electric heating plate, and the outer wall of the mixing tank is provided with a heat insulation cotton layer.
Preferably, the top fixed mounting of blending tank has the air pump, and the air outlet end fixedly connected with outlet duct of air pump, the bottom of outlet duct extend to the inside of blending tank and fixedly connected with annular gas-distributing pipe, and the venthole has evenly been seted up on annular gas-distributing pipe's surface.
Preferably, the front of blending tank is provided with observation window and control box respectively, and the control box passes through this wire and external power source electric connection.
Preferably, an electronic pressure gauge and an electronic thermometer are respectively embedded at the top end of the mixing tank.
Advantageous effects
The utility model provides a green high temperature resistant cementitious material preparation facilities possesses following beneficial effect:
1. this green high temperature resistant cementitious material preparation facilities, add the inside of blending tank with liquid or powder raw materials by main inlet pipe, support tight mechanism through setting up, add inside the standpipe with cubic raw materials by assisting the inlet pipe, cubic raw materials is supported on the surface of abrasive disc, it moves down to drive the push plate through electric putter, the push plate supports solid material and abrasive disc tightly, when servo motor drives the dwang rotation, accept dish and abrasive disc and follow the rotation, thereby reach the mesh of grinding cubic raw materials into powder, the gap between standpipe and the abrasive disc is exposed to the powder after the grinding, it is when mixing with the inside liquid of blending tank, the dissolving speed is fast, thereby can reach the purpose that improves this green high temperature resistant cementitious material preparation efficiency.
2. This green high temperature resistant cementitious material preparation facilities, take control by temperature change electrical heating board through the setting, can reach the purpose that heats the inside material of blending tank, electronic thermometer can detect real-time temperature, through setting up the cotton layer that keeps warm, can reach and carry out heat retaining purpose to the blending tank, through setting up the air pump, the outlet duct, annular gas distribution pipe and venthole, utilize the inside gas injection of air pump to the blending tank, gaseous discharge from the venthole on annular gas distribution pipe surface, utilize the stirring effect that the air pocket rises, can reach the effect of carrying out the stirring to the material in the blending tank, after the material mixing, open the valve on discharging pipe surface, emit the material.
Drawings
FIG. 1 is a schematic view of a front cross-sectional structure of the present invention;
FIG. 2 is a schematic front view of the present invention;
fig. 3 is a schematic view of the top view structure of the annular gas distributing pipe of the present invention.
In the figure: 1 mixing tank, 2 rotating rods, 3 stirring rods, 4 servo motors, 5 bearing discs, 6 grinding discs, 7 vertical pipes, 8 electric push rods, 9 push plates, 10 auxiliary feeding pipes, 11 discharging pipes, 12 electric heating plates with temperature control, 13 heat preservation cotton layers, 14 air pumps, 15 air outlet pipes, 16 annular air distribution pipes, 17 air outlet holes, 18 observation windows, 19 control boxes, 20 electronic gas gauges, 21 electronic thermometers and 22 main feeding pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a green high temperature resistant cementitious material preparation facilities, includes blending tank 1, and the top of blending tank 1 is inlayed and is equipped with main inlet pipe 22, and the bottom of blending tank 1 is inlayed and is equipped with discharging pipe 11.
The front of the mixing tank 1 is respectively provided with an observation window 18 and a control box 19, and the control box 19 is electrically connected with an external power supply through the conducting wire.
The inner bottom wall of blending tank 1 is connected with dwang 2 through the bearing rotation, and the surface of dwang 2 is provided with puddler 3, and the bottom fixed mounting of blending tank 1 has drive dwang 2 pivoted servo motor 4, and the top fixedly connected with of dwang 2 accepts dish 5, and the last fixed surface of accepting dish 5 is connected with abrasive disc 6.
The top of blending tank 1 is provided with supports tight mechanism, support tight mechanism including inlaying standpipe 7 of establishing on 1 top of blending tank, standpipe 7 is corresponding with abrasive disc 6's position, and it has the gap to reserve between the bottom of standpipe 7 and the abrasive disc 6, the top of standpipe 7 is inlayed and is equipped with electric putter 8, electric putter 8's flexible end fixedly connected with push plate 9, the lateral wall of standpipe 7 inlays and is equipped with and assists inlet pipe 10, main inlet pipe 22, the surface of assisting inlet pipe 10 and discharging pipe 11 all is provided with the valve.
In this green high temperature resistant cementitious material preparation process, add liquid or powder raw materials by the inside of main inlet pipe 22 addition blending tank 1, support tight mechanism through the setting, add cubic raw materials inside standpipe 7 by assisting inlet pipe 10, cubic raw materials are born on the surface of abrasive disc 6, drive push plate 9 through electric putter 8 and move down, push plate 9 supports solid material and abrasive disc 6 tightly, when servo motor 4 drives dwang 2 and rotates, accept dish 5 and abrasive disc 6 and follow the rotation, thereby reach the purpose of grinding cubic raw materials into powder, the powder after the grinding exposes from the gap between standpipe 7 and abrasive disc 6, it is when mixing with the inside liquid of blending tank 1, the solution rate is fast, thereby can reach the purpose that improves this green high temperature resistant cementitious material preparation efficiency.
The top fixed mounting of blending tank 1 has air pump 14, and the outlet end fixedly connected with outlet duct 15 of air pump 14, the bottom of outlet duct 15 extend to the inside of blending tank 1 and fixedly connected with annular gas distribution pipe 16, and venthole 17 has evenly been seted up on the surface of annular gas distribution pipe 16.
Through setting up air pump 14, outlet duct 15, annular gas-distributing pipe 16 and venthole 17, utilize air pump 14 to the inside gas injection of blending tank 1, gaseous 16 surperficial venthole 17 discharge from annular gas-distributing pipe of follow, utilize the air pocket to rise to the drumming to the thick liquid, can reach the effect of carrying out the stirring to material in the blending tank 1, after the material mixes, open the valve on 11 surfaces of discharging pipe, emit the material.
The inner wall of blending tank 1 is inlayed and is equipped with and takes temperature control electric heating board 12, and the outer wall of blending tank 1 is provided with the cotton layer 13 that keeps warm, and the top of blending tank 1 is inlayed respectively and is equipped with electron barometer 20 and electronic thermometer 21, through setting up and taking temperature control electric heating board 12, can reach the purpose of heating the material of blending tank 1 inside, and electronic thermometer 21 can detect real-time temperature, through setting up the cotton layer 13 that keeps warm, can reach and carry out heat retaining purpose to blending tank 1.
The working principle is as follows: when this green high temperature resistant cementitious material preparation facilities uses, add liquid or powder raw materials by the inside of main inlet pipe 22 addition blending tank 1, add cubic raw materials inside standpipe 7 by supplementary inlet pipe 10, cubic raw materials are supported on the surface of abrasive disc 6, control electric putter 8 extension drives propelling movement plate 9 and moves down, propelling movement plate 9 supports solid material and abrasive disc 6 tightly, start servo motor 4, servo motor 4 drives dwang 2 and puddler 3 and stirs the material, when servo motor 4 drives dwang 2 and rotates, accept dish 5 and abrasive disc 6 follow the rotation, thereby reach the mesh of grinding cubic raw materials into powder, the powder after the grinding exposes from the gap between standpipe 7 and abrasive disc 6, when it mixes with the liquid inside blending tank 1, the solution rate is fast, thereby can reach the purpose that improves this green high temperature resistant cementitious material preparation efficiency, when the material mixes, start to take temperature-controlled electric heating plate 12, heat the material inside blending tank 1, on the other hand, utilize air pump 14 to the inside gas distributing pipe of blending tank 1, gas reaches the gas injection group discharge hole 16 and opens the gas mixture group effect of utilizing the mixing tank 11 to form after the mixture is mixed material is mixed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a green high temperature resistant cementitious material preparation facilities, includes blending tank (1), its characterized in that: the utility model discloses a mixing tank, including mixing tank (1), dwang (2), the surface of dwang (2) is provided with puddler (3), the bottom fixed mounting of mixing tank (1) has drive dwang (2) pivoted servo motor (4), the top fixedly connected with of dwang (2) accepts dish (5), the last fixed surface who accepts dish (5) is connected with abrasive disc (6), the top of mixing tank (1) is provided with supports tight mechanism, support tight mechanism including inlaying standpipe (7) of establishing on mixing tank (1) top, standpipe (7) are corresponding with the position of abrasive disc (6), and it has the gap to reserve between the bottom of standpipe (7) and abrasive disc (6), the top of standpipe (7) is inlayed and is equipped with electric putter (8), the flexible end fixedly connected with push plate (9) of electric putter (8), the lateral wall of standpipe (7) inlays and is equipped with auxiliary inlet pipe (10), the top of mixing tank (1) inlays and is equipped with main inlet pipe (22).
2. The preparation device of green high temperature resistant cementitious material according to claim 1, characterized in that: the bottom of blending tank (1) inlays and is equipped with discharging pipe (11), and the surface of main inlet pipe (22), supplementary inlet pipe (10) and discharging pipe (11) all is provided with the valve.
3. The apparatus for preparing green high temperature resistant gelling material as claimed in claim 1, wherein: the inner wall of the mixing tank (1) is embedded with a temperature control electric heating plate (12), and the outer wall of the mixing tank (1) is provided with a heat insulation cotton layer (13).
4. The apparatus for preparing green high temperature resistant gelling material as claimed in claim 1, wherein: the top fixed mounting of blending tank (1) has air pump (14), and the gas outlet end fixedly connected with outlet duct (15) of air pump (14), the bottom of outlet duct (15) extend to the inside and the annular gas distribution pipe of fixedly connected with (16) of blending tank (1), venthole (17) have evenly been seted up on the surface of annular gas distribution pipe (16).
5. The preparation device of green high temperature resistant cementitious material according to claim 1, characterized in that: the front of blending tank (1) is provided with observation window (18) and control box (19) respectively, and control box (19) pass through the wire and external power source electric connection.
6. The apparatus for preparing green high temperature resistant gelling material as claimed in claim 1, wherein: the top end of the mixing tank (1) is respectively embedded with an electronic barometer (20) and an electronic thermometer (21).
CN202221009764.3U 2022-04-28 2022-04-28 Green high temperature resistant cementing material preparation facilities Active CN218871940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221009764.3U CN218871940U (en) 2022-04-28 2022-04-28 Green high temperature resistant cementing material preparation facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221009764.3U CN218871940U (en) 2022-04-28 2022-04-28 Green high temperature resistant cementing material preparation facilities

Publications (1)

Publication Number Publication Date
CN218871940U true CN218871940U (en) 2023-04-18

Family

ID=85940907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221009764.3U Active CN218871940U (en) 2022-04-28 2022-04-28 Green high temperature resistant cementing material preparation facilities

Country Status (1)

Country Link
CN (1) CN218871940U (en)

Similar Documents

Publication Publication Date Title
CN218871940U (en) Green high temperature resistant cementing material preparation facilities
CN202078871U (en) Constant-temperature high-pressure stirring and injecting device
CN211487695U (en) Feeding device of reaction kettle
CN209476286U (en) A kind of silica solution production reaction kettle
CN207887169U (en) A kind of adhesive mixing and stirring tank
CN215610820U (en) Mixing equipment for high-viscosity modified asphalt
CN214439029U (en) Reaction kettle
CN214871602U (en) Cement production line cement automatic blending device
CN212882439U (en) Synthetic reation kettle of bulk drug
CN206868061U (en) The beneficial clay agitating device of one kind construction
CN218195985U (en) Energy-concerving and environment-protective type cement apparatus for producing
CN220737517U (en) Glycerol polymer extraction element
CN2486202Y (en) Vacuum emulsifying machine
CN220892791U (en) Drying device
CN216498795U (en) Raw material mixing and heating device
CN213005861U (en) Vacuum mixer for processing non-metallic carbide ceramic blank
CN217715651U (en) Vacuum drying device for lithium borohydride production
CN218872094U (en) Slurry conveying equipment for production of green environment-friendly degradable film
CN213314807U (en) Chemical storage tank production screw extruder group compounding device
CN216024883U (en) High-temperature stirring reaction kettle for preparing polyester slurry
CN215389218U (en) COFs material synthesis equipment with stable temperature rise
CN213058534U (en) Heating type heat-preservation glue barrel for soft capsules
CN213590663U (en) High-temperature stirring ball mill
CN218469495U (en) Foundry sand drying-machine
CN212680857U (en) Paraffin cream stirring and wax injection machine for precision casting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant