CN218847175U - Building electrical construction monitoring devices - Google Patents

Building electrical construction monitoring devices Download PDF

Info

Publication number
CN218847175U
CN218847175U CN202222696142.9U CN202222696142U CN218847175U CN 218847175 U CN218847175 U CN 218847175U CN 202222696142 U CN202222696142 U CN 202222696142U CN 218847175 U CN218847175 U CN 218847175U
Authority
CN
China
Prior art keywords
wall
bull stick
electrical construction
swivelling chute
building electrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222696142.9U
Other languages
Chinese (zh)
Inventor
丘瑶瑶
郑松
程锦涛
赵博
卢十全
余少秋
罗彬�
雷坚
郭善滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202222696142.9U priority Critical patent/CN218847175U/en
Application granted granted Critical
Publication of CN218847175U publication Critical patent/CN218847175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building electrical construction monitoring devices, including bottom plate and install bin, there is the glass board through the hinge mounting on one side outer wall of install bin, and installs the installation piece through the bolt on the top inner wall of install bin, the turn trough and the swivelling chute that the equidistance was the horizontal structure and distributes are seted up to the inside of installation piece, and have the bull stick that runs through to the inside of swivelling chute through bearing movable mounting on one side inner wall of turn trough, install the card wheel through the bolt on the bull stick is located the outer wall of swivelling chute inside, and seted up the constant head tank on one side inner wall of swivelling chute. The utility model discloses a bull stick that sets up, when rotating the bull stick, the bull stick can utilize the effect of card wheel to drive the fixture block and extrude the spring, can sliding connection inside the constant head tank at the in-process fixture block of spring motion to make the bull stick can drive haulage rope and balancing weight motion, the person of can being convenient for again can utilize accurate observing inclination of balancing weight and the inside graduation apparatus of install bin to the transportation of device.

Description

Building electrical construction monitoring devices
Technical Field
The utility model relates to an electrical construction technical field, concretely relates to building electrical construction monitoring devices.
Background
The electric construction refers to projects related to the production, the transmission and the distribution of electric energy, and also comprises projects applying electricity as power and energy in various fields, in the electric construction process, various electric construction devices are required to be used, wherein the electric construction cabinet comprises a cabinet which is processed by steel materials and used for protecting components and parts from normal operation, an electric construction mounting seat is required to be mounted in the mounting process of the electronic construction cabinet, and the mounting inclination angle of the mounting seat is required to be detected in the mounting process.
If the authorized notice number is CN114543765A, the authorized notice date is 2022.05.27, the device can monitor the building in real time through the arrangement of the monitoring mechanism, and one device can monitor various state changes of the building, so that various devices are not needed, the flow is simplified, and the data can be read more easily; after the connecting mechanism is installed in a building, the data change of the whole device can be realized only through the change of the building, so that the whole device is not easily influenced by the outside, the data accuracy and stability are improved, and the reading of the data is facilitated; the integration level of the monitoring device, the bracket and the connecting mechanism is high, and the device is more convenient to connect, install and carry.
The above-mentioned and in the in-process of prior art device using utilizes directly to detect wall body or electric construction mount pad angle through haulage rope and balancing weight usually, but such mode is often detecting the angle of wall body or mount pad through artifical with the eye at the in-process that uses, and because of not having the scale, thereby influence user of service's observation effect, such mode also can not be convenient for the operator to the rolling of balancing weight, and then the inconvenient user is to carrying and transporting of device, consequently, need to design a building electric construction monitoring devices and solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a building electrical construction monitoring devices to solve the above-mentioned weak point among the prior art.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model provides a building electrical construction monitoring devices, includes bottom plate and install bin, there is the glass board through hinged mounting on the outer wall of one side of install bin, and installs the installation piece through the bolt on the inner wall of the top of install bin, the inside of installation piece is seted up the rotary trough and the swivelling chute that the equidistance is horizontal structure and distributes, and has run through the bull stick to the inside of swivelling chute through bearing movable mounting on the inner wall of one side of rotary trough, the bull stick is located and installs the card wheel through the bolt on the outer wall of swivelling chute inside, and has seted up the constant head tank on the inner wall of one side of swivelling chute, the inside grafting of constant head tank has the fixture block, and the welding of one side inner wall of fixture block has the pull rod that extends to the installation piece outside, the spring has been cup jointed on the outer wall that the pull rod is located the constant head tank inside.
Furthermore, the rotating rod is provided with a traction rope on the outer wall of the rotating groove, and the bottom end of the traction rope is provided with a balancing weight.
Furthermore, a moving groove is formed in the outer wall of the top of the bottom plate, a screw rod extending to the outside of the bottom plate is movably mounted inside the moving groove through a bearing, and a moving plate is connected to the outer wall of the screw rod in a threaded mode.
Furthermore, a transmission groove is formed in the moving plate, and a threaded rod extending into the transmission groove is movably mounted on the inner wall of the bottom of the moving plate through a bearing.
Furthermore, the center of the inner wall of the bottom of the transmission groove is movably provided with a rotary rod extending to the outside of the movable plate through a bearing, the rotary rod and the threaded rod are positioned on the outer wall of the inner part of the transmission groove, the transmission wheel is installed through a bolt, and the outer wall of the transmission wheel is sleeved with a transmission belt.
Furthermore, threaded connection has the erection column on the outer wall of threaded rod, and the other end that the movable plate was kept away from to the erection column passes through the bolt fastening on one side outer wall of install bin.
In the technical scheme, the utility model provides a building electrical construction monitoring device, (1) the utility model discloses through the bull stick that sets up, when rotating the bull stick, the bull stick can utilize the effect of card wheel to drive the fixture block and extrude the spring, the fixture block can be connected to the inside of constant head tank in the course of the spring motion in a sliding way, and make the bull stick can drive haulage rope and balancing weight motion, can be convenient for the person to the transportation of device, can utilize balancing weight and the graduator inside the install bin to observe the inclination accurately; (2) Through the arranged rotary rod, when the rotary rod is rotated, the rotary rod can utilize the driving wheel and the driving belt to rotate the threaded rod, and the mounting column and the mounting box can be driven to move in the rotating process of the threaded rod, so that the device can be effectively adjusted when facing an electrical construction mounting seat, and the practicability of the device is improved; (3) The utility model discloses a screw rod that sets up, when installing appointed position and rotating the screw rod with the device, the screw rod can utilize the threaded connection who makes the movable plate can be stable with the movable plate to remove in the inside of shifting chute, and at the in-process that the movable plate removed, the user can move according to the effectual movable plate that drives of width of mount pad.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to these drawings.
Fig. 1 is the utility model relates to a structure sketch that building electrical construction monitoring devices embodiment provided.
Fig. 2 is the utility model relates to an install bin structure schematic diagram that building electrical construction monitoring devices embodiment provided.
Fig. 3 is the utility model relates to an installation piece planar structure sketch map that building electrical construction monitoring devices embodiment provided.
Fig. 4 is the utility model relates to a building electrical construction monitoring devices embodiment provides a swivelling chute internal structure sketch map.
Fig. 5 is a schematic view of a planar structure of a movable plate provided in an embodiment of the monitoring device for electrical construction of building.
Description of reference numerals:
the device comprises a base plate 1, an installation box 2, a glass plate 3, an installation block 4, a rotary groove 5, a rotary groove 6, a rotary rod 7, a clamping wheel 8, a positioning groove 9, a clamping block 10, a pull rod 11, a spring 12, a traction rope 13, a balancing weight 14, a movable groove 15, a screw rod 16, a movable plate 17, a transmission groove 18, a threaded rod 19, a rotary rod 20, a transmission wheel 21 and an installation column 22.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings.
As shown in fig. 1-5, the embodiment of the utility model provides a pair of building electrical construction monitoring devices, including bottom plate 1 and install bin 2, there is glass board 3 through hinged mounting on the outer wall of one side of install bin 2, and install installation piece 4 through the bolt on the inner wall of the top of install bin 2, the rotating groove 5 and the swivelling chute 6 that the equidistance is the horizontal structure and distributes are seted up to installation piece 4's inside, and have through bearing movable mounting to run through to the inside bull stick 7 of swivelling chute 6 on the inner wall of one side of rotating groove 5, bull stick 7 is located and installs card wheel 8 through the bolt on the outer wall of swivelling chute 6 inside, and seted up constant head tank 9 on the inner wall of one side of constant head tank 6, the inside grafting of constant head tank 9 has fixture block 10, and the welding of the inner wall of one side of fixture block 10 has the pull rod 11 that extends to the installation piece 4 outside, spring 12 has been cup jointed on pull rod 11 is located the inner wall of constant head tank 9 inside.
The utility model provides a pair of building electrical construction monitoring devices, including bottom plate 1 and install bin 2, there is glass board 3 through hinged mounting on one side outer wall of install bin 2, and install installation piece 4 through the bolt on the top inner wall of install bin 2, the equidistance is the turn trough 5 and the swivelling chute 6 that the horizontal structure distributes offered to installation piece 4's inside, and have through bearing movable mounting to run through to the inside bull stick 7 of swivelling chute 6 on one side inner wall of turn trough 5, bull stick 7 is located and installs card wheel 8 through the bolt on the outer wall of swivelling chute 6 inside, and seted up constant head tank 9 on one side inner wall of swivelling chute 6, the inside grafting of constant head tank 9 has fixture block 10, and the welding of one side inner wall of fixture block 10 has the outside pull rod 11 that extends to installation piece 4, pull rod 11 is located and has cup jointed spring 12 on the inside outer wall of constant head tank 9, when rotating bull stick 7, the pole 7 can utilize card wheel 8 and fixture block 10 to extrude spring 12, inside fixture block 10 can slide and be connected to constant head tank 9, in-load rope 13 can drive the rolling movement of rolling, thereby the operator can be convenient for movement to balancing weight 14.
The utility model provides a further embodiment, as shown in fig. 1 and 2, the bull stick 7 is provided with haulage rope 13 on being located the inside outer wall of rotary trough 5, and haulage rope 13's bottom is provided with balancing weight 14, can drive balancing weight 14 up-and-down motion when haulage rope 13 at the in-process of motion.
The utility model provides a further embodiment, as shown in fig. 1, the shifting chute 15 has been seted up on the top outer wall of bottom plate 1, and there is a screw rod 16 that extends to the bottom plate 1 outside inside the shifting chute 15 through bearing movable mounting, and threaded connection has movable plate 17 on the outer wall of screw rod 16, and when rotating screw rod 16, screw rod 16 can utilize the threaded connection with movable plate 17 to make movable plate 17 can be at the internal motion of shifting chute 15.
In another embodiment, as shown in fig. 1 and 5, a transmission groove 18 is opened inside the moving plate 17, and a threaded rod 19 extending to the inside of the transmission groove 18 is movably mounted on the inner wall of the bottom of the moving plate 17 through a bearing, the threaded rod 19 can move inside the moving plate 17, and the opening of the transmission groove 18 can limit the rotating rod 20.
The utility model provides a further embodiment, as shown in fig. 1 and 5, there is the rotary rod 20 that extends to movable plate 17 outside bottom inner wall center department of drive groove 18 through bearing movable mounting, and rotary rod 20 and threaded rod 19 are located and install drive wheel 21 through the bolt on the inside outer wall of drive groove 18, the drive belt has been cup jointed on the outer wall of drive wheel 21, when rotating rotary rod 20, rotary rod 20 can drive the motion of drive wheel 21, drive wheel 21 can utilize the transmission to drive the motion of drive threaded rod 19.
In another embodiment, as shown in fig. 1 and 5, the outer wall of the threaded rod 19 is screwed with the mounting post 22, and the other end of the mounting post 22 away from the movable plate 17 is fixed on the outer wall of one side of the mounting box 2 by a bolt, so that the mounting post 22 can move up and down by using the threaded connection with the mounting post 22 in the moving process of the threaded rod 19.
The working principle is as follows: firstly, the bottom plate 1 is installed in a specified electrical construction installation seat, at the moment, the screw 16 is rotated, the screw 16 can be connected with the moving plate 17 through threads to enable the moving plate 17 to move, at the moment, the rotating rod 20 is rotated according to the height of the electrical construction installation seat, the rotating rod 20 can drive the driving wheel 21 to rotate, the moving plate 17 can be attached to the ground through the threads connected with the threaded rod 19 in the rotating process of the driving wheel 21, when the installation box 2 cannot be attached to the ground, the situation that the electrical construction installation seat is inclined is proved, if the electrical construction installation seat can be completely attached, the pull rod 11 can be pulled, the pull rod 11 can extrude the spring 12, the clamping block 10 can be separated from the inside of the clamping wheel 8 in the moving process of the spring 12, at the moment, the rotating rod 7 can be rotated, the rotating rod 7 can drive the traction rope 13 to move, so that the traction rope 13 can drive the balancing weight 14 to move, and finally, a user can detect the installation angle of the electrical construction installation seat more accurately according to the inclination angle of the balancing weight 14.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the invention.

Claims (6)

1. The utility model provides a building electrical construction monitoring devices, includes bottom plate (1) and install bin (2), its characterized in that, install glass board (3) through the hinge on one side outer wall of install bin (2), and install installation piece (4) through the bolt on the top inner wall of install bin (2), the equidistance is revolving chute (5) and the swivelling chute (6) that the horizontal structure distributes that are seted up to the inside of installation piece (4), and has run through to the bull stick (7) of swivelling chute (6) inside through bearing movable mounting on one side inner wall of revolving chute (5), bull stick (7) are located and install card wheel (8) through the bolt on the outer wall of swivelling chute (6) inside, and have seted up constant head tank (9) on one side inner wall of swivelling chute (6), the inside grafting of constant head tank (9) has fixture block (10), and the welding of one side inner wall of fixture block (10) has the outside pull rod (11) that extends to installation piece (4), pull rod (11) are located and have spring (12) cup joint on the outer wall of constant head tank (9) inside.
2. A building electrical construction monitoring device according to claim 1, characterized in that the outer wall of the rotating rod (7) inside the rotating groove (5) is provided with a pulling rope (13), and the bottom end of the pulling rope (13) is provided with a balancing weight (14).
3. The building electrical construction monitoring device according to claim 1, characterized in that a moving groove (15) is formed in the outer wall of the top of the bottom plate (1), a screw (16) extending to the outside of the bottom plate (1) is movably mounted inside the moving groove (15) through a bearing, and a moving plate (17) is connected to the outer wall of the screw (16) in a threaded manner.
4. The building electrical construction monitoring device according to claim 3, characterized in that a transmission groove (18) is formed in the moving plate (17), and a threaded rod (19) extending into the transmission groove (18) is movably mounted on the inner bottom wall of the moving plate (17) through a bearing.
5. The building electrical construction monitoring device according to claim 4, characterized in that a rotating rod (20) extending to the outside of the moving plate (17) is movably mounted at the center of the bottom inner wall of the transmission groove (18) through a bearing, a transmission wheel (21) is mounted on the outer wall of the rotating rod (20) and the threaded rod (19) located inside the transmission groove (18) through bolts, and a transmission belt is sleeved on the outer wall of the transmission wheel (21).
6. A building electrical construction monitoring device according to claim 5, characterized in that the outer wall of the threaded rod (19) is connected with a mounting column (22) in a threaded manner, and the other end of the mounting column (22) far away from the moving plate (17) is fixed on the outer wall of one side of the mounting box (2) through a bolt.
CN202222696142.9U 2022-10-13 2022-10-13 Building electrical construction monitoring devices Active CN218847175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222696142.9U CN218847175U (en) 2022-10-13 2022-10-13 Building electrical construction monitoring devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222696142.9U CN218847175U (en) 2022-10-13 2022-10-13 Building electrical construction monitoring devices

Publications (1)

Publication Number Publication Date
CN218847175U true CN218847175U (en) 2023-04-11

Family

ID=87308776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222696142.9U Active CN218847175U (en) 2022-10-13 2022-10-13 Building electrical construction monitoring devices

Country Status (1)

Country Link
CN (1) CN218847175U (en)

Similar Documents

Publication Publication Date Title
CN106193133B (en) A kind of slope section bridge pile foundation three-dimensional stress model experimental rig
CN109115634A (en) It can accurately measure the falling weight impact test platform and test method of shock loading and dynamic displacement
CN111360784B (en) A rail mounted environment inspection robot for electric power system
CN109115119A (en) A kind of coal mine roadway deformation monitoring device and its application method
CN218847175U (en) Building electrical construction monitoring devices
CN114384230A (en) Farmland soil parameter measuring trolley
CN114279407B (en) Multifunctional laser level measuring instrument
CN220582108U (en) Slope monitoring device based on photovoltaic power generation
CN216813639U (en) Building slope warning device for building monitoring
CN207215805U (en) A kind of bilge well pH detection means with warning function
CN113203651B (en) Test bench for wear test of buoy anchor chain
CN112922583A (en) Logging device for well wall scanning imaging analysis and logging method thereof
CN104020499B (en) The mounting structure of Electromagnetism of Earthquake perturbation sensor and installation method
CN109612533A (en) A kind of middle and small river water quality-flow quantity intelligent monitoring station and monitoring method
CN115326015A (en) Gradient detection device for transmission tower
CN105960126B (en) A kind of damping intelligent electric power electrical cabinet
CN108385736A (en) Passage formula clinoform model foundation level load test device
CN210571734U (en) Highway engineering resistance to compression experimental apparatus
CN220136392U (en) Portable environment monitor
CN112525263A (en) Environment detection device and method for building construction
CN216524241U (en) Water level gauge for acquiring geographic information
CN215064501U (en) Ground inclination monitoring devices
CN216971644U (en) Detection device for analyzing traction stability of elevator
CN213240503U (en) Portable radar detector
CN218766984U (en) Wind speed detector based on wireless communication

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant